Attachment 3- Forest Service Supplemental Specs.pdf
PDF 890 KB Posted
- Attached to
- Herman Gulch Toilet Replacement in the Arapaho & Roosevelt National Forests & Pawnee National Grassland
- Solicitation number
- 1240LT25R0027
About this file
These are the supplemental specifications for the Herman Gulch Trailhead Toilet Installation project in the Arapaho & Roosevelt National Forests. The documents outline comprehensive technical requirements for a toilet replacement project, covering multiple technical sections including general requirements, government-furnished materials, structure demolition, prefabricated building modules, clearing and grubbing, earthwork, temporary erosion control, barrier boulders, aggregate, and revegetation.
The project involves removing an existing damaged vault toilet, utilizing the existing excavation, and installing a new double vault toilet structure manufactured by CXT Incorporated. Specific requirements include precise site preparation, excavation, bedding, backfilling, grading, and revegetation of disturbed areas. The specifications detail technical standards for materials, installation methods, compaction, erosion control, and site restoration, with an emphasis on maintaining environmental integrity and following Forest Service guidelines. The work will be performed at the Herman Gulch Trailhead, located approximately 55 miles west of Denver, Colorado, at an elevation of around 10,400 feet.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GAOA HERMAN GULCH TRAILHEAD TOILET INSTALLATION
ARAPAHO & ROOSEVELT NATIONAL FORESTS
Summary of Specifications
1. Section 010150 – General Requirements
2. Section 016440 – Government Furnished Materials
3. Section 024116 – Structure Demolition
4. Section 133128 – Prefabricated Building Modules
5. Section 311100 – Clearing and Grubbing
6. Section 312250 – Earthwork
7. Section 312500 – Temporary Erosion Control
8. Section 312523 – Barrier Boulders
9. Section 321123 – Aggregate
10. Section 329219 – Revegetation
GAOA HERMAN GULCH TOILET REPLACEMENT &
INSTALL -ARAPAHO & ROOSEVELT NATIONAL FORESTS
010150 – 1
GENERAL REQUIREMENTS
SECTION 010150
PART 1 – SUMMARY OF WORK
1.1 DESCRIPTION
A. The intent of this section is to provide a general outline of the work required under this contract and identify special project conditions and/or requirements. It is not intended to provide detailed specifications for materials, labor, and workmanship. These are covered in other sections of these specifications.
I. The Herman Gulch trailhead is a popular gateway for hikers, fishers, backpackers, and back country skiers. Located just east of Loveland pass (HWY 6), the trailhead is a minute off i- 70, providing easy access to trail systems on the Clear Creek Ranger District (CCRD) of the Arapaho & Roosevelt National Forests and Pawnee National Grassland. Herman Gulch sees very heavy recreation use for both the winter and summer months, and it is not uncommon for the parking lot to fill up year-round. The vault toilets at the trailhead were hit and damaged by a snowplow. The building posed a safety hazard and was removed.
Currently, there are two portable toilets to accommodate the large volume of trailhead users. The old vaults and lids need to be properly disposed so the existing excavation can be used, and a new vault toilet can be installed.
1.1 LOCATION
A. The Herman Gulch Trailhead is located approximately 55 miles west of Denver, Colorado.
1.2 SPECIFICATIONS
A. The specifications establish the construction procedures and materials to be employed throughout.
1.3 GENERAL SITE CONDITIONS AND WEATHER
A. The elevation of the area is approximately 10,400 feet above mean sea level. The area generally experiences heavy snowfalls beginning in October and November and ending in April or May. The average annual temperatures are 70° F in July and 33° F in January.
The area is generally accessible year-round given its close proximity to I-70.
1.4 SITE ACCESS
A. Directions to Herman Gulch Trailhead from Denver: Take I-70 west towards Grand Junction and exit for Loveland Pass (HWY 6) and Loveland ski area. Turn right and pull into the Herman Gulch parking lot.
010150 – 2
1.5 USE OF FACILITIES AND UTILITIES
A. Water is not available on site.
B. Cell phone coverage is generally available at the site.
C. Vault toilets will not be available for contractor use in the area during the project.
D. Electrical service is not available in these areas.
E. Camping will not be allowed on-site.
1.7
STAGING AREA
A. An area at or near the project sites will be made available for use as a staging area. Staging areas shall be approved by the Contracting Officer (CO) prior to use. No camping will be allowed at the site. Security and clean-up of this area shall be the responsibility of the Contractor.
1.8 WORK RESTRICTIONS
A. Site Closure to Public: To ensure public safety, the Forest Service will coordinate a seven
(7) – 14 day closure for the Herman Gulch Trailhead parking lot during construction. An accurate contractor schedule for all work items is critical for coordinating this closure.
B. Nonsmoking Buildings: Smoking is not permitted within any buildings or within 25 feet (8 m) of entrances.
C. Smoking is not permitted outside vehicles.
1.9 SCHEDULE
A. The Contractor shall submit, at the pre-work conference, a construction schedule showing the proposed scheduling of all project’s work items.
