Attachment 1- Schedule of Items.pdf

PDF 401 KB Posted

Attached to
Herman Gulch Toilet Replacement in the Arapaho & Roosevelt National Forests & Pawnee National Grassland
Solicitation number
1240LT25R0027
Issued by

About this file

The document is a Schedule of Items (SOI) for the Herman Gulch Trailhead Toilet Installation project located in the Arapaho & Roosevelt National Forests and Pawnee National Grassland. The SOI lists four base items to be procured and installed: (1) Mobilization, (2) Old Vault and Lid Demolition, (3) Double Vault Toilet Procurement and Installation, and (4) Furnish and Install Pour-In-Place Concrete Bollards. The quantity for the first three items is one lump sum each, while the concrete bollards are specified as 10 each. The method of measurement for items 1-3 is L.S.Q (Lump Sum Quantity), and item 4 uses EA (Each) as the unit of measure. Unit prices and total costs are left blank in this document, indicating this is likely a bid template for potential contractors to complete.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Items

Description Method of

Measure Unit Quantity Unit Price TOTAL

1 Mobilization L.S.Q Lump Sum 1

2 Old Vault and Lid Demolition L.S.Q Lump Sum 1

Double Vault Toilet Procurement and Installation

L.S.Q Lump Sum 1

Furnish and Install Pour-In-Place Concrete Bollards

EA Each 10

SCHEDULE OF ITEMS (SOI)

GAOA HERMAN GULCH TRAILHEAD TOILET INSTALLATION

ARAPAHO & ROOSEVELT NATIONAL FORESTS AND PAWNEE NATIONAL GRASSLAND

TOTAL BASE ITEMS