Attachment 1 - SOW Carpet replacement - B739.pdf
PDF 428 KB Posted
- Solicitation number
- FA462126Q0049
About this file
This is a Statement of Work (SOW) for carpet replacement at Building 739, McConnell Air Force Base, Kansas, dated 20 August 2026. The contractor must provide all personnel, equipment, tools, supplies, materials, supervision, and transportation to remove existing carpet tiles and transitions, remove rubber base from walls while reinstalling existing wood baseboards, completely remove old carpet tile adhesive and prepare the floor, and furnish and install new carpet. The contractor is responsible for verifying all dimensions and measurements, submitting physical samples of carpet tiles, transitions, and cove base along with manufacturer's technical data and installation instructions to the customer prior to installation, and moving furniture.
The project scope includes demolition of 1,202 square feet of carpet tiles and 309 linear feet of cove base, with installation of 133 square yards of carpet tiles (plus 15% extra tiles to be provided to the customer) and 309 linear feet of cove base. All carpet installation must comply with the Air Force Carpet Program and utilize one of seven awarded Tier 1 C-Type contracts from vendors including Milliken, Engineered Floors, Mohawk, Interface Americas, Bentley Mills, Mannington, and Tarkett. Carpet must feature moisture-proof thermoplastic hard or thermoset backing with maximum thickness of 0.250 inches. Installation must be performed by Certified Floor Covering Installers (International Certified Floor Covering Installer Association) or manufacturer-approved installers with foremen holding "Certified C-II Minimum" certification. All work must comply with CRI 104-2002 and CRI 105-2002 standards. Work hours are 7:00 a.m. to 4:00 p.m. central time, Monday through Friday, with weekend availability if scheduling permits. The performance period shall not exceed 30 days from receipt of all materials. Carpet removal and disposal must comply with EPA guidelines to reduce landfilling, with certification that products were not deposited in landfills when feasible.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Carpet Replacement
Bldg. 739 20 Aug 2026
McConnell AFB, Kansas
GENERAL:
The contractor shall provide all personnel, equipment, tools, supplies, materials, supervision, and transportation necessary to:
1. Remove and dispose of indicated existing carpet tiles and transitions.
2. Remove indicated portions of existing rubber base from wall, existing wood base boards will be removed and reinstalled.
3. Completely remove old carpet tile adhesive and perform floor prep as necessary to ensure carpet tiles adhere properly to subfloor leaving a clean and professional finished product.
4. Furnish and install new carpet.
5. Contractor shall verify all dimensions and measurements.
6. Contractor shall submit physical samples of carpet tiles, transitions, cove base, carpet manufacturer’s technical data, and carpet installation instructions to customer prior to installation.
7. Contractor shall move furniture.
PERFORMANCE REQUIREMENTS:
Air Force Carpet Program: All carpet installation shall comply with the Air Force Carpet Program (https://usaf.dps.mil/sites/aficc/afcc/aficc/affcc/sitecollectiondocuments/carpet/carpethomepage.aspx), using the carpet ordering guide and one of the seven contracts awarded for materials. The AF Carpet program includes modular carpet tiles, roll goods, walk-off tiles, and adhesives. Installation will be managed by local installers.
Measurements: The contractor shall be responsible for measuring and verifying the area and perimeter of all spaces receiving carpet tiles, cove base and floor transitions.
Bldg.
Demo
Installation
Carpet Tiles Cove base Carpet Tiles Cove base Transitions
SF LF SY LF EA
739 1,202 309 133 +15% extra tiles 309 As necessary
Table 1. Carpet Demo & Installation measurements
Product Data: Submit 2 copies of manufacturer's full technical data and installation instructions for the carpet, cove base and transition selections. Contractor shall submit physical samples to customer for approval prior to installation.
Requirements:
1. Furniture. All furniture to include modular furniture will be moved and returned to original location by contractor. Government personnel will be responsible for moving computers, personal items and easily broken items. Heavy filing cabinets, lockers, safes and other like items will be emptied or moved by government personnel.
2. Carpet Selections. The contractor shall contact and work with one of the vendors listed below to choose one of the 7 carpet tile choices listed in Table 1. Vendor contacts listed on pages 4 and 5. The product shall be the moisture proof thermoplastic hard or thermoset backing option with a maximum thickness no greater than 0.250”
Tier 1 C-Type Contract Vendors Carpet Selection Installation Method Milliken FA8003-23-C-0008 City Proper-Design
Quarter; DES 133 Market
Determined on site by customer
Engineered Floors FA8003-23-C-0004 Passages-7037; Trail-
Determined on site by customer
Mohawk FA8003-23-C-0003 BT 433 Academic View Tile; 959 Slate
Determined on site by customer
Interface Americas FA8003-23-C-0005 Night Flight; Smoky Ridge 105705
Determined on site by customer
Bentley Mills FA8003-23-C-0009 Outlier; AFIRMA II;
801681 Extremity
Determined on site by customer
Mannington FA8003-23-C-0006 Organic Small Scale Option #2; Exchange 2 Collection; Transmit Style; Dial Tone 11142
Determined on site by customer
Tarkett FA8003-23-C-007 Aggregate 11016;
CrossCut Collection;
Oregon Fir 28309
Determined on site by customer
Table 1. Carpet Selections
3. Carpet Removal and Disposal. In accordance with EPA guidelines to reduce land filling, provide for carpet and carpet installation waste handling in the project’s overall waste management plan. When feasible, all carpet and carpet installation waste disposal should require a certification that the products were not deposited in a landfill. There are carpet reclamation centers in most major cities. Other sources for carpet reclamation can be found by contacting the carpet manufacturer/provider for their reclamation/recycling options. Also see Carpet America Recovery Effort (CARE) at https://carpetrecovery.org/recovery-effort/collector-finder-map/.
