Attachment 3- Drawings 692-22-105 Renovate Spaces B217A and B218A for Mental Health Services.pdf
PDF 30 MB Posted
- Solicitation number
- 36C26025R0074
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26025R0074 0003.docx | DOCX document | |
| P07 White City Wage Determination DBA.docx | DOCX document | |
| 692-22-105 217A and 218A Q_A revised.docx | DOCX document | |
| 23 25 00 HVAC WATER TREATMENT.pdf | ||
| 218 Hazardous materials.doc | DOC document | |
| 217 Hazardous materials.doc | DOC document | |
| 36C26025R0074 0002.docx | DOCX document | |
| 692-22-105 217A and 218A Q_A.docx | DOCX document | |
| 07 31 13.pdf | ||
| B217A site visit sign in 7.15.2025.pdf | ||
| 36C26025R0074 0001.docx | DOCX document | |
| Attachment 2- Specifications 692-22-105 Renovate Spaces B217A and B218A for Mental Health Services.pdf | ||
| Attachment 1- SOW 692-22-105 Renovate Spaces B217A and B218A for Mental Health Services.pdf | ||
| Attachment 5- Optional Past Performance Questionnaire.docx | DOCX document | |
| Attachment 4- OR20250103 Wage Determination.pdf | ||
| 36C26025R0074.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BIKE RACK
PROJECT SITE:
VA SORCC
AREA OF WORK
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
PROJECT LOCATION:
PROJECT TITLE:
BUILDING NUMBER:
ARCHITECTS + MEPT ENGINEERS:
BANCROFT ARCHITECTS + ENGINEERS
CONTRACT NUMBER:
STATION PROJECT NUMBER:
BANCROFT-AE PROJECT NUMBER:
Bancroft Project No. VA CONTRACT NO.
PROJECT NUMBERS:
STRUCTURAL ENGINEER:
HOHBACH-LEWIN, INC.
909 MONTGOMERY STREET
SUITE 260
SAN FRANCISCO, CA 94133
T: 415.318.8520 www.hohback-lewin.com
01/27/2025
100% ISSUE FOR BID
01/27/2025
GENERAL - COVER SHEET RENOVATE SPACES B217A &
B218A FOR MENTAL HEALTH
SERVICES
VA SORCC - WHITE CITY VA MEDICAL CENTER
CZ RMB
692-22-105
G001
RENOVATE SPACES B217A & B218A FOR MENTAL
HEALTH SERVICES
692-22-105 36C26018D0044
22-110
B217A & B218A
B217A & B218A
8495 CRATER LAKE HIGHWAY, WHITE CITY, OREGON 97503
100% - ISSUE FOR BID
VA SORCC - WHITE CITY VA MEDICAL CENTER
3300 DUNDEE ROAD
NORTHBROOK, IL 60062
T:847.952.9362 www.bancroft-ae.com
22-11036C26018D0044
NOT TO SCALE
1 VICINITY MAP
NOT TO SCALE
2 CAMPUS MAP
N
N
TRUE NORTH
N
Revisions: Date:
35% CONSTRUCTION DOCUMENTS 03/10/2023
50% CONSTRUCTION DOCUMENTS 12/18/2023
95% CONSTRUCTION DOCUMENTS 02/02/2024
100% CONSTRUCTION DOCUMENTS 04/05/2024
99% AHU REPLACEMENT MODIFICATION 01/13/2025
100% ISSUE FOR BID 01/27/2025
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
Bancroft Project No. VA CONTRACT NO. 01/27/2025
GENERAL - DRAWING INDEX RENOVATE SPACES B217A &
B218A FOR MENTAL HEALTH
SERVICES
VA SORCC - WHITE CITY VA MEDICAL CENTER
CZ RMB
692-22-105
G002
B217A & B218A
100% - ISSUE FOR BID
22-11036C26018D0044
DRAWING INDEX
SHEET NUMBER SHEET TITLE 100%
GENERAL
G001 GENERAL - COVER SHEET X
G002 GENERAL - DRAWING INDEX X
GI001 GENERAL - GENERAL PROJECT NOTES X
GI101 GENERAL - CODE AND BUILDING INFORMATION X
GI201 GENERAL - LIFE SAFETY FLOOR PLAN X
GC101 GENERAL - SEQUENCE OF WORK / ICRA X
GC102 GENERAL - INFECTION CONTROL TYPICAL DETAILS - CLASS IV X
STRUCTURAL
S100 STRUCTURAL - GENERAL NOTES X
S200 STRUCTURAL - FOUNDATION & FLOOR FRAMING PLAN X
S200A MEZZANINE FRAMING PLAN
S201 STRUCTURAL - ROOF FRAMING PLAN X
S801 STRUCTURAL - TYPICAL WOOD DETAILS X
S802 STRUCTURAL - WOOD DETAILS X
ARCHITECTURAL
A001 ARCHITECTURAL - SYMBOLS, ABBREVIATIONS AND LEGENDS X
A002 ARCHITECTURAL - STANDARD MOUNTING HEIGHTS AND DIMENSIONS X
A003 ARCHITECTURAL - GENERAL SHEET NOTES AND LEGENDS X
AD101 ARCHITECTURAL - DEMOLITION PLAN X
ACD101 ARCHITECTURAL - DEMOLITION REFLECTED CEILING PLAN X
AS101 ARCHITECTURAL - OVERALL SITE PLAN X
AE101 ARCHITECTURAL - OVERALL FLOOR PLAN X
AE101.1 ARCHITECTURAL - ENLARGED FLOOR PLAN - AREA A X
AE101.2 ARCHITECTURAL - ENLARGED FLOOR PLAN - AREA B X
AE101.3 ARCHITECTURAL - ENLARGED FLOOR PLAN - AREA C X
AE102 ARCHITECTURAL - OVERALL ROOF PLAN X
AC101 ARCHITECTURAL - REFFLECTED CEILING PLAN X
A301 ARCHITECTURAL - PARTITION TYPES X
A401 ARCHITECTURAL - INTERIOR ELEVATIONS X
A402 ARCHITECTURAL - INTERIOR ELEVATIONS X
A403 ARCHITECTURAL - INTERIOR ELEVATIONS X
A501 ARCHITECTURAL - DETAILS X
A601 DOOR AND FRAME SCHEDULE X
AF101 ARCHITECTURAL - FINISH PLAN X
AF601 ARCHITECTURAL - FINISH SCHEDULE X
AF602 ARCHITECTURAL - WAYFINDING TYPES X
AQ101 ARCHITECTURAL - EQUIPMENT PLANS X
AQ601 ARCHITECTURAL - EQUIPMENT SCHEDULE X
FIRE PROTECTION
FX001 FIRE PROTECTION - GENERAL NOTES, SYMBOLS AND ABBREVIATIONS X
FD101 FIRE PROTECTION - DEMOLITION PLAN X
FX101 FIRE PROTECTION - SPRINKLER PLAN X
FX501 FIRE PROTECTION - DETAILS X
PLUMBING
P001 PLUMBING - GENERAL NOTES, SYMBOLS AND ABBREVIATIONS X
PD100 PLUMBING - DEMOLITION UNDERGROUND / BASEMENT PLAN X
PD101 PLUMBING - DEMOLITION FIRST FLOOR PLAN X
PD102 PLUMBING - DEMOLITION ATTIC PLAN X
P100 PLUMBING - UNDERGROUND / BASEMENT PLAN X
P101 PLUMBING - FIRST FLOOR PLAN X
P102 PLUMBING - ATTIC PLAN X
P501 PLUMBING - DETAILS X
P502 PLUMBING - DETAILS X
P601 PLUMBING - RISER DIAGRAMS X
P701 PLUMBING - SCHEDULES X
DRAWING INDEX
SHEET NUMBER SHEET TITLE 100%
MECHANICAL
M001 MECHANICAL - SYMBOLS, NOTES AND ABBREVIATIONS X
MVD101 MECHANICAL - VENTILATION DEMOLITION PLAN - CEILING/LOWER LEVEL X
MVD102 MECHANICAL - VENTILATION DEMOLITION PLAN - CEILING/UPPER LEVEL X
MVD103 MECHANICAL - ENLARGED MECHANICAL ROOM VENTILATION DEMOLITION PLAN X
MPD100 MECHNICAL CHILLER DEMOLITION PLAN X
MPD101 MECHANICAL - PIPING DEMOLITION PLAN - BUILDING 218A X
MPD102 MECHANICAL - PIPING DEMOLITION PLAN - ATTIC X
MV101 MECHANICAL - VENTILATION PLAN - FIRST FLOOR X
MV102.1 MECHANICAL - VENTILATION ATTIC PLAN - AREA A X
MV102.2 MECHANICAL - VENTILATION ATTIC PLAN - AREA B X
MV102.3 MECHANICAL - VENTILATION ATTIC PLAN - AREA D X
MV103 MECHANICAL - ENLARGED MECHANICAL ROOM - VENTILATION PLAN X
MV104 MECHANICAL - UPPER LEVEL VENTILATION PLAN - AREA C X
MV105 MECHANICAL AIR FLOW TEST AND BALANCE FLOOR PLAN X
MP100 MECHANICAL PIPING PLAN X
MP101 MECHANICAL - PIPING PLAN X
MP102 MECHANICAL - PIPING PLAN - ATTIC X
MP103 MECHANICAL - ENLARGED MECHANICAL ROOM PIPING PLAN X