B. Work will not be allowed during the weekends or on holidays.
1.10 PROTECTION OF PUBLIC
A. Install and maintain suitable barriers to ensure the protection of the public, employees, and facilities.
1. Fence, barricade, or otherwise block off the immediate work area to prevent unauthorized entry to the work area.
2. Erect and maintain barricades and warning signs in accordance with ANSID6.1.
3. Material may be new or used but shall be suitable for intended purpose.
4. Fences and barriers shall be structurally adequate and neat in appearance.
010150 – 3
1.11 CONTRACTOR’S RESPONSIBILITIES
A. Confine storage of materials to areas as approved by the CO.
B. Provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Minimize disturbance of all undisturbed areas.
C. All construction signage shall be in accordance with MUTCD.
D. The contractor is responsible for coordinating with the double vault toilet manufacturer, Colorado
Department of Transportation (CDOT), and the United States Forest Service (USFS) to ensure the ability to safely transport the double vault toilet to the project site, including any overload permits and any other related coordination.
E. The Contractor at the Contractor’s expense shall repair Existing Forest Service roads and parking areas disturbed by construction activities. Repair includes any work needed to return the roads and parking areas to their existing condition before construction began and shall include replacing road aggregate if necessary.
F. All areas where the existing grass vegetation is removed or damaged, or destroyed due to construction activities, shall be recontoured and seeded. Contractor shall apply all seed in accordance with specifications. Government shall furnish all seed.
G. The Contractor shall be responsible for all damage that results from the Contractor's action during completion of the project work. Any damage that occurs due to action of the Contractor shall be repaired at the Contractor's expense.
H. Protect trees and vegetation within project area from damage. Areas within the drip-zone or root zone, shall not be disturbed unless authorized by the CO.
1.12 UTILITY LOCATIONS
A. No utilities are known to exist at the site however, the Contractor shall be responsible for hiring a locating service to locate all utility lines including but not limited to electrical, water, and phone. This includes the Forest Service utilities and lines.
1.13 CONSTRUCTION WASTE DISPOSAL FACILITIES
A. Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste. All waste that can be considered a bear or wildlife attractant shall be stored or disposed of in commercially labeled bear-proof containers.
1.14 SITE CLEANUP AND DISPOSAL AREA
A. The Contractor shall cleanup construction debris at the completion of each day’s work.
Disposal of construction debris shall be at an established Sanitary Landfill, with all permits and related costs of disposal being the responsibility of the Contractor. The Contractor and
010150 – 4 the CO shall mutually agree to the frequency of disposal. The Contractor shall not use existing on-site trash receptacles for disposal or interim storage of construction debris.
INSTALL
010150 – 5
INSTALL-ARAPAHO & ROOSEVELT NATIONAL FORESTS
Burning of construction debris shall not be allowed on lands administered by the Forest Service.
1.15 FIELD VERIFICATION
A. Contractor shall field verify all new and existing dimensions affecting the work of this contract before ordering products.
1.16 PERMITS
A. Obtain permits required by County, State, or Federal laws or regulations. This will include but not limited to Road and Bridge permits for hauling the toilet structures to the sites.
PART 2 – DEFINITION OF ITEMS AND PAYMENT
2.1 DESCRIPTION
A. This section explains what is and what is not included in each pay item; the limits or cut-off points where one item ends, and another begins; and basis of payment for work items listed in the Schedule of Items (SOI).
B. Payment: For each individual item listed here and in the Schedule of Items, payment shall be full compensation for all work related to the particular item in accordance with these specifications, and as shown on the drawings.
2.2 SCHEDULE OF ITEMS
A. Schedule of Items: The project Schedule of Items includes several sections to organize the work into Base Items and Optional Items.
1. Provide pricing for all items listed in the Schedule of Items.
2. Contract award will be made for all Base Items.
3. Optional Items will be awarded based on available project funding, if applicable.
B. Determination of Quantities:
1. The contractor shall perform, or cause to be performed, all measurement of quantities of materials incorporated into the work processes that are to be measured under the provisions of the contract.
2. Quantity Measurements:
a. The Contractor shall make all measurements for computation of quantities for all work items except those specified for payment by Actual Quantify (AQ), Designed Quantity (DQ), Each (EA), or Lump Sum Quantity (LSQ).
b. The contractor shall compute the quantities for periodic progress payments;
the Contracting Officer shall compute the quantities for the final payment based on measurements taken by the Contractor.
c. All Contractor measurements are subject to verification.
010150 – 6
d. The Contractor shall submit all field notes, calculation sheets, and other data used to determine quantities.
e. The Contractor shall certify in writing as to the accuracy of the measurements and computations submitted.
C. Units of Measurement:
1. Payment shall be by units defined and determined according to U.S. Standard measure and by the following:
a. Actual Quantities (AQ): Estimated quantities which are determined from actual measurements of completed work.
b. Linear Feet (LF): Linear feet measured horizontally.
c. Lump Sum Quantities (LSQ): These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.
d. Each (EA): One complete unit, which may consist of one or more parts.