a. Carpet: The contractor shall remove and dispose of carpet indicated on floor plans without disturbing the surface underneath.
b. Carpet adhesive removal: The contractor shall completely remove existing carpet adhesive in all areas receiving new carpet.
c. Cove base and transitions: The contractor shall remove and dispose of existing rubber base and transitions in areas receiving new carpet.
4. Installation:
a. Contractor Qualifications: All work shall be performed by Certified Floor covering Installers (International Certified Floor covering Installer Association) or manufacturer’s approved installers. Foremen on the jobsite shall be “Certified C-II Minimum.”
b. Warranty: For warranties to be valid, all carpet shall be installed in accordance with the installation guidelines set forth by the manufacturer and/or the minimum guidelines set forth in CRI 104-2002, Standard for Installation Specification of Commercial Carpet, and CRI 105- 2002, Standard for Installation of Residential Carpet.
c. Samples: The contractor shall inform the contracting office which carpet is selected for installation and provide a sample.
d. Carpet: The contractor shall work with one of the vendors listed under General Information and install the carpet tile choice (or approved equal) in the areas indicated.
e. Cove base: Install resilient rubber cove base, (0.080” thick, 4” high, Flexco, or approved equal to leave a clean professional appearance) in areas where carpet has existing rubber cove base installed. Color to be determined. Contractor shall provide samples of cove base in a complimentary color once carpet is decided.
f. Transitions: The contractor shall install transitions in all areas where there is a change in floor type or carpet height. Transitions shall match or compliment cove base. Color to be determined.
Contractor shall provide samples of transitions in a complimentary color once carpet is decided.
g. Additional material: The contractor shall provide 15% of extra carpet tiles above the amount installed. These will be given to the customer.
5. Doors: After carpet installation is complete, the contractor shall ensure that any doors affected by the project can open and close properly.
6. Cleaning: After carpet and installation is complete and prior to furniture reinstallation, the contractor shall remove all debris, scraps, and any other foreign matter. Contractor shall remove any spots or adhesive from the carpet or adjoining surfaces, to include walls, clip any protruding face yarn and vacuum the entire work area to leave a clean and professional site.
7. PERFORMANCE PERIOD: Shall not exceed 30 days from receipt of all material.
WORK HOURS: Work shall be performed during normal hours 7:00 am – 4:00 pm central time throughout the week Monday thru Friday. Weekend days Saturday & Sunday may be available if scheduling permits.
VACATING ROOMS: Furniture shall be moved by contractor and returned to original location after installation is complete. A POC will be assigned to coordinate scheduling and relocations.
Vendor POCs:
Milliken Contract #: FA8003-23-C-008 Web: www.millikenfloors.com POC: Timothy Bagg Phone: (704) 617-1329 Email: timothy.bagg@milliken.com
Engineered Floors Contract #: FA8003-23-C-0004 Web: www.jjflooringgroup.com POC: Debra Ramsay Phone: (800) 241-4585 Email: contract.team@engineeredfloors.com
Mohawk Contract #: FA8003-23-C-0003 Web: www.mohawkgroup.com POC: Annaleigh Warmack Phone: (706) 459-4965 Email annaleigh_warmack@mohawkind.com
Interface Americas Contract #: FA8003-23-C-0005 Web: www.interface.com/US/en-US/homepage POC: Interface Customer Service Phone: (800)-634-6032 Email: orders@interface.com
Bentley Mills Contract #: FA8003-23-C-0009 Web: www.bentleymills.com POC: Carolyn Drummond Phone: (859) 536-7846 Email: Carolyn.drummond@bentleymills.com
Mannington Contract #: FA8003-23-C-0006 Web: www.manningtoncommercial.com POC: Jody Steger Phone: (703) 489-5698 Email: Jody.steger@mannington.com
Tarkett Contract #: FA8003-23-C-007 Web: www.commercial.tarkett.com POC: Jamie Collins Phone: (757) 810-8893 Email: Jamie.collins@tarkett.com
Bldg. 739 1st Floor Layout w/ Designated Area Highlighted