MP104 MECHANICAL WATER FLOW TEST AND BALANCE PLAN X
M501 MECHANICAL - DETAILS X
M502 MECHANICAL - DETAILS X
M503 MECHANICAL - DETAILS X
M504 MECHANICAL - DETAILS X
M505 MECHANICAL - DETAILS X
M506 MECHANICAL - DETAILS X
M601 MECHANICAL - EQUIPMENT SCHEDULES X
M602 MECHANICAL - EQUIPMENT SCHEDULES X
M701 MECHANICAL - TEMPERATURE CONTROLS X
M702 MECHANICAL - TEMPERATURE CONTROLS X
M703 MECHANICAL - TEMPERATURE CONTROLS X
ELECTRICAL
E001 ELECTRICAL - GENERAL NOTES X
E002 ELECTRICAL - SYMBOLS AND ABBREVIATIONS X
EPD101A ELECTRICAL - ELECTRICAL DEMOLITION PLAN, SITE X
EPD101 ELECTRICAL - POWER DEMO PLAN, FIRST FLOOR X
EPD102 ELECTRICAL - POWER DEMO PLAN, ATTIC X
ELD101 ELECTRICAL - LIGHTING DEMO PLAN, FIRST FLOOR X
EFD101 ELECTRICAL - FIRE ALARM DEMO PLAN, FIRST FLOOR X
EP100 ELECTRICAL - POWER PLAN, BASEMENT X
EP101A ELECTRICAL - ELECTRICAL NEW WORK PLAN, SITE X
EP101 ELECTRICAL - POWER PLAN, FIRST FLOOR X
EP102 ELECTRICAL - POWER PLAN, ATTIC X
EL101 ELECTRICAL - LIGHTING PLAN, FIRST FLOOR X
EL102 ELECTRICAL - LIGHTING PLAN, ATTIC X
EF101 ELECTRICAL - FIRE ALARM & SECURITY PLAN, FIRST FLOOR & ATTIC X
ET101 ICT - TELECOMMUNICATIONS FLOOR PLAN, FIRST FLOOR X
ET102 ICT - TELECOMMUNICATIONS PLAN, ATTIC X
E501 ELECTRICAL - DETAILS X
E502 ELECTRICAL - DETAILS X
E503 ELECTRICAL - DETAILS X
E504 ELECTRICAL - DETAILS X
E601 ELECTRICAL - SCHEDULES X
E701 ELECTRICAL - PANEL SCHEDULES X
E702 ELECTRICAL - PANEL SCHEDULES X
Revisions: Date:
35% CONSTRUCTION DOCUMENTS 03/10/2023
50% CONSTRUCTION DOCUMENTS 12/18/2023
95% CONSTRUCTION DOCUMENTS 02/02/2024
100% CONSTRUCTION DOCUMENTS 04/05/2024
PHASE 1 1
PHASE 2
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
Bancroft Project No. VA CONTRACT NO. 01/27/2025
GENERAL - SEQUENCE OF WORK / ICRA RENOVATE SPACES B217A &
B218A FOR MENTAL HEALTH
SERVICES
VA SORCC - WHITE CITY VA MEDICAL CENTER
Checker Author
692-22-105
GC101
B217A & B218A
100% - ISSUE FOR BID
22-11036C26018D0044
N 1/16" = 1'-0"
1 ICRA / PHASE 1 FLOOR PLAN
GENERAL PHASING NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
CONTRACTOR SHALL BE RESPONSIBLE FOR SEQUENCING AND COORDINATION OF
CONSTRUCTION PHASING WITH THE VAMC'S SCHEDULE, INFECTION CONTROL, AND INTERIM
LIFE SAFETY REQUIREMENTS. REFER TO SPECIFICATIONS FOR PROJECT GENERAL
CONDITIONS, INFECTION CONTROL, SPECIAL NOTES, PROJECT SCHEDULE, ETC. FOR ALL
PROJECT REQUIREMENTS.
CONTRACTOR SHALL PROVIDE ALL SUB-PHASING ACTIVITIES AS REQUIRED FOR WORK
OCCURRING BETWEEN VARIOUS PHASES.
THE PHASING PLAN IS NOT TO BE TAKEN AS AN ALL INCLUSIVE LIST OF ALL ITEMS TO BE
COMPLETED WITHIN A SPECIFIC OUTLINED PHASE. PLEASE REFER TO ALL DISCIPLINES AND
CONTRACT DOCUMENTS FOR ALL WORK ASSOCIATED IN THESE AREAS
THE PHASING PLAN IS SUBJECT TO THE CONTRACTORS MEANS AND METHODS, SCHEDULING
AND TO EXISTING CONDITIONS AND TIME RESTRAINTS.
CONTRACTOR SHALL REFER TO ALL DEMOLITION AND CONSTRUCTION DRAWINGS FOR A
COMPLETE UNDERSTANDING OF THE SPECIFIED SCOPE OF WORK.
CONTRACTOR SHALL MAINTAIN EGRESS PASSAGE WAYS DURING COMPLETE PROJECT
DURATION. ALSO MAINTAIN ALL EGRESS/EXIT DOORS OF THE FACILITY.
CONTRACTOR SHALL REFER TO SUGGESTED LOCATION OF CONSTRUCTION BARRIERS AND
ENTRANCES.
CONTRACTOR SHALL NOTE ALL EXISTING PLUMBING, MECHANICAL AND ELECTRICAL
SERVICES AND SYSTEMS THAT ARE SCHEDULED TO REMAIN FULLY OPERATIONAL AND
FUNCTIONAL FOR DURATION OF SPECIFIC PHASES.
CONTRACTOR SHALL NOTE BUILDINGS WILL BE OCCUPIED DURING CONSTRUCTION.
HOURS OF OPERATION FOR NOISE AND VIBRATION OPERATIONS ARE DURING OFF NORMAL
HOSPITAL OPERATION HOURS (6:00PM TO 6:00AM).
SERVICE INTERRUPTIONS DURING OFF NORMAL WORK HOURS ARE SCHEDULED MINIMUM (2)
WEEK ADVANCED NOTICE.
WHERE SEQUENCES MEET IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE
THE TRANSITION WORK BETWEEN SEQUENCES.
CONTRACTOR TO HAVE ALL MATERIALS AND EQUIPMENT ON SITE FOR THE COMPLETION OF
ANY WORK THAT IS DESIGNATED FOR OFF HOURS PRIOR TO THE START OF OFF HOURS WORK
PHASES TO BE PERFORMED IN SEQUENCE.
N 1/16" = 1'-0"
2 ICRA / PHASE 2 FLOOR PLAN
GENERAL ICRA NOTES
1.
2.
3.
4.
5.
6.
7.
8.
THIS PROJECT TO ADHERE TO CLASS III OR IV INFECTION CONTROL PRECAUTIONS. REFER TO
GI201 FOR DETAILS.
ALL PERSONNEL ENTERING THE CONSTRUCTION SITE AREA MUST WEAR A HARD HAT AND
SAFETY GLASSES ALONG WITH ANY OTHER PERSONAL PROTECTIVE EQUIPMENT REQUIRED
IN THAT AREA
ALL APPLICABLE INFECTION CONTROL FORMS TO BE COMPLETED AND APPROVED BY VA/COR
PRIOR TO STARTING WORK.
THE CONSTRUCTION AREA MUST MAINTAIN A NEGATIVE PRESSURE VENTILATION. NEGATIVE
PRESSURE MACHINES MUST BE ON AND OPERATIONAL 24/7. NEGATIVE AIR UNIT TO BE
MAINTAINED WITH FILTER(S) REPLACEMENT PER SPECIFICATIONS. CLEAN ALL EXTERIOR
SURFACES OF CARTS AND TOOLS AT THE END OF EACH SHIFT. MONITOR NEGATIVE
PRESSURE AND POST LOG AT THE END OF EACH SHIFT.
DURING CONSTRUCTION BE CERTAIN THAT: WALLS ARE INTACT AND MAINTAINED,
PARTICLE COUNT METER IS AVAILABLE, NEGATIVE INDICATOR IS AVAILABLE, ICRA
REQUIREMENTS ARE INTACT AND BEING MAINTAINED.
CONTRACTOR SHALL PROVIDE TEMPORARY SEPARATION WALLS PER ICRA AND FIRE
PROTECTION REQUIREMENTS DURING ALL DEMOLITION AND CONSTRUCTION ACTIVITIES.
CONTRACTOR TO COORDINATE LOCATIONS WITH THE COR IN CONJUNCTION WITH THE
CONTRACT DOCUMENTS. IF EXISTING WALLS ARE USED, PENETRATIONS MUST BE SEALED TO
CREATE A DUST PROOF ENCLOSURE.
CONTRACTOR TO REPAIR DAMAGE DONE DURING CONSTRUCTION TO ALL WALLS INDICATED
AS PERMANENT PRIOR TO APPLICATIONS OF FINISHES.
CONTRACTOR SHALL REMOVE GARBAGE DURING NONE WORK HOURS.
PLAN KEYNOTES
ICRA PLAN LEGEND
TEMPORARY SEPARATION WALL
CONSTRUCTION TO BE REMOVED
AREA UNDER CONSTRUCTION
NOT INCLUDED IN AREA OF WORK
1 TEMPORARY ANTE ROOM. REER TO DRAWIN GC102.
2 FINISH WORK IN THIS AREA TO BE COMPLETED AFTER HOURS.
3 TEMPORARY CONSTRUCTION BARRIER.
Revisions: Date:
95% CONSTRUCTION DOCUMENTS 02/02/2024
A
O
V
FL
EX
DU
CT
E
AA
ELEVATION
TYPE
TYPE
OUTSIDE OF
BUILDING
FIRE RATED
PLYWOOD (REFER
TO ELEVATION)
COVER ALL RETURNS AT THE
GRATE/DIFFUSERS WITH FIRE RATED PLASTIC
SHEETINGAND SECURE WITH DUCT TAPE.
SUPPLY DUCTS TO BE COVERED
WITH FIRE RATED PLASTIC
SHEETING AND SECURE WITH
DUCT TAPE TO KEEP DUST OUT.