D. Base Items (BI):
1. Base Item No. 1 – Mobilization
a. This base item consists of all preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site (this includes bonding). This base item applies to work included in the base items only.
b. Payment shall be made at the contract lump-sum price.
2. Base Item No 2. – Old Vault and Lid Demolition
a. This base item consists of demolition work associated with removing and disposing of the old vault toilet components as described in the specifications. Disposal to an approved landfill is included in this pay item. If there are any liquids or solids in the vault, it is the contractor’s responsibility to remove and haul those materials off-site before demolition as part of this pay item.
b. Payment shall be made at the contract lump-sum price upon completion of all parts of this line item. All work, labor and materials necessary for vault and lid demolition, and hauling off-site, is incidental to this line item.
3. Base Item No 3 – Double Vault Toilet Procurement and Installation
a. This base item consists of all materials, personnel, equipment, and supplies to procure and install precast concrete toilet including site preparation, excavation, bedding, backfill, final site grading, any necessary clearing & grubbing, and revegetation of disturbed areas, as shown on the drawings.
b. This base item consists of all materials, personnel, equipment, and supplies to construct all toilet access trails as shown on the drawings. This includes site preparation, excavation, aggregate placement, final site grading, and revegetation of disturbed areas, as shown on the drawings.
010150 – 7
c. Payment shall be made at the contract lump-sum price upon completion of all parts of this line item. All work, labor and materials necessary for site preparation and installation of double vault toilet, in compliance with manufacturer’s specifications and drawings, is incidental to this line item.
4. Base Item No. 4 – Protection Bollard Installation
a. This base item includes furnishing and installing protection bollards in locations dictated by the Contracting Officer as shown in the manufacturer’s specifications. Each bollard is to be filled with concrete to the top, and capped.
b. The following item shall be furnished and installed by the contractor: Pour-In- Place Safety Bollard – 5.5 X 48” – ULINE – H-9089, or approved equal.
c. This base item consists of all materials, personnel, equipment, and supplies to construct all toilet access trails as shown on the drawings. Grading of all disturbed areas associated with this work is included in this base item.
d. Payment shall be made for each bollard provided and installed, in accordance with specifications and drawings. All work, labor and materials necessary for bollard preparation and installation in compliance with specifications, including but not limited to concrete work, is incidental to this line item.
PART 3 – ACCIDENT PREVENTION
3.1 DESCRIPTION
A. This section consists of establishing an effective accident prevention plan and providing a safe environment for personnel and visitors.
3.2 SUBMITTALS
A. Accident Prevention Plan: Before on-site work begins, submit a company approved accident prevention plan. This plan will be posted in the contract file. Design the plan to address Federal, State, and Local Occupational Safety and Health requirements that apply to this project. No progress payments will be processed until the plan is received. At a minimum the plan shall include:
1. Name, position title and contact information of company executive responsible for approving the Accident Prevention Plan.
2. Name and contact information of supervisor responsible to carry out the plan.
3. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to ensure property protection and safety of the public, government personnel, and the Contractor's employees. Identify the work included under each phase by reference to specification section or division numbers.
4. Contingency plans for emergency situations such as medical, fire, hazard material spills and other contract assessed hazard prevention and abatement requirement needs that apply to this project.
B. Traffic Control Plan: Before on-site work begins, submit a traffic control plan to the Contracting Officer and Contracting Officer’s Representative. Once approved, this plan will be posted in the contract file. Design the plan to address traffic control of the entire site during construction. The plan must accommodate the site access as it will remain
010150 – 8 open to the public during the duration of construction.
C. Certificates: Provide certificates from a mechanic that all mechanical equipment has been inspected and meets OSHA requirements.
D. Submit a copy of test reports, as required by OSHA, for personnel working with hazardous materials.
E. Submit a brief report of safety meetings and of inspections.
F. Upon request, submit proof of employees’ qualifications to performed assigned duties in a safe manner.
3.3 QUALITY ASSURANCE
A. Clauses entitled "Accident Prevention" and "Permits and Responsibilities" of the General Provisions: In case of conflicts between Federal, state, and local safety and health requirements, the most stringent shall apply. Equipment or tools not meeting OSHA requirements will not be allowed on the project sites. Failure to comply with the requirements of this section and related sections may result in suspension of work.
B. Qualifications of Employees: Ensure employees are physically qualified to perform assigned duties in a safe manner.
3.4 ACCIDENT REPORTING
A. Reportable Accidents: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, property damage by accident in excess of $100, and fires. Within 7 calendar days of a reportable accident, fill out and forward to the CO a CA-1 form, which may be obtained from CO.
B. All Other Accidents: Report all other accidents to the CO as soon as possible and assist the
CO and other officials as required in the investigation of the accident.
