Attachment 3- Performance Work Statement.pdf
PDF 192 KB Posted
- Attached to
- Dyess Washer and Dryer Service/Lease
- Solicitation number
- FA466124Q0082
About this file
This document is a Performance Work Statement (PWS) for a Washer and Dryer Rental Service contract at Dyess Air Force Base in Texas. The contractor shall provide all management, tools, supplies, equipment, and labor necessary to purchase, deliver, maintain, and repair washers and dryers at various dormitory locations on the base. The contract will be a firm-fixed-price service contract with a 12-month base period and four 1-year option periods. The contractor shall furnish and install 72 top-load and 76 front-load commercial-grade washers and dryers per the specified sizes and capabilities. Key requirements include scheduled preventative maintenance, responding to service calls within 1 day, and replacing any units that cannot be repaired within 3 days. The contractor shall also provide an appliance inventory, maintenance schedule, and quality control plan. This is a small disadvantaged business set-aside under NAICS 532210, with offers due by 4 July 2024.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WASHER AND DRYER RENTAL SERVICE
PERFORMANCE WORK STATEMENT (PWS)
7th CIVIL ENGINEER SQUADRON at DYESS AFB TEXAS
Table of Contents
1. DESCRIPTION OF SERVICES 3
1.1 SCOPE OF WORK 3
1.2. INITIAL INSTALL 3
1.2.1. WASHER SPECIFICATIONS 3
1.2.2. DRYER SPECIFICATIONS 3
1.3. PHASE OUT AND PHASE IN 4
1.4. APPLIANCE INVENTORY 4
1.4.1. APPLIANCE IDENTIFICATION AND SIGNAGE 4
1.5. CLEAN-UP 5
1.6. WATER CONDITION 5
1.7. MAINTENANCE 5
1.8. INOPERATIVE UNITS 5
1.9. SCHEDULED PREVENTATIVE MAINTENANCE 5
1.9.1 DRYER VENTS AND WALL DUCT MAINTENANCE 6
1.9.2. WASHER MAINTENANCE 6
1.9.3. DRYER MAINTENANCE 6
1.9.4. PERMANENT EXHAUST-DUCT CLEANING 7
1.10. SERVICE CALLS 7
1.11. DELIVERABLES 7
1.12. DOCUMENTATION 7
1.13. EQUIPMENT USE/ABUSE: 8
2. SERVICE SUMMARY 8
2.1. QUALITY CONTROL 8
2.2. QUALITY ASSURANCE 9
3. GOVERNMENT FURNISHED PROPERTY AND SERVICES 9
3.1. UTILITIES 9
3.2. SAFEGUARDING ALL GOVERNMENT PROPERTY 9
4. GENERAL INFORMATION 9
4.1. MISSION 9
4.2. HOURS OF OPERATION 9
4.3. RECOGNIZED HOLIDAYS 9
4.4. BASE CLOSURE 10
4.5. SERVICE DURING CRISIS OR HEIGHTENED SECURITY 10
4.6. CONTRACTOR PERSONNEL 10
4.6.1. PROJECT MANAGER 10
4.6.2. CONTRACT EMPLOYEES 10
4.6.3. REPAIR TECHNICIAN 11
4.6.4. COMMUNICATIONS 11
4.7. SAFETY REQUIREMENTS AND REPORTS 11
4.8. FIRE CODES 11
4.9. SPILL CONTROL 11
4.10. BASE RULES AND REGULATIONS 11
Appendix A - LOCATION OF WASHERS & DRYERS 12
PERFORMANCE WORK STATEMENT
WASHER/DRYER RENTAL SERVICE
1. DESCRIPTION OF SERVICES
1.1. SCOPE OF WORK
The contractor shall provide all management, tools, supplies, equipment, and labor necessary to purchase, delivery, maintain, and repair washers and dryers at various locations on Dyess AFB.
The buildings identified within schedule set forth herein are located on Dyess AFB, approximately five (5) miles from Abilene, TX. This will be a firm-fixed price service contract with One 12-month base period, and 4- One-Year Option Periods. This service is to provide washers and dryers for dormitory residents at no cost to the resident, and to ensure that all washers and dryers are maintained in operating order during the life of the contract.
1.2. INITIAL INSTALL
All equipment shall be installed in accordance with the standards of applicable codes (i.e., National Electric Code, National Mechanical Code) and in compliance with all commercial standards. The equipment provided by the contractor during the period of this contract shall comply with the specifications set forth herein. All equipment shall be subject to the government’s inspection as to new condition, appearance, and serviceability prior to installation.
