Attachment 12 URF Chippewa County Prevailing Wage.pdf

PDF 150 KB Posted

Attached to
RFP commercial dish machines for correctional facilities
Solicitation number
RFP 472 220000002396 4
Issued by
Macomb County, Michigan

About this file

This is a prevailing wage rate document issued by the State of Michigan for state-funded projects in Chippewa County, effective as of May 5, 2022. The document establishes mandatory hourly wage rates for various skilled trade classifications and labor categories applicable to public construction projects in the county. The rates cover over 50 distinct job classifications spanning multiple trades including boilermakers, carpenters, electricians, operating engineers, plumbers, and laborers across building construction, heavy construction, underground work, and specialized trades such as sewer relining and sprinkler fitting.

The prevailing wage rates are structured to include straight hourly rates, time-and-a-half overtime rates, and double-time rates, with most classifications updated between November 2021 and January 2022. Apprentice rates are provided for most trades, typically showing progression through multiple periods or hours worked. Notable provisions include allowances for four-ten hour work weeks on consecutive days for certain trades (such as electricians, plumbers, and sheet metal workers), makeup day provisions for inclement weather, and special overtime rules with some classifications requiring double-time payment after 12 hours of work. The document also identifies differential rates for specific work conditions, such as electricians working on projects above or below $160,000 and ironworkers on projects over or under $10 million. Marine construction classifications for Great Lakes work are included with their own rate structures. All rates must be paid to workers performing these job classifications on state-funded construction projects in Chippewa County.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State of Michigan

Official Rates

Prevailing Wage Rates for State Funded Projects

Date Rendered: 5/5/2022

Straight Hourly

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Chippewa County

Last Updated

Classification Number

Boilermaker

H H H H H H H D Y$72.47 $107.55 $142.63BO169Boilermaker

12/13/2021

Apprentice Rates:

1st Period $53.53 $79.15 $104.75

2nd Period $55.14 $81.56 $107.97

3rd Period $56.73 $83.94 $111.15

4th Period $58.31 $86.31 $114.31

5th Period $59.85 $88.62 $117.39

6th Period $63.03 $93.39 $123.75

7th Period $66.17 $98.10 $130.03

8th Period $69.32 $102.83 $136.33

Bricklayer

H H H H H H H D N$51.92 $66.19 $80.46BR2-UPBricklayers, Stone Masons, Marble Masons, Mosaic Workers, Cement Masons, Plasterers, Pointer, Cleaner, Caulkers, Plant Masonry Workers, Refractory Specialists, Tuck Pointers, Tile Layers, Terrazzo Workers, and Marble, Tile & Terrazzo Finishers.

12/3/2021

1st Period $41.93 $51.20 $60.48

2nd Period $43.36 $53.35 $63.34

3rd Period $44.78 $55.48 $66.18

4th Period $46.21 $57.62 $69.04

5th Period $47.64 $59.77 $71.90

6th Period $49.07 $61.92 $74.76

ChippewaCounty: zz alpha web rates

Official Rates

Date Rendered: 5/5/2022

Attachment 12

Straight Hourly

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Chippewa County

Last Updated

Classification Number

Carpenter

X X H X X X X D Y$48.25 $61.82 $75.38CA1510-CCarpenter, Drywall Taper & Finisher, & Floor Layer

Saturday

Comment Make up day allowed

12/1/2021

Apprentice Rates:

1st 6 months $37.40 $45.54 $53.68

2nd 6 months $38.75 $47.56 $56.38

3rd 6 months $40.11 $49.60 $59.10

4th 6 months $41.47 $51.64 $61.82

5th 6 months $42.82 $53.67 $64.52

6th 6 months $44.18 $55.71 $67.24

7th 6 months $45.54 $57.75 $69.96

8th 6 months $46.89 $59.78 $72.66

X X X X X X X D Y$61.82 $82.17 $102.52CA1510-DCarpenter - Diver

1st 6 months $49.61 $63.86 $78.10

2nd 6 months $50.63 $65.38 $80.14

3rd 6 months $51.64 $66.90 $82.16

4th 6 months $53.68 $69.96 $86.24

5th 6 months $55.72 $73.02 $90.32

6th 6 months $57.75 $76.06 $94.38

7th 6 months $59.78 $79.11 $98.44

8th 6 months $60.80 $80.64 $100.48

X X X X X X X D Y$54.33 $70.65 $86.96CA1510-MwMillwright

12/1/2021

1st 6 months $44.54 $55.96 $67.38

2nd 6 months $45.19 $56.94 $68.68

3rd 6 months $46.17 $58.40 $70.64

4th 6 months $47.80 $60.85 $73.90

5th 6 months $49.44 $63.31 $77.18

6th 6 months $51.07 $65.76 $80.44

7th 6 months $52.70 $68.20 $83.70

8th 6 months $53.51 $69.42 $85.32

ChippewaCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Chippewa County

Last Updated

Classification Number

X X H X X H H D Y$48.45 $62.12 $75.78CA1510-PPile driver

Saturday

Comment Make up day allowed

12/1/2021

Apprentice Rates:

1st 6 months $40.25 $49.82 $59.38

2nd 6 months $40.93 $50.84 $60.74

3rd 6 months $41.62 $51.87 $62.12

4th 6 months $42.98 $53.91 $64.84

5th 6 months $44.35 $55.96 $67.58

6th 6 months $45.72 $58.02 $70.32

7th 6 months $47.08 $60.06 $73.04

8th 6 months $47.77 $61.10 $74.42

X X H X X H H D Y$48.34 $61.91 $75.47CA202UPCarpenter and Floor layer

Saturday for inclemen weather at straight time

Comment Make up day allowed

12/1/2021

Apprentice Rates:

0-6 months $40.20 $49.69 $59.19

6-12 months $40.88 $50.71 $60.55

12-18 months $41.56 $51.73 $61.91

18-24 months $42.91 $53.76 $64.61

24-30 months $44.27 $55.80 $67.33

30-36 months $45.63 $57.84 $70.05

36-42 months $46.98 $59.87 $72.75

42-48 months $47.66 $60.89 $74.11

Cement Mason

H H H H H H H D Y$38.67 $50.71 $62.74CE514-UPCement Mason

11/29/2021

1st Year $30.25 $38.08 $45.90

2nd Year $32.65 $41.68 $50.70

3rd Year $35.06 $45.29 $55.52

ChippewaCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Chippewa County

Last Updated

Classification Number

Drywall

H H H H H H H D N$42.87 $57.12 $71.36PT-1011-DFDrywall Finisher, Soundproofing, & Plural Component Applicator

1/7/2022

1st 1,000 hours $31.47 $40.02 $48.56

2nd 1,000 hours $32.90 $42.16 $51.42

3rd 1,000 hours $34.32 $44.29 $54.26

4th 1,000 hours $35.75 $46.44 $57.12

5th 1,000 hours $37.17 $48.56 $59.96

6th 1,000 hours $38.60 $50.71 $62.82

7th 1,000 hours $40.02 $52.84 $65.66

8th 1,000 hours $41.45 $54.98 $68.52

Electrician

H H H H H H H D Y$59.63 $78.17 $96.71EC-906z1HInside wireman for work above $160,000

4 consecutive tens allowed M-Th F makeup day for inclement weather and holidays

Comment Make up day allowed

11/15/2021

Apprentice Rates:

1st period $30.57 $37.99 $45.40

2nd period $32.43 $40.78 $49.12

3rd period $36.13 $46.33 $56.52

4th period $39.84 $51.89 $63.94

5th period $43.55 $57.46 $71.36

6th period $47.26 $63.02 $78.78

H H H H H H H D Y$57.57 $75.08 $92.59EC-906z1LInside wireman for work below $160,000

4 consecutive tens allowed M-Th F makeup day for inclement weather & holidays

Comment

11/15/2021

Apprentice Rates:

1st period $29.75 $36.76 $43.76

2nd period $31.50 $39.38 $47.26

3rd period $35.00 $44.63 $54.26

4th period $38.50 $49.88 $61.26

5th period $42.00 $55.13 $68.26

6th period $45.51 $60.40 $75.28

ChippewaCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Chippewa County

Last Updated

Classification Number

Elevator Constructor

D D D D D D D D Y$96.72 $152.57EL-85Elevator Constructor Mechanic

4 tens allowed M-TH

Comment

11/30/2021

Apprentice Rates:

1st year $68.96 $99.68

2nd year $74.88 $111.18

3rd year $77.85 $116.95

4th year $84.65 $129.33

Glazier

H H H H H H H D Y$49.84 $67.73 $85.62GL-826Glazier 4 tens allowed on consecutive days

12/9/2021

1st level $31.62 $40.40 $49.18

2nd level $35.12 $45.66 $56.18

3rd Level $40.38 $53.54 $66.70

4th level $45.66 $61.46 $77.26

Heat and Frost Insulator

X X X H H H H H N$25.29 $36.51 AS25SSpray Insulation

6/2/2016

Heat and Frost Insulator and Asbestos Worker

X X X H H H H D Y$52.00 $68.89 $85.77AS47Heat and Frost Insulators and Asbestos Workers

Friday for cancelled work in a 4 10 schedule

Comment Make up day allowed

12/20/2021

Apprentice Rates:

1st year $26.38 $33.69 $40.99

2nd year $30.15 $38.92 $47.68

3rd year $33.92 $44.15 $54.37

4th year $37.70 $49.39 $61.08

5th year $41.48 $54.63 $67.78

ChippewaCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Chippewa County

Last Updated

Classification Number

Ironworker

H H D H D D D D Y$50.07 $69.76 $89.45IR-8-AFor work over $10 million: Structural, Ornamental, Machinery Rigger & Reinforcing Ironworker; installation of sheet metal siding A 4-10 work week allowed Monday thru Thursday. Friday may be used as a make-up day.

Hours in excess of 40 must be paid tim

Make up day allowed

9/29/2014

Apprentice Rates:

0 - 1,000 hours $25.39 $37.75 $50.11

1,001 - 2,000 hours $37.71 $51.22 $64.73

2,001 - 3,000 hours $39.01 $53.17 $67.33

3,001 - 4,000 hours $40.31 $55.12 $69.93

4,001 - 5,000 hours $41.61 $57.07 $72.53

5,001 - 6,000 hours $42.92 $59.04 $75.15

6,001 - 7,000 hours $44.22 $60.98 $77.75

H H D H D D D D Y$46.73 $64.76 $82.79IR-8-BFor work under $10 Million: Structural, Ornamental, Machinery Rigger & Reinforcing Ironworker; pre-engineered metal buildings A 4-10 work week allowed Monday thru Thursday. Friday may be used as a make-up day. Hours in excess of 40 must be paid time a

Make up day allowed

9/29/2014

Apprentice Rates:

0-1,000 hours $25.39 $37.75 $50.11

1,001 - 2,000 hours $37.71 $51.22 $64.73

2,001 - 3,000 hours $39.01 $53.17 $67.33

3,001 - 4,000 hours $40.31 $55.12 $69.93

4,001 - 5,000 hours $41.61 $57.07 $72.53

5,001 - 6,000 hours $42.92 $59.04 $75.15

6,001 - 7,000 hours $44.22 $60.98 $77.75

ChippewaCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Chippewa County

Last Updated

Classification Number

Laborer

X X D X D D D D Y$38.93 $51.52 $64.11L1329-B-A Class A Laborer - construction laborer on building and heavy construction work, storm, and sanitary sewers on all construction sites and streets which are not included in the road builder rates, tool crib attendant, civil engineer helper, rodman, oxi-gun

5/5/2022

0 - 1,000 hours $32.64 $42.09 $51.53

1,001 - 2,000 hours $33.79 $43.86 $53.93

2,001 - 3,000 hours $35.05 $45.75 $56.45

3,001 - 4,000 hours $37.67 $49.63 $61.59

X X D X D D D D Y$41.16 $54.87 $68.57L1329-B-BClass B Laborer - Cement gun nozzleman, blasters, miners, drillers, buster operators, layers of all non-metallic pipe

