TE H-002 - Privatized Utilities Provider Demarcation Points.docx

DOCX document 327 KB Posted

Attached to
Fort Gordon BASOPS
Solicitation number
W911S021R0017
Issued by

View the file

Other files

File Type Posted
TE J-009 - Tank Trails and Range Roads Map.pdf PDF
TE H-011 - Communication Towers.docx DOCX document
TE A-2.4 Sec 7.3.2 - Estimated Real Property Maintenance Activity (RPMA) Workload Data.docx DOCX document
TE F-011 - Shrub Types and Sizes.docx DOCX document
TE K-004 - BLDG 25910 CHW and HTW Operations (Final).docx DOCX document
TE A-2.6 Sec 7.3.2 - Estimated Unaccompanied Housing Transaction and Workload Data.docx DOCX document
TE J-008 - Detention Pond Map List.pdf PDF
TE A-6.9 Contractor Personnel Minimum Qualifications 2021-08-22 v2.docx DOCX document
TE K-009 - Central Energy Plans 310 and 25910 Operation Logs.docx DOCX document
TE H-007 - Playground Equipment.docx DOCX document
TE A-1.02 - Installation Map.pdf PDF
TE A-6.7 - Spill Prevention Control and Countermeasure Plan.docx DOCX document
TE J-003 - Fire Breaks and Ranges.docx DOCX document
Annex H Facilities Maintenance Vertical.docx DOCX document
Attachment 9 Collective Bargaining Agreement CBA 2021 87.pdf PDF
TE F-008 - Line Clearing Specifications.docx DOCX document
TE H-004 - Communication Manholes.docx DOCX document
TE F-006 - Tree Inspection Zone Map.docx DOCX document
Annex K Heating Cooling Services.docx DOCX document
TE A-6.11.1 - Government Furnished Equipment (Supplemtal).pdf PDF
TE A-2.2 Sec 7.3.2 - Estimated Project Work Order (PWO) Workload Data.docx DOCX document
TE G-001 - ANNEX V SWEAP ALL HAZARD OPORD 2020.docx DOCX document
TE H-015 - Fort Gordon Elevator Inventory List.docx DOCX document
TE K-008 - Visible Emission Form (Final).docx DOCX document
TE F-002 - Grounds Sections.doc DOC document
TE J-006 - Bailey Bridge M and PM INS..docx DOCX document
TE F-009 - Flower Beds.doc DOC document
Attachment 5 Sample Partner Consent Letter.docx DOCX document
Attachment 8 Pricing Matrix - Fort Gordon BASOPS.xlsx XLSX spreadsheet
TE J-004 - Vehicle Bridge List.docx DOCX document
TE K-005 - BLDG 25910 Operation CHW and HTW Controls (Final.docx DOCX document
TE K-003 - Buildings Served by CEP 25910 (Final).docx DOCX document
TE A-6.8 - Training and Medical Testing (003).docx DOCX document
TE H-006 - Emergency Generators.docx DOCX document
TE F-010 - Tree Types and Sizes.docx DOCX document
TE F-003 - High Vis.docx DOCX document
Annex C Unaccompanied Housing.docx DOCX document
TE A-6.6 - Fort Gordon Integrated Cultural Resources Plan.pdf PDF
TE A-6.10 - Government Furnished Vehicles.docx DOCX document
TE H-008 - Sample IBOM Checklist.docx DOCX document
TE H-016 - Elevator Inspection Checklist.docx DOCX document
TE J-001 - Recreation and Athletic Fields.docx DOCX document
Annex J Facilities Maintenance Horizontal.docx DOCX document
TE G-004 - Borrow Pit - Surface Mine Template.docx DOCX document
TE K-006 - Buildings Served By 310 (Final).docx DOCX document
TE A-6.2 - Fort Gordon Facility Listing (RPI).xlsx XLSX spreadsheet
TE A-1.03 - Points West RecArea Map.pdf PDF
TE F-005 - Ft. Gordon Cemeteries.doc DOC document
TE A-2.5 Sec 7.3.2 - Estimated U-DO-IT Ttransaction and Workload Data.docx DOCX document
TE A-2.3 Sec 7.3.2 - Estimated Operations Work Order (OWO) Workload Data.docx DOCX document
Show 40 more

Latest 50 of 101 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fort Gordon BASOPS Technical Exhibit H-002 - Privatized Utilities Provider Demarcation Points Electrical Lines of Demarcation

Point of Demarcation
Applicable Scenario
Diagram

Point of demarcation is the first point of disconnect at or in the facility.

