Attachment 3 Pricing Schedule 02.xlsx
XLSX spreadsheet 26 KB Posted
- Solicitation number
- 36C24926R0049
About this file
This is a pricing schedule template for construction proposals submitted to the Department of Veterans Affairs (VA) for Project 626-25-101, Upgrade Critical Environments I (Solicitation Number 36C24926R0049). The template provides a detailed line-item breakdown structure organized by the MasterFormat divisions system, requiring contractors to itemize labor, material, and equipment costs across all applicable construction categories including general requirements, demolition, concrete, masonry, metals, carpentry, thermal protection, openings, finishes, specialties, furnishings, fire suppression, plumbing, HVAC, electrical, communications, electronic safety and security, and exterior improvements. Each division must be listed regardless of applicability to the project.
The template establishes mandatory pricing submission requirements for all proposals: contractors must provide complete cost breakdowns by labor, materials, and equipment for each division and subdivision to the greatest degree possible, with lump-sum pricing for individual divisions explicitly prohibited. The pricing structure includes calculations for 6% material tax, 10% overhead, 10% profit, and 3% bond/fee, culminating in a grand total. Contractors must include the applicable VA Medical Center, proposal date, job title, project number, and solicitation number in their submissions. The instructions note that this template does not necessarily include all possible divisions needed and that contractors must provide all applicable categorical pricing similar to the example provided. This pricing schedule is a mandatory requirement for all proposals to the VA Network Contracting Office 9 - Construction as of June 30, 2016.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24926R0049 0001.docx | DOCX document | |
| RFI RESPOSNES - 626-25-101 - Upgrade Critical Environments I.pdf | ||
| Sign-in Sheet - 626-25-101 - Upgrade Critical Environments I.pdf | ||
| Attachment 6 Past Performance Questionnaire.docx | DOCX document | |
| Attachment 4 Calc. of Self Performed Work.xlsx | XLSX spreadsheet | |
| Attachment 3 Pricing Schedule.xlsx | XLSX spreadsheet | |
| Attachment 2 DRAWINGS - FINAL - 03-02-2026.pdf | ||
| Attachment 1 SPECIFCIATIONS - FINAL - 03-02-2026.pdf | ||
| Attachment 9 Wage Determination - TN20260178 - Modification 0 - 01-02-2026.pdf | ||
| Attachment 5 General Condition Breakdown.docx | DOCX document | |
| Header - List of Attachments.docx | DOCX document | |
| 36C24926R0049_1.docx | DOCX document | |
| Attachment 8 Request For Information Form.docx | DOCX document | |
| Attachment 7 Contractor EMR Certification Form.docx | DOCX document | |
| LIST OF ATTACHMENTS.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Breakdown
| JOB NAME: LOCATION: TBD PROPOSAL DATE: 01/01/1900 | Solicitation Number | Project Number | Project Title | Proposal Date | |
| 36C24926R0049 | 626-25-101 | Upgrade Critical Environments I | 4/15/26 | ||
| SPEC/COST CODE | DESCRIPTION | LABOR | MATERIAL | EQUIPMENT | DIVISION TOTALS |
| DIVISION 1 | GENERAL REQUIREMENTS | $0.00 |
| 01 33 23 | Shop Drawings, Product Data, & Samples | |
| 01 35 26 | Safety Requirements | |
| 01 42 19 | Reference Standards | |
| 01 45 00 | Quality Control | |
| 01 45 29 | Testing Laboratory Services | |
| 01 45 35 | Special Inspections | |
