Attachment_3_Performacne_Work_Statement.pdf
PDF 180 KB Posted
- Attached to
- Replace Lighthouse Well Pump, Point Reyes N. S. Federal contract opportunity
- Solicitation number
- 140P8325Q0014
About this file
This Performance Work Statement (PWS) outlines a well pump replacement project for the National Park Service (NPS) at Point Reyes National Seashore. The solicitation (RFQ no. 140P8425Q0014) requires a contractor to remove the existing pump from a 422-foot deep well (currently suspended at 315 feet) and install a new Goulds 5G50 or equivalent 2 horsepower, 230-volt pump. Additional requirements include installing a 2-inch diameter drop pipe, electrical wiring and controls, and sterilizing the well after installation.
The project is scheduled for performance between 10/06/2025 and 12/18/2025, with the contractor responsible for conforming to County of Marin Environmental Health Services Department regulations and adhering to local, state, and federal waste disposal guidelines. The NPS emphasizes environmental protection, requiring minimal construction impact and pre-approved staging areas. Contractors must submit specification sheets and manufacturer warranties to the Contracting Officer's Representative (COR) for review and approval prior to installation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8325Q0014_Amd_0002.pdf | ||
| Attachment_7_Q_and_A_0002.pdf | ||
| Attachment_6_Revised_Performacne_Work_Statement_0002.pdf | ||
| Sol_140P8325Q0014_Amd_0001.pdf | ||
| Attachment_2_DOL_Service_Wage_Rates_2015-5725.pdf | ||
| Attachment__1_Terms_Provisions_Clauses.pdf | ||
| Sol_140P8325Q0014.pdf | ||
| Attachment_4_Forms_and_Provisions_to_Return_with_Quote.docx | DOCX document | |
| Attachment_5_Optional_Past_Performance_Questionnaire.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation (RFQ) no. 140P8425Q0014, Attachment 3 – Performance Work Statement (8/21/25)
Replace Pump at Lighthouse Well, Point Reyes National Seashore (PORE)
General Information:
The Contractor shall furnish all materials, equipment, and personnel necessary to manage and accomplish the work.
This is a Performance Work Statement, meaning the NPS has provided a list of key tasks below, but that list may not cover all that’s required for the contractor to do a full well pump replacement. NPS is relying on Contractor’s expertise and experience to prepare a firm-fixed priced quote for complete replacement of the well pump.
Point Reyes National Seashore site map is available here:
https://www.nps.gov/pore/planyourvisit/directions.htm
A. Description of Primary Tasks/Work:
1. Remove and dispose of the existing pump located in the Lighthouse well in Point
Reyes National Seashore. The well is about 422 feet deep, and the existing pump is suspended at 315 feet.
2. Furnish and install a new well pump, Goulds 5G50 or equivalent, but must be 2 horsepower, 230 volts.
3. Furnish and install a 2-inch dimeter drop pipe.
4. Furnish and install electrical wiring and controls needed to operate the pump.
5. After installation the well is to be sterilized with chlorine and sealed.
6. Submit specification sheets for products and materials to be installed to the
Contracting Officer’s Representative (COR) for COR’s review and approval prior to contractor installing them.
7. Furnish the well pump manufacturer’s warranty to the COR along with any other materials’ warranties.
B. Contractor will also be responsible for the following:
1. The Contractor is responsible for completing work that conforms to the County of
Marin Environmental Health Services Department regulations.
2. Removing all waste materials, adhering to Local, State, and Federal regulations.
C. Environmental protection:
To minimize environmental impact, construction activity shall be limited to a small allowable work area in order to protect as much as possible the natural environment around where the pump is located. Coordinate staging areas for equipment and work zones with COR prior to start of work.
D. Period of Performance:
Government’s anticipated period of performance is from 10/06/2025 – 12/18/2025.