Furnish all parts and accessories necessary to connect appliances at no additional cost to the government. All appliances meet current Energy Star® requirements or Federal Energy Management Program (FEMP) guidelines.
1.2.1. WASHER SPECIFICATIONS
The contractor shall supply 72 top-load commercial-grade washers, 5.0 cubic feet capacity for buildings 6112, 6113, 6114, 6125, 6138, 7219, 7220, and 7221. The contractor shall supply 76 front-load commercial-grade washers, 5.0 cubic feet capacity, stackable units (these buildings are quad units) for buildings 6126, 6127, 6136, and 6137. Machines in quad units are installed in a utility closet 79” high and 35” wide. Washers shall be new, convenient to operate, and capable of withstanding at least 15 full-capacity loads of wash per week. Units shall operate on 120-volt, 60 Hertz, single phase power supply, not to exceed 10 amps. Operational cycle shall consist of wash, rinse, and spin dry cycles. Washers shall have a proper number of controls for automatic operation. Selection shall be a minimum of three (3) water temperatures and three (3) wash cycles; selection may be by individual control or automatic pre-set. Washers shall require no bolting down. Machines shall be designed so that if an unbalanced (load) condition occurs during spin phase, this condition will be automatically compensated for within the machine. Provide the Government with the manufacturer warranty details and utilize the warranty for covered parts during the duration of the contract. The Contractor is responsible for ensuring the connections for the utilities and vents are compatible with the existing connections.
1.2.2. DRYER SPECIFICATIONS
The contractor shall supply 72 commercial-grade 7.5 cubic feet dryers for buildings 6112, 6113, 6114, 6125, 6138, 7219, 7220, and 7221. The contractor shall supply 76 front load commercial grade 7.5 cubic feet dryers, stackable units (these buildings are quad units) for buildings 6126, 6127, 6136, and 6137. Machines in quad units are installed in a utility closet 79” high and 35”
TAYLOR
List all applicable codes or reference where they are located in appendices.
wide. Dryers shall have a minimum of two (2) dryer cycles; selection may be by individual control or automatic pre-set. Dryers shall have a door-operated safety switch which stops the drum and source of heat whenever door is opened during the cycle. Dryers shall be new, convenient to operate, and of rugged construction capable of withstanding heavy use. Units shall operate on nominal 240-volt, 60 Hertz, 4-prong power supply. All dryers must be electric--no hybrid or gas models are allowed. Provide the Government with the manufacturer warranty details and utilize the warranty for covered parts during the duration of the contract. The Contractor is responsible for ensuring the connections for the utilities and vents are compatible with the existing connections.
1.3. PHASE OUT AND PHASE IN
The Contracting Officer’s Representative (COR) will coordinate the phase-out and phase-in. The phase-out of government-owned appliances and phase-in of contractor-owned appliances is performed within thirty (30) business days after the contract award. The Contractor shall submit a phase-in schedule to the COR for review and acceptance, within 10 business days after the contract award.
The Contractor shall work closely with the COR to ensure that there are no lapses in service. The phase-in schedule shall be written and include the building number and date the appliance will be installed. Installation of all appliances coincides with the phase-in schedule and completed within thirty (30) business days after contract award. Ensure appliances are fully operational before proceeding to another building. No building shall be without washer and dryer services for any period longer than 1 day.
After completion of work at each location, remove all packing boxes, paper, and excess materials. The government is not obligated to provide storage areas for machines during the transition period. All existing 296 units shall be removed and disposed of by the contractor off-base in accordance with local, state, and federal guidelines.
The contractor shall remove all washer and dryer equipment no later than 30 business days after contract expiration.
1.4. APPLIANCE INVENTORY
After completion of the phase-in period, the contractor shall provide the COR with a complete appliance inventory within five (5) business days. The inventory contains, at a minimum, appliance type (washer or dryer), model number, serial number, assigned machine identification number and building number where the machine is installed. An updated appliance inventory is submitted within five (5) business days of any change in the inventory=. The contractor shall submit a corrected inventory within three (3) business days after COR identifies any inaccuracies in the inventory.
1.4.1. APPLIANCE IDENTIFICATION AND SIGNAGE
The contractor shall place an approved sign or decal with operating instructions in each laundry room. The operating instruction shall be 24” x 36” in size. If the appliance has operating instructions preprinted on the lid, this will meet the requirement.
