Attachment 3- Floor Plans.pptx

PPTX presentation 379 KB Posted

Attached to
Uninterruptable Power Supply (UPS) Federal contract opportunity
Solicitation number
FA570225R0002
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 3- Floor Plans.pptx is a technical layout document for UPS system installation at Buildings B5506 and B5507 at Al Udeid Air Base, Qatar. The file provides detailed floor plans and power infrastructure specifications, including proposed equipment placement and electrical receptacle requirements. Key details include recommended room configurations for network systems, computer and phone allocations across security levels (NIPR, SIPR, TS), and specific power infrastructure needs such as installing five NEMA L5-20R receptacles and three NEMA L6-30R receptacles.

The document includes specific technical recommendations for system placement, such as potentially relocating the MPS (Multifunction Printer System) to Room 103 for noise consolidation and moving the Database Administrator (DBA) to Room 101. The floor plan also highlights a 10' x 4' desired UPS location with raised flooring, and provides visual references through multiple images showing equipment and room layout configurations. The recommendations appear to support the broader UPS installation project outlined in the related solicitation, which seeks a contractor to design, procure, install, and commission UPS systems in these facilities.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

Building 5506 Option 1 9’x 5 Option 2 9’x 5

208-240v 50/60 HZ Socket/ NEMA L6-30R receptacle 120v 50/60 HZ Socket/ NEMA L5-20R receptacles

See Slide 3

Building B5507

Computers available for allocation:

NIPR:

SIPR:

TS:

Phones available for allocation:

UNCL:

SECRET:

VIPER:

NSTS:

Printers available for allocation:

UNCL:

SECRET:

TS:

MFD(U):

MFD(S):

MFD(TS):

Phil Earsley 402-294-7657

Desired UPS Location 10’ x 4 feet (raised flooring)

CRAC

DESK

DESK

CRAC

DBA

GSAP

GSAP

2X GOWS

2X GOWS

RM103

RM101

Copy Station

GSS

GSS

SACS

A

A A B A B C C C C C D D D D D D

MPS

Elec Panel Building B5507 Rooms 101 & 103 Additional Space for UPS (4’ x 4”) Acquire and install five (5x) NEMA L5-20R receptacles Acquire and install three (3x) NEMA L6-30R receptacle

OL15 Modified Layout This is my take on the layout I believe the systems should be in when we move over. Feel free to change systems around as necessary.

The RED CIRCLE is of interest…please measure how big this is and compare with the measurements provided for the GSS Copy Station The GSS is in a dashed-line GREEN Box to be installed ~July ‘24 Things to Consider:

If Rm103 has the power, I’d recommend moving the MPS here to consolidate noise Recommend moving DBA to Rm101 away from the noise, but that’s a CSA choice image1.png image2.png image3.wmf image4.png image5.png image6.png