Attachment 3 - SOW Carpet replacement - B955.pdf

PDF 401 KB Posted

Attached to
Carpet replacement for buildings 739 and 840 and 955 at McConnell AFB
Solicitation number
FA462126Q0049
Issued by

About this file

This is a Statement of Work (SOW) for carpet replacement at Building 955, McConnell Air Force Base, Kansas, with a performance period not to exceed 30 days from receipt of all material.

The contractor shall remove and dispose of 1,237 square feet of existing carpet tiles and 381 linear feet of rubber base, completely remove old carpet tile adhesive and perform floor preparation, furnish and install new carpet tiles, and provide 15% extra carpet tiles (138 tiles plus 15% overage) to the customer. Installation includes 381 linear feet of resilient rubber cove base (0.080" thick, 4" high, Flexco or approved equal) and transitions as necessary where floor types or carpet heights change. All carpet must comply with the Air Force Carpet Program using materials from one of seven awarded contracts: Milliken (FA8003-23-C-0008), Engineered Floors (FA8003-23-C-0004), Mohawk (FA8003-23-C-0003), Interface Americas (FA8003-23-C-0005), Bentley Mills (FA8003-23-C-0009), Mannington (FA8003-23-C-0006), or Tarkett (FA8003-23-C-007). The contractor must submit physical samples of carpet tiles, transitions, cove base, manufacturer's technical data, and installation instructions for customer approval prior to installation, and must move all furniture to be removed from areas receiving new carpet. All installation work must be performed by Certified Floor Covering Installers (International Certified Floor covering Installer Association) or manufacturer-approved installers with job foremen holding "Certified C-II Minimum" certification. Work shall be performed Monday through Friday, 7:00 a.m. to 4:00 p.m. central time, with weekend availability as scheduling permits.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Carpet Replacement

Bldg. 955 20 Aug 2026

McConnell AFB, Kansas

GENERAL:

The contractor shall provide all personnel, equipment, tools, supplies, materials, supervision, and transportation necessary to:

1. Remove and dispose of indicated existing carpet tiles and transitions.

2. Remove indicated portions of existing rubber base from wall, existing wood base boards will be removed and reinstalled.

3. Completely remove old carpet tile adhesive and perform floor prep as necessary to ensure carpet tiles adhere properly to subfloor leaving a clean and professional finished product.

4. Furnish and install new carpet.

5. Contractor shall verify all dimensions and measurements.

6. Contractor shall submit physical samples of carpet tiles, transitions, cove base, carpet manufacturer’s technical data, and carpet installation instructions to customer prior to installation.

7. Contractor shall move furniture.

PERFORMANCE REQUIREMENTS:

Air Force Carpet Program: All carpet installation shall comply with the Air Force Carpet Program (https://usaf.dps.mil/sites/aficc/afcc/aficc/affcc/sitecollectiondocuments/carpet/carpethomepage.aspx), using the carpet ordering guide and one of the seven contracts awarded for materials. The AF Carpet program includes modular carpet tiles, roll goods, walk-off tiles, and adhesives. Installation will be managed by local installers.

Measurements: The contractor shall be responsible for measuring and verifying the area and perimeter of all spaces receiving carpet tiles, cove base and floor transitions.

Bldg.

Demo

Installation

Carpet Tiles Cove base Carpet Tiles Cove base Transitions

SF LF SY LF EA

955 1,237 381 138 +15% extra tiles 381 As necessary

Table 1. Carpet Demo & Installation measurements

Product Data: Submit 2 copies of manufacturer's full technical data and installation instructions for the carpet, cove base and transition selections. Contractor shall submit physical samples to customer for approval prior to installation.

Requirements:

1. Furniture. All furniture to include modular furniture will be moved and returned to original location by contractor. Government personnel will be responsible for moving computers, personal items and easily broken items. Heavy filing cabinets, lockers, safes and other like items will be emptied or moved by government personnel.

2. Carpet Selections. The contractor shall contact and work with one of the vendors listed below to choose one of the 7 carpet tile choices listed in Table 1. Vendor contacts listed on pages 4 and 5. The product shall be the moisture proof thermoplastic hard or thermoset backing option with a maximum thickness no greater than 0.250”

Tier 1 C-Type Contract Vendors Carpet Selection Installation Method Milliken FA8003-23-C-0008 Ghost Artist-Façade;

Elusory FAC67-119 Determined on site by customer Engineered Floors FA8003-23-C-0004 Reveal 7685; Pipes

Determined on site by customer Mohawk FA8003-23-C-0003 BT433 Academic View

Tile; Charcoal 989 Determined on site by customer Interface Americas FA8003-23-C-0005 Cloud Cover; 105710

Rocky Shore Determined on site by customer

Bentley Mills FA8003-23-C-0009 Misfit The Sorted Collection; Benevolent 801787 Afirma II

Determined on site by customer

Mannington FA8003-23-C-0006 Paper Collection;