The contractor shall label each appliance with a numeric or alpha/numeric combination, which uniquely identifies each appliance. Ensure machines are numbered by their location, for example Bldg. 6113, first floor washing machine is numbered 6113-1-01W in consecutive sequence. The numbering format shall remain during the contract period. The operator when calling in equipment malfunctions will use this number. The label shall always be legible and replaced, if necessary, at no additional cost to the government. Numbers must be waterproof and replaced when they become faded, soiled, or defaced or within five (5) business days (excluding federal holidays), of notification by the COR. Affix label on the front of each appliance with the following information:
This is property of: CONTRACTOR INC.
Appliance Identification Number: 6113-1-01W Report problems by calling: 325-696-4403
1.5. CLEAN-UP
The contractor shall leave appliances and work area clean where maintenance is performed.
Debris generated by the Contractor is disposed at an off-base disposal site. Appliances and parts shall not be disposed on base.
1.6. WATER CONDITION
Abilene is known to have very hard water. The Contractor shall take any precaution they deem necessary to protect and minimize any potential damage to the machine. The government will not be held responsible for the condition of the water nor any damage that may be incurred.
1.7. MAINTENANCE
The contractor shall maintain, repair, and/or replace all units furnished under this contract. This includes, but is not limited to, all parts and labor, hot and cold-water connection hoses, hose screens, dryer vents, dryer clamps, and flexible exhaust hoses. Ensure that proper maintenance/repair is performed on units in accordance with the PWS during the period of performance and that the manufacturer’s warranty is utilized.
1.8. INOPERATIVE UNITS
The COR will notify the Contractor when units are inoperative or defected. The contractor shall repair the units within three (3) business days of notification (excluding holidays and weekends).
The Contractor shall provide a replacement unit if repair time exceeds three (3) business days.
Upon completion of repairs, the contractor shall notify the COR. Upon completion of machine installation, removal and/or repair, the contractor shall clean and wipe down each machine and ensure the entire site is left clean.
The Contractor is not to accept notification directly from the machine users.
1.9. SCHEDULED PREVENTIVE MAINTENANCE
The contractor shall submit a semi-annual maintenance schedule to the COR for all appliances within ten (10) business days after contract award. Include at a minimum the building number, appliance number, and the date in which services will be performed. If there are any revisions to the schedule, the contractor shall submit a revised schedule at least three (3) business days prior to the effective change. After conducting the preventative maintenance, the contractor shall submit a report by the 5th business day following the maintenance to the COR.
The Contractor shall ensure all machines operate safely, are clean and are free of corrosion.
Inspect appliances for cleanliness and ensure equipment is operational and performing according to design. Minimize disruptions and inconveniences to users.
All replacement parts shall be new. If contractor discovers any abuse or damage to the appliances or if maintenance is required involving government-supplied utilities or property such as electrical outlets, drains, or faucets, the contractor shall immediately notify the COR in writing with all applicable information, i.e., bldg., machine number, etc.
If an appliance requires maintenance, the contractor shall post a professional sign stating “OUT OF SERVICE – DO NOT USE” with the date the problem was noted, and the estimated date of repair/returned to service. Any appliance that will be out of service for more than three (3) business days shall be replaced by the contractor, and the contractor shall notify the COR of the replacement and provide an updated inventory within five (5) business days.
1.9.1 DRYER VENTS AND WALL DUCT MAINTENANCE
The contractor shall perform inspection and cleaning of dryer vents and wall ducts during semi-annual inspections. The dryer vents shall be maintained free of any debris, which can cause blockage in the dryer vents. This is to prevent unit’s failure, fire, and impairment to mission essential personnel. The contractor shall clean the lint traps, exhaust duct on the dryers, central ducts from the dryers to the exterior of the facilities and the multi-story facilities.
1.9.2. WASHER MAINTENANCE
The contractor shall inspect and repair all supply hoses, splitter connections, drains lines, power cords, filters, agitators, drive belts, dials, knobs and switches condition/adjustment, level machines and tightening/replacing screws, bolts, and door seals, to ensure proper and safe operations. The contractor shall inspect washer water hoses to ensure they are properly secure and no signs of wear, rust, bulges, cracks or leakage exist. Replace when necessary. Removal of water hoses may become necessary to clear debris in hose filter to prevent water flow restriction and blockage.
1.9.3. DRYER MAINTENANCE
The contractor shall inspect and repair all electrical connections, power cords, knobs, dials, switches, door seals and exhaust hoses/ducts, to ensure proper and safe operations. The contractor shall clean out vent hoses on an annual basis. All dirt, debris, and lint shall be removed from the inside of the vent hose.