| 01 57 19 | Temporary Environmental Controls | |
| 01 74 19 | Construction Waste Management | |
| 01 91 00 | General Commissioning Requirements |
| DIVISION 2 | Existing Conditions | $0.00 |
| 02 41 00 | Demolition |
| DIVISION 3 | CONCRETE | $0.00 |
| 03 30 53 | Cast in Place Concrete | |
| DIVISION 4 | MASONRY | |
| 04 05 13 | Masonry Mortaring | |
| DIVISION 5 | Metals | $0.00 |
| 05 12 00 | Structrural Steel Framing | |
| 05 50 00 | Metal Fabrications | |
| DIVISION 6 | Wood, plastics and Composites | $0.00 |
| 06 10 00 | Rough Carpentry | |
| 06 20 00 | Finish Carpentry | |
| DIVISION 7 | THERMAL AND MOISTURE PROTECTION | $0.00 |
| 07 21 13 | Thermal Insulation | |
| 07 60 00 | Flashing and Sheet Metal | |
| 07 71 00 | Roof Specialties | |
| 07 72 00 | Roof Accessories | |
| 07 84 00 | Firestopping | |
| 07 92 00 | Joint Sealants |
| DIVISION 8 | Openings | $0.00 |
| 08 11 13 | Hollow Metal Doors & Frames | |
| 08 14 00 | Interior Wood Doors | |
| 08 42 43 | Intensive Care Unit Entrances | |
| 08 71 00 | Door Hardware | |
| 08 71 13.11 | Low Energy Power Assist Door Operators | |
| 08 80 00 | Glazing |
| DIVISION 9 | FINISHES | $0.00 |
| 09 05 16 | Subsurface Prep for Floor Finishing | |
| 09 06 00 | Schedule for Finishes | |
| 09 22 16 | Non Struct Metal Framing | |
| 09 29 00 | Gypsum Board | |
| 09 30 13 | Ceramic/Porcelain Tiling | |
| 09 51 00 | Acoustical Ceilings | |
| 09 65 13 | Resilient Base and Accessories | |
| 09 65 16 | Resilient Sheet Flooring | |
| 09 65 19 | Resilient Tiling Flooring | |
| 09 67 23.20 | Resinous Epoxy Base With Vinyl Chip Broadcast (RES 2) | |
| 09 68 00 | Carpeting | |
| 09 91 00 | Painting | |
| 09 96 59 | High-Build Glazed Coatings | |
| DIVISION 10 | Specialties | $0.00 |
| 10 11 13 | Chalkboards and Markerboards | |
| 10 14 00 | Signage | |
| 10 21 23 | Cubicle Curtain Tracks | |
| 10 26 00 | Wall & Door Protection | |
| 10 28 00 | Toilet, Bath, & Laundry Accessories | |
| 10 44 13 | Fire Extinguisher Cabinets |
| DIVISION 11 | EQUIPMENT | |
| DIVISION 12 | Furnishings | $0.00 |
| 12 24 00 | Window Shades | |
| 12 31 00 | Manufactured Metal Casework | |
| 12 32 00 | Manufactured Wood Casework | |
| 12 36 00 | Countertops |
| DIVISION 13 | Special Construction | $0.00 |
| 13 05 41 | Seismic Restraint Requirements for Non- Structural Components | |
| DIVISION 21 | Fire Suppression | $0.00 |
| 21 13 13 | Wet-Pipe Sprinkler Systems |
| DIVISION 22 | Plumbing | $0.00 |
| 22 05 11 | Common Work Results for Plumbing | |
| 22 05 19 | Meters and Gages for Plumbing piping | |
| 22 05 23 | General-Duty Valves for Plumbing Piping | |
| 22 07 11 | Plumbing Insulation | |
| 22 11 00 | Facility Water Distribution | |
| 22 13 00 | Facility Sanitary & Vent Piping | |
| 22 14 00 | Facility Storm Drainage | |
| 22 40 00 | Plumbing Fixtures | |
| 22 62 00 | Vacuum Systems for Laboratory & Healthcare Facilities | |
| 22 63 00 | Gas Systems for Laboratory & Healthcare Facilities |
| DIVISION 23 | Heating, Ventilating and Air Conditioning HVAC | $0.00 |
| 23 05 11 | Testing, Adjusting and Balancing for HVAC | |
| 23 05 12 | General Motor Requriments for HVAC and Steam Generation Equipment | |
| 23 05 41 | Noise and Vibration Control for HVAC piping and Equipment | |
| 23 05 93 | Testing, Adjusting and Balancing for HVAC | |
| 23 07 11 | HVAC and Boiler Plant Insulation | |
| 23 08 00 | Commissioning of HVAC Systems | |
| 23 09 23 | Direct Digital Control System for HVAC | |
| 23 21 13 | Hydronic Piping | |