3.5 FIRST AID FACILITIES
A. Provide adequate facilities for the number of employees and the type of construction at the site.
3.6 PERSONNEL PROTECTIVE EQUIPMENT
A. Meet requirements of NIOSH and MSHA, where applicable, as well as ANSI.
B. Inspect personal protective equipment daily and maintain in a serviceable condition. Clean, sanitize, and repair, as appropriate, personal items before issuing them to another individual.
C. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.
010150 – 9
3.7 EMERGENCY INSTRUCTIONS
A. Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
3.8 SAFETY MEETINGS
A. As a minimum, conduct weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite.
3.9 HARD HATS AND PROTECTIVE EQUIPMENT AREAS
A. The CO will designate a hard hat area. Post the hard hat area in a manner satisfactory to the CO.
B. It is the Contractor's responsibility to require all those working on or visiting the site to wear hard hats and other necessary protective equipment at all times. As a minimum, provide two hard hats for use by visitors. Change liners before reissuing hats.
3.10 TRAINING
A. First Aid: Provide adequate training to ensure prompt and efficient first aid.
B. Hazardous Material: Train and instruct each employee exposed to hazardous material in safe and approved methods of handling and storage. Hazardous materials are defined as explosive, flammable, poisonous, corrosive, oxidizing, irritating, or otherwise harmful substances that could cause death or injury.
PART 4 – SUBMITTAL PROCEDURES
4.1 DESCRIPTION
A. This section includes administrative and procedural requirements for submittals.
B. Submittals may be rejected for not complying with requirements.
4.2 DEFINITIONS
A. Action Submittals: Written and graphic information that requires Contracting Officer’s (CO's) responsive action.
B. Informational Submittals: Written information that does not require CO's approval.
010150 – 10
4.3 PROCEDURES
A. Submittal Register: Contractor shall provide submittal register which identifies all required submittals listed in specifications for review by CO prior to submission of any other submittals.
B. Processing Time: Allow enough time for submittal review, including time for resubmittals, as follows. Time for review shall commence on CO's receipt of submittal.
1. Initial Review: Allow 10 working days for initial review of each submittal.
a. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.
2. If intermediate submittal is necessary, process it in same manner as initial submittal.
3. Allow 10 working days for processing each re-submittal.
4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.
C. Identification: Place a permanent label or title block on each submittal for identification.
1. Indicate name of firm or entity that prepared each submittal on label or title block.
2. Provide a space approximately 2 by 3 inches on label or beside title block to record
Contractor's review and approval markings and action taken by CO.
3. Include the following information on label for processing and recording action taken:
a. Project name.
b. Date.
c. Name and address of Contractor.
d. Name of manufacturer.
e. Unique identifier, including revision number.
f. Number and title of appropriate Specification Section.
g. Drawing number and detail references, as appropriate.
D. Other necessary identification. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.
E. Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.
F. Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.
G. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.
010150 – 11
H. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.
I. CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.
J. Submittals not required by the Contract Documents will not be reviewed and may be discarded.
4.4 ACTION SUBMITTALS
A. General: Prepare and submit Action Submittals required by individual Specification
Sections.
1. Number of Copies: Submit four copies of each submittal, unless otherwise indicated.
CO will return two copies. Mark up and retain one returned copy as a Project Record Document.
B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.
2. Mark each copy of each submittal to show which products and options are applicable.
3. Include the following information, as applicable:
a. Manufacturer's written recommendations.
b. Manufacturer's product specifications.
c. Manufacturer's installation instructions.
d. Manufacturer's catalog cuts.
e. Wiring diagrams showing factory-installed wiring.
f. Compliance with recognized trade association standards.
g. Compliance with recognized testing agency standards.
4.5 INFORMATIONAL SUBMITTALS
A. General: Prepare and submit Informational Submittals required by other Specification
Sections.
010150 – 12
1. Number of Copies: Submit two copies of each submittal, unless otherwise indicated.
CO will not return copies.
2. Certificates and Certifications: Provide a notarized statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.
B. Contractor's Construction Schedule: Provide a construction schedule that incorporates the full contract period.
C. Cost Breakdown: Following award provide a cost breakdown schedule listing main types of work with associated costs for each bid item in CSI format.
PART 5 – EXECUTION REQUIREMENTS
5.1 DESCRIPTION
A. This section consists of general procedural requirements governing execution of the Work including, but not limited to, the following:
1. General installation of products.
2. Progress cleaning.
3. Protection of installed construction.
4. Correction of the Work.
5.2 PREPARATION
A. Field Measurements: Take field measurements as required to fit the Work properly.
B. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to CO.
Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents.
5.3 INSTALLATION
A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated. Make vertical work plumb and make horizontal work level.
B. Comply with manufacturer's written instructions and recommendations for installing products.
C. Hazardous Materials: Use products, cleaners, and installation materials that are not considered hazardous.
010150 – 13
5.4 PROGRESS CLEANING
A. General: Clean Project site and work areas daily, including common areas. Dispose of materials lawfully.
1. Comply with requirements in NFPA 241 for removal of combustible waste materials and debris.
2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F (27 deg C).