EXHAUST DUCTS
(COVER THE GRATES
AND THE DIFFUSERS)
WEEKLY CHANGED
(OR MORE AS
NEEDED) PRE-FILTER
HEPA NEGATIVE AIR
UNIT
TAPE ALL SERVICES TO
PROTECT AGAINST
CONTAMINATION
ABC TYPE FIRE EXTINGUISHER
ON PORTABLE FLOOR BRACKET
(ILSM MAY REQUIRE MORE THAN
ONE OR WALL MOUNTED). NEED
INSPECTION TAG AND MONTHLY
INSPECTION). (INITIALS/DATED).
MONTHLY
CHANGED HEPA
FILTER
INDICATOR MUST BE AT -0.01 OR MORE NEGATIVE
(VERIFY DAILY), IF NOT VERIFY ALL OPENING SUCH
AS DOORS ARE CLOSED AND/OR CHANGE OUT
NEGATIVE AIR PRE-FILTER. (TYPICAL REGULATOR
INSTALLATION).
HARD
BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
(REFER TO ELEV. DETAIL)
PROVIDE STICKY MATS (CHANGED END OF SHIFT
OR MORE IF NECESSARY TO MAINTAIN
CLEANLINESS).
TEMP ANTE ROOM
BLUE CORE
LOCKSET
(LOCKED AT
ALL TIMES)
B
A
EXISTING FIRE
SPRINKLER SYSTEM
FINISHED FLOORING TO BE KEPT CLEAN.
FLOORS NOT BEING REPLACED TO BE
PROTECTED OR COVERED WITH ROSEN
PAPER/FIRE RATED PLYWOOD.
EXISTING WINDOW FRAME
FIRE-RATED PLYWOOD (TEMP.
REMOVE GLASS PANEL)
EXISTING DECK VIF
HEPA NEGATIVE AIR
UNIT
EXISTING WALLS USED AS
TEMPORARY BARRIERTEMPORARY
CONSTRUCTION BARRIER
FIRE/U.L. RATED PLASTIC TO PREVENT
DUST INFILTRATION (INSTALL PRIOR TO
CONSTRUCTION).
FLEX
DUCT
MOBILE CONTAINMENT
CART WITH CANVAS/
1-1/4" SQAURE STEEL
TUBULAR FRAME
PLASTIC WINDOW
(ON ALL SIDES)
HEPA NEGATIVE AIR UNIT
FLEX DUCT
AD
JU
ST
AB
LE
HE
IGH
T
SWIVEL CASTERS
ZIPPER SIDE ENTRY
FIE
LD
VE
RIF
Y
WA
LL
HE
IGH
T V
AR
IES
2' X 4' SUSPENDED
ACOUSTICAL CEILING AS
SCHEDULED ON FLOOR
PLAN.
INSULATED WALL WITH 2X4 STUDS
AT 16" O.C. WITH 5/8" GYPSUM
BOARD EACH SIDE. WALL TO
EXTEND TO DECK.
4" RUBBER COVE TO MATCH
EXISTING AREA BASE @ BOTH
SIDES
EXISTING FLOOR/ROOF DECK
FIE
LD
VE
RIF
Y W
AL
L H
EIG
HT
VA
RIE
S
2' X 4' SUSPENDED
ACOUSTICAL CEILING AS
SCHEDULED ON FLOOR
PLAN.
2X4 STUDS AT 16" O.C. WITH 5/8"
GYPSUM BOARD EACH SIDE.
4" RUBBER COVE TO MATCH
EXISTING AREA BASE @ BOTH
SIDES
TYPE
NOTE: ALL TEMPORARY CONSTRUCTION BARRIERS TO BE 1 -HOUR RATED.
A UL DESIGN NO. 419 TYPE B
FRAMED PICTURE
OF C.O.R. WITH
CONTACT
INFORMATION
CONST. SUPERVISOR
NAME AND CELL
PHONE
AP
PR
OX
. 4
8" A.F
.F.
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE
TO PUBLIC
INDICATOR MUST BE AT -0.01 OR MORE NEGATIVE
(VERIFY DAILY), IF NOT VERIFY ALL OPENING
SUCH AS DOORS ARE CLOSED AND/OR CHANGE
OUT NEGATIVE AIR PRE-FILTER.
INDICATOR
(REFER TO
PLAN &
ELEVATION)
AFTER HOURS CALL (VA PROVIDED #)
IN-HOUSE PHONE (VA PROVIDED #)
FIRE EMERGENCY DIAL 911
AREA UNDER
CONSTRUCTION
ICRA, ILSM
FIRE WATCH
MISC. FORMS
PAPER
CADDY
PERSONNEL ENTERING MUST HAVE: HARD HAT,
SAFETY GLASSES AND PROPER I.D.
COMING SOON!!!
-DESCRIPTION OF NEWLY PROPOSED OCCUPANCY-
THIS IS A
RESTRICTED AREA
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
Bancroft Project No. VA CONTRACT NO. 01/27/2025
GENERAL - INFECTION CONTROL TYPICAL
DETAILS - CLASS IV
RENOVATE SPACES B217A &
B218A FOR MENTAL HEALTH
SERVICES
VA SORCC - WHITE CITY VA MEDICAL CENTER
CR JC
692-22-105
GC102
B217A & B218A
100% - ISSUE FOR BID
22-11036C26018D0044
1/2" = 1'-0"
1 TYPICAL IDEAL CONSTRUCTION LAYOUT
1/2" = 1'-0"
2 CROSS SECTION 'A-A'
1/2" = 1'-0"
3 MOBILE CONTAINMENT CART
1/2" = 1'-0"
4 WALL CONSTRUCTION TYPES (DETAILS)
1/2" = 1'-0"
5 ANTE ROOM ELEVATION
Revisions: Date:
95% CONSTRUCTION DOCUMENTS 02/02/2024
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
GENERAL NOTES FOR CONTRACTORS: SEE ALL PROJECT GENERAL NOTES AND OTHER
REQUIREMENTS INCLUDING THE LIFE SAFETY AND INFECTION CONTROL WORK LOCATED WITHIN
THE GENERAL DRAWINGS SECTION. COMPLY WITH ALL REQUIREMENTS AS THEY ARE A DIRECT
PART OF THIS SECTION AS IF THEY WERE DIRECTLY INCLUDED AND PROVIDED HEREIN.
PROTECTION PROTOCOLS: VERIFY AND COORDINATE ALL PROTECTION REQUIREMENTS TO BE
PROVIDED FOR EACH SPECIFIC AREA OR LOCATION OF SCHEDULED WORK WITH THE VA/COR,
BEFORE BEGINNING ANY WORK. WHEN PERFORMING DEMOLITION WORK IN ANY OCCUPIED
SPACES FOLLOW THE “OCCUPIED AREAS PROTECTION PROTOCOLS ” UNLESS MODIFIED IN
WRITING BY THE VA/COR ON A CASE BY CASE BASIS.
BEFORE BEGINNING ANY DEMOLITION WORK EACH CONTRACTOR AND DISCIPLINE SHALL
PERFORM A FULL EXAMINATION OF ALL AREAS OF WORK AND FULLY VERIFY ALL EXISTING
CONDITIONS ALONG WITH ALL OF THE AREAS OF WORK FOR ANY UNFORESEEN CONDITIONS
OR DISCREPANCIES FROM THE DOCUMENTATION THAT WOULD AFFECT THEIR WORK AND/OR
THE WORK OF OTHERS. ANY UNFORESEEN CONDITIONS OR DISCREPANCIES DISCOVERED
ARE TO BE IMMEDIATELY IDENTIFIED AND COORDINATED WITH THE GENERAL/PRIME
CONTRACTOR WHO SHALL IN TURN DOCUMENT AND PROMPTLY REPORT ANY SUCH
CONDITIONS DIRECTLY TO THE VA/COR FOR DIRECTION ON HOW TO PROCEED BEFORE
ALLOWING ANY WORK TO BEGIN.
ALL REQUIRED DEMOLITION WORK IS NOT NECESSARY LIMITED TO WHAT IS ONLY
SPECIFICALLY SHOWN OR DIRECTLY CALLED OUT ON THE DEMOLITION PLANS OR THAT IS
ONLY SPECIFICALLY IDENTIFIED WITHIN THE DEMOLITION NOTES DESCRIPTIONS. THE INTENT
OF THE DOCUMENTATION IS TO GENERALLY IDENTIFY THE MORE SPECIFIC MAJOR ELEMENTS
OF WORK IN PLACE THAT SHALL REQUIRE REMOVAL AND/OR REWORK IN ORDER TO
ACCOMPLISH THE DESIGN INTENT OF THE DOCUMENTS. THE FULL EXTENT OF DEMOLITION
WORK COULD INCLUDE BUT NOT NECESSARILY BE LIMITED TO ALL AFFECTED LESSER
ELEMENTS OF ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, MEDICAL GASES,
FIRE PROTECTION SPRINKLER SYSTEMS AND ALL ELECTRICAL SYSTEMS WORK INCLUDING
HIGH AND LOW VOLTAGE POWER, COMMUNICATION SYSTEMS SUCH AS CCTV, SECURITY, IT
DATA, LIFE SAFETY, FIRE PROTECTION, NURSE CALL, PA, BAS CONTROLS SYSTEMS,
TEMPERATURE AND OTHERWISE, ETC.
