TE H-008 - Sample IBOM Checklist.docx

DOCX document 47 KB Posted

Attached to
Fort Gordon BASOPS
Solicitation number
W911S021R0017
Issued by

View the file

Other files

File Type Posted
TE J-009 - Tank Trails and Range Roads Map.pdf PDF
TE H-011 - Communication Towers.docx DOCX document
TE A-2.4 Sec 7.3.2 - Estimated Real Property Maintenance Activity (RPMA) Workload Data.docx DOCX document
TE F-011 - Shrub Types and Sizes.docx DOCX document
TE K-004 - BLDG 25910 CHW and HTW Operations (Final).docx DOCX document
TE A-2.6 Sec 7.3.2 - Estimated Unaccompanied Housing Transaction and Workload Data.docx DOCX document
TE J-008 - Detention Pond Map List.pdf PDF
TE A-6.9 Contractor Personnel Minimum Qualifications 2021-08-22 v2.docx DOCX document
TE K-009 - Central Energy Plans 310 and 25910 Operation Logs.docx DOCX document
TE H-007 - Playground Equipment.docx DOCX document
TE A-1.02 - Installation Map.pdf PDF
TE A-6.7 - Spill Prevention Control and Countermeasure Plan.docx DOCX document
TE J-003 - Fire Breaks and Ranges.docx DOCX document
TE H-002 - Privatized Utilities Provider Demarcation Points.docx DOCX document
Annex H Facilities Maintenance Vertical.docx DOCX document
Attachment 9 Collective Bargaining Agreement CBA 2021 87.pdf PDF
TE F-008 - Line Clearing Specifications.docx DOCX document
TE H-004 - Communication Manholes.docx DOCX document
TE F-006 - Tree Inspection Zone Map.docx DOCX document
Annex K Heating Cooling Services.docx DOCX document
TE A-6.11.1 - Government Furnished Equipment (Supplemtal).pdf PDF
TE A-2.2 Sec 7.3.2 - Estimated Project Work Order (PWO) Workload Data.docx DOCX document
TE G-001 - ANNEX V SWEAP ALL HAZARD OPORD 2020.docx DOCX document
TE H-015 - Fort Gordon Elevator Inventory List.docx DOCX document
TE K-008 - Visible Emission Form (Final).docx DOCX document
TE F-002 - Grounds Sections.doc DOC document
TE J-006 - Bailey Bridge M and PM INS..docx DOCX document
TE F-009 - Flower Beds.doc DOC document
Attachment 5 Sample Partner Consent Letter.docx DOCX document
Attachment 8 Pricing Matrix - Fort Gordon BASOPS.xlsx XLSX spreadsheet
TE J-004 - Vehicle Bridge List.docx DOCX document
TE K-005 - BLDG 25910 Operation CHW and HTW Controls (Final.docx DOCX document
TE K-003 - Buildings Served by CEP 25910 (Final).docx DOCX document
TE A-6.8 - Training and Medical Testing (003).docx DOCX document
TE H-006 - Emergency Generators.docx DOCX document
TE F-010 - Tree Types and Sizes.docx DOCX document
TE F-003 - High Vis.docx DOCX document
Annex C Unaccompanied Housing.docx DOCX document
TE A-6.6 - Fort Gordon Integrated Cultural Resources Plan.pdf PDF
TE A-6.10 - Government Furnished Vehicles.docx DOCX document
TE H-016 - Elevator Inspection Checklist.docx DOCX document
TE J-001 - Recreation and Athletic Fields.docx DOCX document
Annex J Facilities Maintenance Horizontal.docx DOCX document
TE G-004 - Borrow Pit - Surface Mine Template.docx DOCX document
TE K-006 - Buildings Served By 310 (Final).docx DOCX document
TE A-6.2 - Fort Gordon Facility Listing (RPI).xlsx XLSX spreadsheet
TE A-1.03 - Points West RecArea Map.pdf PDF
TE F-005 - Ft. Gordon Cemeteries.doc DOC document
TE A-2.5 Sec 7.3.2 - Estimated U-DO-IT Ttransaction and Workload Data.docx DOCX document
TE A-2.3 Sec 7.3.2 - Estimated Operations Work Order (OWO) Workload Data.docx DOCX document
Show 40 more

