Attachment 3 - FY25 Concrete Repairs Drawings.pdf

PDF 10 MB Posted

Attached to
FY25 Concrete Project - National Animal Disease Center - Ames, Iowa
Solicitation number
12505B25R0015
Issued by

About this file

The document is a set of 12 technical drawings for Fiscal Year 2025 Concrete Repairs at the USDA National Centers for Animal Health in Ames, Iowa. The drawings detail concrete repair and infrastructure improvements across multiple buildings (Buildings 3, 4, 5, 7, 8, and 21), including sidewalk and driveway reconstructions, curb details, utility references, and site layout diagrams. The drawings include specific measurements, area calculations, and annotations for construction sequencing, such as lay-down areas, storm intake locations, and parking areas.

The technical drawings provide comprehensive visual guidance for contractors, showing precise locations for concrete work, guardrail installations, and infrastructure modifications. Key elements include detailed site maps, basement lighting and power system references, and specific instructions like "Reconstruct this section 1st!" and "Remove this landing and reconstruct with roadway." The drawings also include a note emphasizing that utility reference drawings are for reference only, and contractors must perform their own utility locates prior to ground disruption.

View the file

Other files

File Type Posted
Attachment 23 - RFI Submittal Form - Answers.pdf PDF
Sol_12505B25R0015_Amd_0002.pdf PDF
Attachment 24 - Addendum 02.pdf PDF
Attachment 20 - Statement of Work-Addendum.pdf PDF
Sol_12505B25R0015_Amd_0001.pdf PDF
Attachment 21 - Addendum - Site Map.pdf PDF
Attachment 22 - Addendum - Alt 4-Area 4-Bldg 21 Sidewalk and Dock Approach.pdf PDF
Attachment 5 - Site Map.pdf PDF
Attachment 1 - Statement of Work 050825.docx DOCX document
Attachment 12 - Alt 2-Area 2-Bldg21 Sidewalk.pdf PDF
Attachment 2 - Specifications.pdf PDF
Attachment 11 - Alt 1-Area 1-Bsmt 4 Power.pdf PDF
Attachment 19 - ARS-372.pdf PDF
Attachment 16 - Wage Determination IA20250081 01032025.pdf PDF
Attachment 14 - Details.pdf PDF
Attachment 17 - RFI Submittal Form.xlsx XLSX spreadsheet
Attachment 18 - ARS-371.pdf PDF
Attachment 9 - Alt 1-Area 1-Bsmt3 Power.pdf PDF
Attachment 13 - Alt 3-Area 3-Roadway Repair for Bldg 7 Access.pdf PDF
Attachment 8 - Alt 1-Area 1-Bsmt3 Lighting.pdf PDF
Attachment 10 - Alt 1-Area 1-Bsmt 4 Lighting.pdf PDF
Attachment 7 - Alt 1-Area 1.pdf PDF
Sol_12505B25R0015.pdf PDF
Attachment 4 - Title Page.pdf PDF
Attachment 6 - Base Bid-Area 1.pdf PDF
Attachment 15 - Utilities Reference Record Drawing.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Location Coordinator:Contracting Officer Rep.:Contracting Officer:Engineering Project Manager:

Task

Order #:

Drawing Title:PROJECT TITLE:

FEU Project #:

Drawing Number:

Agricultural Research Service U.S. Department of Agriculture

NCAH

1920 Dayton Avenue Ames, Iowa 50010

Revision:

Client:

Sheet:

Designer:

Date:

Date:

Thomas.Walker Text Box

UNITED STATES DEPARTMENT OF AGRICULTURE

AGRICULTURE RESEARCH SERVICE

NATIONAL CENTERS FOR ANIMAL HEALTH

Thomas.Walker Line

Thomas.Walker Snapshot

Thomas.Walker Text Box

Thomas.Walker Stamp

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Ellipse

Tommy Walker Ellipse

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Text Box N

Tommy Walker Text Box S

Tommy Walker Text Box W

Tommy Walker Text Box E

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Drawing Title:

Drawing Number:

Sheet:

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Ellipse

Tommy Walker Ellipse

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Text Box E

Tommy Walker Text Box W

Tommy Walker Text Box N

Tommy Walker Text Box S

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Thomas.Walker Snapshot

Sheet:

Thomas.Walker Snapshot

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Ellipse

Tommy Walker Ellipse

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Text Box N

Tommy Walker Text Box S

Tommy Walker Text Box W

Tommy Walker Text Box E

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Thomas.Walker Text Box

Thomas.Walker Text Box

Thomas.Walker Text Box Total area of Field Barn 215 is same as 216.