ALL REQUIRED DEMOLITION WORK IS NECESSARY TO FACILITATE THE EXTENT OF BOTH THE
NEW CONSTRUCTION WORK AS WELL AS TO FACILITATE THE REPLACEMENT, RELOCATION
AND/OR THE REWORKING OF THE EXISTING SYSTEMS. ANY REWORKING OF THE CURRENT
ELEMENTS AND COMPONENTS CURRENTLY NEEDING TO BE MODIFIED IN ORDER TO
PROPERLY SUPPORT THE COMPLETED PROJECT SHALL BE PROVIDED AS INTENDED TO
CONFORM WITH THE ORIGINAL DESIGN INTENT WHETHER SPECIFICALLY CALLED FOR IN
GREAT DETAIL WITH EVERY ANCILLARY ELEMENT FULLY NAMED AND IDENTIFIED OR AS
CALLED OUT AS A GENERAL COMPONENT PORTION OF WORK THAT NEEDS TO BE PROPERLY
REMOVED IN ORDER TO COMPLETE THE SCOPE OF WORK AS INTENDED TO COMPLY WITH
ALL BASES OF DESIGN REQUIREMENTS.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE DEMOLITION AND REMOVAL
OF ALL EXISTING WALLS, CEILINGS, SUSPENSION SYSTEMS, FLOORING, ELECTRICAL,
TELEPHONE AND PLUMBING CONSTRUCTION AS WELL AS ALL MATERIALS, FINISHES AND
EQUIPMENT THAT IS NOT SPECIFICALLY SHOWN OR CALLED FOR AS REQUIRED TO
FACILITATE THE NEW CONSTRUCTION WORK INSIDE THE CONTRACT AREA, THE ADJACENT
SPACES AND THE SPACES ABOVE AND BELOW. SOME ADDITIONAL ITEMS THAT MAY NOT BE
SPECIFICALLY SHOWN IN GREAT DETAIL ON THE DEMOLITION PLAN THAT ARE A PART OF THE
DEMOLITION WORK, BUT NOT LIMITED TO, ARE CASEWORK, SHELVING, BRACKETS,
STANDARDS, DOOR HARDWARE, MISCELLANEOUS OTHER HARDWARE, SIGNAGE, FLOORING
MATERIALS, WALL BASE, WOOD GROUNDS, WALL COVERING MATERIALS, BACKING LINERS OR
BOARDS, ANY REMAINING MASTIC, GROUT, CAULKING AND SEALANTS, EXPOSED ANCHORS
AND FASTENERS, FRAMING MATERIALS, BACKER BOARDS OR METAL PLATES, CHAIR RAILS,
BRACKETS, HOOKS, SURFACE MOUNTED OR RECESSED ACCESSORIES, PRIVACY CURTAINS
AND TRACKS, ETC.
ALL DEMOLITION WORK SHALL BE PERFORMED IN A SYSTEMATICALLY SAFE FULLY
SUPERVISED COORDINATED AND PROPERLY MANAGED SEQUENCE OF WORK UNDER THE
DIRECT SUPERVISION OF THE GENERAL/PRIME CONTRACTOR'S SUPERINTENDENT AND/OR
THEIR MANAGEMENT PERSONNEL INCLUDING THE PERFORMANCE OF ANY ANCILLARY
ELEMENTS OF SELECTIVE DEMOLITION.
ALL DEMOLITION, THE HANDLING OF MATERIALS AND EQUIPMENT ALONG WITH THE
MOVEMENT OF THESE ELEMENTS THROUGHOUT THE FACILITY SHALL BE PERFORMED SO AS
TO PREVENT DAMAGE TO ADJACENT IMPROVEMENTS AND FACILITIES TO REMAIN AS WELL AS
TO PROVIDE SAFETY FOR ALL TRADESPEOPLE, STAFF, RESIDENTS/PATIENTS, VISITORS AND
SERVICE PROVIDERS.
PROVIDE ALL PHYSICAL AND ENVIRONMENTAL PROTECTIVE MEASURES AS REQUIRED BY THE
PROJECT DOCUMENTS, VA FEDERAL AND LOCAL REQUIREMENTS, APPLICABLE OSHA
REGULATIONS, THE STATION AND ALL LOCAL INFECTION CONTROL AUTHORITIES, NFPA
REQUIREMENTS, THE VA/COR AND ALL OTHER REGULATORY AGENCIES AND VA AUTHORITIES
HAVING JURISDICTION OVER THIS PROJECT.
PROVIDE ALL SEPARATION WALLS, PROTECTION, DOOR ACCESS UNITS, ENCLOSURES,
WALKWAYS, FENCING, RAILINGS, CANOPIES, AIR FILTRATION DEVICES, VESTIBULES,
AIRLOCKS, ETC., WHERE REQUIRED BY THE CONTRACT DOCUMENTS, THE VA/COR AND ALL
AUTHORITIES HAVING JURISDICTION OVER THE PROJECT AND SHALL BE SURE TO MAINTAIN
ADEQUATE AND SAFE EMERGENCY MEANS OF EGRESS FROM ALL AREAS. ALL SUCH WORK
NEEDING TO BE PROVIDED WILL REQUIRE VA/COR REVIEW AND APPROVAL BEFORE
BEGINNING ANY OF SUCH WORK.
GREAT CARE SHALL BE TAKEN WHEN PERFORMING SELECTIVE DEMOLITION IN THE
UTILIZATION OF MORE SENSITIVE AND LESS EVASIVE METHODS OF DEMOLITION/REMOVAL,
AS WELL AS PROVIDING THE APPROPRIATE ENHANCED PROTECTIVE BARRIERS IN ORDER TO
PROVIDE FOR THE LEAST AMOUNT OF DAMAGE TO THE WORK THAT IS TO REMAIN IN PLACE.
EXISTING FINISHED SURFACES, MATERIALS AND EXPOSED EQUIPMENT THAT WOULD
RECEIVE SIGNIFICANT AMOUNTS OF SURFACE DAMAGE AND WOULD REQUIRE SIGNIFICANT
AMOUNTS OF PATCHING, REPAIRS AND REFINISHING WORK SHALL BE DEEMED AS DAMAGED
AND UNUSABLE AND WILL NEED TO BE REPLACED IN WHOLE BY THE RESPONSIBLE
CONTRACTOR AND ITS REPLACEMENT ONCE COMPLETED WILL NEED TO RECEIVE VA/COR
APPROVAL.
WHERE EXISTING FLOOR FINISHES ARE TO BE FULLY REMOVED TO ALLOW FOR THE
INSTALLATION OF NEW, PROVIDE FOR THE COMPLETE REMOVAL OF THE EXISTING FLOOR
FINISHES ALONG WITH ALL ASSOCIATED ATTACHMENT SYSTEMS SUCH AS MASTICS,
ADHESIVES, TACKLES STRIPS, STAPLES, SETTING BEDS OF GROUT, MORTAR OR CONCRETE,
CARPET PADDING, ATTACHED SUBFLOORING MATERIALS, ETC. AS REQUIRED TO GET DOWN
TO THE EXISTING STRUCTURAL FLOOR SUBSTRATE THAT CAN BE PROPERLY PATCHED,
REPAIRED, LEVELED AND MADE READY TO RECEIVE THE NEW FLOOR FINISHES.
ITEMS INDICATED TO BE REMOVED AND SALVAGED FOR THE VA SHALL REMAIN THE VA'S
PROPERTY AND SHALL BE CAREFULLY REMOVED, CLEANED AND PROTECTED FROM DAMAGE
BY THE CONTRACTOR RESPONSIBLE AT ALL TIMES. ALL SUCH ITEMS INDICATED TO BE
SALVAGED WILL BE PACKAGED AND/OR CRATED AS REQUIRED BY THE VA/COR TO PROPERLY
PROTECT THEM FROM DAMAGE CAUSED BY THE HANDLING, MOVING AND/OR THE STORAGE
OF THESE ITEMS. ALL PACKAGES AND/OR CRATES OF ITEMS SHALL HAVE THEIR CONTENTS
CLEARLY MARKED AND FULLY IDENTIFIED ON BOTH THE TOP AND ONE SIDE OF EACH
CONTAINER TO BE COORDINATED WITH AND APPROVED BY THE VA/COR. DELIVER ALL
SALVAGED MATERIALS TO THE LOCATIONS INDICATED IN THE PROJECT DOCUMENTATION OR
TO THE GOVERNMENTS DESIGNATED STORAGE FACILITY ON THE STATIONS CAMPUS AS
DIRECTED BY THE VA/COR.
UNLESS OTHERWISE INDICATED OR STATED TO BE SAVED, SALVAGED OR IDENTIFIED AS
NEEDING TO REMAIN OR BE RELOCATED AND/OR REUSED, ALL ITEMS IDENTIFIED TO BE
REMOVED, DEMOLISHED, SCRAPED, ETC. BECOMES THE PROPERTY AND RESPONSIBILITY OF
THE CONTRACTOR AND AS SUCH IT IS THEIR RESPONSIBILITY TO REMOVE ALL SUCH ITEMS
FROM THE SITE ON A DAILY BASIS UNLESS OTHERWISE APPROVED BY THE VA/COR.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
DEMOLITION ITEMS OF VALUE TO THE CONTRACTOR(S) ARE NOT TO BE STORED ON SITE AND
NEED TO BE REMOVED ON A DAILY BASIS UNLESS OTHERWISE APPROVED BY THE VA/COR.
ALL ITEMS OF WORK THAT ARE IDENTIFIED AS EXISTING TO BE REMOVED AND
REUSED/REINSTALLED SHALL BE CAREFULLY DISCONNECTED, DETACHED, REMOVED AND
DISASSEMBLED AS REQUIRED FOR CONVENIENCE AND EASE OF HANDLING, MOVING,
STORAGE AND FOR THEIR PROTECTION FROM DAMAGE. ALL SUCH ITEMS ARE TO BE
INDIVIDUALLY WRAPPED, BOXED OR PLACED IN CARTONS FOR THE EASE OF HANDLING THE
MATERIALS AND THEIR PLACEMENT IN A VA/COR IDENTIFIED PROTECTED STORAGE AREA
(TBD) LOCATED ON THE STATION BUT NOT NECESSARILY CONVENIENT TO THE SITE OF THE
WORK. EACH ITEM SHALL BE FULLY CLEANED, FREE FROM DAMAGE, PREPARED FOR
SERVICE AND FULLY TESTED TO VERIFY ITS ABILITY FOR PROPER FUNCTIONAL REUSE PRIOR
TO BEING PLACED IN STORAGE. THE CONTRACTOR TAKES RESPONSIBILITY FOR AND
CERTIFIES ITS PERFORMANCE CAPABILITIES AND THE FACT THAT IT IS NOT DAMAGED AND
FULLY CAPABLE FOR REUSE WHEN READY FOR ITS REINSTALLATION. IN THE EVENTUALITY
THAT AN ITEM IS ULTIMATELY FOUND TO BE DAMAGED OR INOPERABLE AT THE POINT OF
REINSTALLATION THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A NEW
ITEM/DEVICE ALONG WITH ALL ANCILLARY SUPPORT WORK AND EQUIPMENT NECESSARY TO
FULLY REPLACE THE EXISTING.