Pad mounted transformer located outside of structure with underground service to structure and no meter exists.

Down current side of the meter.
Residential service (less than 200 amps and 240V One-Phase) and Three-Phase self-contained meter installations. Electric meter exists within five feet of the exterior of the building on an underground secondary line.
Point of demarcation is the first point of disconnect at or in a facility.
Three-Phase CT metered service.
Secondary terminal of the transformer inside of the structure.
Transformer located inside the structure and an isolation device is in place with or without meter.

Note: Utility owner must be granted 24-hour access to transformer room.

Secondary terminal of the transformer inside of the structure.
Transformer located inside the structure with no isolation device in place.

Note: Utility owner must be granted 24-hour access to transformer room.

Wastewater Lines of Demarcation

Point of Demarcation
Applicable Scenario
Diagram
The point of demarcation is five feet away from the exterior of the structure or to a point beyond the cleanout, whichever is closest to the building.
All scenarios.
The point of demarcation is where the effluent pipe exits the oil/water separator.
All scenarios where an oil/water separator discharges to the waste water system.
Point of Demarcation
Applicable Scenario
Point of Demarcation Description/ Diagram
17th Street Landfill (Main Post) - The point of demarcation is where the leachate line crosses the property boundary of the landfill.
All scenarios.
The point of demarcation is the Prison side of the closest manhole.
All scenarios.

Natural Gas Lines of Demarcation

Point of Demarcation
Applicable Scenario
Diagram

Point of demarcation is the downstream side of the natural gas meter.

Natural Gas service to the building is metered.

The point of demarcation is the downstream side of the pressure regulator.
Natural gas service to the building is regulated but not metered.
The point of demarcation is the downstream side of the closest apparatus to the exterior of the facility.
More than one apparatus is connected to the service line feeding the facility.
The point of demarcation is where the piping penetrates the building envelope.
No meter or regulator exists at the facility.

Water Lines of Demarcation

Point of Demarcation
Applicable Scenario
Diagram

The point of demarcation is on the side of the post indicator valve.

Structures with fire suppression lines supplied by the water distribution system

Unique Points of Demarcation Water Distribution System – Fort Gordon

Point of Demarcation
Applicable Scenario
Diagram

The point of demarcation is the downstream side of the valve pit.

Augusta Richmond County 18” distribution line.

The point of demarcation is the downstream side of the valve pit.

Columbia County Distribution to Fort Gordon Recreation Area (Pointes West Army Resort / Clarke Hill Recreation Area).

The point of demarcation is the downstream side of the meter.

Augusta State Medical Prison (Fort Gordon Gate 3).

The point of demarcation is the downstream side of the valve box.

National Science Center.

AUD’s Purple Pipe Irrigation System – Fort Gordon

*Note: This irrigation system is not BASOPS Contractor responsibility

Replica Pool Solar Water Heating System Line of Demarcation – Fort Gordon

Point of Demarcation
Applicable Scenario
Diagram

The points of demarcation for this system are the valves on the pipes that tap off of the return piping from the filters.

The Replica Pool includes a solar water heating system that will not be part of this contract.

Solar Heater Solar Heater Valve Pool Return Line

Point of Demarcation image5.emf image6.emf image7.emf image8.emf image9.emf image10.emf image11.emf image12.emf image13.emf image14.emf image15.emf image16.emf image17.emf image18.emf image19.JPG image20.png image21.png image22.png image23.png image24.png image25.png image1.emf image2.emf image3.emf image4.emf

File details come from the government source that posted it. Updated .