3. Containerize hazardous and unsanitary waste materials separately from other waste.
Mark containers appropriately and dispose of legally, according to regulations.
B. Site: Maintain Project site free of waste materials and debris.
C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work.
D. Waste Disposal: Burying or burning waste materials on-site will not be permitted. Washing waste materials down sewers or into waterways will not be permitted.
5.5 PROTECTION OF INSTALLED CONSTRUCTION
A. Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration at time of Substantial Completion.
5.6 CORRECTION OF THE WORK
A. Repair or remove and replace defective construction. Restore damaged substrates and finishes.
1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.
PART 6 – CLOSEOUT PROCEDURES
6.1 DESCRIPTION
A. This section consists of administrative and procedural requirements for contract closeout, including, but not limited to, the following:
1. Inspection procedures.
2. Project Record Documents.
3. Final cleaning.
010150 – 14
6.2 SUBSTANTIAL COMPLETION
A. Definition of Substantial Completion: The Date certified by the Contracting Officer when construction is sufficiently complete, in accordance with the Contract Documents, so the Government can occupy or utilize the Work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents.
B. Preliminary Procedures: Before requesting inspection for determining date of Substantial
Completion, complete the following. List items below that are incomplete in request.
1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.
2. Advise Contracting Officer (CO) of pending insurance changeover requirements.
3. Submit specific warranties, workmanship bonds, final certifications, and similar documents.
4. Obtain and submit releases permitting Government unrestricted use of the Work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases.
5. Prepare and submit Project Record Documents, operation and maintenance manuals, Final Completion construction photographs, and similar final record information.
6. Deliver tools, spare parts, extra materials, and similar items to location designated by Government. Label with manufacturer's name and model number where applicable.
7. Complete startup testing of systems.
8. Submit changeover information related to Government occupancy, use, operation, and maintenance.
9. Complete final cleaning requirements, including touchup painting.
C. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects. Inspection: Submit a written request for inspection for Substantial Completion at least 24 hours before inspection is needed. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by CO, that must be completed or corrected before certificate will be issued.
1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
2. Results of completed inspection will form the basis of requirements for Final
Completion.
010150 – 15
6.3 FINAL COMPLETION
A. Preliminary Procedures: Before requesting final inspection for determining date of Final
Completion, complete the following:
1. Submit certified copy of CO’s Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by CO. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.
2. Submit evidence of final, continuing insurance coverage complying with insurance requirements.
3. Instruct Government personnel in operation, adjustment, and maintenance of products, equipment, and systems.
B. Inspection: Submit a written request for final inspection for acceptance at least 24 hours before inspection is needed. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.
1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
6.4 LIST OF INCOMPLETE ITEMS (PUNCH LIST)
A. Preparation: Submit three copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.
6.5 PROJECT RECORD DOCUMENTS
A. General: Do not use Project Record Documents for construction purposes. Protect Project
Record Documents from deterioration and loss. Provide access to Project Record Documents for CO's reference during normal working hours.
B. Record Drawings: Maintain and submit one set of blue- or black-line white prints of Contract Drawings and Shop Drawings.
016440 –1
GOVERNMENT FUNISHED MATERIALS
1. Mark Record Prints to show the actual installation where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to prepare the marked-up Record Prints.
a. Give particular attention to information on concealed elements that cannot be readily identified and recorded later.
b. Record data as soon as possible after obtaining it. Record and check the markup before enclosing concealed installations.
2. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at the same location.
3. Note Construction Change Directive numbers, Change Order numbers, alternate numbers, and similar identification where applicable.
4. Identify and date each Record Drawing; include the designation "PROJECT RECORD DRAWING" in a prominent location. Organize into manageable sets; bind each set with durable paper cover sheets. Include identification on cover sheets.
6.6 FINAL CLEANING
A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.
B. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.
C. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:
1. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.
2. Remove tools, construction equipment, machinery, and surplus material from Project site.
3. Touch up and otherwise repair and restore marred, exposed finishes and surfaces.
Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.
D. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on Government property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from Project site and dispose of lawfully.
END OF SECTION 010150
016440 –1
GOVERNMENT FUNISHED MATERIALS
SECTION 016440 GOVERNMENT
FURNISHED MATERIALS
PART 1 - GENERAL
1.1 SUMMARY
A. This Section applies to materials that shall be provided by the Government and installed by the Contractor. Contractor shall be responsible for labor, equipment, and incidentals necessary to acquire these materials and for placement in accordance with the plans and specifications.
1.2 INSPECTION
A. The Contractor shall notify the Contracting Officer at least 15 calendar days prior to picking up or returning Government furnished materials.
B. The Contractor and the Contracting Officer shall jointly inspect all materials during the loading operation at the storage area, and at the project site.
1.3 LIABILITY
A. The Contractor's liability for Government-furnished material shall start at the time he accepts the materials at the storage area and shall terminate upon completion and final acceptance of the work.
1. It shall be implied that the Contractor has accepted Government-furnished materials prior to the materials being loaded and ready for transportation from the storage area to the worksite.