WHERE EXISTING MATERIALS, ITEMS OR EQUIPMENT ARE TO BE REMOVED FOR THEIR
REPLACEMENT IN THE SAME LOCATION BY THE SAME OR SIMILAR NEW MATERIALS, ITEMS OR
EQUIPMENT, CAREFULLY DISCONNECT, DETACH, DISASSEMBLE IF REQUIRED, REMOVE AND
DISPOSE OF THE ITEMS INDICATED ALONG WITH ANY AND ALL ANCILLARY SYSTEM
COMPONENTRY OR SUPPORT ITEMS ADDITIONALLY IDENTIFIED OR REQUIRED TO BE
REPLACED.
WHERE STRUCTURAL SUPPORT OF EXISTING CONSTRUCTION ELEMENTS OR PORTIONS OF
STRUCTURAL ELEMENTS TO REMAIN IS REQUIRED THE RESPONSIBLE CONTRACTOR
PERFORMING THE WORK SHALL PROVIDE AND MAINTAINING ALL NECESSARY STRUCTURAL
SUPPORTS, SHORING, STIFFENERS, BRACING, BEAMS, COLUMNS, FOOTINGS AND SUPPORTS
AS NECESSARY TO ENSURE THE STABILITY OF THE ELEMENTS BEING SUPPORTED AND TO
ADEQUATELY DISTRIBUTE ANY TEMPORARY LOADING SO AS NOT TO OVER LOAD ANY OF THE
EXISTING STRUCTURE AND THE CONSTRUCTION BELOW. THIS CONTRACTOR SHALL BE
RESPONSIBLE FOR PROVIDING ALL STRUCTURAL ENGINEERING ANALYSIS, CALCULATIONS
AND SOLUTIONS FOR PROVIDING ANY SUCH WORK AND WILL NEED TO PROVIDE ALL SUCH
PROPER DOCUMENTATION PREPARED BY A LICENSED STRUCTURAL ENGINEER TO THE
VA/COR AS A SHOP DRAWING SUBMITTAL FOR PROPER REVIEW AND APPROVAL BEFORE
BEING ALLOWED TO BEGIN ANY SUCH WORK
ALL EXISTING CONSTRUCTION OR ITEMS INDICATED TO REMAIN IN PLACE AND OPERATION
SHALL BE PROTECTED FROM DAMAGE BOTH DURING THE DEMOLITION OPERATIONS AS WELL
AS THE NEW CONSTRUCTION EFFORTS. WHERE PRACTICABLE, AND WITH THE VA/COR'S
APPROVAL, THE CONTRACTOR MAY ELECT TO REMOVE SUCH ITEMS TO A SUITABLE
STORAGE LOCATION DURING THE DEMOLITION PHASE AND THEN PROPERLY CLEAN AND
REINSTALL THE ITEMS WHEN APPLICABLE. IN NO CASE SHALL ANY LIFE SAFETY DEVICES,
SYSTEMS OR MEASURES BE COMPROMISED BY THE TEMPORARY REMOVAL OF ANY
NECESSARY ELEMENTS OF WORK, FOR THE CONVENIENCE OF THE CONTRACTOR, THAT
WERE NOT PROPERLY REPLACED IN KIND WITH A SIMILAR PROPERLY OPERATING
TEMPORARY DEVICE.
DURING THE COURSE OF SELECTIVE DEMOLITION OR REMOVAL OPERATIONS AND THE
EXISTING SUBSTRATE MATERIALS/CONSTRUCTION IS DAMAGED BEYOND REASONABLE
REPAIR, THE CONTRACTOR SHALL BE RESPONSIBLE TO FULLY REPLACE THE ENTIRE
DAMAGED SECTION AND/OR SECTIONS. THIS DAMAGED AREA SHALL BE REMOVED AND
REPLACED AS REQUIRED TO REPAIR THE SUBSTRATE TO A LIKE NEW CONDITION THAT
CONTAINS NO IRREGULAR JOINT CONNECTIONS, CONDITIONS, DEFECTS, WEAKNESS OR WILL
CAUSE ADVERSE EFFECTS THAT WILL RESULT IN ANY DIFFERENTIAL FINISHED SURFACE
CONDITIONS OR AREAS OF JOINT WEAKNESS THAT WILL RESULT IN SURFACE CRACKING AND
BE APPARENT THAT THE CONDITION IS IN FACT A PATCH/REPAIR.
REFER TO ALL ENGINEERING DISCIPLINE DRAWINGS AND DOCUMENTATION FOR THE BASIC
EXTENT BEING REQUIRED FOR ALL INFRASTRUCTURE AND SYSTEMS DEMOLITION AS WELL
AS FOR IDENTIFYING ALL EXISTING EQUIPMENT, PIPING, CONDUITS, DUCTWORK, WIRING,
CONTROLS, ETC. THAT ARE INTENDED TO REMAIN WITHIN ANY OF THE AREAS OF
DEMOLITION, THE AREAS OF REWORKING OF EXISTING SYSTEMS AND THE AREAS OF NEW
WORK.
UNLESS OTHERWISE NOTED ALL EXISTING PARTITION CONSTRUCTION WITHIN THE PROJECT
AREA OF WORK SCHEDULED TO RECEIVE NEW FINISHES SHALL HAVE ALL EXISTING FINISHES
REMOVED INCLUDING BUT NOT LIMITED TO ALL CERAMIC TILE, VINYL WALL COVERING, WOOD
PANELING, WAINSCOT MATERIALS, GROUT, MASTIC, WALL COVERING BACKING, WALL BASE,
ADHESIVE, STAPLES, EXPOSED FASTENERS, ETC. SUCH THAT THE SUB-STRAIGHT
WALL/PARTITION SURFACES REQUIRE NO FURTHER DEMOLITION AND ARE PREPARED TO
RECEIVE ALL REQUIRED PATCHING, REPAIRS, RESURFACING AND REFINISHING AS REQUIRED
TO RECEIVE THE NEW FINISHES.
ALL FINISHED AREAS ADJACENT TO OR INCLUDED WITHIN THE AREA(S) OF CONSTRUCTION
ALONG WITH ALL PUBLIC PROJECT ACCESS ROUTES SHALL BE PROTECTED FROM DUST AND
DIRT THROUGH THE USE OF VA/COR APPROVED DUSTPROOF PROTECTION. SEE THE
OCCUPIED AREA PROTECTION PROTOCOLS PROVIDED IN THE "GENERAL" DRAWINGS
SECTION AND COORDINATE ALL SITE SPECIFIC CONDITIONS IMPACTS ENCOUNTERED WITH
THE VA/COR.
ALL NEW WORK ALONG WITH ANY PORTIONS OF EXISTING EQUIPMENT, MATERIALS OR
REWORKED ELEMENTS WHEN COMPLETED SHALL FULLY COMPLY WITH ALL BASES OF
DESIGN REQUIREMENTS.
IT SHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO ADEQUATELY PROTECT
EXISTING CONSTRUCTION AND FINISHES TO REMAIN IN PLACE DURING BOTH THE
DEMOLITION AND CONSTRUCTION SEQUENCES OF WORK. ANY DAMAGE TO SUCH AREAS
SHALL BE RESTORED AND REFINISHED TO A "LIKE-NEW" CONDITION PRIOR TO THE VA/COR'S
ACCEPTANCE OF THAT WORK.
THE GENERAL/PRIME CONTRACTOR IS RESPONSIBLE FOR THE PATCH, REPAIR, REFINISHING
AND/OR REPLACEMENT OF ALL CONSTRUCTION, MATERIALS, ASSEMBLIES, EQUIPMENT,
SIGNAGE AND FINISHES DAMAGED BY THE PROJECT DEMOLITION, TEMPORARY
CONSTRUCTION, NEW CONSTRUCTION OR THE MOVEMENT OF PERSONNEL, TOOLS,
EQUIPMENT, MATERIALS, ETC. BOTH INSIDE AND OUTSIDE OF THE DESIGNATED AREAS OF
WORK.
PROVIDE THE CUTTING AND PATCHING FOR ALL DEMOLITION WORK AND ALL NEW
CONSTRUCTION WORK BEING PERFORMED OUTSIDE OF THE PROJECT LIMIT LINES AS
REQUIRED TO PROPERLY COMPLETE THE PROJECT SCOPE OF WORK.
ALL CUTTING, CORING AND DRILLING OF EXISTING CONCRETE AND MASONRY
CONSTRUCTION SHALL NOT DAMAGE EXISTING REINFORCING STEEL, PIPING, CONDUITS OR
OTHER CONCEALED CONSTRUCTION WITHIN. PRIOR TO CORING, DRILLING, CUTTING OR
PERFORMING ANY BREAKING EFFORTS, PROVIDE PENETRATING FIELD X-RAYING OF THE
INTENDED AREAS AND DOCUMENT THE EXACT SIZE AND LOCATIONS OF ALL SUCH
INTERFERENCES. COORDINATE WITH AND OBTAIN VA/COR APPROVAL BEFORE PROCEEDING
WITH ANY SUCH REQUIRED PENETRATIONS WORK.
