Attachment 3- Floor Plans.pptx is a technical layout document for UPS system installation at Buildings B5506 and B5507 at Al Udeid Air Base, Qatar. The file provides detailed floor plans and power infrastructure specifications, including proposed equipment placement and electrical receptacle requirements. Key details include recommended room configurations for network systems, computer and phone allocations across security levels (NIPR, SIPR, TS), and specific power infrastructure needs such as installing five NEMA L5-20R receptacles and three NEMA L6-30R receptacles.
The document includes specific technical recommendations for system placement, such as potentially relocating the MPS (Multifunction Printer System) to Room 103 for noise consolidation and moving the Database Administrator (DBA) to Room 101. The floor plan also highlights a 10' x 4' desired UPS location with raised flooring, and provides visual references through multiple images showing equipment and room layout configurations. The recommendations appear to support the broader UPS installation project outlined in the related solicitation, which seeks a contractor to design, procure, install, and commission UPS systems in these facilities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Consolidated Solicitation Questions for UPS.pdf | ||
| B5507. 58 -FA5702-19-C-0022 Construct 763 ERS IC - As Build - Attach (1).pdf | ||
| FA5702-19-C-0022 Construct 763 ERS IC As Build - Attach.pdf | ||
| Solicitation - FA570225R0002.pdf | ||
| Attachment 2 Functional Performance Test Example.pdf | ||
| STATEMENT OF WORK.pdf | ||
| Attachment 1 B5507 Electrical Requirements.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
Building 5506 Option 1 9’x 5 Option 2 9’x 5
208-240v 50/60 HZ Socket/ NEMA L6-30R receptacle 120v 50/60 HZ Socket/ NEMA L5-20R receptacles
See Slide 3
Building B5507
Computers available for allocation:
NIPR:
SIPR:
TS:
Phones available for allocation:
UNCL:
SECRET:
VIPER:
NSTS:
Printers available for allocation:
UNCL:
SECRET:
TS:
MFD(U):
MFD(S):
MFD(TS):
Phil Earsley 402-294-7657
Desired UPS Location 10’ x 4 feet (raised flooring)
CRAC
DESK
DESK
CRAC
DBA
GSAP
GSAP
2X GOWS
2X GOWS
RM103
RM101
Copy Station
GSS
GSS
SACS
A
A A B A B C C C C C D D D D D D
MPS
Elec Panel Building B5507 Rooms 101 & 103 Additional Space for UPS (4’ x 4”) Acquire and install five (5x) NEMA L5-20R receptacles Acquire and install three (3x) NEMA L6-30R receptacle
OL15 Modified Layout This is my take on the layout I believe the systems should be in when we move over. Feel free to change systems around as necessary.
The RED CIRCLE is of interest…please measure how big this is and compare with the measurements provided for the GSS Copy Station The GSS is in a dashed-line GREEN Box to be installed ~July ‘24 Things to Consider:
If Rm103 has the power, I’d recommend moving the MPS here to consolidate noise Recommend moving DBA to Rm101 away from the noise, but that’s a CSA choice image1.png image2.png image3.wmf image4.png image5.png image6.png