ATTACHMENT 3 Bid Schedule~1.xlsx

XLSX spreadsheet 175 KB Posted

Attached to
On-Call Aerial Pole Services Invitation to Bid
Solicitation number
00002626
Issued by
Oregon

About this file

This is a Bid Schedule (Attachment 3) for an Invitation to Bid #00002626 issued by the State of Oregon for On-Call Aerial Communications Maintenance and Repair services. The bid schedule outlines 35 distinct work items measured in linear feet, per span, or per unit, covering aerial cable installation, fiber-optic cable placement, wreck-out and removal operations, anchor installations, grounding work, riser installations, attachment transfers, pole work, and fiberglass arm installations. Bidders must provide unit pricing for all items, with ACMR-25 (raise, lower, or transfer first level attachment) designated as mandatory to quote. The contract requires submission of hourly labor rates for up to five labor classifications, hourly vehicle and equipment rates for nine categories of work vehicles and equipment with Labor Classification 3 (such as truck driver or aerial crew) mandatory, a mobilization fee, and material markup not to exceed 15 percent.

Pricing is structured across four billing categories: unit costs per work item including labor and vehicle costs; hourly crew member rates differentiated by standard hours (Monday-Friday 7 AM to 5 PM), outside standard hours, emergency standard hours, and emergency outside standard hours; hourly rates for vehicles and equipment under the same time classifications; and a one-time mobilization fee covering all labor and vehicle costs to mobilize to the work site. Labor and vehicle rates from the hourly tables shall not be charged for driving to and from the work site. Contractor shall charge in one-hour increments for onsite time with no additional mobilization fee applied. For bidding evaluation purposes, the City will use a hypothetical project consisting of 10 standard hours of aerial crew work, 10 standard hours of articulated telescoping truck usage, five instances of ACMR-25 work, and one mobilization fee. All rates are fixed and firm for the first year of the contract.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Aerial Maintenance and Repair

ATTACHMENT 3 to ITB #00002626 - BID SCHEDULE
On-call Aerial Communications Maintenance and Repair

Company name:

Table 1: Unit cost per work item, includes labor and vehicle costs. See Note 1.
ItemDescriptionUnit of Measurement (UOM)Price per UOMMandatory to quote this item
ACMR-1Place 1/4" 6.6M EHS Strand and associated hardwareLinear FootNo
ACMR-2Place 5/16" 11.2M EHS Strand and associated hardwareLinear FootNo
ACMR-3Place aerial cable and lash, first cable on bare strand, tag cable at each utility poleLinear FootNo
ACMR-4Place aerial cable and overlash to existing cable and strand, tag cable at each utility poleLinear FootNo
ACMR-5Place aerial fiber storage loopLinear FootNo
ACMR-6Lash fiber-optic cableLinear FootNo
ACMR-7Overlash fiber-optic cableLinear FootNo
ACMR-8De-lash and re-lash cableLinear FootNo
ACMR-9Install fiber-optic cable storage loop and associated hardwareLinear FootNo
ACMR-10Re-sag existing spanPer SpanNo
ACMR-11Wreck-out existing aerial plantLinear footNo
ACMR-12Wreck-out existing aerial plant, de-lash, remove cable from bundle and strand, re-lash remaining bundleLinear footNo
ACMR-13Install down guy and associated hardwareEachNo
ACMR-14Install screw anchor and thimble eye with associated hardwareEachNo
ACMR-15Install expanding (bust) anchor and thimble eye with associated hardwareEachNo
ACMR-16Install sidewalk anchor including post, guard, anchor, sidewalk arm if required, does not include sidewalk concrete restorationEachNo
ACMR-17Remove anchor and disposeEachNo
ACMR-18Sidewalk concrete restoration, per panelEachNo
ACMR-19Install copper ground bond, #6 copper wireEachNo
ACMR-20Install copper vertical ground, including rod, #6 copper wire, molding, to top communications attachment on utility poleEachNo
ACMR-21Remove and dispose of riserEachNo
ACMR-22Relocate riser, up to 2 feet, including new conduit sweeps or split duct. Does not include sidewalk restorationEachNo
ACMR-23Install 2" or 3" riser and stand-offs, additional hardwareEachNo
ACMR-24Install 4" riser and stand-offs, additional hardwareEachNo
ACMR-25Raise, lower, or transfer first level attachment. Includes sag adjustment and bond (mandatory to quote this)
EachYes
ACMR-26Raise, lower, or transfer additional level attachment(s). Includes sag adjustment and bond. Requires ACMR-22 for first attachmentEachNo
ACMR-27Raise, lower, or transfer 45-degree angled attachment. Includes sag adjustment and bondEachNo
ACMR-28Raise, lower, or transfer dead-end or T-lead attachment. Includes sag adjustment and bondEachNo
ACMR-29Transfer cable and messenger at T-shaped intersection. Includes bondEachNo
ACMR-30Transfer cable and messenger at 4-way intersection. Includes bondEachNo
ACMR-31Top pole and dispose. Price each in conjunction with transferEachNo
ACMR-32Remove and dispose of poleEachNo
ACMR-33Install up to 5 foot wooden alley arm on utility poleEachNo
ACMR-34Install one fiberglass arm (FGA) on utility poleEachNo
ACMR-35Additional mark-up for work off-road where a truck cannot reach. Price per linear foot added to each labor unitLinear FootNo
Table 2. Hourly Cost Per Crew Member (quote for any positions Contractor may employ to complete work). Contractor will use rates in Table 2 for work not priced per-unit. See Note 2.Position Title (enter titles of personnel as will appear on invoices)Standard Hours
M-F 7a-5pOutside

Standard Hours Emergency Standard Hours Emergency Outside Standard Hours

Rate per Hour ($)Rate per Hour ($)Rate per Hour ($)Rate per Hour ($)
Labor Classification 1

Such as Flagger Labor Classification 2 Such as General Laborer, Ground crew Labor Classification 3 (mandatory to quote this) Such as Truck driver, Aerial crew Labor Classification 4 Such as Line person Labor Classification 5 Such as Supervisor, Inspector, Manager, etc.

Table 3. Hourly Cost Per Vehicle or Equipment (quote for any items Contractor may employ to complete work). Contractor will use rates in Table 3 for vehicle costs not priced per-unit. See Note 3.Notes (if any)Standard Hours
M-F 7a-5pOutside

Standard Hours Emergency Standard Hours Emergency Outside Standard Hours

Rate per Hour ($)Rate per Hour ($)Rate per Hour ($)Rate per Hour ($)
Work Vehicle
Articulated telescoping bucket trucks, working height up to 40 feet (mandatory to quote this)
Articulated telescoping bucket trucks, working height up to 60 feet
Dump Truck, class 1 through 8
Vacuum Excavator, truck or trailer-mounted, minimum 500 CFM of air-flow
Equipment Trailer
Backhoe tractor or Excavator tractor
Mini Excavator, up to 12,000 pounds
Air Compressor
Utility Truck
Table 4. Mobilization Fee. See Note 4NotesAmount ($)
Amount for crew and equipment to mobilize onsite.
Table 5. Material Markup - See Note 5NotesMarkup %
For purchased items, amount Contractor adds as a percentage to the cost of materials required for the work performed.15% is a not-to-exceed amount, Contractor may charge a lesser amount.15%
Notes
Note 1Amount to be charged to City inclusive of delivery and installation costs. Contractor shall refrain from charging for other items not listed and will seek City approval to furnish other items not listed. Must quote ACMR-25.
Note 2Definition of business hours. Standard Hours M-F 7a-5p includes hours between 7 AM and 5 PM, Monday through Friday. Outside Standard Hours includes hours from 5 PM to 7 AM (evenings) and all Weekend hours between Friday at 5 PM and Monday at 7 AM. Emergency Standard Hours are the same time and days of the week as Standard Hours, when the Contractor responds to an emergency call-out. Emergency Outside Standard Hours are the same time and days of the week as Outside Standard Hours, when the Contractor responds to emergency call-out.
Note 3Contractor to charge in 1-hour increments for time onsite with no mobilization fee added other than as specified in Table 4.
Note 4Mobilization fee shall cover all labor and vehicle costs to mobilize to work site. Labor or vehicle rates from Table 1, 2, or 3 shall not be charged for driving to and from work site.
Note 5For special items not listed in this contract but needed to complete a City project, Contractor may purchase item then add 15% to the cost of materials. For example, if completion of project requires Contractor to purchase a special item for $10, then Contractor may charge City $11.50 for the item.
Note 6Rates to remain fixed and firm for first year of contract.
Note 7For bidding purposes, to determine lowest-cost bidder, City's evaluation method will be for this hypothetical project:

A) Aerial crew, 10 standard hours B) Articulated telescoping truck, 10 standard hours C) ACMR-25: raise, lower, or transfer first level attachments, 5 times D) Mobilization fee (if any), 1 time image1.png