Attachment 3 ARF Lenawee County Prevailing Wage.pdf

PDF 109 KB Posted

Attached to
RFP commercial dish machines for correctional facilities
Solicitation number
RFP 472 220000002396 4
Issued by
Macomb County, Michigan

About this file

This document is a prevailing wage rate schedule issued by the State of Michigan for state-funded projects in Lenawee County, effective as of February 9, 2022. The schedule establishes mandatory hourly wage rates for various skilled trades and labor classifications required on public construction projects within the county jurisdiction.

The prevailing wage rates cover approximately 60 distinct job classifications spanning multiple trade categories, including boilermakers, bricklayers, carpenters, cement masons, electricians, ironworkers, operating engineers, plumbers, pipefitters, roofers, and various laborer classifications. Each classification includes straight hourly rates, time-and-a-half overtime rates, and double-time rates. The document specifies apprentice wage schedules with graduated rates based on hours worked or time in apprenticeship for most classifications. Notable provisions include allowances for four-ten-hour work schedules on specified days of the week for many trades, with Friday designated as a makeup day for weather-related cancellations or holidays. The rates range from $15.54 per hour for inexperienced landscape laborers to $96.72 per hour for elevator constructor mechanics, with apprentice rates proportionally lower. Special subdivisions within Lenawee County apply different rates for specific townships, particularly for heat and frost insulators and plumbers. The document was last updated on various dates throughout 2021 and early 2022, with the most recent updates reflecting current market conditions for skilled trades in the region.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State of Michigan

Official Rates

Prevailing Wage Rates for State Funded Projects

Date Rendered: 2/9/2022

Straight Hourly

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Lenawee County

Last Updated

Classification Number

Boilermaker

H H H H H H H D N$47.24 $70.27 $93.29BO85Boilermaker

3/28/2008

Apprentice Rates:

1st 6 months $30.47 $45.11 $59.75

2nd 6 months $31.22 $46.24 $61.25

3rd 6 months $39.72 $58.99 $78.25

4th 6 months $40.47 $60.11 $79.75

5th 6 months $41.22 $61.24 $81.25

6th 6 months $42.73 $63.51 $84.27

7th 6 months $44.23 $65.75 $87.27

8th 6 months $45.74 $68.02 $90.29

Bricklayer

H H H H H H H D Y$55.29 $71.04 $86.79BR2-3-BSPBRICK MASONRY, STONE MASONRY, POINTING, CAULKING, CLEANING

11/19/2021

0-749 hours $42.69 $52.14 $61.59

750-1,499 hours $44.27 $54.51 $64.75

1,500-2,249 hours $45.84 $56.87 $67.89

2,250-2,999 hours $47.41 $59.22 $71.03

3,000-3,749 hours $48.99 $61.59 $74.19

3,750-4,499 hours $50.57 $63.96 $77.35

4,500-5,249 hours $52.14 $66.31 $80.49

5,250 hours $53.71 $68.67 $83.63

LenaweeCounty: zz alpha web rates

Official Rates

Date Rendered: 2/9/2022

Attachment 3

Straight Hourly

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Lenawee County

Last Updated

Classification Number

Carpenter

X X H H H H H D N$47.10 $60.69 $74.27CA1004FLFloor layer

Saturday

Comment Make up day allowed

12/9/2021

Apprentice Rates:

1st Year $38.95 $48.46 $57.97

2nd Year $40.31 $50.50 $60.69

3rd Year $43.02 $54.57 $66.11

4th Year $45.74 $58.65 $71.55

X X H H H H H D Y$48.12 $61.82 $75.51CA1004J CarpenterFour 10s allowed Monday-Thursday. Friday make up day for inclement weather. Hours worked on Friday except for inclement weather make up shall be paid at time and one half.

Saturday

Comment Make up day allowed

12/9/2021

Apprentice Rates:

1st Year $39.90 $49.49 $59.07

2nd Year $41.27 $51.54 $61.81

3rd Year $44.01 $55.65 $67.29

4th Year $46.75 $59.76 $72.77

Cement Mason

H H H H H H H D N$54.04 $68.37 $82.81BR2-3-CMCEMENT MASON

0-749 hours $43.93 $53.21 $62.59

750-1,499 hours $45.38 $55.38 $65.49

1,500-2,249 hours $46.82 $57.54 $68.37

2,250-2,999 hours $48.26 $59.70 $71.25

3,000-3,749 hours $49.71 $61.87 $74.15

3,750-4,499 hours $51.15 $64.03 $77.03

4,500 hours $52.60 $66.21 $79.93

LenaweeCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Lenawee County

Last Updated

Classification Number

H H D H H D D D Y$54.23 $74.07 $93.91PL886-CMCement Mason

4 tens allowed M-Th, Friday makeup day

Comment Make up day allowed

11/19/2021

Apprentice Rates:

1st year $40.33 $55.57 $70.81

2nd year $43.39 $60.16 $76.93

3rd year $46.46 $64.77 $83.07

Drywall

H H H H H H H D Y$51.86 $67.66 $83.46CE514-DFDrywall Finishers

12/9/2021

1st period $39.22 $48.70 $58.18

2nd period $40.80 $51.07 $61.34

3rd period $43.96 $55.81 $67.66

4th period $48.70 $62.92 $77.14

X X D X X X D D Y$49.78 $63.89 $78.00PL886-DRDrywaller

1st 6 months $33.49 $41.96 $50.42

2nd 6 months $34.90 $44.07 $53.24

3rd 6 months $36.31 $46.18 $56.06

4th 6 months $37.72 $48.30 $58.88

5th 6 months $39.14 $50.43 $61.72

6th 6 months $40.55 $52.54 $64.54

7th 6 months $41.96 $54.66 $67.36

8th 6 months $43.37 $56.78 $70.18

H H D H D D D D Y$45.91 $59.74 $73.56PT-22-D Drywall Taper Four 10s allowed Monday-Thursday

Friday make-up day for bad weather or holidays

Comment Make up day allowed

1/7/2022

Apprentice Rates:

First 3 months $32.08 $38.99 $45.90

Second 3 months $34.85 $43.14 $51.44

Second 6 months $37.62 $47.30 $56.98

Third 6 months $40.38 $51.44 $62.50

4th 6 months $41.76 $53.51 $65.26

LenaweeCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Lenawee County

Last Updated

Classification Number

Electrician

H H H H H H H D Y$45.69 $68.54 $91.38EC-8Teledata Journeyman Installer Technician - Voice, Data and VideoFour tens may be worked any 4 consecutive days Monday thru Friday.