THE GENERAL/PRIME CONTRACTOR IS RESPONSIBLE TO PROVIDE THE REMOVAL OF ALL
CONSTRUCTION DEMOLITION DEBRIS, SPOIL AND MATERIALS FROM THE PROJECT SITE ON A
DAILY BASIS UNLESS SPECIFICALLY REFERENCED OTHERWISE IN THE PROJECT SPECIFIC
LOGISTICAL SEQUENCING REQUIREMENTS OR AS APPROVED BY THE VA/COR.
1.
2.
3.
4.
5.
6.
7.
8.
VERIFY AND COORDINATE ALL PROTECTION REQUIREMENTS TO BE PROVIDED FOR EACH
SPECIFIC AREA OR LOCATION OF SCHEDULED WORK WITH THE VA/COR, BEFORE BEGINNING ANY
WORK. WHEN PERFORMING CONSTRUCTION WORK (DEMOLITION OR NEW) IN OCCUPIED
SPACES, THE FOLLOWING PROTECTION PROTOCOLS WILL BE FOLLOWED ON A DAILY BASIS
UNLESS MODIFIED IN WRITING BY THE VA/COR ON A CASE BY CASE BASIS:
CAREFULLY MOVE/RELOCATE ANY SIGNAGE, WALL HUNG ITEMS, BLINDS, CURTAINS, ETC.
THAT ARE WITHIN THE AREA/ZONE WHERE THE WORK IS TO BE ACCOMPLISHED AND IN
DANGER OF BEING DAMAGED BY THE PERFORMANCE OF THE WORK, INCLUDING DAMAGE
THAT CAN BE CAUSED BY FALLING OBJECTS, DUST OR MOISTURE. NOTE: THIS ALSO APPLIES
TO THE DIRECT ACCESS ROUTE(S) THRU THE OCCUPIED AREA(S) TO AND FROM THE ACTUAL
WORK AREA/ZONE. NOTE: THE VA/COR WILL BE RESPONSIBLE TO MOVE/RELOCATE ANY
FURNITURE, EQUIPMENT, BOXES, FILES, USER BELONGINGS, ETC. THAT WOULD BE IN THE
AREA OF WORK AND OBSTRUCT/INTERFERE WITH THE PERFORMANCE OF THE
CONTRACTOR'S WORK. COORDINATE ALL REQUIRED VA RELOCATIONS WITH VA/COR.
CAREFULLY PROVIDE FULL PROTECTIVE DUST, MOISTURE AND DAMAGE PREVENTION
BARRIERS/COVERS FOR ALL SUCH ITEMS ADDRESSED ABOVE INCLUDING THE ADDITIONAL
PROTECTION OF ALL WALL SURFACES/FINISHES, WINDOWS/GLAZING, DOORS, FRAMES,
HARDWARE, CARPETING, FLOOR COVERINGS, WALL BASE, ELECTRICAL DEVICES,
WALL/CEILING MOUNTED EQUIPMENT & CONTROLS, CEILING CONSTRUCTION, TILE, GRID,
WALL ANGLES, LIGHT FIXTURES, DIFFUSERS, GRILLES, LIFE SAFETY DEVICES, FIRE
SPRINKLER HEADS, ETC.
FLOOR FINISHES SHALL BE PROTECTED THROUGHOUT THE AREA WITH A 6 MIL HEAVY DUTY
STRING REINFORCED FIRE RETARDANT POLYETHYLENE SHEETING (VISQUEEN) AND/OR
TEMPORARY TARPAULIN(S)/DROP CLOTH(S) AS A MINIMUM FOR DUST, MOISTURE AND VERY
LIGHT FOOT TRAFFIC PROTECTION.
ALL MAIN TRAFFIC AREAS TO AND INSIDE THE WORK ZONE/AREAS SHALL HAVE ADDITIONAL
PROTECTION PROVIDED OVER THE 6 MIL HEAVY DUTY STRING REINFORCED FIRE
RETARDANT POLYETHYLENE SHEETING (VISQUEEN), IN THE FORM OF FULL SHEETS OF 3/16 ”
TEMPERED HARDBOARD (MASONITE) 4'X8' PANELS. ALL MASONITE PANELS SHALL BE FIRMLY
HELD TOGETHER AND SECURED IN PLACE VIA THE USE OF AN INDUSTRY APPROVED 2"
HEAVY DUTY CONSTRUCTION ADHESIVE TAPE, INTENDED FOR THIS APPLICATION. NOTE: ALL
BOARD TO BOARD JOINTS WILL BE FULLY TAPED THE LENGTH OF THE JOINT AND ALL BOARD
TO VISQUEEN JOINTS WILL BE TAPED AT 4' ON CENTER WITH A MINIMUM 8 ” LENGTH OF TAPE.
PAINTERS TAPE AND/OR MASKING TAPE ARE NOT CONSIDERED EQUIVALENTS TO THE HEAVY
DUTY CONSTRUCTION ADHESIVE TAPE BEING SPECIFIED.
CONSTRUCT A TEMPORARY FULL HEIGHT, FULLY SEALED, SEPARATION WALL AROUND ALL
CONSTRUCTION AREAS/ZONES IN ORDER TO CONTAIN AS MUCH DUST AND DEBRIS AS
POSSIBLE DURING THE PERFORMANCE OF ANY DEMOLITION, CONSTRUCTION AND CLEAN-UP
WORK.
WHEN ALL WORK IS COMPLETED FOR THE PREARRANGED SPECIFIC LOCATION(S),
SCHEDULED TASKING AND IDENTIFIED PERIOD OF TIME THE ENTIRE AREA IS TO BE FULLY
CLEANED-UP, ALL TEMPORARY SEPARATION WALLS AND PROTECTION REMOVED WITH ALL
ITEMS IDENTIFIED IN NOTE #1 RETURNED TO THEIR PRIOR FUNCTIONING POSITIONS. NOTE:
FULLY CLEANED-UP MEANS COMMERCIALLY VACUUM CLEANED WITH ALL SURFACES BEING
FULLY WIPED DOWN AND DUST FREE AS THE CONTRACTOR ACCEPTED THE AREA/SPACE
PRIOR TO PERFORMING THE WORK.
THE BASIS OF DESIGN FOR ALL 6 MIL HEAVY DUTY STRING REINFORCED FIRE RETARDANT
POLYETHYLENE SHEETING WILL BE IN FULL COMPLIANCE WITH NFPA 701-04, ASTM E84 AND
CPAI 84 SECTION 6. IT SHALL BE MANUFACTURED WITH 3 PLY CONSTRUCTION CONSISTING
OF FIRE RETARDANT VIRGIN POLYETHYLENE IN THE (2) OUTER LAYERS OF PLASTIC WITH A
DIAMOND SCRIM REINFORCING MESH PLACED BETWEEN. POLYETHYLENE SHEETING TO BE
USED ONLY IN NON-COMBUSTIBLE SPACES SUCH AS ABOVE THE CEILING LINE.
MOBILE CONTAINMENT SYSTEMS MAY BE UTILIZED WHERE APPLICABLE, IF APPROVED FOR
USE BY THE VA/COR. MOBILE UNITS SHALL BE FULLY EQUIPPED WITH A NEGATIVE AIR HEPA
FILTRATION SYSTEM THAT IS IN COMPLIANCE WITH THE INFECTION CONTROL
REQUIREMENTS OF EACH SPECIFIC AREA OF WORK AND TASK BEING PERFORMED.
GENERAL DEMOLITION NOTESOCCUPIED AREAS PROTECTION PROTOCOLS
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
ALL WORK SHALL BE COMPLETED IN ACCORDANCE WITH ALL PUBLISHED APPLICABLE LOCAL /
STATE / FEDERAL / NATIONAL CODES, ORDINANCES AND REGULATIONS ALONG WITH ALL RELATED VA DIRECTIVES, DESIGN GUIDES AND MANUALS, SPECIFICATIONS AND STANDARDS PLUS ALL VA
REQUIREMENTS (FEDERAL AND LOCAL) THAT ARE PROJECT SPECIFIC TO THE DOCUMENTED
SCOPE OF WORK ON THIS SITE.
CONTRACTORS SHALL REFERENCE ALL DRAWINGS IN ALL SECTIONS OF WORK FOR FULLY
DEFINING THEIR SCOPE OF WORK RESPONSIBILITIES AND COORDINATE SAME WITH THE
GENERAL/PRIME CONTRACTOR. SUBCONTRACTORS AND SUPPLIERS FOR EACH TRADE ARE
ADVISED THAT INFORMATION PERTINENT TO THEIR SCOPE OF WORK ALSO OCCURS IN OTHER
SECTIONS OF THE DRAWINGS AND THE COMPLETE SET OF CONTRACT DOCUMENTS.
ALL ENGINEERING SYSTEMS WORK INCLUDED IN THE CONTRACT DRAWINGS SHALL BE TAKEN IN A SENSE AS A DIAGRAMMATIC REPRESENTATION OF ITS INTENDED PLACEMENT AND DISTRIBUTION
WITHIN THE GENERAL PROXIMITY WHERE SHOWN. THE SIZE AND THE MEANS OF RUNNING
DISTRIBUTION SYSTEMS ARE SHOWN BUT IT IS NOT INTENDED TO SHOW EVERY CONNECTION,
FITTING, OFFSET, SUPPORT ELEMENT, OR EVERY STRUCTURAL DIFFICULTY THAT CAN BE
ENCOUNTERED DURING THE INSTALLATION OF THE WORK.
PROJECT LIMIT LINES ARE SHOWN ON THE DRAWINGS FOR ORIENTATION PURPOSES ONLY AND
SHOULD NOT BE CONSTRUED TO INDICATE THE FULL EXTENT OR LIMITS OF THE AREA(S) OF
WORK.