Crinkled Paper; Linen 83228

Determined on site by customer

Tarkett FA8003-23-C-007 Fallow Ground 11598;

Renewal Series;

Artesian 62911

Determined on site by customer

Table 1. Carpet Selections

3. Carpet Removal and Disposal. In accordance with EPA guidelines to reduce land filling, provide for carpet and carpet installation waste handling in the project’s overall waste management plan. When feasible, all carpet and carpet installation waste disposal should require a certification that the products were not deposited in a landfill. There are carpet reclamation centers in most major cities. Other sources for carpet reclamation can be found by contacting the carpet manufacturer/provider for their reclamation/recycling options. Also see Carpet America Recovery Effort (CARE) at https://carpetrecovery.org/recovery-effort/collector-finder-map/.

a. Carpet: The contractor shall remove and dispose of carpet indicated on floor plans without disturbing the surface underneath.

b. Carpet adhesive removal: The contractor shall completely remove existing carpet adhesive in all areas receiving new carpet.

c. Cove base and transitions: The contractor shall remove and dispose of existing rubber base and transitions in areas receiving new carpet.

4. Installation:

a. Contractor Qualifications: All work shall be performed by Certified Floor covering Installers (International Certified Floor covering Installer Association) or manufacturer’s approved installers. Foremen on the jobsite shall be “Certified C-II Minimum.”

b. Warranty: For warranties to be valid, all carpet shall be installed in accordance with the installation guidelines set forth by the manufacturer and/or the minimum guidelines set forth in CRI 104-2002, Standard for Installation Specification of Commercial Carpet, and CRI 105- 2002, Standard for Installation of Residential Carpet.

c. Samples: The contractor shall inform the contracting office which carpet is selected for installation and provide a sample.

d. Carpet: The contractor shall work with one of the vendors listed under General Information and install the carpet tile choice (or approved equal) in the areas indicated.

e. Cove base: Install resilient rubber cove base, (0.080” thick, 4” high, Flexco, or approved equal to leave a clean professional appearance) in areas where carpet has existing rubber cove base installed. Color to be determined. Contractor shall provide samples of cove base in a complimentary color once carpet is decided.

f. Transitions: The contractor shall install transitions in all areas where there is a change in floor type or carpet height. Transitions shall match or compliment cove base. Color to be determined.

Contractor shall provide samples of transitions in a complimentary color once carpet is decided.

g. Additional material: The contractor shall provide 15% of extra carpet tiles above the amount installed. These will be given to the customer.

5. Doors: After carpet installation is complete, the contractor shall ensure that any doors affected by the project can open and close properly.

6. Cleaning: After carpet and installation is complete and prior to furniture reinstallation, the contractor shall remove all debris, scraps, and any other foreign matter. Contractor shall remove any spots or adhesive from the carpet or adjoining surfaces, to include walls, clip any protruding face yarn and vacuum the entire work area to leave a clean and professional site.

7. PERFORMANCE PERIOD: Shall not exceed 30 days from receipt of all material.

WORK HOURS: Work shall be performed during normal hours 7:00 am – 4:00 pm central time throughout the week Monday thru Friday. Weekend days Saturday & Sunday may be available if scheduling permits.

VACATING ROOMS: Furniture shall be moved by contractor and returned to original location after installation is complete. A POC will be assigned to coordinate scheduling and relocations.

Vendor POCs:

Milliken Contract #: FA8003-23-C-008 Web: www.millikenfloors.com POC: Timothy Bagg Phone: (704) 617-1329 Email: timothy.bagg@milliken.com

Engineered Floors Contract #: FA8003-23-C-0004 Web: www.jjflooringgroup.com POC: Debra Ramsay Phone: (800) 241-4585 Email: contract.team@engineeredfloors.com

Mohawk Contract #: FA8003-23-C-0003 Web: www.mohawkgroup.com POC: Annaleigh Warmack Phone: (706) 459-4965 Email annaleigh_warmack@mohawkind.com

Interface Americas Contract #: FA8003-23-C-0005 Web: www.interface.com/US/en-US/homepage POC: Interface Customer Service Phone: (800)-634-6032 Email: orders@interface.com

Bentley Mills Contract #: FA8003-23-C-0009 Web: www.bentleymills.com POC: Carolyn Drummond Phone: (859) 536-7846 Email: Carolyn.drummond@bentleymills.com

Mannington Contract #: FA8003-23-C-0006 Web: www.manningtoncommercial.com POC: Jody Steger Phone: (703) 489-5698 Email: Jody.steger@mannington.com

Tarkett

Contract #: FA8003-23-C-007 Web: www.commercial.tarkett.com POC: Jamie Collins Phone: (757) 810-8893 Email: Jamie.collins@tarkett.com

Bldg. 955 1st Floor Layout w/ Designated Area Highlighted

File details come from the government source that posted it. Updated .