Four tens may be worked any four consecutive days Monday thru Friday

Comment

12/3/2021

Apprentice Rates:

1st Period 0-749 hours $21.69 $32.54 $43.38

2nd Period 750-1499 hours $25.10 $37.65 $50.20

3rd Period 1500-2249 hours $37.93 $56.90 $75.86

4th Period 2250-2999 hours $39.48 $59.23 $78.96

5th Period 3000-3749 hours $41.03 $61.55 $82.06

6th Period 3750-4499 hours $42.59 $63.88 $85.18

H H H X H H H D Y$66.44 $99.66 $132.88EC-8-IW Inside WiremanFour consecutive 10 hour days may be worked at the straight time rate of pay Mon-Fri.

Any day except Sunday when work cancelled due to weather conditions

Comment Make up day allowed

12/3/2021

Apprentice Rates:

1st 0-900 Hours $27.48 $41.22 $54.96

2nd 901-1800 Hours $32.32 $48.49 $64.64

3rd 1801-3300 Hours $39.68 $59.52 $79.36

4th 3301-4800 Hours $45.03 $67.55 $90.06

5th 4801-6300 Hours $50.38 $75.58 $100.76

6th 6301-8000 Hours $55.73 $83.60 $111.46

H H H H H H H D Y$17.07 $25.61 $34.14EC-8-TC Teledata Cable PullerFour tens may be worked any 4 consecutive days Monday thru Friday.

Make up day allowed

12/3/2021

Apprentice Rates:

0-499 hours $12.36 $18.54 $24.72

500-1000 hours $14.57 $21.85 $29.14

LenaweeCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Lenawee County

Last Updated

Classification Number

Elevator Constructor

D D D D D D D D Y$77.53 $122.30EL-44Elevator Constructor Mechanic

4 10s allowed M-Th

Comment

2/4/2015

Apprentice Rates:

1st year $55.41 $80.03

2nd year $60.33 $89.43

3rd year $62.79 $94.13

4th year $67.71 $103.53

D D D D D D D D Y$96.72 $152.57EL-85Elevator Constructor Mechanic

4 tens allowed M-TH

Comment

11/30/2021

Apprentice Rates:

1st year $68.96 $99.68

2nd year $74.88 $111.18

3rd year $77.85 $116.95

4th year $84.65 $129.33

Glazier

H H H H H H H D Y$53.55 $70.10 $86.65GL-357 GlazierIf a four 10 hour day workweek is scheduled, four 10s must be consecutive, M-F.

1st 6 months $37.00 $45.27 $53.55

2nd 6 months $37.75 $46.40 $55.05

3rd 6 months $41.97 $52.73 $63.49

4th 6 months $43.62 $55.21 $66.79

5th 6 months $45.27 $57.68 $70.09

6th 6 months $46.93 $60.17 $73.41

7th 6 months $48.59 $62.66 $76.73

8th 6 months $51.89 $67.61 $83.33

Heat and Frost Insulator

X X X H H H H H N$25.29 $36.51 AS25SSpray Insulation

6/2/2016

StatewideCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Lenawee County

Last Updated

Classification Number

H H H H H H H D Y$63.06 $94.32 $125.58AS45Heat and Frost Insulators

1/19/2022

1st - 2nd period $36.62 $53.76 $70.90

3rd period $39.69 $58.36 $77.03

4th period $41.36 $60.86 $80.37

5th period $43.03 $63.37 $83.71

6th period $44.69 $65.86 $87.03

7th period $51.37 $75.44 $107.84

8th period $53.04 $77.95 $102.84

9th period $54.71 $80.46 $106.18

10th period $56.37 $82.94 $109.50

Subdivision of county Twps of Blissfield, Clinton, Deerfield, Fairfield, Macon, Ogden, Palmyra, Raisin, Ridgeway, Riga and Tecumseh

Heat and Frost Insulator and Asbestos Worker

X X X H H H H D Y$52.00 $68.89 $85.77AS47Heat and Frost Insulator and Asbestos Worker

Friday for cancelled work in a 4 10 schedule

Comment Make up day allowed

12/20/2021

Apprentice Rates:

1st year $26.38 $33.69 $40.99

2nd year $30.15 $38.92 $47.68

3rd year $33.92 $44.15 $54.37

4th year $37.70 $49.39 $61.08

5th year $41.48 $54.63 $67.78

Subdivision of county Twps of Adrian, Cambridge, Dover, Franklin, Hudson, Madison, Madina, Rollen, Rome, Seneca and Woodstock

Ironworker

H H D H D D D D Y$49.24 $73.86 $98.48IR-55 Ironworker Four tens allowed M-Th.

