This is a Bid Schedule for a construction project at San Bernardino National Wildlife Refuge in Chocise County, Arizona, for the construction of a New Fish Laboratory with an estimated completion date of February 26.

The project comprises ten direct cost line items totaling a direct cost subtotal to be determined by bidder pricing. Direct costs include: Earthwork (Item 0001), Demolition of the Old Fish Lab (Item 0002), Concrete work for slab, footing, and aprons at 2,345 square feet (Item 0003), Building enclosure including doors, windows, and canopy at 2,345 square feet (Item 0004), Metal Building Erection (Item 0005), Interior Partitions with doors (Item 0006), Walls and Roof Insulation (Item 0007), Electrical systems for power and lighting (Item 0008), Mechanical systems (Item 0009), and Uninstall, relocation, and reinstallation of Fish Laboratory Equipment including two RAS tanks from the current to new facility (Item 0010). The bid schedule requires bidders to provide unit prices and extended amounts for each line item. Additionally, bidders must calculate indirect costs as percentages applied to the direct cost subtotal, including Mobilization & Demobilization, Unknown and Rural Area Factor, Overhead Cost, Architectural & Engineering Services, and Insurance/Payment & Performance Bonds. A Profit percentage is then applied to derive the Total Base Award Price. The document is marked as a Confidential Government Estimate.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

San Bernardino NWR Feb-26 Chocise County, AZ New Fish Laboratory

CONFIDENTIAL GOV. ESTIMATE

ITEM

NO. Direct Cost Bid Item Description Unit Est QTY Unit Price AMOUNT

[0001] Earthwork JOB 1 [0002] Demolition (Old Fish Lab) JOB 1 [0003] Concrete (slab, footing, aprons) SF 2345

[0004]

(including doors, windows and canopy) SF 2345

[0005] Metal Building Erection JOB 1 [0006] Interior Partitions (including doors) JOB 1 [0007] Walls and Roof Insulation JOB 1 [0008] Electrical (power & lighting) JOB 1 [0009] Mechanical JOB 1

[00010]

Unistall, relocate and re-install Fish Laboratory Equipment (Including 2 RAS Tanks) from the current lab to the new lab JOB 1

[00012]

Direct Cost SUBTOTAL

Indirect Cost Item Description M Mobilization & Demobilization % U Unknown and Rural Area Factor % O Overhead Cost % G Architectural & Engineering Services % I Insurance, Payment & Performance bon %

Indirect Cost SUBTOTAL

P Profit %

Indirect Cost Subtotal

Total Base Award Price