2. The Contractor shall provide all labor, equipment, and incidentals necessary to load, unload, and transport Government furnished materials between the worksite and the specified storage area.
1.4 REPLACEMENT AND/OR SUPPLEMENTAL MATERIALS
A. Any defective materials discovered prior to the Contractor's acceptance of the materials will be replaced by the Government.
B. If the quantity of Government furnished material accepted by the Contractor is insufficient to complete the specified work, supplemental materials complying with these specifications shall be provided by the Government at no expense to the Contractor.
C. The Government shall not replace any materials that, in the opinion of the Contracting
Officer, are damaged or lost due to the Contractor's negligence after the Contractor accepts the materials. Such materials shall be replaced at the Contractor's expense.
GAOA HERMAN GULCH TOILET REPLACEMENT & INSTALL 016440 – 1
GOVERNMENT FURNISHED
MATERIALS
1.5 SURPLUS MATERIAL
A. After completion and final acceptance of the work, surplus Government furnished materials shall be returned to the specified storage area in the same mechanical and physical condition as originally accepted.
B. Damaged surplus materials shall be replaced at the Contractor's expense.
C. The Contractor's liability for surplus materials shall terminate upon unloading at the storage area.
PART 2 – PRODUCTS
2.1 GOVERNMENT FURNISHED MATERIALS
A. Government furnished materials shall be limited to:
1. Forest Service locks, lock cores, and keys for toilets.
2. Seed for revegetation.
2.2 GOVERNMENT FURNISHED MATERIAL LOCATION
A. Government furnished materials may be available at the Idaho Springs Work Center located at 111 East Idaho Springs Rd, Idaho Springs, Colorado 80452 or as otherwise specified by the Contracting Officer.
PART 3 - EXECUTION
3.1 GENERAL
A. Installation and testing of Government furnished materials shall comply with the applicable contract specifications covering work requiring the use of such materials.
END OF SECTION
GAOA HERMAN GULCH TOILET REPLACEMENT & INSTALL 016440 – 2
GOVERNMENT FURNISHED
MATERIALS
ANRA D.M. – PHASE # 1 TOILET REPLACEMENT & INSTALL 024116-1
STRUCTURE DEMOLITION
SECTION 024116
A. This item shall consist of removal and disposal of all materials and remaining components of existing vault toilet structure at Herman Gulch Trailhead in accordance with the specifications. The single existing vault consists of a 10’x16’ slab, with an unknown vault depth.
PART 2 – PRODUCTS (NOT APPLICABLE, NO BACKFILLING)
PART 3 – EXECUTION
3.1 REMOVAL
A. The Contractor shall contact the Contracting Officer to receive approval before any demolition begins. It must be verified the vaults were entirely pumped out before removal and disposal begins.
A. The Contractor may use any means (except blasting) to remove the structure, as long as he provides for the safety of the public and preservation of existing vegetation.
B. All above grade concrete shall be broken into sufficiently small pieces to enable handling and disposal off site.
3.2 DISPOSAL
A. Unless specifically directed in writing, no attempt will be made to salvage for reuse any of the materials comprising the existing structure.
B. All wooden, concrete, and metal materials shall be removed from the site and disposed of off National Forest lands at an approved landfill.
C. The vault toilet waste was pumped out, but this should be verified. If existing water or human waste remains, it shall be pumped by a commercial hauler with equipment for pumping and hauling human waste. Hauler shall have the necessary equipment to add water to the tank and break up solids in order to pump waste. Add water, and ‘rinse’ the tank. This water shall be pumped out also.
ANRA D.M. – PHASE # 1 TOILET REPLACEMENT & INSTALL 024116-2
D. If pumping is required, disposal of vault waste shall be at any state approved sewage treatment facility. The Contractor shall be responsible to obtain permission to dump the waste in the treatment facilities and pay any fees required.
E. The existing vault location will be reused for the new toilet installation. All vault components and materials must be removed and disposed of in the appropriate landfill off National Forest.
F. The remaining depression after the existing vault components have been removed will remain without backfill. It must be fenced off and protected in a way that prohibits public access and any other hazards.
3.3 FINISHING AND CLEANUP
A. After the existing vault components have been removed, the area should be cleaned up by removing all debris and materials left from the removal of the toilet structures.
GAOA HERMAN GULCH TOILET REPLACEMENT & INSTALL 024119 – 3
SELECTIVE DEMOLITION
GAOA HERMAN GULCH TOILET REPLACEMENT & INSTALL
133128 – 1
PREFABRICATED
BUILDING MODULES
SECTION 133128
PREFABRICATED BUILDING MODULES
A. This section includes the installation of pre-engineered concrete vault toilet structures.
The work includes moving, excavation, placement of aggregate base, backfill, and final site grading.
1.2 LOCATIONS
A. Install the toilet structures at the locations and orientation shown on the drawings and as approved by the Contracting Officer (CO).