Latest 50 of 101 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Inspection Sheet

DESCRIPTION

Bldg.#

Room #

QTY
U/M
U/P
TOTAL
0007
S.O. WORK ROUTINE PLUMBER
HR
$46.32
0007
S.O. WORK ROUTINE GENERL MAINT
HR
$52.62
0007
S.O. WORK ROUTINE ELEC. MAINT
HR
$48.71
0008
S.O. WORK EMERG. PLUMBER
HR
$46.32
0008
S.O. WORK EMERG. GENERL MAINT
HR
$45.51
0008
S.O. WORK EMERG. ELEC. MAINT
HR
$48.71

material cost only unless annotated

0022
PM CARPET (clean)
SF
$0.20
$0.20
0030
PRIMER, 1 COAT, LATEX, LOW VOC
SF
$0.10
$0.10

PRIMER, 1 COAT, LATEX, LOW VOC, MATL & LABOR

SF
$0.38
$0.38
0031
PNT, 2 FINSIH COAT, LATEX, LOW VOC
SF
$0.21
$0.21

PNT, 2 FINSIH COAT, LATEX, LOW VOC, MATL & LABOR

SF
$0.66
$0.66

1 COAT PRIMER, 2 FINISH COATS, LATEX, LOW VOC

SF
$0.31
$0.31

1 COAT PRIMER, 2 FINISH COATS, LATEX, MATL & LABOR

SF
$0.87
$0.87
0036
VINYL COVE BASE - 4", DEMO & INSTALL, MATL & LABOR
LF
$2.83
$2.83

VINYL COVE BASE - 4", INSTALL ONLY, MATL & LABOR

LF
$2.46
$2.46
0037
CARPET, 2' x2', TILE, DEMO & INSTALL, MATL & LABOR
SY
$38.98
$38.98

CARPET, 2' x2', TILE, INSTALL ONLY, MATL & LABOR

SY
$38.61
$38.61
0044
REPAIR GYPSUM BOARD
SF
$4.50
$4.50

REPAIR GYPSUM BOARD, MATL & LABOR

SF
$1.17
$1.17

REPLACE VCT, MATL & LABOR

SF
$3.54
$3.54
0046
INSTALL PASSAGE DOOR BLANK
EA
$68.00
$68.00
0048
BI-PASS CLOSET DOOR BLANK
EA
$45.00
$45.00
0049
BI-PASS CLOSET DOOR COMP
EA
$267.02
$267.02
0052
RECASE DOORWAYS
EA
$95.45
$95.45
0058
METAL TRANSITION STRIP
EA
$12.90
$12.90
0059
EXT. DOOR COMP
EA
$480.00
$480.00
0062
REPLACE BACKSPLASH-KT/BATH
SF
$7.83
$7.83
5000
FAUCET, SINK REPAIR
EA
$30.00
$30.00
5001
FAUCET, SINK
EA
$67.41
$67.41
5002
FAUCET, TUB & SHOWER
EA
$37.06
$37.06
5004
DRAIN, SNAKE TO RISER
EA
$42.78
$42.78
5005
SINK, SGL DRAIN ASSEMBLY
EA
$14.66
$14.66
5007
SINK, P-TRAP, NEW
EA
$8.60
$8.60
5008
SINK, BATHROOM, FAUCET
EA
$89.60
$89.60
5010
SINK, KITCHEN, FAUCET
EA
$88.58
$88.58