Friday for inclement weather

Comment Make up day allowed

1/7/2022

Apprentice Rates:

1st year $25.04 $37.56 $50.08

2nd year $40.50 $60.75 $81.00

3rd year $43.42 $65.13 $86.84

4th year $46.33 $69.50 $92.66

LenaweeCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Lenawee County

Last Updated

Classification Number

H H D H H H H D Y$39.87 $59.81 $79.74IR-55-MF Metal Fence & Guard Rail Four tens allowed M-Th

Friday for inclement weather

Comment Make up day allowed

1/7/2022

Apprentice Rates:

1st year $19.57 $29.36 $39.14

2nd year $33.87 $50.81 $67.74

3rd year $35.87 $53.81 $71.74

4th year $37.87 $56.81 $75.74

H H D H D D D D Y$43.17 $64.76 $86.34IR-55-PE Pre-engineered Metal Building Four tens allowed M-Th

Friday for inclement weather

Comment Make up day allowed

12/22/2021

Apprentice Rates:

1st year $21.55 $32.33 $43.10

2nd year $36.09 $54.13 $72.18

3rd year $38.45 $57.67 $76.90

4th year $40.81 $61.21 $81.62

Laborer

X X H X X H H D N$37.68 $49.92 $62.16L499DLaborer -- building and heavy construction craft laborer, portable concrete mixer operator, air, electric or gasoline tool operator, hot dope carrier, tar kettle tender, gasoline vibrators, concrete gas buggies, concrete saw, signal person and top person

Saturday

Comment Make up day allowed

11/29/2021

Apprentice Rates:

0-1,000 Hours $31.56 $40.74 $49.92

1,001-2,000 Hours $32.78 $42.57 $52.36

2,001-3,000 Hours $34.01 $44.42 $54.82

3,001-4,000 Hours $36.46 $48.09 $59.72

X X H X X H H D N$38.18 $50.67 $63.16L499JGround burner

Saturday

Comment Make up day allowed

12/14/2021

LenaweeCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Lenawee County

Last Updated

Classification Number

H H H H H H H D Y$42.27 $56.46 $70.64MITA-RZ2-C1Laborer Road Class 1: asphalt shoveler or loader, yard man, fence erector tender, dumper, joint filling, form setting, form stripper, pavement reinforcing, waterproofing, seal coating, bridge painting, sandblasting, pressure grouting, RC equipment

1/5/2022

3,001-4,000 hours

2,001-3,000 hours

1,001-2,000 hours

0-1,000 hours

3,001-4,000 hours $41.06 $54.64 $68.22

2,001-3,000 hours $38.64 $51.01 $63.38

1,001-2,000 hours $37.44 $49.21 $60.98

0-1,000 hours $36.23 $47.40 $58.56

H H H H H H H D Y$42.47 $56.76 $71.04MITA-RZ2-C2Laborer Road Class 2: mixer operator, air or electric tool operator, spreader, boxman, concreter paddler, power chain saw operator, paving patch truck dumper, tunnel mucker, concrete saw operator, dry pack macine and roto-mill grounds person

3,001-4,000 hours $41.25 $54.92 $68.60

2,001-3,000 hours $38.81 $51.26 $63.72

1,001-2,000 hours $37.60 $49.45 $61.30

0-1,000 hours $36.38 $47.62 $58.86

H H H H H H H D Y$42.71 $57.12 $71.52MITA-RZ2-C3Laborer Road Class 3: tunnel miner, finish tenders, guard rail builder, median barrier installer, earth retention barrier and wall installer, fence erector, bottom man, powder man, wagon drill and air track operator, curb and side rail setter

3,001-4,000 hours $41.48 $55.27 $69.06

2,001-3,000 hours $39.02 $51.58 $64.14

1,001-2,000 hours $37.79 $49.74 $61.68

0-1,000 hours $36.56 $47.89 $59.22

LenaweeCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Lenawee County

Last Updated

Classification

H H H H H H H D Y$43.06 $55.54 $68.02MITA-RZ2-C4Laborer Road Class 4: asphalt raker

3,001-4,000 hours $41.81 $53.66 $65.52

2,001-3,000 hours $39.32 $49.93 $60.54

1,001-2,000 hours $38.07 $48.06 $58.04

0-1,000 hours $36.82 $46.18 $55.54

H H H H H H H D Y$42.93 $57.45 $71.96MITA-RZ2-C5Laborer Road Class 5: pipe layers, oxy-gun

3,001-4,000 hours $41.69 $55.58 $69.48

2,001-3,000 hours $39.21 $51.86 $64.52

1,001-2,000 hours $37.96 $49.99 $62.02

0-1,000 hours $36.72 $48.13 $59.54

H H H H H H H D Y$43.27 $58.33 $73.14MITA-RZ2-C6Laborer Road Class 6: line form setter for curb or pavement, asphalt screed checker/screw man on asphalt paving machines

3,001-4,000 hours $42.01 $56.44 $70.62

2,001-3,000 hours $39.49 $52.66 $65.58

1,001-2,000 hours $38.24 $50.79 $63.08

0-1,000 hours $36.98 $48.90 $60.56

H H H H H H H D Y$45.84 $61.81 $77.78MITA-RZ2-C7Laborer Road Class 7: concrete specialist - including finishing and trowling, cast in place or precast by any method

3,001-4,000 hours $44.45 $59.72 $75.00

2,001-3,000 hours $41.68 $55.57 $69.46

1,001-2,000 hours $40.29 $53.48 $66.68

0-1,000 hours $38.90 $51.40 $63.90

LenaweeCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Lenawee County

Last Updated

Classification Number

H H H X X X X D Y$46.70 $62.52 $78.33MLDC Asbestos & Lead Abatement Laborer 4 ten hour days @ straight time allowed Monday-Saturday, must be consecutive calendar days

1/7/2022

Trainee 600 hours +1 year $34.07

Laborer - Hazardous

H H H H H H H D Y$37.68 $53.42 $69.16LHAZ-Z4-AClass A - performing work in conjunction with site preparation and other preliminary work prior to actual removal, handling, or containment of hazardous waste substances not requiring use of personal protective equipment required by state or federal regu

4 10s allowed M-Th or T-F; inclement weather makeup day Friday

Comment Make up day allowed

12/14/2021

Apprentice Rates:

0-1,000 work hours $31.56 $44.24 $56.92

1,001-2,000 work hours $32.78 $46.07 $59.36

2,001-3,000 work hours $34.01 $47.92 $61.82

3,001-4,000 work hours $36.46 $51.59 $66.72

H H H H H H H D Y$38.68 $54.92 $71.16LHAZ-Z4-BClass B - performing work in conjunction with the removal, handling, or containment of hazardous waste substances when the use of personal protective equipment levels "A", "B" or "C" is required.