EACH CONTRACTOR PRIOR TO THE COMMENCEMENT OF WORK SHALL FULLY COORDINATE AND
VERIFY WITH ALL OTHER CONTRACTORS, OTHER TRADES AND THE VA/COR CONCERNING ALL
SPACE REQUIREMENTS FOR THIS PROJECT. THE GENERAL/PRIME CONTRACTOR SHALL BE
RESPONSIBLE FOR COMMUNICATING, DOCUMENTING AND COORDINATING ALL SPACE
REQUIREMENTS WITH THE VA/COR TO AVOID CONFLICTS AND MISCOMMUNICATION.
ALL EXISTING BUILDING UTILITIES AND INFRASTRUCTURE SERVICES SYSTEMS THAT FEED OTHER
SPACES OUTSIDE THE DEMISED PROJECT AREA AND THAT ARE LOCATED WITHIN THE AREA OF
WORK, THEREBY INTERFERING WITH THE NEW CONSTRUCTION, SHALL BE REROUTED AND
RELOCATED AS REQUIRED TO MAINTAIN FULL SERVICE TO THE AFFECTED AREAS.
ALL FINISHED AREAS ADJACENT TO OR INCLUDED WITHIN THE AREA(S) OF CONSTRUCTION
ALONG WITH ALL PUBLIC PROJECT ACCESS ROUTES SHALL BE PROTECTED FROM DUST AND DIRT
THROUGH THE USE OF VA/COR APPROVED DUSTPROOF PROTECTION. SEE THE OCCUPIED AREA
PROTECTION PROTOCOLS PROVIDED IN THE "GENERAL" DRAWINGS SECTION AND COORDINATE
ALL SITE SPECIFIC CONDITIONS IMPACTS ENCOUNTERED WITH THE VA/COR.
DO NOT SCALE THE DRAWINGS. USE THE GIVEN DIMENSIONS.
THE GENERAL/PRIME CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL SHOP
DRAWING REQUIREMENTS WITH ALL OF THE AFFECTED TRADES, THE VA/COR AND WITH THE AE.
OBTAIN ALL REQUIRED VA/COR AUTHORIZATIONS BEFORE BEGINNING ANY DEMOLITION WORK OR
NEW CONSTRUCTION, INCLUDING TEMPORARY BARRICADES AND PROTECTION WORK.
IT SHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO ADEQUATELY PROTECT EXISTING
CONSTRUCTION AND FINISHES TO REMAIN IN PLACE DURING BOTH THE DEMOLITION AND
CONSTRUCTION SEQUENCES OF WORK. ANY DAMAGE TO SUCH AREAS SHALL BE RESTORED AND
REFINISHED TO A "LIKE-NEW" CONDITION PRIOR TO THE VA/COR'S ACCEPTANCE OF THAT WORK.
THE GENERAL/PRIME CONTRACTOR IS RESPONSIBLE FOR THE PATCH, REPAIR, REFINISHING
AND/OR REPLACEMENT OF ALL CONSTRUCTION, MATERIALS, ASSEMBLIES, EQUIPMENT, SIGNAGE
AND FINISHES DAMAGED BY THE PROJECT DEMOLITION, TEMPORARY CONSTRUCTION, NEW
CONSTRUCTION OR THE MOVEMENT OF PERSONNEL, TOOLS, EQUIPMENT, MATERIALS, ETC. BOTH
INSIDE AND OUTSIDE OF THE DESIGNATED AREAS OF WORK.
PROVIDE THE CUTTING AND PATCHING FOR ALL DEMOLITION WORK AND ALL NEW
CONSTRUCTION WORK BEING PERFORMED OUTSIDE OF THE PROJECT LIMIT LINES AS REQUIRED
TO PROPERLY COMPLETE THE PROJECT SCOPE OF WORK.
GENERAL NOTES
1.
2.
ALL CONTRACTORS, SUBCONTRACTORS AND THEIR REPRESENTATIVES WORKING ON THIS
PROJECT SHALL AT ALL TIMES PRIOR TO AND DURING THE COURSE OF THEIR ACTIVITY BE
RESPONSIBLE FOR THE SAFETY OF THEIR EMPLOYEES, ALL OTHERS AND ARE TO BE IN CARE
OF THE PROPERTY.
EACH CONTRACTOR OR SUBCONTRACTOR, AS REPRESENTATIVES OF THEIR EMPLOYEES,
SHALL ASCERTAIN THAT THE CONDITIONS UNDER WHICH THEY WILL BE REQUIRED TO
ACCOMPLISH THEIR WORK ARE SAFE AND MEET ALL APPLICABLE REQUIREMENTS OF THE
OCCUPATIONAL SAFETY AND HAZARD ACT, ALONG WITH ALL OTHER APPLICABLE GOVERNING
REGULATIONS AND VA REQUIREMENTS.
SPECIAL SAFETY NOTES
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
Bancroft Project No. VA CONTRACT NO. 01/27/2025
GENERAL - GENERAL PROJECT NOTES RENOVATE SPACES B217A &
B218A FOR MENTAL HEALTH
SERVICES
VA SORCC - WHITE CITY VA MEDICAL CENTER
CZ RMB
692-22-105
GI001
B217A & B218A
100% - ISSUE FOR BID
22-11036C26018D0044 Revisions: Date:
35% CONSTRUCTION DOCUMENTS 03/10/2023
50% CONSTRUCTION DOCUMENTS 12/18/2023
95% CONSTRUCTION DOCUMENTS 02/02/2024
100% CONSTRUCTION DOCUMENTS 04/05/2024
TOTAL RENOVATIONS 11,450 GSF
B217A FIRST FLOOR 6,915 GSF
B218A FIRST FLOOR 3,985 GSF
B218A SECOND FLOOR 550 GSF
AREA NOT IN CONTRACT
BUILDING B217A - 6,915 SF
BUILDING B218A - 3,985 SF
B217A B218A
1 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
B
C
D
E
F
A
B
C
D
E
F
CONSULTANT ARCHITECT/ENGINEER OF RECORD STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Drawing Title
Approved: Project Director
Phase Project Title Project Number
Building Number
Drawing NumberLocation
Issue Date Checked Drawn
VA FORM 08-6231
FULLY SPRINKLERED
Bancroft Project No. VA CONTRACT NO. 01/27/2025
GENERAL - CODE AND BUILDING
INFORMATION
RENOVATE SPACES B217A &
B218A FOR MENTAL HEALTH
SERVICES
VA SORCC - WHITE CITY VA MEDICAL CENTER
CZ RMB
692-22-105
GI101
B217A & B218A
100% - ISSUE FOR BID
22-11036C26018D0044
PROJECT INFORMATION
GROSS SQUARE FOOTAGE INFORMATION
PROGRAM AREAS
(NET SQUARE FEET)
N 1/16" = 1'-0"
1 AREA OF WORK PLAN
ROOM NAME PROGRAM TYPE AREA
STORAGE (EX) SUPPORT 125 SF
TOILET (EX) SUPPORT 79 SF
TOILET (EX) SUPPORT 79 SF
TOILET SUPPORT 75 SF
TOILET SUPPORT 75 SF
STOR. SUPPORT 67 SF
CORRIDOR SUPPORT 925 SF
CORRIDOR SUPPORT 544 SF
CORRIDOR SUPPORT 336 SF
MEZZANINE (EX) SUPPORT 301 SF
STAIRS (EX) SUPPORT 192 SF
CORRIDOR SUPPORT 398 SF
CORRIDOR SUPPORT 364 SF
CORRIDOR SUPPORT Not Placed
ROOM NAME PROGRAM TYPE AREA
RISER (EX) EXISTING TO REMAIN 63 SF
TREATMENT (EX) EXISTING TO REMAIN 206 SF
ELEC (EX) EXISTING TO REMAIN 52 SF
TR / ELEC (EX) EXISTING TO REMAIN 86 SF
HAC (EX) EXISTING TO REMAIN 69 SF
ELEC (EX) EXISTING TO REMAIN 100 SF
CONFERENCE (EX) EXISTING TO REMAIN 256 SF
ROOM NAME PROGRAM TYPE AREA
OFFICE OFFICE / CONSULTATION 168 SF
OFFICE OFFICE / CONSULTATION 188 SF
OFFICE OFFICE / CONSULTATION 176 SF
OFFICE OFFICE / CONSULTATION 176 SF
OFFICE OFFICE / CONSULTATION 176 SF
OFFICE OFFICE / CONSULTATION 176 SF
OFFICE OFFICE / CONSULTATION 175 SF
OFFICE OFFICE / CONSULTATION 176 SF
OFFICE OFFICE / CONSULTATION 175 SF
OFFICE OFFICE / CONSULTATION 176 SF
OFFICE OFFICE / CONSULTATION 243 SF
OFFICE OFFICE / CONSULTATION 241 SF
OFFICE OFFICE / CONSULTATION 176 SF
OFFICE OFFICE / CONSULTATION 176 SF
OFFICE OFFICE / CONSULTATION 176 SF
OFFICE OFFICE / CONSULTATION 176 SF
OFFICE OFFICE / CONSULTATION 205 SF
OFFICE OFFICE / CONSULTATION 207 SF
OFFICE OFFICE / CONSULTATION 215 SF
OFFICE OFFICE / CONSULTATION 211 SF
FLEX OFFICE (EX) OFFICE / CONSULTATION 114 SF
FLEX OFFICE (EX) OFFICE / CONSULTATION 113 SF
OFFICE OFFICE / CONSULTATION 191 SF
OFFICE OFFICE / CONSULTATION 181 SF
OFFICE (EX) OFFICE / CONSULTATION 171 SF
OFFICE (EX) OFFICE / CONSULTATION 160 SF
OFFICE (EX) OFFICE / CONSULTATION 166 SF
OFFICE (EX) OFFICE / CONSULTATION 156 SF
ROOM NAME PROGRAM TYPE AREA
MSA / STAFF INTAKE / MSA STAFF 166 SF
MSA / STAFF INTAKE / MSA STAFF 130 SF
CHECK-IN/OUT INTAKE / MSA STAFF 374 SF
ATRIUM / WAITING INTAKE / MSA STAFF 661 SF
EGRESS REQUIREMENTS
AISLES, CORRIDOR AND RAMPS REQUIRED FOR EXIT ACCESS
MINIMUM CLEAR WIDTH FOR DOORS IN THE MEANS OF EGRESS
DEAD END CORRIDORS
COMMON PATH OF TRAVEL
44" MINIMUM
2'-8" (32")
50' 100'
TRAVEL DISTANCE BETWEEN ANY POINT IN A ROOM AND EXIT /
TRAVEL DISTANCE TO SMOKE BARRIER DOOR
200'
NFPA 101, 2021
HAZARDOUS AREAS REQUIREMENTS
MINIMUM CEILING HEIGHT 7'-6"
FIRE EXTINGUISHER REQUIREMENTS
NFPA 10, 2018, TABLE 6.2.1.1
MINIMUM RATED SINGLE EXTINGUISHER 2-A, 2 1/2 GALLON
MAXIMUM FLOOR AREA PER UNIT OF A 1,500 SQ FT
MAXIMUM FLOOR AREA PER EXTINGUISHER
MAXIMUM TRAVEL DISTANCE TO EXTINGUISHER
11,250 SQ FT
75 FT
EXTINGUISHERS REQUIRED
EXTINGUISHERS PROVIDED NO NEW FE PROVIDED IN PROJECT - (4) EXISTING FE CABINETS ARE WITHIN CURRENT AREA -