5/5/2022

X X X X X X X D Y$37.68 $49.67 $61.66L1329-B-CClass C Laborer - caisson worker & airtrack

12/16/2021

X X X X X X X D Y$39.91 $53.02 $66.12L1329-B-D Class E Laborer - digester, tanks & kilns

H H H H H H H D Y$41.52 $55.58 $69.64MITA-RZ4-C1Laborer Road Class 1: asphalt shoveler or loader, yard man, fence erector tender, dumper, joint filling, form setting, form stripper, pavement reinforcing, waterproofing, seal coating, bridge painting, sandblasting, pressure grouting, RC equipment

1/5/2022

3,001-4,000 hours $40.31 $53.77 $67.22

2,001-3,000 hours $39.46 $52.49 $65.52

1,001-2,000 hours $36.68 $48.32 $59.96

0-1,000 hours $35.46 $46.49 $57.52

ChippewaCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Chippewa County

Last Updated

Classification Number

H H H H H H H D Y$41.73 $55.90 $70.06MITA-RZ4-C2Laborer Road Class 2: mixer operator, air or electric tool operator, spreader, boxman, concreter paddler, power chain saw operator, paving patch truck dumper, tunnel mucker, concrete saw operator, dry pack macine and roto-mill grounds person

3,001-4,000 hours $40.51 $54.07 $67.62

2,001-3,000 hours $38.07 $50.41 $62.74

1,001-2,000 hours $36.84 $48.56 $60.28

0-1,000 hours $35.62 $46.73 $57.84

H H H H H H H D Y$42.02 $56.33 $70.64MITA-RZ4-C3Laborer Road Class 3: tunnel miner, finish tenders, guard rail builder, median barrier installer, earth retention barrier and wall installer, fence erector, bottom man, powder man, wagon drill and air track operator, curb and side rail setter

3,001-4,000 hours $40.78 $54.47 $68.16

2,001-3,000 hours $38.31 $50.77 $63.22

1,001-2,000 hours $37.08 $48.92 $60.76

0-1,000 hours $35.84 $47.06 $58.28

H H H H H H H D Y$42.46 $56.99 $71.52MITA-RZ4-C4Laborer Road Class 4: asphalt raker

3,001-4,000 hours $41.20 $55.10 $69.00

2,001-3,000 hours $38.69 $51.33 $63.98

1,001-2,000 hours $37.43 $49.45 $61.46

0-1,000 hours $36.17 $47.55 $58.94

H H H H H H H D Y$42.08 $56.42 $70.76MITA-RZ4-C5Laborer Road Class 5: pipe layers, oxy-gun

3,001-4,000 hours $40.84 $54.56 $68.28

2,001-3,000 hours $38.36 $50.84 $63.32

1,001-2,000 hours $37.12 $48.98 $60.84

0-1,000 hours $35.88 $47.12 $58.36

ChippewaCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Chippewa County

Last Updated

Classification Number

H H H H H H H D Y$42.51 $57.07 $71.62MITA-RZ4-C6Laborer Road Class 6: line form setter for curb or pavement, asphalt screed checker/screw man on asphalt paving machines

3,001-4,000 hours $41.25 $55.17 $69.10

2,001-3,000 hours $38.73 $51.39 $64.06

1,001-2,000 hours $37.47 $49.51 $61.54

0-1,000 hours $36.21 $47.61 $59.02

H H H H H H H D Y$45.84 $62.06 $78.28MITA-RZ4-C7Laborer Road Class 7: concrete specialist - including finishing and trowling, cast in place or precast by any method

3,001-4,000 hours $44.41 $59.91 $75.42

2,001-3,000 hours $41.56 $55.64 $69.72

1,001-2,000 hours $40.13 $53.49 $66.86

0-1,000 hours $38.70 $51.35 $64.00

H H H X X X X D Y$46.70 $62.52 $78.33MLDCAsbestos & Lead Abatement Laborer 4 ten hour days @ straight time allowed Monday-Saturday, must be consecutive calendar days