4 10s allowed M-Th or T-F; inclement weather makeup day Friday

Comment Make up day allowed

12/14/2021

Apprentice Rates:

0-1,000 work hours $32.31 $45.36 $58.42

1,001-2,000 work hours $33.58 $47.27 $60.96

2,001-3,000 work hours $34.86 $49.19 $63.52

3,001-4,000 work hours $37.41 $53.02 $68.62

Laborer Underground - Tunnel, Shaft & Caisson

X X X X X X X D Y$38.42 $51.00 $63.57LAUCT-Z2-1Class I - Tunnel, shaft and caisson laborer, dump man, shanty man, hog house tender, testing man (on gas), and watchman.

1/4/2022

0-1,000 work hours $32.85 $42.64 $52.43

1,001-2,000 work hours $33.97 $44.32 $54.67

2,001-3,000 work hours $35.08 $45.99 $56.89

3,001-4,000 work hours $37.31 $49.33 $61.35

LenaweeCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Lenawee County

Last Updated

Classification Number

X X X X X X X D Y$38.51 $51.13 $63.75LAUCT-Z2-2Class II - Manhole, headwall, catch basin builder, bricklayer tender, mortar man, material mixer, fence erector, and guard rail builder

0-1,000 work hours $32.92 $42.75 $52.57

1,001-2,000 work hours $34.04 $44.43 $54.81

2,001-3,000 work hours $35.16 $46.11 $57.05

3,001-4,000 work hours $37.39 $49.45 $61.51

X X X X X X X D Y$38.61 $51.28 $63.95LAUCT-Z2-3Class III - Air tool operator (jack hammer man, bush hammer man and grinding man), first bottom man, second bottom man, cage tender, car pusher, carrier man, concrete man, concrete form man, concrete repair man, cement invert laborer, cement finisher, con

0-1,000 work hours $32.99 $42.85 $52.71

1,001-2,000 work hours $34.12 $44.55 $54.97

2,001-3,000 work hours $35.24 $46.23 $57.21

3,001-4,000 work hours $37.49 $49.60 $61.71

X X X X X X X D Y$38.77 $51.52 $64.27LAUCT-Z2-4Class IV - Tunnel, shaft and caisson mucker, bracer man, liner plate man, long haul dinky driver and well point man.

0-1,000 work hours $33.11 $43.03 $52.95

1,001-2,000 work hours $34.25 $44.74 $55.23

2,001-3,000 work hours $35.38 $46.43 $57.49

3,001-4,000 work hours $37.64 $49.83 $62.01

X X X X X X X D Y$39.03 $51.91 $64.79LAUCT-Z2-5Class V - Tunnel, shaft and caisson miner, drill runner, keyboard operator, power knife operator, reinforced steel or mesh man (e.g. wire mesh, steel mats, dowel bars)

0-1,000 work hours $33.31 $43.33 $53.35

1,001-2,000 work hours $34.45 $45.04 $55.63

2,001-3,000 work hours $35.60 $46.77 $57.93

3,001-4,000 work hours $37.89 $50.20 $62.51

LenaweeCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Lenawee County

Last Updated

Classification

X X X X X X X D Y$39.34 $52.38 $65.41LAUCT-Z2-6Class VI - Dynamite man and powder man.

0-1,000 work hours $33.54 $43.67 $53.81

1,001-2,000 work hours $34.70 $45.41 $56.13

2,001-3,000 work hours $35.86 $47.15 $58.45

3,001-4,000 work hours $38.18 $50.63 $63.09

X X X X X X X D Y$31.61 $40.78 $49.95LAUCT-Z2-7Class VII - Restoration laborer, seeding, sodding, planting, cutting, mulching and topsoil grading and the restoration of property such as replacing mail boxes, wood chips, planter boxes and flagstones.

0-1,000 work hours $27.75 $34.99 $42.23

1,001-2,000 work hours $28.52 $36.15 $43.77

2,001-3,000 work hours $29.29 $37.30 $45.31

3,001-4,000 work hours $30.84 $39.63 $48.41

Landscape Laborer

X X H X X X H D Y$28.80 $39.51 $50.18LLAN-Z2-AClass B1: Landscape Operatior includes air, gas, and diesel equipment operator, lawn sprinkler installer,skidsteer, mini excavators, ride and walk behind trenchers, backhoe loaders, off road dump vehicle, articulated haulers, hydroseeder, wheel loaders

X X H X X X H D Y$26.80 $36.48 $46.15LLAN-Z2-BClass B2: Skilled Landscape Laborer: small power tool operator, lawn sprinkler installers' tender, irrigation installers' tender material mover

H H H H H H H D N$24.66 $33.27 $41.87LLAN-Z2-CClass C: landscape laborer with 90 or more calendar days worked

H H H H H H H D N$15.54 $23.31 $31.08LLAN-Z2-DClass D: Inexperienced landscape laborer - individual who has worked less than 90 calendar days

Operating Engineer

X X H H D D D D Y$65.71 $86.00 $106.28EN-324-A120Crane with boom & jib or leads 120' or longer

Double time after 12 hours M-F

Comment

12/10/2021

LenaweeCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Lenawee County

Last Updated

Classification Number

X X H H D D D D Y$66.53 $87.23 $107.92EN-324-A140 Crane with boom & jib or leads 140' or longerWork in excess of 12 per day M-F shall be paid at double time.