| 23 21 23 | Hydronic Pumps | |
| 23 22 13 | Steam & Condensate Heating Piping | |
| 23 31 00 | HVAC Ducts and Casing | |
| 23 34 00 | HVAC Fans | |
| 23 36 00 | Air Terminal Units | |
| 23 37 00 | Air Outlets & Inlets | |
| 23 40 00 | HVAC Air Cleaning Devices | |
| 23 73 00 | Indoor Central Station Air Handling units |
| DIVISION 26 | ELECTRICAL | $0.00 |
| 26 05 11 | Requirements for Electrical Installations | |
| 26 05 19 | Low-Voltage Electrical Power Conductors and Cables | |
| 26 05 26 | Grounding and Bonding for Electrical Systems | |
| 26 05 33 | Raceway & Boxes for Electrical Systems | |
| 26 05 73 | Overcurrent Protective Device Coordination Study | |
| 26 08 00 | Commissioning of Electrical Systems | |
| 26 08 00.01 | DVA/USACE Projects Commissioning of Electrical Systems | |
| 26 09 23 | Lighting Controls | |
| 26 27 26 | Wiring Devices | |
| 26 29 21 | Enclosed Switches & Circuit Breakers | |
| 26 51 00 | Interior Lighting |
| DIVISION 27 | COMMUNICATIONS | $0.00 |
| 27 05 11 | Requirements for Communications Installations | |
| 27 05 33 | Raceways & Boxes for Communications Systems | |
| 27 08 00 | Commissioning of Communications Systems | |
| 27 10 00 | Control, Communication and Signal Wiring | |
| 27 11 00 | Communications Equipment Room Fittings | |
| 27 15 00 | Communications Structured Cabling | |
| 27 52 23 | Nurse Call & Code Blue Systems |
| DIVISION 28 | ELECTRONIC SAFETY AND SECURITY | $0.00 |
| 28 05 00 | Common Work Results for Electronic Safety and Security | |
| 28 05 13 | Conductors and Cables for Electronic Safety and Security | |
| 28 05 28.33 | Conduits & Backboxes for Electronic Safety & Security | |
| 28 13 00 | Physical Access Control System | |
| 28 31 00 | Fire Detection & Alarm | |
| DIVISION 32 | EXTERIOR IMPROVEMENTS | $0.00 |
| 32 05 23 | Cement & Concrete for Exterior Improvements |
| TOTALS | ||||
| $0.00 | ||||
| TOTAL LABOR | ||||
| $0.00 | ||||
| TOTAL MATERIALS | ||||
| 6% | $0.00 | |||
| TAX FOR MATERIALS | ||||
| $0.00 | ||||
| TOTAL EQUIPMENT | ||||
| DIVISION GRAND TOTALS | $0.00 |
| $0 | INSTRUCTIONS | |
| DIVISION GRAND TOTALS | $0 | |
| TAX FOR MATERIALS | 1. Contract breakdowns must include the applicable VA Medical Center, the date the proposal was provided to the VA, the job title, project number, and the solicitation number; | |
| SUBTOTAL | $0 |
| OVERHEAD | 10% | $0 | |
| PROFIT | 10% | $0 | 2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division or subdivision when each division or subdivision can be broken down by price to a greater degree; |
| $0 | |
| SUBTOTAL |
| BOND/FEE | 3% | $0 | 3. Divisions must still be listed even if not applicable to the construction requirement; |
| PERMITS/LICENSES |
GRAND TOTAL $0 4. The template above does not include all possible divisions or subdivisions needed for the fictitious requirement referenced above. It is only provided as an example of what would be acceptable to the VA Network Contracting Office 9 -Construction Team as of 6-30-2016. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept any subsequent price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown. Therefore, it is in the Governments and contractor’s best interest to provide a thorough price breakdown initially; and
5. This template, or another template that would be provide the same kind of information referenced above, is required for all proposals provided to the VA Network Contracting Office 9 - Construction as of 6-30-2016.