SINK, KITCHEN, FAUCET, STEM

EA
$15.00
$15.00

SINK, KITCHEN, FAUCET, AERATOR

EA
$7.00
$7.00

SINK, KITCHEN, FAUCET, SPRAYER

EA
$12.00
$12.00

SINK, KITCHEN, DISPOSAL

EA
$100.00
$100.00

SINK, KITCHEN, DROP IN SINK, STAINLESS

EA
$100.00
$100.00

SINK, KITCHEN, BASKET AND STRAINER

EA
$20.00
$20.00
5011
TUB, DRAIN P-TRAP
EA
$18.50
$18.50
5012
TUB, DRAIN, STOPPER
EA
$8.00
$8.00
5013
TOILET SEAT
EA
$16.80
$16.80

TOILET, WAX RING W/ JOHNNY BOLTS

EA
$8.00
$8.00

TOILET, SLOAN REPAIR KIT

EA
$31.00
$31.00

19750 Barracks Kitchen/Bathroom

Baseboard - 26 LF Ceiling - 101 SQ.FT. Walls = 1010 SQ.FT. VCT = 40 SQ.FT.

19750 Barracks Per Room Avg. Cost Per Room $3,708.00

Baseboard - 55 LF Ceiling - 124 SQ.FT.

Carpet - 124 SQ.FT. = 13.78 SQ.YD Walls = 1240 SQ.FT.

VCT = 16 SQ.FT.

19730 Barracks Avg. Cost Per Room $4,215.00

Cove Base - 150 LF Ceiling - 307 SQ.FT.

Carpet - 211 SQ.FT. = 23.44 SQ.YD Walls = 2010 SQ.FT.

VCT = 66 SQ.FT.

25400-28400 Barracks Avg. Cost Per Room $4,015.00

Cove Base - 112 LF Ceiling - 303 SQ.FT.

Carpet - 237 SQ.FT. = 26.3 SQ.YD

Walls = 1320 SQ.FT.

**Minor repairs will be base off of a minium labor charge of 2 hours plus material cost.**

**Items that are in red are derived from the latest RSMeans publication.**

Fort Gordon BASOPS Technical Exhibit H-008 - IBOM

Bldg.#

Room #

QTY

U/M U/P

TOTAL

TOILET, SUPPLY LINE 7/8" X 3/8" X 12"