The contractor shall inspect dryer lint filters and replace torn or bent filters. Ensure dryer exhaust vents are properly secured to dryer and exhaust ducting at all times to prevent fire hazards. In addition, the contractor shall be responsible for cleaning the front, back, and sides of appliances to remove ink stains, detergent, lint, and debris. Items of value found in the process of cleaning around the machine are considered government property and shall be turned into the COR.
1.9.4. PERMANENT EXHAUST-DUCT CLEANING
The contractor shall inspect and clean all accessible permanent horizontal and vertical exhaust ducts. Notification of inaccessible areas must be submitted to the COR in writing. The contractor shall affix a label to each permanent duct, which identifies the date when the ducting was cleaned and inspected and date when next inspection and cleaning is due. The contractor shall write out the date by month and year; to avoid confusion the month shall be spelled out. The label shall include a place for Contractor’s signature indicating the technician’s name that performed services. Either place the label on the door or duct at the point the dryer vent enters the permanent duct. The cleaning and inspection of the duct work is critical to the government to eliminate potential fire hazards.
1.10. SERVICE CALLS
The contractor shall respond to a repair service requests within one (1) day. Service repair calls shall occur when machines malfunction or fail to operate properly. If unable to repair appliance at the time of the service call, post a professional sign on the appliance that is non-operational.
Include the following information: “OUT OF SERVICE - DO NOT USE,” with the date when the Contractor made initial response to service call, and the estimated repair date. If an appliance cannot be repaired within three (3) days (excluding holidays and weekends), the contractor shall replace the appliance with a new appliance, and notify the COR of the replacement and the new appliance’s identification number and provide an updated inventory within five (5) business days.
1.11. DELIVERABLES
The contractor shall submit the following deliverables in accordance with the timelines in the below table. All deliverables must meet professional standards and meet the requirements set forth in the contract documentation. The contractor shall submit all deliverables in electronic soft copy format and all deliverables must be compatible with standard office productivity applications (i.e. Word, Excel).
Deliverable PWS
Paragraph Frequency Deliver to
Phase-in Schedule 1.3 Submit a phase-in schedule for review and acceptance, within 10 business days after the contract award.
COR
Appliance Inventory List
1.4. Provide an appliance inventory list
within five (5) business days after initial installation is complete & when any change occurs.
COR
Semi-Annual Maintenance Schedule
1.9. Within ten (10) business days after
contract award
COR
Employee List 4.6. Within five (5) business days of contract award &
KO &
COR
TAYLOR
Vague sentence. Please clarify what needs replacing and what qualifies as “when necessary”.
When/timeline?
when any staffing change occurs.
Quality Control Plan 2.1 Submitted at time of proposal KO
1.12. DOCUMENTATION
The contractor shall maintain a log for inspections, repairs, and preventive maintenance performed. The log shall be made available to the COR upon request.
1.13. EQUIPMENT USE/ABUSE
The contractor shall notify the Contractor Officer (KO) and COR in writing of any suspected abuse of appliances. The COR will validate the alleged abuse and forward the findings to the KO for a final determination. An equitable price adjustment for abuse of appliances shall be verified and approved by the KO. Payment for abuse will be negotiated with the KO and the final ruling will be documented. The documentation will include the method and steps in which the Contractor will take to recoup payment; the COR has no authority to make a determination.
2. SERVICE SUMMARY
The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to contract success.
Performance Objective PWS Paragraph Performance Threshold
1. Appliance Signage must be replaced if faded, soiled, or defaced within five (5) business days (excluding federal holidays) of notification by the COR.
1.4.1. 98% of the signage must be accurate within the time frame provided.
2. Fully operational washers and dryers.
1.8-1.10. If units need to be repaired, 100% of the units shall be operational within three (3) business days (excluding weekends and holidays), or the unit(s) shall be replaced.
3. Schedules for Preventive Maintenance and Permanent Exhaust-Duct Cleaning
1.9. Schedule should be followed and accurate
95% of time for each semi-annual maintenance. Revisions shall be reported at least three (3) business days prior to the effective change
4. Permanent Exhaust-Duct Cleaning
1.9.4. 95% of the semi-annual scheduled cleanings are completed within the required time.
5. Service Calls 1.10. 95% of all service calls are completed within required time.
2.1. QUALITY CONTROL
Not sure this should be included as a contract deliverable, since it will be submitted as part of the contractor proposal.