1.3 CODE AND COMPLIANCE STANDARDS
A. All work and materials shall comply with the latest industry building codes and regulations, including but not limited to the following:
1. Uniform Building Code
2. National Electrical Code
3. Uniform Plumbing Code
1.4 DELIVERY AND STORAGE
A. Pre-engineered units, accessories and other manufactured items shall be delivered to the site. Materials shall be handled, transported, and erected to prevent damage and/or deformation of materials.
B. Contractor supplied material stored at the project site shall be protected from weather.
C. Delivery to the site shall be made on normal highway trucks and trailers. Ensure that delivery conditions and access at the site is not hazardous or unsuitable for truck and equipment due to weather, physical constraints, roadway width or grade to provide a safe and quality installation.
1.5 BUILDING DESCRIPTIONS
A. All building orders shall be approved by CO, prior to submitting to prefabricated building manufacturer.
B. Base Item #3 – Pre-cast Concrete Toilet Installation shall be:
1. Double Unit Vault Toilet: Double Rocky Mountain with Chase as produced by CXT Incorporated, Precast Concrete Products, Spokane, WA (800) 696-5766, or approved equal.
133128 – 2
a. Roof Style = Cedar Shake
b. Roof Color = Malibu Taupe
c. Top Section of Building Exterior = Horizontal Lap
d. Exterior Wall Color = Rich Earth
e. Bottom Section of Building Exterior = Napa Valley
f. Rock Color Selection = Romana
g. Signage = Unisex and Accessible symbols
h. Wall Vent Location = Rear
i. Paper Holders = 4-Roll Stainless Steel (Custom option)
j. Deadbolt Lock = Government Furnished Material – Forest Service Yale cylinders
k. Door Opener = Privacy Latch ADA Handle
l. Owl Guard = Yes, one on each vent stack (qty. 2 total)
PART 2 – PRODUCTS
2.1 EXCAVATION, BEDDING MATERIALS AND BACKFILL
A. See toilet structure manufacturers specifications and installation requirements.
B. See Section 312250 and 312317 for excavation, bedding and backfill materials.
3.1 GENERAL
A. Obtain manufacturer’s supplied materials necessary to complete construction of the prefabricated toilet structure as listed in the manufacturer’s supplied installation manuals and specifications.
B. Excavate existing hole for building to accommodate the fill for the base large enough to be workable and allow the floor of the building to fit on the fill for the base when placed.
C. Compact the bottom of the area for the building after it has been excavated to a minimum bearing pressure of 1,500 psf.
D. Construct building aggregate base in accordance with manufacturer’s recommendations.
E. Complete adjacent site work as detailed on the drawings. Grade site to obtain positive drainage away from structure.
F. Thoroughly clean all surfaces, interior and exterior, making facilities ready for use.
G. Make sure all locks on the building work.
133128 – 3
GAOA HERMAN GULCH TOILET REPLACEMENT & INSTALL 311100 – 1
CLEARING AND GRUBBING
SECTION 311100
A. This work consists of clearing, grubbing, trimming, removing, and disposing of, or treatment of, live and dead timber, construction slash, and debris within the areas shown on the drawings or designated on the ground. Areas may include but are not limited to recreation sites, roads, trails, parking areas, and other areas to be graded.
This work shall include the removal and disposal of designated trees outside the clearing limits. Also included is the protection from injury or defacement of vegetation and other objects designated to remain and treatment or removal of damaged trees.
PART 2 – PRODUCTS (NOT APPLICABLE)
3.1 CLEARING
A. Clearing Limits:
1. Paths, Roads, Recreation Sites, and Parking Areas: as shown on the drawings.
2. Areas to be graded: 2 feet past the intersection of the existing ground with the cut slope and to the toe of fill as applicable.
B. Remove all trees, down timber, snags, underbrush, rubbish, and other objectionable materials within the clearing limits.
C. Existing trees, within the clearing limits, shall be left standing and uninjured unless otherwise approved by Contracting Officer.
D. Protect existing trees and other vegetation indicated to remain in place, against unnecessary cutting, breaking, or skinning of roots, skinning and bruising of bark, smothering of trees by stockpiling construction materials or excavated materials within drip line, excess foot or vehicular traffic, or parking of vehicles within drip line.
E. Provide temporary guards to protect trees and vegetation to be left standing.
F. Where any trees are damaged, or where limbs are required to be trimmed or removed because of operations under this contract, or because of interference with new construction, any cutting or removal of limbs or branches shall be done only with prior approval of Contracting Officer.
GAOA HERMAN GULCH TOILET REPLACEMENT & INSTALL 311100 – 2
G. Solvents, oils, and other material which may be harmful to plant life shall be disposed of in containers and removed from the site. At the completion of the work, any contaminated soil shall be removed and replaced with topsoil.
H. Trees shall be felled into the area being cleared when ground conditions, tree lean, and shape of clearing permit. Controlled felling shall be used that will ensure the direction of fall to prevent damage to property, structures, trees designated to remain, or traffic.