Trainee 600 hours +1 year $34.07

Laborer - Hazardous

H H H H H H H D Y$37.50 $52.99 $68.48LHAZ-Z11-AClass A - performing work in conjunction with site preparation and other preliminary work prior to actual removal, handling, or containment of hazardous waste substances not requiring use of personal protective equipment required by state or federal reg

4 10s allowed M-Th or T-F; inclement weather makeup day Friday

Comment Make up day allowed

12/14/2021

Apprentice Rates:

0-1,000 work hours $31.50 $43.99 $56.48

1,001-2,000 work hours $32.70 $45.79 $58.88

2,001-3,000 work hours $33.90 $47.59 $61.28

3,001-4,000 work hours $36.30 $51.19 $66.08

ChippewaCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Chippewa County

Last Updated

Classification Number

H H H H H H H D Y$38.50 $54.29 $70.28LHAZ-Z11-BClass B - performing work in conjunction with the removal, handling, or containment of hazardous waste substances when the use of personal protective equipment levels "A", "B" or "C" is required.

4 10s allowed M-Th or T-F; inclement weather makeup day Friday

Comment Make up day allowed

12/14/2021

Apprentice Rates:

0-1,000 work hours $32.26 $44.93 $57.80

1,001-2,000 work hours $33.50 $46.79 $60.28

2,001-3,000 work hours $34.75 $48.66 $62.78

3,001-4,000 work hours $37.25 $52.42 $67.78

Laborer - Landscape

X X H X X X H D Y$28.80 $39.51 $50.18LLAN-Z2-AClass B1: Landscape Operatior includes air, gas, and diesel equipment operator, lawn sprinkler installer,skidsteer, mini excavators, ride and walk behind trenchers, backhoe loaders, off road dump vehicle, articulated haulers, hydroseeder, wheel loaders

1/4/2022

X X H X X X H D Y$26.80 $36.48 $46.15LLAN-Z2-BClass B2: Skilled Landscape Laborer: small power tool operator, lawn sprinkler installers' tender, irrigation installers' tender material mover

H H H H H H H D N$24.66 $33.27 $41.87LLAN-Z2-CClass C: landscape laborer with 90 or more calendar days worked

H H H H H H H D N$15.54 $23.31 $31.08LLAN-Z2-DClass D: Inexperienced landscape laborer - individual who has worked less than 90 calendar days

Laborer Underground - Tunnel, Shaft & Caisson

X X X X X X X D Y$38.42 $51.00 $63.57LAUCT-Z2-1Class I - Tunnel, shaft and caisson laborer, dump man, shanty man, hog house tender, testing man (on gas), and watchman.

0-1,000 work hours $32.85 $42.64 $52.43

1,001-2,000 work hours $33.97 $44.32 $54.67

2,001-3,000 work hours $35.08 $45.99 $56.89

3,001-4,000 work hours $37.31 $49.33 $61.35

ChippewaCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Chippewa County

Last Updated

Classification Number

X X X X X X X D Y$38.51 $51.13 $63.75LAUCT-Z2-2Class II - Manhole, headwall, catch basin builder, bricklayer tender, mortar man, material mixer, fence erector, and guard rail builder

0-1,000 work hours $32.92 $42.75 $52.57

1,001-2,000 work hours $34.04 $44.43 $54.81

2,001-3,000 work hours $35.16 $46.11 $57.05

3,001-4,000 work hours $37.39 $49.45 $61.51

X X X X X X X D Y$38.61 $51.28 $63.95LAUCT-Z2-3Class III - Air tool operator (jack hammer man, bush hammer man and grinding man), first bottom man, second bottom man, cage tender, car pusher, carrier man, concrete man, concrete form man, concrete repair man, cement invert laborer, cement finisher, con

0-1,000 work hours $32.99 $42.85 $52.71

1,001-2,000 work hours $34.12 $44.55 $54.97

2,001-3,000 work hours $35.24 $46.23 $57.21

3,001-4,000 work hours $37.49 $49.60 $61.71

X X X X X X X D Y$38.77 $51.52 $64.27LAUCT-Z2-4Class IV - Tunnel, shaft and caisson mucker, bracer man, liner plate man, long haul dinky driver and well point man.