REFER TO LIFE SAFETY PLANS FOR EXISTING LOCATIONS
BUILDING DATA
APPLICABLE CODE
USE AND OCCUPANCY CLASSIFICATION
NFPA 101, 2021
CHAPTER 38/39 NEW AND EXISTING BUSINESS
OCCUPANT LOAD BUSINESS USE:
150 SF PER OCCUPANT. 10,900/150=73 OCCUPANTS
TABLE 7.3.1.2
FIRE RESISTIVE RATINGS
NFPA 220, TABLE 4.1.1
EXISTING BEARING WALLS
INTERIOR BEARING WALLS
COLUMNS
BEAMS/GIRDERS/TRUSSES/ARCHES
FLOOR/CEILING ASSEMBLIES
ROOF/CEILING ASSEMBLIES
EXTERIOR NON-BEARING WALLS
INTERIOR NON-BEARING WALLS
0 HRS
0 HRS
EGRESS CAPACITY .2" PER PERSON (LEVEL COMPONENTS)
INTERIOR FINISH (38.3.3) INTERIOR FINISHES SHALL BE IN
ACCORDANCE WITH 10.2
0 HRSUPPORTING MORE THAN ONE FLOOR,
COLUMNS, OR OTHER BEARING WALLS
SUPPORTING ONE FLOOR ONLY
SUPPORTING A ROOF ONLY
SUPPORTING MORE THAN ONE FLOOR,
COLUMNS, OR OTHER BEARING WALLS
SUPPORTING ONE FLOOR ONLY
SUPPORTING A ROOF ONLY
SUPPORTING MORE THAN ONE FLOOR,
COLUMNS, OR OTHER BEARING WALLS
SUPPORTING ONE FLOOR ONLY
SUPPORTING A ROOF ONLY
SUPPORTING MORE THAN ONE FLOOR,
COLUMNS, OR OTHER BEARING WALLS
SUPPORTING ONE FLOOR ONLY
SUPPORTING A ROOF ONLY
CONSTRUCTION TYPE TYPE V (000)
HEIGHT 1 FLOOR
AREA 10,900 SF
SUBDIVISION OF BUILDING SPACES 38.3.7
CONSTRUCTION OF CORRIDOR WALLS NO FIRE RESISTIVE RATING, AUTOMATIC
SPRINKLER SYSTEM PROVIDED
38.3.6.1
NUMBER OF MEANS OF EGRESS 2 PER STORY, 2 PER ROOM >2500 SQUARE FEET
CODE REVIEW SUMMARY
SECTION
38.3.3
NFPA 10, 2021 TABLE 6.2.1.1 ORDINARY HAZARD OCCUPANCY
10,900 SF / 11,250 SF = 0.97 = 1 EXTINGUISHER PER SQ FT REQUIRMENTS
NFPA 101, 2021
SOILED LINEN / TRASH EXCEEDING 64 GAL.
APPLICABLE CODE
SHAFT ENCLOSURE
NO RESTRICTIONS
0 HR
0 HR
0 HR
0 HR
0 HR
0 HR
0 HR
0 HR
0 HR
0 HR
0 HR
0 HR
0 HR
APPLICABLE CODES
ALL WORK SHALL COMPLY WITH THE MOST RECENTLY ADOPTED VERSIONS OF THE FOLLOWING
CODES:
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NCS APPLICATION GUIDE,
VA SUSTAINABLE DESIGN MANUAL AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION
LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA
DOCUMENTS).
NFPA 101 LIFE SAFETY CODE (LSC). NFPA NATIONAL FIRE CODES WITH EXCEPTION OF NFPA
5000 AND NFPA 900.
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
VA SEISMIC DESIGN REQUIREMENTS, H-18-8.
NATIONAL ELECTRICAL CODE (NEC) .
INTERNATIONAL PLUMBING CODE (IPC).
ASME CODE FOR PRESSURE PIPING.
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA
SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13).
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE
INSTITUTE AND COMMENTARY (ACI 318).
ENERGY POLICY ACT OF 2005 (EPAct) ENERGY EFFICIENCY PROVIDED ( COMCHECK NOT
APPLICABLE TO THIS PROJECT)
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS: STATED IN THE GENERAL
REQUIREMENTS SECTION 01 00 00 OF THE VA MASTER SPECIFICATION.
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY- ASHRAE STANDARD 62.1.
SAFETY STANDARD FOR REFRIGERANT SYSTEMS- ASHRAE STANDARD 15.
ASHRAE-110 F VELOCITY MEASUREMENT PROCEDURES.
SHEET METAL AND AIR CONDITIONING CONTRACTORS ASSOCIATION (SMACNA).
INTERNATIONAL MECHANICAL CODE (IMC).
UNDERWRITER'S LABORATORIES (UL).
ASHRE 90.1.
NFPA 241 - DEMOLITION
ARCHITECTURAL BARRIERS ACT
PER ICC/ANSI-A117.1 THE FOLLOWING COMPLY FULLY:
ACCESSIBLE MAIN ENTRY.
ACCESSIBLE TOILET ROOM.
ACCESSIBLE HI-LO DRINKING FOUNTAIN.
ALL CONTROLS AND OPERABLE PARTS FULLY COMPLY AND ARE BETWEEN 15" AND 48".
ALL SIGNAGE COMPLIES - IS OF BRAILLE AND TACTILE AND IS LOCATED ON THE DOOR
HANDLE SIDE OF DOOR. INSTALLED AT APPROPRIATE HEIGHT AND DISTANCE FROM DOOR
FRAME.
ICC/ANSI-A1117.1 TO THE ABA STANDARDS
1.
2.
3.
4.
5.
6.
Isolate HVAC system in area where work is being done to prevent contamination of duct system.
Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
Seal holes, pipes, conduits, and punctures.
Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave work site.
All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
1.
2.
3.
4.
5.
6.
7.
Do not remove barriers from work area until completed project is inspected by the owner ’s Safety Department and Infection Prevention & Control Department and thoroughly cleaned by the owner’s Environmental Services Dept.
Remove barrier material carefully to minimize spreading of dirt and debris associated with construction.
Contain construction waste before transport in tightly covered containers.
Cover transport receptacles or carts. Tape covering unless solid lid.
Vacuum work area with HEPA filtered vacuums.
Wet mop area with cleaner/disinfectant.
Upon completion, restore HVAC system where work was performed.
During Construction Project Upon Completion of Project
CL
AS
S I V
Description of Required Infection Control Precautions by Class
1.
2.
Execute work by methods to minimize raising dust from construction operations.
Immediately replace a ceiling tile displaced for visual inspection.
1. Clean work area upon completion of task.
1.
2.
3.
4.
5.
6.
Provide active means to prevent airborne dust from dispersing into atmosphere.
Water mist work surfaces to control dust while cutting.
Seal unused doors with duct tape.
Block off and seal air vents.
Place dust mat at entrance and exit of work area.
Remove or isolate HVAC system in areas where work is being performed.
1.
2.
3.
4.
Wipe work surfaces with disinfectant.
Contain construction waste before transport in tightly covered containers.
Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.
Remove isolation of HVAC system in areas where work is being performed.
1.
2.
3.
4.
5.
Remove or Isolate HVAC system in area where work is being done to prevent contamination of duct system.
Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
Contain construction waste before transport in tightly covered containers.
Cover transport receptacles or carts. Tape covering unless solid lid.
1.
2.
3.
4.
5.
Remove barrier material carefully to minimize spreading of dirt and debris associated with construction.
Contain construction waste before transport in tightly covered containers.
Cover transport receptacles or carts. Tape covering unless solid lid. Vacuum work area with HEPA filtered vacuums.
Wet mop area with disinfectant.
Remove isolation of HVAC system in areas where work is being performed.
CL
AS
S I
II
CL
AS
S I I
CL
AS
S I
Inspection and Non-Invasive Activities .
Includes, but is not limited to:
removal of ceiling tiles for visual inspection only, e.g., limited to 1 tile per 50 square feet painting (but not sanding) wallcovering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection.
Small scale, short duration activities which create minimal dust Includes, but is not limited to:
installation of telephone and computer cabling access to chase spaces cutting of walls or ceiling where dust migration can be controlled.
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:
sanding of walls for painting or wall covering removal of floorcoverings, ceiling tiles and casework new wall construction minor duct work or electrical work above ceilings major cabling activities any activity…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .