This document is a Question and Answer (Q&A) file for the FY25 Concrete Project at the National Animal Disease Center in Ames, Iowa. The Q&A addresses eight specific technical questions about concrete work, including details about concrete dimensions, fence panel lengths, post footings, and stoop installations. Key answers include: USDA will move concrete feed bunks, concrete will be placed up to fence posts, and stoops will be installed to match the height of new concrete drives. The responses provide clarification on installation methods, removal of existing structures, and specific site-specific construction requirements for various project alternatives.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question Answer
1 Base Bid - What are the dimensions of concrete underneath the feed bunks? Refer to Attachment 24 - Addendum 2
ALT-3 - On page 10 of the drawings, there is a callout for removing and replacing the landing/stoop near the building. Is this concrete supposed to match the height of the concrete to the west? Or is it to remain a step down?
There is to be a stoop to match height of new concrete drive.
ALT-1 - What is the maximum length of the removable panels? Do you want multiple fence panels or just one for the long side?
No maximum length was determined. The intent is to have multiple panels for ease of installation and removal.
ALT-2 - There are post footings on the south side of the sidewalk that's to be replaced. Do these need to be removed entirely? Or removed to below the new concrete? Remove the footings with remaining post material and fill with concrete.
Base Bid - Does the new concrete stop inside of the fence posts? Or do they surround the posts? Up to the fence posts. The thickness of dimensional lumber used for forms shall be the space between the concrete and posts.
6 Base Bid - Who is responsible for moving the feed bunks? USDA shall move the concrete feed bunks.
At building 21, adjacent to the sidewalk that is to be removed and replaced, there are footing interfering with the patch of the sidewalk. During the freeze thaw cycle, these footings are responsible for breaking the top of the sidewalk off; does the owner wish to have these footings removed? If so, please outlay the scope of work that is desired.
Remove the footings with remaining post material and fill with concrete.
At Court Buildings 5/7/8; the plan shows concrete being installed adjacent to building pedestrian doors; Is there an existing stoop at these walk-through doors? If not, does the owner desire a stoop to be installed to avoid heaving in the winter? There is to be a stoop to match height of new concrete drive.