12/10/2021

X X H H D D D D Y$66.83 $87.68 $108.52EN-324-A220 Crane with boom & jib or leads 220' or longerWork in

X X H H D D D D Y$68.33 $89.93 $111.52EN-324-A300 Crane with boom & jib or leads 300' or longerWork in

X X H H D D D D Y$69.82 $92.16 $114.50EN-324-A400 Crane with boom & jib or leads 400' or longerWork in

X X H H D D D D Y$54.86 $69.72 $84.58EN-324-CW Compressor or welding machineWork in excess of 12 per day M-F shall be paid at double time.

X X H H D D D D Y$62.17 $80.69 $99.20EN-324-FL Forklift, lull, extend-a-boom forkliftWork in excess of 12 per day M-F shall be paid at double time.

X X H H D D D D Y$53.83 $68.18 $82.52EN-324-FO Fireman or oilerWork in excess of 12 per day M-F shall be paid at double time.

X X H H D D D D Y$64.85 $84.71 $104.56EN-324-RCRegular crane, job mechanic, concrete pump with boomWork in excess of 12 per day M-F shall be paid at double time.

X X H H D D D D Y$63.88 $83.25 $102.62EN-324-RERegular engineer, hydro-excavator, remote controlled concrete breakerWork in excess of 12 per day M-F shall be paid at double time.

0-999 hours $46.35 $58.48 $70.61

1,000-1,999 hours $48.09 $61.10 $74.09

2,000-2,999 hours $49.82 $63.68 $77.55

3,000-3,999 hours $51.55 $66.28 $81.01

4,000-4,999 hours $53.29 $68.90 $84.49

5,000-5,999 hours $55.01 $71.47 $87.93

LenaweeCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Statewide County

Last Updated

Classification Number

Operating Engineer - DIVER

H H H H H H H D N$52.81 $78.57 $104.32GLF DDiver/Wet Tender/Tender/Rov Pilot/Rov Tender

12/16/2021

Operating Engineer - Marine Construction

X X H H H H H D Y$78.97 $102.47 $125.97GLF-1Diver/Wet Tender, Engineer (hydraulic dredge)

Make up day allowed

1/7/2022

Subdivision of county all Great Lakes, islands therein, & connecting & tributary waters

X X H H H H H D Y$77.47 $100.22 $122.97GLF-2Crane/Backhoe Operator, 70 ton or over Tug Operator, Mechanic/Welder, Assistant Engineer (hydraulic dredge), Leverman (hydraulic dredge), Diver Tender

Make up day allowed

1/7/2022

Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters

X X H H H H H D Y$78.97 $102.47 $125.97GLF-2BFriction, Lattice Boom or Crane License Certification30

Make up day allowed

1/7/2022

Subdivision of county All Great Lakes, islands, therein, & connecting & tributary waters

X X H H H H H D Y$72.92 $93.40 $113.87GLF-3Deck Equipment Operator, Machineryman, Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 lbs or more), Tug/Launch Operator, Loader, Dozer on Barge, Deck Machinery

Make up day allowed

1/7/2022

Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters

X X H H H H H D Y$66.72 $84.10 $101.47GLF-4Deck Equipment Operator, (Machineryman/Fireman), (4 equipment units or more), Off Road Trucks, Deck Hand, Tug Engineer, & Crane Maintenance 50 ton capacity and under or Backhoe 115,000 lbs or less, Assistant Tug Operator

Make up day allowed

1/7/2022

Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters

Operating Engineer Steel Work

H H D H H H D D Y$59.30 $76.43 $93.56EN-324-efForklift, 1 Drum Hoist

4 10s allowed M-Th with Friday makeup day because of bad weather

Comment Make up day allowed

12/9/2021

H H D H H H D D Y$68.61 $90.40 $112.18EN-324-SW120Crane w/ 120' boom or longer

4 10s allowed M-Th with Friday makeup day because of bad weather

Comment Make up day allowed

12/10/2021

H H D H H H D D Y$69.61 $91.90 $114.18EN-324-SW120-OCrane w/ 120' boom or longer w/ Oiler

4 10s allowed M-Th with Friday makeup day because of bad weather

Comment Make up day allowed

12/10/2021

LenaweeCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Lenawee County

Last Updated

Classification Number

H H D H H H D D Y$69.79 $92.17 $114.54EN-324-SW140Crane w/ 140' boom or longer

4 10s allowed M-Th with Friday makeup day because of bad weather

Comment Make up day allowed

12/10/2021

H H D H H H D D Y$70.79 $93.67 $116.54EN-324-SW140-OCrane w/ 140' boom or longer W/ Oiler

4 10s allowed M-Th with Friday makeup day because of bad weather

Comment Make up day allowed

12/10/2021

H H D H H H D D Y$70.06 $92.57 $115.08EN-324-SW220Boom & Jib 220' or longer

4 10s allowed M-Th with Friday makeup day because of bad weather

Comment Make up day allowed

12/10/2021

H H D H H H D D Y$71.06 $94.07 $117.08EN-324-SW220-OCrane w/ 220' boom or longer w/ Oiler

4 10s allowed M-Th with Friday makeup day because of bad weather

Comment Make up day allowed

12/10/2021

H H D H H H D D Y$71.56 $94.82 $118.08EN-324-SW300Boom & Jib 300' or longer

4 10s allowed M-Th with Friday makeup day because of bad weather

Comment Make up day allowed

12/10/2021

H H D H H H D D Y$72.56 $93.20 $113.84EN-324-SW300-OCrane w/ 300' boom or longer w/ Oiler