EA

$6.00 $ 6.00

TOILET, FLAPPER

$10.00 $ 10.00

TOILET, TANK TO BOIL GASKET KET

$5.00 $ 5.00

TOILET, FLOAT CONTROL

$7.57 $ 7.57

TOILET COMPLETE

$200.00 $ 200.00

TOILET, COMPLETE SLOAN FLUSH VALVE KIT

$150.00 $ 150.00

TOILET, SPUD

$20.00 $ 20.00

TOILET, STOP VALVE, SLOAN

$60.00 $ 60.00

TOILET, FLUSHMATE PRESSURE TANK

$130.00 $ 130.00

DIVERTER VALVE OR SHOWER

$ 60.00

SHOWER SOAP DISH, CERAMIC

$9.68 $ 9.68

MEDICINE CABINET, GLASS

$34.22 $ 34.22

MEDICINE CABINET, WALL

$96.64 $ 96.64

SHOWER CURTAIN ROD

$4.87 $ 4.87

BATH/SHOWER WALL TILES

SF

$5.40 $ 5.40

BATH/SHOWER WALL TILES, GRT

SF

$4.50 $ 4.50

CAULK, REPLACEMENT

LF

$0.25 $ 0.25

TUB ENCLOSURE

$245.00 $ 245.00

KITCHEN COUNTER TOP

$120.00 $ 120.00

KITCHEN COUNTER TOP, END

$22.00 $ 22.00

CABINET, DOOR

$ 60.00

CABINET, DOOR HINGES

$4.30 $ 4.30

CABINET, DOOR LATCH

$2.86 $ 2.86

CABINET DRAWER COMPLETE

$ 60.00

CABINET DRAWER TRACK/GLIDE

$9.63 $ 9.63

R&R EXT. DOOR COMPLETE

$480.00 $ 480.00

DOOR, EXTERIOR, HINGES

$18.00 $ 18.00

DOOR, EXTERIOR, WEATHER STRIP

$18.90 $ 18.90

DOOR, INTERIOR, DOOR KNOB

$35.00 $ 35.00

DOOR, INTERIOR, LEVER HANDLE, KEYED

$130.00 $ 130.00

DOOR, VIEWER, 160 DEGREE

$6.31 $ 6.31

DOOR, EXTERIOR, DOOR KNOB

$87.00 $ 87.00

DOOR, CLOSER, 3 WAY MOUNT, REGULAR ARM

$221.00 $ 221.00

DOOR, HARDWARE, CIPHER LOCK, KABA SIMPLEX

$509.49 $ 509.49

DOOR STOP, WALL MOUNTED

$6.00 $ 6.00

DOOR BELL

$5.47 $ 5.47

LIGHT SWITCH/DUPLEX

$6.20 $ 6.20

FACE PLATE, ELECTRICAL

$3.00 $ 3.00

FACE PLATE, ELECTRICAL (DBL)

$5.00 $ 5.00

FACE PLATE, ELECTRICAL (TRPL)

$7.00 $ 7.00

RECEPTACLE FACE PLATE

$3.00 $ 3.00

RECEPTACLE, GFCI

$18.30 $ 18.30

SMOKE ALARM, 110 VOLT

$8.96 $ 8.96

PHONE JACK

$0.00

LIGHT FIXTURE, INCANDESCENT

$35.00 $ 35.00

LIGHT FIXTURE, FLUORESCENT

$45.00 $ 45.00

LIGHT GLOBE/DIFFUSER

$8.50 $ 8.50

LIGHT BULB

$2.00 $ 2.00

LIGHT TUBE, FLUORESCENT

$4.50 $ 4.50

315-317 Avg. Cost Per Room $2,220.00 (W/O Carpet) $3,400.00 (With Carpet) Baseboard - 80 LF Ceiling - 330 SQ.FT. Walls = 3060 SQ.FT. VCT = 330 SQ.FT.

Bldg.#

Room #

QTY
U/M
U/P
TOTAL
5068
WINDOW, HANDLE
EA
$12.82
$12.82
5069
WINDOW, LATCH OR CRANK
EA
$9.60
$9.60
5070
WINDOW, SASHES
EA
$180.00
$180.00
5071
BLINDS, MINI, 3'
EA
$14.00
$14.00
5072
BLINDS, MINI, 6'
EA
$18.00
$18.00
5073
DRAPE HARDWARE
EA
$38.00
$38.00
5074
SCREEN, WINDOW, DOOR
EA
$14.50
$14.50
5085
VANITY, BATHROOM
EA
$99.00
$99.00
5086
KEY, REPLACEMENT
EA
$7.00
$7.00
5087
KEY, RE-CORE
EA
$40.00
$40.00

MOULDING, CROWN, PINE, 11/16" X 4-1/4", PRIME & 2 FINISH COATS,

MATL & LABOR

LF
$6.05
$677.60

MOULDING, CHAIR RAIL, PINE, 3-1/2" x 5/8", PRIME & 2 FINISH COATS, MATL & LABOR

LF
$5.41
$605.92

MOULDING, QUARTER ROUND, PINE, 3/4" X 3/4", PRIME & 2 FINISH

COATS, MATL & LABOR

LF
$4.48
$4.48

MOULDING, SHOE, PINE, 11/16" X 1-1/2", PRIME & 2 FINISH COATS, MATL

& LABOR

LF
$3.65
$3.65

MOULDING, BASEBOARD, PINE, 1" X 6", PRIME & 2 FINISH COATS, MATL &

LABOR

LF

$3.64
$3.64

File details come from the government source that posted it. Updated .