Attachment 10 - Alt 1-Area 1-Bsmt 4 Lighting.pdf
PDF 101 KB Posted
- Solicitation number
- 12505B25R0015
About this file
This document is a Building 4 Basement Lighting Phase 1 architectural floor plan for the FY25 Concrete Project at the National Animal Disease Center in Ames, Iowa. The lighting plan schematic shows a detailed basement floor layout with grid-referenced structural lines and a specific annotation in the bottom left indicating "Remove conduit and fixtures for reconstruction and replace with existing." The drawing is marked "FOR REFERENCE ONLY" and is page 7 of a 12-page set, focusing on electrical infrastructure modifications for the basement area.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Drawing Title:
Drawing Number:
Sheet:
Thomas.Walker Snapshot
Thomas.Walker Highlight
Thomas.Walker Text Box Remove conduit and fixtures for reconstruction and replace with existing.
Thomas.Walker Text Box
FOR REFERENCE ONLY
| Drawing Title:: Bldg 4 Basement Lighting |
| Drawing Number: 7 |
| Sheet #: 7 of 12 |
File details come from the government source that posted it. Updated .