4 10s allowed M-Th with Friday makeup day because of bad weather

Comment Make up day allowed

12/10/2021

H H D H H H D D Y$73.06 $97.07 $121.08EN-324-SW400Boom & Jib 400' or longer

4 10s allowed M-Th with Friday makeup day because of bad weather

Comment Make up day allowed

12/10/2021

H H D H H H D D Y$74.06 $98.57 $123.08EN-324-SW400-OCrane w/ 400' boom or longer w/ Oiler

4 10s allowed M-Th with Friday makeup day because of bad weather

Comment Make up day allowed

12/10/2021

H H D H H H D D Y$68.25 $89.86 $111.46EN-324-SWCOCrane Operator, Job Mechanic, 3 Drum Hoist & Excavator

4 10s allowed M-Th with Friday makeup day because of bad weather

Comment Make up day allowed

12/10/2021

Apprentice Rates:

0-999 hours $49.22 $62.96 $76.70

1,000-1,999 hours $51.18 $65.90 $80.62

2,000-2,999 hours $53.15 $68.85 $84.56

3,000-3,999 hours $55.11 $71.80 $88.48

4,000-4,999 hours $57.07 $74.74 $92.40

5,000 hours $59.04 $77.69 $96.34

LenaweeCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Lenawee County

Last Updated

Classification Number

H H D H H H D D Y$69.25 $91.36 $113.46EN-324-SWCO-OCrane Operator w/ Oiler

4 10s allowed M-Th with Friday makeup day because of bad weather

Comment Make up day allowed

12/10/2021

H H D H H H D D Y$37.03 $49.48 $61.92EN-324-SWCWCompressor or Welder Operator

4 10s allowed M-Th with Friday makeup day because of bad weather

Comment Make up day allowed

12/10/2021

H H D H H H D D Y$67.61 $88.90 $110.18EN-324-SWHOHoisting Operator, 2 Drum Hoist, & Rubber Tire Backhoe

4 10s allowed M-Th with Friday makeup day because of bad weather

Comment Make up day allowed

12/10/2021

H H D H H H D D Y$53.42 $67.61 $81.80EN-324-SWOOiler

4 10s allowed M-Th with Friday makeup day because of bad weather

Comment Make up day allowed

12/10/2021

H H D H H H D D Y$69.34 $91.49 $113.64EN-324-SWTD50Tower Crane & Derrick where work is 50' or more

4 10s allowed M-Th with Friday makeup day because of bad weather

Comment Make up day allowed

12/10/2021

H H D H H H D D Y$70.34 $92.99 $115.64EN-324-SWTD50-OTower Crane & Derrick 50' or more w/ Oiler

4 10s allowed M-Th with Friday makeup day because of bad weather

Comment Make up day allowed

12/10/2021

Operating Engineer Underground

H H H H H H H D Y$60.93 $78.89 $96.85EN-324A2-UC1Class I Equipment - Backfiller Tamper, Backhoe, Batch Plant Operator, Clamshell, Concrete Paver 2 drums or larger, Conveyor Loader Euclid type, Crane (crawler, truck type or pile driving), Dozer, Dragline, Elevating Grader, endloader, gradall, grader, hyd

0-999 hours $49.19 $61.74 $74.29

1,000-1,999 hours $50.99 $64.44 $77.89

2,000-2,999 hours $52.78 $67.12 $81.47

3,000-3,999 hours $54.58 $69.82 $85.07

4,000-4,999 hours $56.37 $72.51 $88.65

5,000-5,999 hours $58.16 $75.19 $92.23

H H H H H H H D Y$56.04 $71.56 $87.07EN-324A2-UC2Class II Equipment - Boom Truck, Crusher, Hoist, Pump 6 inch discharge or larger, side boom tractor, Tractor (pneu-tired other than backhoe or front end loader), Trencher 8 ft. digging capcity and smaller, Vac Truck

LenaweeCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Lenawee County

Last Updated

Classification Number

H H H H H H H D Y$55.54 $70.81 $86.07EN-324A2-UC3Class III Equipment - Air Compressors 600 cfm or larger, Air Compressors 2 or more less than 600 dfm, Boom Truck non-swinging non-powered type boom, Concrete Breaker self-propelled or truck mounted, Concrete paver 1 drum 1/2 yd. or larger, Elevator other

H H H H H H H D Y$55.26 $70.39 $85.51EN-324A2-UC4Class IV Equipment - Boiler, Concrete Saw 40 hp or over, curing machine self propelled, end dumps, extend a boom forklift, farm tractor with attachment, finishing machine concrete, firemen, hydraulic pipe pushing machine, mulching equipment, oiler, pumps

Painter

H H H H H H H D Y$50.12 $64.80 $79.73CE514-PTPainter

1st period $35.19 $42.41 $49.87

2nd period $38.18 $46.89 $55.85

3rd period $41.16 $51.36 $61.81

4th period $45.64 $58.08 $70.77

Pipe and Manhole Rehab

H H H H H H H H N$28.20 $38.20 TM247General Laborer for rehab work or normal cleaning and cctv work-top man, scaffold man, CCTV assistant, jetter-vac assistant

4/17/2015

H H H H H H H H N$32.70 $44.95 TM247-2Tap cutter/CCTV Tech/Grout Equipment Operator: unit driver and operator of CCTV; grouting equipment and tap cutting equipment

H H H H H H H H N$31.45 $43.07 TM247-3CCTV Technician/Combo Unit Operator: unit driver and operator of cctv unit or combo unit in connection with normal cleaning and televising work

H H H H H H H H N$33.20 $45.70 TM247-4Boiler Operator: unit driver and operator of steam/water heater units and all ancillary equipment associated

H H H H H H H H N$33.20 $45.70 TM247-5Combo Unit driver & Jetter-Vac Operator

StatewideCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Statewide County

Last Updated

Classification

H H H H H H H H N$34.20 $47.20 TM247-6Pipe Bursting & Slip-lining Equipment Operator

