Attachment 3 Past Performance Questionnaire.pdf

PDF 108 KB Posted

Attached to
Fort Gordon BASOPS
Solicitation number
W911S021R0017
Issued by

View the file

Other files

File Type Posted
TE J-009 - Tank Trails and Range Roads Map.pdf PDF
TE H-011 - Communication Towers.docx DOCX document
TE A-2.4 Sec 7.3.2 - Estimated Real Property Maintenance Activity (RPMA) Workload Data.docx DOCX document
TE F-011 - Shrub Types and Sizes.docx DOCX document
TE K-004 - BLDG 25910 CHW and HTW Operations (Final).docx DOCX document
TE A-2.6 Sec 7.3.2 - Estimated Unaccompanied Housing Transaction and Workload Data.docx DOCX document
TE J-008 - Detention Pond Map List.pdf PDF
TE A-6.9 Contractor Personnel Minimum Qualifications 2021-08-22 v2.docx DOCX document
TE K-009 - Central Energy Plans 310 and 25910 Operation Logs.docx DOCX document
TE H-007 - Playground Equipment.docx DOCX document
TE A-1.02 - Installation Map.pdf PDF
TE A-6.7 - Spill Prevention Control and Countermeasure Plan.docx DOCX document
TE J-003 - Fire Breaks and Ranges.docx DOCX document
TE H-002 - Privatized Utilities Provider Demarcation Points.docx DOCX document
Annex H Facilities Maintenance Vertical.docx DOCX document
Attachment 9 Collective Bargaining Agreement CBA 2021 87.pdf PDF
TE F-008 - Line Clearing Specifications.docx DOCX document
TE H-004 - Communication Manholes.docx DOCX document
TE F-006 - Tree Inspection Zone Map.docx DOCX document
Annex K Heating Cooling Services.docx DOCX document
TE A-6.11.1 - Government Furnished Equipment (Supplemtal).pdf PDF
TE A-2.2 Sec 7.3.2 - Estimated Project Work Order (PWO) Workload Data.docx DOCX document
TE G-001 - ANNEX V SWEAP ALL HAZARD OPORD 2020.docx DOCX document
TE H-015 - Fort Gordon Elevator Inventory List.docx DOCX document
TE K-008 - Visible Emission Form (Final).docx DOCX document
TE F-002 - Grounds Sections.doc DOC document
TE J-006 - Bailey Bridge M and PM INS..docx DOCX document
TE F-009 - Flower Beds.doc DOC document
Attachment 5 Sample Partner Consent Letter.docx DOCX document
Attachment 8 Pricing Matrix - Fort Gordon BASOPS.xlsx XLSX spreadsheet
TE J-004 - Vehicle Bridge List.docx DOCX document
TE K-005 - BLDG 25910 Operation CHW and HTW Controls (Final.docx DOCX document
TE K-003 - Buildings Served by CEP 25910 (Final).docx DOCX document
TE A-6.8 - Training and Medical Testing (003).docx DOCX document
TE H-006 - Emergency Generators.docx DOCX document
TE F-010 - Tree Types and Sizes.docx DOCX document
TE F-003 - High Vis.docx DOCX document
Annex C Unaccompanied Housing.docx DOCX document
TE A-6.6 - Fort Gordon Integrated Cultural Resources Plan.pdf PDF
TE A-6.10 - Government Furnished Vehicles.docx DOCX document
TE H-008 - Sample IBOM Checklist.docx DOCX document
TE H-016 - Elevator Inspection Checklist.docx DOCX document
TE J-001 - Recreation and Athletic Fields.docx DOCX document
Annex J Facilities Maintenance Horizontal.docx DOCX document
TE G-004 - Borrow Pit - Surface Mine Template.docx DOCX document
TE K-006 - Buildings Served By 310 (Final).docx DOCX document
TE A-6.2 - Fort Gordon Facility Listing (RPI).xlsx XLSX spreadsheet
TE A-1.03 - Points West RecArea Map.pdf PDF
TE F-005 - Ft. Gordon Cemeteries.doc DOC document
TE A-2.5 Sec 7.3.2 - Estimated U-DO-IT Ttransaction and Workload Data.docx DOCX document
Show 40 more

Latest 50 of 101 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCE SELECTION INFORMATION (SEE FAR 3.104)

APPENDIX D – ENCLOSURE 2

PAST PERFORMANCE EVALUATION QUESTIONNAIRE FORM

Contractor:____________________ Contract No.:____________________________ Subcontract No. (if applicable):_________________________________ POC:________________________ Title:________________________ (Name) (E.G. PCO/ACO/TM) (Agency, Telephone No., & E-mail Address)

The following questions pertain to the Contractor’s record of past (within the past three years) and current performance. The information that you provide will be used in the awarding of a federal contract. Therefore, it is important that our information be as factual and accurate as possible. Please provide examples and/or explanations (use additional pages if necessary). The following adjectival ratings shall be used in your response.

Outstanding: Performance meets contractual requirements and exceeds many requirements that benefit the end user. Work was accomplished with few, if any, minor problems for which corrective actions taken by the Contractor were highly effective.

Good: Performance meets contractual requirements and exceeds some requirements that benefit the end user. Work was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.

Acceptable: Performance meets contractual requirements. Work was accomplished with some minor problems for which corrective actions taken by the Contractor were satisfactory.

Marginal: Performance does not meet some contractual requirements. Serious problems with Contractor performance were experienced for which the Contractor has either not yet identified corrective actions or the corrective actions taken appear only marginally effective.

Unacceptable: Performance does not meet most contractual requirements. Serious problems with Contractor performance were experienced for which the corrective actions were ineffective.

PART I. (To be completed by the Offeror)

A. CONTRACT IDENTIFICATION

Contractor/Company Name/Division:

Address:

Program Identification/Title:

Contract Number:

Contract Type:

Prime Contractor Name (if different from the Contractor name cited above):

Contract Award Date:

Forecasted or Actual Contract Completion Date:

Nature of the Contractual Effort or Items Purchased:

B. IDENTIFICATION OF OFFEROR’S REPRESENTATIVE

Name:

Title:

Date:

Telephone Number:

Address:

E-mail Address:

PART II. EVALUATION (To be completed by Point of Contact – Respondent)

A. Compliance of Products, Services, Documents, and Related Deliverables to Specification Requirements and Standards of Good Workmanship

Outstanding (Explanation must be provided in Comments field below) Good Acceptable Marginal (Explanation must be provided in Comments field below) Unsatisfactory (Explanation must be provided in Comments field below)

Comments:

B. Effectiveness of Project Management (to include use and control of subcontractors).

Acceptable

C. Timeliness of Performance for Services and Product Deliverables.

Acceptable

D. Effectiveness in Forecasting and Controlling Estimated Costs (Use this Question on Cost Reimbursement Type Contracts Only).

Acceptable

E. Commitment to Customer Satisfaction and Business-like Concern for its Customers’ Interest

Acceptable

F. General Comments. Provide any other relevant performance information.

G. Other Information Sources. Please provide the following information:

Are you aware of other relevant past efforts by this company?

If yes, please provide the name and telephone number of a point of contact:

H. Respondent Identification. Please provide the following information:

Organization:

Name:

Title:

Date:

Telephone Number Address:

E-mail Address:

PART III. RETURN INFORMATION

Please return this completed Questionnaire via e-mail to the Contracting Officer identified in the cover letter.

Thank you for your assistance.

Signature Date

Typed or Printed Name

File details come from the government source that posted it. Updated .