The contractor shall develop and implement procedures to identify, prevent, and ensure non-performance, and a continual repeat of poor service does not occur.
Submit a written Quality Control Plan to the KO for review and feedback. Provide a written description of the quality control system to include identification of the standard industry practices, such as those of the American National Standards Institute (ANSI), Occupational Safety and Health Administration (OSHA) and Environmental Protection Agency (EPA). Include the inspection system requirements of FAR 52.246-4 in this document. Submit the plan no later than the pre-performance conference. The plan shall specifically address the Contractor’s strategy to provide quality workmanship, continual process improvement, and correcting deficiencies as required.
2.2. QUALITY ASSURANCE
The Government may use any method to inspect and evaluate the Contractor’s performance to ensure that services have fulfilled the contract obligations pertaining to quality and quantity.
Inspections include validating actual work performance, physically checking an attribute of the completed task, validating a management information report, investigating customer complaints, and conferring with facility managers. The KO or COR will use the Contractor’s work schedule or a modified version thereof, to record validation results. Results of the validation then become the official Air Force record of the Contractor’s performance. When a performance threshold is unsatisfactory or Contractor performance not accomplished, the COR will initiate and provide the KO a Contract Discrepancy Report (CDR) DD Form 2772 for issuance to the Contractor.
Respond to the CDR IAW instructions provided and return it to the KO within one (1) calendar days of receipt.
3. GOVERNMENT FURNISHED PROPERTY AND SERVICES
3.1. UTILITIES
The government will provide water and electricity as needed in performance of work and when appliances are in operations. The Contractor shall provide the tools, equipment, and other items as necessary to make utility connections. Utility connections shall be coordinated with the COR.
If the Contractor notes a deficiency regarding the utilities, immediate notification is required to the COR (email would be an acceptable form of notification).
3.2. SAFEGUARDING ALL GOVERNMENT PROPERTY
The contractor shall conduct work so that property, personnel, and work areas shall be protected at all times from inconvenience, damage, or injury. In the event of damage caused by contractor operations or employees, due to improper protection, precaution, or safety measures, such damages shall be repaired or replaced by the contractor at no cost to the government.
4. GENERAL INFORMATION
4.1. MISSION
The overall Civil Engineer mission at Dyess AFB is to plan, maintain, operate, and protect the infrastructure, facilities, and environment for assigned Airmen, families, and civilian employees.
4.2. HOURS OF OPERATION
Perform services during regular duty hours, which are 0800 - 1600, Mondays through Fridays, See comment above. This should all be included in solicitation/contract.
excluding federal holidays, unless otherwise required in the contract or approved by the KO.
When the Contractor’s work schedule conflicts with an Air Force mission requirement, advise the KO and reschedule the work to minimize disruption.
4.3 RECOGNIZED HOLIDAYS
The Contractor is not required to provide service on the following holidays. Under current definitions, the following four are set by date:
New Year's Day January 1 Independence Day July 4
Veteran’s Day November 11 Christmas Day December 25
If any of the above falls on a Saturday, then Friday is observed as a holiday. Similarly, if one falls on a Sunday, then Monday is observed as a holiday. The other six are set by a day of the week and month:
Martin Luther King's Birthday Third Monday in January Washington's Birthday Third Monday in February
Memorial Day Last Monday in May Labor Day First Monday in September
Columbus Day Second Monday in October Thanksgiving Fourth Thursday in November
4.4. BASE CLOSURE
Work scheduled but not accomplished because of base closure due to weather, exercises, or Actual Alert, shall be performed as soon as possible after reopening the base.
4.5. SERVICE DURING CRISIS OR HEIGHTENED SECURITY
The services under this contract are not essential for performance during a crisis. The KO will determine the circumstances, which constitute a crisis based on direction from Security Forces and base leadership.
4.6. CONTRACTOR PERSONNEL
The project manager, contract employees, and repair technician names shall be designated in writing and be provided to the KO and COR within five (5) business days of contract award. The contract shall send an updated list if any of the employees’ names change, within five (5) business days.
4.6.1. PROJECT MANAGER
The contract shall designate a project manager who shall be responsible for the operations, management, and ensure compliance of contract requirements. The contractor shall appoint an alternate and/or alternates, who act on behalf of the Contractor when the manager is absent. The project manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract.