Plasterer

H H H H H H H D N$53.38 $67.63 $81.88BR2-3-PPlasterer

0-749 hours $43.41 $52.68 $61.94

750-1,499 hours $44.83 $54.80 $64.78

1,500-2,249 hours $46.26 $56.95 $67.64

2,250-2,999 hours $47.68 $59.08 $70.48

3,000-3,749 hours $49.10 $61.21 $73.32

3,750-4,499 hours $50.53 $63.36 $76.18

4,500 hours $53.38 $67.63 $81.88

X X H X X X H D N$51.79 $66.91 $82.02PL886Plasterer

1st 6 months $34.70 $43.77 $52.84

2nd 6 months $36.21 $46.04 $55.86

3rd 6 months $37.72 $48.30 $58.88

4th 6 months $39.23 $50.56 $61.90

5th 6 months $40.74 $52.83 $64.92

6th 6 months $42.26 $55.11 $67.96

7th 6 months $43.77 $57.38 $70.98

8th 6 months $45.28 $59.64 $74.00

LenaweeCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Lenawee County

Last Updated

Classification Number

Plumber & Pipefitter

H H H H H H H D Y$63.77 $95.66 $127.54PL-333-RI Plumber, Pipefitter and HVACTech Four 10s allowed Monday thru Thursday. Friday not a makeup, considered OT, paid @ time & one-half.

1st 6 months $41.61 $62.42 $83.22

2nd 6 months $43.62 $65.43 $87.24

3rd 6 months $45.64 $68.46 $91.28

4th 6 months $47.65 $71.48 $95.30

5th 6 months $49.67 $74.50 $99.34

6th 6 months $51.68 $77.52 $103.36

7th 6 months $53.70 $80.55 $107.40

8th 6 months $55.71 $83.56 $111.42

9th 6 months $57.73 $86.60 $115.46

10th 6 months $59.74 $89.61 $119.48

Subdivision of county EXCEPT Townships of Clinton, Macon and Tecumseh

Plumber, Pipefitter, Welder & HVAC

H H H H H H H D Y$68.20 $94.78 $121.36PL-190Plumber, Pipefitter, Welder & HVAC

4 tens can be worked between Monday and Friday

Comment Make up day allowed

12/16/2021

Apprentice Rates:

1st Year $45.02 $60.01 $75.00

2nd Year $49.05 $66.06 $83.06

3rd Year $53.08 $72.11 $91.12

4th Year $57.12 $78.17 $99.20

5th Year-1st 6 months $59.13 $81.18 $103.22

5th Year-2nd 6 months $61.15 $84.21 $107.26

Subdivision of county The Townships of Tecumseh, Clinton and Macon ONLY.

LenaweeCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Lenawee County

Last Updated

Classification Number

Roofer

H H D X D D D D Y$36.79 $48.98 $61.16RO-134Commercial Roofer

Make up day allowed

Apprentice Rates:

1st period $24.61 $30.70 $36.80

2nd period $25.82 $32.52 $39.22

3rd period $27.04 $34.35 $41.66

4th period $28.26 $36.18 $44.10

5th period $29.48 $38.01 $46.54

6th period $30.70 $39.84 $48.98

7th period $31.92 $41.67 $51.42

8th period $33.13 $43.48 $53.84

Sewer Relining

H H H H H H H D N$49.71 $67.42 $85.13SR-IClass I-Operator of audio visual CCTV system including remote in-ground cutter and other equipment used in conjunction with CCTV system.

0-6 months $39.05 $51.43 $63.81

6-12 months $42.83 $57.10 $71.37

H H H H H H H D N$47.67 $64.36 $81.05SR-IIClass II-Operator of hot water heaters and circulation system; water jetters; and vacuum and mechanical debris removal systems and those assisting.

Sheet Metal Worker

H H D H D D D D Y$67.92 $91.48 $115.03SHM-33Sheet Metal Worker

4 ten hour days allowed when scheduled as four consecutive days, Monday thru Friday

Comment Make up day allowed

11/22/2021

Apprentice Rates:

1st Year $31.17 $41.07 $50.97

2nd Year $44.37 $56.16 $67.93

3rd Year $46.57 $59.45 $72.33

4th Year $48.77 $62.75 $76.73

5th Year $55.38 $72.67 $89.95

LenaweeCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Lenawee County

Last Updated

Classification Number

Sprinkler Fitter

H H H H H H H D Y$60.34 $78.45 $96.56SP 669Sprinkler Fitter

Make up day allowed

11/16/2021

Apprentice Rates:

Class 1 $24.57 $32.72 $40.87

Class 2 $26.38 $35.43 $44.49

Class 3 $39.14 $49.10 $59.06

Class 4 $40.95 $51.82 $62.68

Class 5 $43.01 $54.78 $66.55

Class 6 $44.82 $57.49 $70.17

Class 7 $46.63 $60.21 $73.79

Class 8 $48.45 $62.94 $77.43

Class 9 $50.26 $65.65 $81.05

Class 10 $52.07 $68.37 $84.67

Tile, Marble and Terrazzo Finisher

H H D H D D D D Y$51.67 $66.51 $81.34BR2-FTile, Marble and Terrazzo Finisher

12/3/2021

1st Period $34.76 $44.41 $54.05

2nd Period $36.24 $46.63 $57.01

3rd Period $37.72 $48.85 $59.97

4th Period $39.21 $51.08 $62.95

5th Period $40.69 $53.30 $65.91

6th Period $42.17 $55.52 $68.87

LenaweeCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Lenawee County

Last Updated

Classification Number

Tile, Marble and Terrazzo Setter

H H D H D D D D Y$58.80 $77.20 $95.60BR2-TMTTile, Marble Terrazzo Setter

1st Period $38.77 $49.81 $60.85

2nd Period $40.61 $52.57 $64.53

3rd Period $42.45 $55.33 $68.21

4th Period $44.29 $58.09 $71.89

5th Period $46.13 $60.85 $75.57

6th Period $47.97 $63.61 $79.25

7th Period $49.81 $66.37 $82.93

8th Period $51.65 $69.13 $86.61

Tile, Terrazzo and Mosaic Finisher

H H H H H H H D N$42.34 $54.17 $65.99BR2-TFTile, Terrazzo and Mosaic Finisher

1st Period $35.25 $43.53 $51.81

2nd Period $36.43 $45.30 $54.17

3rd Period $37.61 $47.07 $56.53

4th Period $38.79 $48.84 $58.89

5th Period $39.97 $50.61 $61.25

6th Period $41.16 $52.39 $63.63

Tile, Terrazzo and Mosaic Setters

H H H H H H H D N$48.48 $62.11 $75.73BR2-TileTile, Terrazzo and Mosaic Setters

1st Period $40.31 $49.85 $59.39

2nd Period $41.67 $51.89 $62.11

3rd Period $43.03 $53.93 $64.83

4th Period $44.39 $55.97 $67.55

5th Period $45.75 $58.01 $70.27

6th Period $47.12 $60.07 $73.01

LenaweeCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Lenawee County

Last Updated

Classification Number

Truck Driver

H H H H H H H H Y$44.10 $48.81 TM-RB2of all trucks of 8 cubic yd capacity or over

1/12/2022

H H H H H H H H Y$44.00 $48.66 TM-RB2Aof all trucks of 8 cubic yard capacity or less (except dump trucks of 8 cubic yard capacity or over, tandem axle trucks, transit mix and semis, euclid type equipment, double bottoms and low boys)

6/7/2016

H H H H H H H H Y$44.25 $49.04 TM-RB2Bon euclid type equipment

6/7/2016

Underground Laborer Open Cut, Class I

X X X X X X X D Y$36.36 $47.86 $59.35LAUC-Z3-1Construction Laborer

0-1,000 work hours $31.39 $40.40 $49.41

1,001-2,000 work hours $32.38 $41.88 $51.39

2,001-3,000 work hours $33.38 $43.38 $53.39

3,001-4,000 work hours $35.37 $46.37 $57.37

Underground Laborer Open Cut, Class II

X X X X X X X D Y$36.50 $48.07 $59.63LAUC-Z3-2Mortar and material mixer, concrete form man, signal man, well point man, manhole, headwall and catch basin builder, guard rail builders, headwall, seawall, breakwall, dock builder and fence erector.

0-1,000 work hours $31.49 $40.55 $49.61

1,001-2,000 work hours $32.49 $42.05 $51.61

2,001-3,000 work hours $33.50 $43.56 $53.63

3,001-4,000 work hours $35.50 $46.56 $57.63

LenaweeCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Lenawee County

Last Updated

Classification Number

Underground Laborer Open Cut, Class III

X X X X X X X D Y$36.62 $48.25 $59.87LAUC-Z3-3Air, gasoline and electric tool operator, vibrator operator, drillers, pump man, tar kettle operator, bracers, rodder, reinforced steel or mesh man (e.g. wire mesh, steel mats, dowel bars, etc.), cement finisher, welder, pipe jacking and boring man, wagon

0-1,000 work hours $31.58 $40.68 $49.79

1,001-2,000 work hous $32.59 $42.20 $51.81

2,001-3,000 work hours $33.60 $43.72 $53.83

3,001-4,000 work hours $35.61 $46.73 $57.85

Underground Laborer Open Cut, Class IV

X X X X X X X D Y$36.67 $48.32 $59.97LAUC-Z3-4Trench or excavating grade man.

0-1,000 work hours $31.62 $40.74 $49.87

1,001-2,000 work hours $32.63 $42.26 $51.89

2,001-3,000 work hours $33.64 $43.78 $53.91

3,001-4,000 work hours $35.66 $46.80 $57.95

Underground Laborer Open Cut, Class V

X X X X X X X D Y$36.81 $48.53 $60.25LAUC-Z3-5Pipe Layer (including crock, metal pipe, multiplate or other conduits)

0-1,000 work hours $31.73 $40.91 $50.09

1,001-2,000 work hours $32.74 $42.42 $52.11

2,001-3,000 work hours $33.76 $43.96 $54.15

3,001-4,000 work hours $35.79 $47.00 $58.21

LenaweeCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Lenawee County

Last Updated

Classification Number

Underground Laborer Open Cut, Class VI

X X X X X X X D Y$34.11 $44.48 $54.85LAUC-Z3-6Grouting man, top man assistant, audio visual television operations and all other operations in connection with closed circuit television inspection, pipe cleaning and pipe relining work and the installation & repair of water service pipe & appurtenances

0-1,000 work hours $29.70 $37.86 $46.03

1,001-2,000 work hours $30.58 $39.18 $47.79

2,001-3,000 work hours $31.46 $40.50 $49.55

3,001-4,000 work hours $33.23 $43.16 $53.09

Underground Laborer Open Cut, Class VII

X X X X X X X D Y$31.26 $40.21 $49.15LAUC-Z3-7Restoration laborer, seeding, sodding, planting, cutting, mulching and topsoil grading and the restoration of property such as replacing mail boxes, wood chips, planter boxes, flagstones etc.

0-1,000 work hours $27.56 $34.66 $41.75

1,001-2,000 work hours $28.30 $35.76 $43.23

2,001-3,000 work hours $29.04 $36.88 $44.71

3,001-4,000 work hours $30.52 $39.10 $47.67

LenaweeCounty: zz alpha web rates

File details come from the government source that posted it. Updated .