Polygon

Sheet:

Thomas.Walker Snapshot

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Ellipse

Tommy Walker Ellipse

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Text Box N

Tommy Walker Text Box S

Tommy Walker Text Box W

Tommy Walker Text Box E

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Thomas.Walker PolyLine

Thomas.Walker PolyLine

Thomas.Walker Text Box Curb sections

Thomas.Walker Text Box Bldg.

Thomas.Walker Text Box Bldg.

Thomas.Walker Cloud

Thomas.Walker Snapshot

Thomas.Walker Typewritten Text Curb Detail

Thomas.Walker Typewritten Text Exact boundaries determined at site visit.

Sheet:

Thomas.Walker Snapshot

Thomas.Walker Highlight

Thomas.Walker Text Box Remove conduit and fixtures for reconstruction and replace with existing.

Thomas.Walker Text Box

FOR REFERENCE ONLY

Sheet:

Thomas.Walker Snapshot

Thomas.Walker Highlight

Thomas.Walker Text Box Stainless telecoms box stays in place. Adjust saw cuts to avoid.

Thomas.Walker

Sheet:

Thomas.Walker Snapshot

Thomas.Walker Highlight

Thomas.Walker Text Box Remove conduit and fixtures for reconstruction and replace with existing.

Thomas.Walker

Sheet:

Thomas.Walker Snapshot

Thomas.Walker Text Box Stainless telecoms box stays in place. Adjust saw cuts to avoid.

Thomas.Walker Highlight

Thomas.Walker

Sheet:

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Ellipse

Tommy Walker Ellipse

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Text Box N

Tommy Walker Text Box S

Tommy Walker Text Box W

Tommy Walker Text Box E

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Thomas.Walker Image

Thomas.Walker Text Box Bldg. 21

Thomas.Walker Dimension 20'

Thomas.Walker Rectangle

Thomas.Walker

Match existing sidewalk width

Sheet:

Thomas.Walker Snapshot

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Ellipse

Tommy Walker Ellipse

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Line

Tommy Walker Text Box N

Tommy Walker Text Box S

Tommy Walker Text Box W

Tommy Walker Text Box E

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Tommy Walker Polygon

Thomas.Walker Text Box Remove this landing and reconstruct with roadway.

Thomas.Walker Text Box Storm intake

Thomas.Walker Text Box Construct this section 2nd!

Thomas.Walker Polygon

Thomas.Walker Rectangle

Thomas.Walker Length Measurement 18'-10 1/2"

Thomas.Walker Length Measurement 15'-10"

Thomas.Walker Polygon

Thomas.Walker Text Box Parking area.

Thomas.Walker Text Box Lay-down area

Thomas.Walker Rectangle

Thomas.Walker Text Box Reconstruct this section 1st!

Thomas.Walker

See attached Utilities Reference Record Drawing for above and underground obstructions. Drawings are reference only. Contractor to perform locates prior to disrupting any ground.

Sheet:

Thomas.Walker Line

Thomas.Walker Length Measurement 19'-4"

Thomas.Walker Length Measurement 8'-0"

Thomas.Walker Polygon

Thomas.Walker Rectangle

Thomas.Walker Line

Thomas.Walker Line

Thomas.Walker Line

Thomas.Walker Line

Thomas.Walker Line

Thomas.Walker Line

Thomas.Walker Line

Thomas.Walker Line

Thomas.Walker Line

Thomas.Walker Line

Thomas.Walker Rectangle

Thomas.Walker Length Measurement 3'-6 1/2"

Thomas.Walker Length Measurement 0'-10"

Thomas.Walker Rectangle Sketch to Scale

0.54 sf

Thomas.Walker Rectangle Sketch to Scale

0.41 sf

Thomas.Walker Rectangle Sketch to Scale

1.08 sf

Thomas.Walker Rectangle Sketch to Scale

1.08 sf

Thomas.Walker Typewritten Text

CURB DETAIL

Thomas.Walker Snapshot

Thomas.Walker Typewritten Text

GUARDRAIL BASE

W/RECEIVER POST DETAIL

Thomas.Walker Image

Thomas.Walker Image

Thomas.Walker Line

Thomas.Walker Line

Thomas.Walker Line

Thomas.Walker Typewritten Text

GUARDRAIL BASE

W/RECEIVER POST EXAMPLE-1

Thomas.Walker Typewritten Text

GUARDRAIL BASE

W/RECEIVER POST EXAMPLE-2

Sheet:

Thomas.Walker Polygon

Thomas.Walker Polygon

Thomas.Walker Polygon

Thomas.Walker Polygon

Thomas.Walker Polygon

Thomas.Walker Polygon

Thomas.Walker Polygon

Thomas.Walker Polygon

Thomas.Walker Polygon

Thomas.Walker Ellipse

Thomas.Walker Ellipse

Thomas.Walker Line

Thomas.Walker Line

Thomas.Walker Line

Thomas.Walker Line

Thomas.Walker Line

Thomas.Walker Line

Thomas.Walker Line

Thomas.Walker Line

Thomas.Walker Line

Thomas.Walker Line

Thomas.Walker Line

Thomas.Walker Line

Thomas.Walker Line

Thomas.Walker Line

Thomas.Walker Line

Thomas.Walker Line

Thomas.Walker Line

Thomas.Walker Text Box N

Thomas.Walker Text Box S

Thomas.Walker Text Box W

Thomas.Walker Text Box E

Thomas.Walker Polygon

Thomas.Walker Polygon

Thomas.Walker Polygon

Thomas.Walker Polygon

Thomas.Walker Polygon

Thomas.Walker Polygon

Thomas.Walker Polygon

Thomas.Walker Polygon

Thomas.Walker Polygon

Thomas.Walker Polygon

Thomas.Walker Polygon

Thomas.Walker Polygon

Thomas.Walker Polygon

Thomas.Walker Polygon

Thomas.Walker Polygon

Thomas.Walker Snapshot

Thomas.Walker Snapshot

Thomas.Walker Text Box Building

Thomas.Walker Text Box Building

Thomas.Walker Text Box Building

Thomas.Walker PolyLine

Thomas.Walker PolyLine

Thomas.Walker PolyLine

Thomas.Walker PolyLine

Thomas.Walker PolyLine

Thomas.Walker Typewritten Text Driveway edges

Thomas.Walker Rectangle

PolyLine

1 - Title Page
2 - Site Map
3 - Base Bid-Area 1
4 - Alt #1-Area 1
5 - Alt #1-Area 1-Bsmt3 Lighting
6 - Alt #1-Area 1-Bsmt3 Power
7 - Alt #1-Area 1-Bsmt 4 Lighting
8 - Alt #1-Area 1-Bsmt 4 Power
9 - Alt #2-Area 2-Bldg21 Sidewalk
10 - Alt #3-Area 3-Roadway Repair for Bldg 7 Access
11 - Details
12 - Utilities Reference Record Drawing
EPM Dropdown: [Katherine Madson]
CO Dropdown: [TBD]
COR Dropdown: [Tommy Walker]
LC: n/a
PROJECT TITLE:

FY25 Concrete Repairs

Task Order-Contract #:
Task Order-Contract Award Date=:
Drawing Title:: Title Page
Revision Date:: 3/10/2025
File Name=: Tommy Walker
Drawing Number: 1
FEU Project #: 24017
Client=ARU, APHIS, CVB, etc: NCAH - ARU
Sheet # Total: 1 of 12
Project Title: 25011 - FY25 Concrete Repairs
PAGE:
1: 1
2: 2
3: 3
4: 4
5: 5
6: 6
7: 7
8: 8
9: 9
10: 10
11: 11
12: 12
13:
14:
15:
16:
17:
DESCRIPTION:
0: Title Page
1: Site Map
2: Base Bid-Area
3: Alt #1-Area 1
4: Alt #1-Area 1-Basement 3 Lighting (reference only drawing)
5: Alt #1-Area 1-Basement 3 Power (reference only drawing)
6: Alt #1-Area 1-Basement 4 Lighting (reference only drawing)
7: Alt #1-Area 1-Basement 4 Power (reference only drawing)
8: Alt #2-Area 2-Building 21 Sidewalk
9: Alt #3-Area 3-Building 5,7,8 Courtyard Road Enhancement
10: Details
11: Utilities Reference Record Drawings
12:
13:
14:
15:
16:
Revision: [FOR BID]
Drawing Title:: Site Map
Drawing Number: 2
Sheet #: 2 of 12
Drawing Title:: Base Bid-Area 1
Drawing Number: 3
Sheet #: 3 of 12
Drawing Title:: Alt #1Area 1
Drawing Number: 4
Sheet #: 4 of 12
Drawing Title:: Bldg 3 Basement Lighting
Drawing Number: 5
Sheet #: 5 of 12
Drawing Title:: Bldg 3 Basement Power
Drawing Number: 6
Sheet #: 6 of 12
Drawing Title:: Bldg 4 Basement Lighting
Drawing Number: 7
Sheet #: 7 of 12
Drawing Title:: Bldg 4 Basement Power
Drawing Number: 8
Sheet #: 8 of 12
Drawing Title:: Alt #2 Area 2-Building 21 Sidewalk
Drawing Number: 9
Sheet #: 9
Drawing Title:: Alt #3-Area 3
Drawing Number: 10
Sheet #: 10 of 12
Drawing Title:: Details
Drawing Number: 11
Sheet #: 11 of 12
Drawing Title:: Utilities Reference Record Drawing
Drawing Number: 12
Sheet #: 12 of 12

File details come from the government source that posted it. Updated .