Trees shall be limbed to allow the bole or main trunk of the tree to lay flat on the ground. Stumps shall be cut flush with the surrounding grade up to 6” in height.
I. Felling, cutting, and trimming methods shall not cause bark damage to standing timber. Trees with major roots exposed by construction that are rendered unstable shall be felled and disposed of in accordance with the above paragraphs.
3.2 GRUBBING
A. All debris, stumps, roots, and other protruding vegetative material within the clearing limits, not designated to remain, shall be grubbed, removed, and disposed of, except the following:
1. Trails: On all trails, stumps within the trailbed shall be removed. Stumps located between the edge of the trailbed and the edge of the trailway that cannot be cut flush with the finished slope, or are not tightly rooted, shall be removed.
2. Roads and Parking Areas: Undisturbed stumps outside the roadway or in embankment areas, provided they can be cut flush above the original ground (measured from the uphill side) nor closer than 2 feet to the finished subgrade or 1 foot to any slope surface or as otherwise shown on the drawings and they do not interfere with the placement or compaction of embankments.
3. All roots over 3 inches in diameter within the roadbed area shall be grubbed to a minimum depth of 6 inches below subgrade. Roots over 1 inch in diameter protruding from the excavated slope shall be cut flush with the excavated slope surface.
4. Branches on remaining trees or shrubs shall be trimmed to give a clear height of 14 feet above the roadbed unless otherwise shown on the drawings. Tree limbs shall be trimmed as near flush with the trunk as practicable.
5. When grubbing for structures, buildings, and areas to be landscape graded; grub and remove all stumps inside the clearing limits, Grub and remove all roots to a depth of at least 6 inches below the natural ground when fill is required for site grading. When excavation is required for site grading, grub and remove all roots to a depth of at least 6 inches below finished grade.
6. Stumps, roots, and material developed in grubbing operations shall be scattered.
3.3 UTILIZATION OF TIMBER
A. Logging methods and utilization shall conform to the following:
1. Felling and Bucking. Felling shall be done to minimize damage to remaining trees outside of clearing limits. Felling shall be done with saws or shears unless otherwise agreed to by the Contracting Officer.
GAOA HERMAN GULCH TOILET REPLACEMENT & INSTALL 311100 – 3
2. Utilization and Removal of Timber. Trees that equal or exceed the diameters and minimum lengths listed in 3.1 and contain one minimum piece shall be removed or disposed of by one of the following methods.
a. Logs meeting utilization standards shall be limbed and decked at locations shown on the drawings or at locations approved by the Contracting Officer. Decking shall be done in such a manner that logs are piled parallel one to the other, can reasonably be removed by standard log loading equipment, will not damage standing trees, and will not roll. Decks shall be free of brush and soil.
3.4 SLASH TREATMENT
A. Treatment of construction vegetation slash shall be accomplished by one or more of the following methods:
1. Removal from site
B. All Methods. No construction slash shall be deposited in lakes, meadows, streams, or streambeds. Construction slash that interferes with drainage structures shall be removed immediately.
C. Specific Methods
1. Removal. Construction slash shall be hauled to locations designated on the ground or removed from National Forest Lands at an approved landfill.
GAOA HERMAN GULCH TOILET REPLACEMENT & INSTALL 311100 – 4
This page intentionally left blank.
GAOA HERMAN GULCH TOILET REPLACE & INSTALL
312250 – 1
EARTHWORK
SECTION 312250
A. This Section includes the following:
1. Preparing subgrades for slabs-on-grade, walks, pavements, and plantings.
2. Excavating and backfilling for buildings and structures.
3. Handling of waste materials.
1.2 DEFINITIONS
A. Backfill: Soil materials used to fill an excavation.
1. Initial Backfill: Backfill placed below and beside the toilet structure and vault.
2. Subsequent Backfill: Backfill placed over initial backfill to fill the excavated vault hole.
B. Aggregate Base Course: Layer placed between the subgrade and concrete slab, concrete walk, or structure.
C. Borrow: Satisfactory soil from on-site for fill or backfill.
D. Excavation: Removal of material encountered above subgrade elevations and to lines and dimensions indicated.
1. Additional Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions as directed by CO. Additional excavation and replacement material will be paid for according to Contract provisions for changes in the Work.
2. Bulk Excavation: Excavations more than 10 feet (3m) in width and pits more than 30 feet (9m) in either length or width.
3. Unauthorized Excavation: Excavation below subgrade elevations or beyond indicated lines and dimensions without direction of the CO. Unauthorized excavation, as well as remedial work directed by CO, shall be without additional compensation.
4. Unclassified Excavation: Excavation to subgrade elevation and to lines and dimensions indicated regardless of the character of surface and subsurface conditions encountered, including rock, soil materials, and obstructions.
5. Rock Excavation: Rock material in beds, ledges, unstratified masses, and conglomerate deposits and boulders of rock material exceeding 2.5 cubic yards that cannot be removed by rock excavating equipment equivalent to the following in size and performance ratings, without systematic…
This is the start of the file's text. The full file is on GovTribe.