4.6.2. CONTRACT EMPLOYEES
The contractor’s employees shall present a neat appearance and must be easily recognizable while on the installation. This can be accomplished through the wear of distinctive clothing, overcoats, or hats, bearing the company name or logo. The coloring or design of the items selected should be such that identifies personnel easily and quickly for reasons of safety and personal protection. The Contractor shall not employ persons for work on this contract who are identified by the KO as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.
The contractor shall report to an appropriate authority, any information, which they are aware of, which may pose a threat to the security of the DoD personnel, Contractor personnel, resources, and classified or unclassified defense information.
4.6.3. REPAIR TECHNICIAN
The contractor shall provide a local, qualified, and experienced repair technician who will be responsible for the day-to-day appliance repair and maintenance. The repair technician shall respond to repair service requests within one (1) day.
4.6.4. COMMUNICATIONS
The contractor shall provide a phone number where the project manager and repair technician can be contacted during normal duty hours of operation. The contractor shall stablish and maintain a cellular/mobile telephone system for two-way communications with the COR prior to the contract start date. The communications system shall be established at no cost to the government and consist of sufficient phones, power, and range to establish and maintain immediate, direct, and sustained communications between any key Contractor personnel and the
COR.
4.7. SAFETY REQUIREMENTS AND REPORTS
All Contractor operations shall be conducted and performed in accordance with the Department of Labor, OSHA requirements, and Air Force Safety & Health standards. Provide a verbal report to the KO within two hours of each occurrence of damage to Government property or an accident resulting in death, injury, occupational disease, or adverse environmental impact. Provide a completed copy of required Accident Investigation Reports to the KO within five (5) calendar days of each occurrence.
4.8. FIRE CODES
The contractor shall comply with all fire and safety codes. This shall include using metal/nonflammable exhaust vent hoses for all dryers.
4.9. SPILL CONTROL
The contractor shall maintain spill control material on hand at all times sufficient to contain a worse case spill, both volume and hazard level.
4.10. BASE RULES AND REGULATIONS
Contractor personnel shall report to an appropriate authority, any information or circumstances of which they are aware may pose a threat to the security of Department of Defense (DoD)
Business?
personnel, Contractor personnel, resources, and classified or unclassified defense information.
Contractor employees are required to obey base rules and regulations. All contract personnel shall obey posted signs (controlled entry, speed limits). Comply with base traffic regulations;
failure to do so could result in terminating base access. Smoking is prohibited in all government facilities, unless otherwise posted.
APPENDIX A - LOCATION OF WASHERS & DRYERS
BLDG
NO.
STREET
ADDRESS
NO. OF
WASHERS
NO. OF
DRYERS
TYPE OF
DRYERS
LDRY RM
LOCATION
6112 442 4th Ave 3 3 Elec. 1st Floor 3 3 Elec. 2nd Floor 3 3 Elec. 3rd Floor
6113 426 4th Ave 3 3 Elec. 1st Floor 3 3 Elec. 2nd Floor 3 3 Elec. 3rd Floor
6114 426 4th Ave 3 3 Elec. 1st Floor 3 3 Elec. 2nd Floor 3 3 Elec. 3rd Floor
6125 410 Avenue B 3 3 Elec. 1st Floor 3 3 Elec. 2nd Floor 3 3 Elec. 3rd Floor
6126 418 Avenue B 6 6 Elec. 1st Floor 6 6 Elec. 2nd Floor 6 6 Elec. 3rd Floor
6127 426 Avenue B 6 6 Elec. 1st Floor 6 6 Elec. 2nd Floor 6 6 Elec. 3rd Floor
6136 317 3rd Ave 6 6 Elec. 1st Floor 7 7 Elec. 2nd Floor 7 7 Elec. 3rd Floor
6137 325 3rd Ave 6 6 Elec. 1st Floor 7 7 Elec. 2nd Floor 7 7 Elec. 3rd Floor
6138 325 3rd Ave 3 3 Elec. 1st Floor 3 3 Elec. 2nd Floor 3 3 Elec. 3rd Floor
Remove. Already required in para 4.6.2
7219 410 Avenue D 3 3 Elec. 1st Floor 3 3 Elec. 2nd Floor 3 3 Elec. 3rd Floor
7220 418 Avenue D 3 3 Elec. 1st Floor 3 3 Elec. 2nd Floor 3 3 Elec. 3rd Floor
7221 426 Avenue D 3 3 Elec. 1st Floor 3 3 Elec. 2nd Floor 3 3 Elec. 3rd Floor
Total 148 148
File details come from the government source that posted it. Updated .