0-1,000 work hours $33.11 $43.03 $52.95

1,001-2,000 work hours $34.25 $44.74 $55.23

2,001-3,000 work hours $35.38 $46.43 $57.49

3,001-4,000 work hours $37.64 $49.83 $62.01

X X X X X X X D Y$39.03 $51.91 $64.79LAUCT-Z2-5Class V - Tunnel, shaft and caisson miner, drill runner, keyboard operator, power knife operator, reinforced steel or mesh man (e.g. wire mesh, steel mats, dowel bars)

0-1,000 work hours $33.31 $43.33 $53.35

1,001-2,000 work hours $34.45 $45.04 $55.63

2,001-3,000 work hours $35.60 $46.77 $57.93

3,001-4,000 work hours $37.89 $50.20 $62.51

ChippewaCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Chippewa County

Last Updated

Classification Number

X X X X X X X D Y$39.34 $52.38 $65.41LAUCT-Z2-6Class VI - Dynamite man and powder man.

0-1,000 work hours $33.54 $43.67 $53.81

1,001-2,000 work hours $34.70 $45.41 $56.13

2,001-3,000 work hours $35.86 $47.15 $58.45

3,001-4,000 work hours $38.18 $50.63 $63.09

X X X X X X X D Y$31.61 $40.78 $49.95LAUCT-Z2-7Class VII - Restoration laborer, seeding, sodding, planting, cutting, mulching and topsoil grading and the restoration of property such as replacing mail boxes, wood chips, planter boxes and flagstones.

0-1,000 work hours $27.75 $34.99 $42.23

1,001-2,000 work hours $28.52 $36.15 $43.77

2,001-3,000 work hours $29.29 $37.30 $45.31

3,001-4,000 work hours $30.84 $39.63 $48.41

Laborer -Underground Open Cut, Class I

X X X X X X X D Y$35.55 $46.67 $57.79LAUC-Z5-1Construction Laborer

0-1,000 work hours $30.71 $39.41 $48.11

1,001-2,000 work hours $31.68 $40.86 $50.05

2,001-3,000 work hours $32.65 $42.32 $51.99

3,001-4,000 work hours $34.58 $45.22 $55.85

Laborer -Underground Open Cut, Class II

X X X X X X X D Y$35.69 $46.88 $58.07LAUC-Z5-2Mortar and material mixer, concrete form man, signal man, well point man, manhole, headwall and catch basin builder, guard rail builders, headwall, seawall, breakwall, dock builder and fence erector.

0-1,000 work hours $30.82 $39.58 $48.33

1,001-2,000 work hours $31.79 $41.03 $50.27

2,001-3,000 work hours $32.77 $42.50 $52.23

3,001-4,000 work hours $34.72 $45.42 $56.13

ChippewaCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Chippewa County

Last Updated

Classification Number

Laborer -Underground Open Cut, Class III

X X X X X X X D Y$35.82 $47.08 $58.33LAUC-Z5-3Air, gasoline and electric tool operator, vibrator operator, drillers, pump man, tar kettle operator, bracers, rodder, reinforced steel or mesh man (e.g. wire mesh, steel mats, dowel bars, etc.), cement finisher, welder, pipe jacking and boring man, wagon

0-1,000 work hours $30.92 $39.72 $48.53

1,001-2,000 work hours $31.90 $41.20 $50.49

2,001-3,000 work hours $32.88 $42.66 $52.45

3,001-4,000 work hours $34.84 $45.60 $56.37

Laborer -Underground Open Cut, Class IV

X X X X X X X D Y$35.87 $47.15 $58.43LAUC-Z5-4Trench or excavating grade man.

0-1,000 work hours $30.95 $39.77 $48.59

1,001-2,000 work hours $31.94 $41.26 $50.57

2,001-3,000 work hours $32.92 $42.72 $52.53

3,001-4,000 work hours $34.89 $45.68 $56.47

Laborer -Underground Open Cut, Class V

X X X X X X X D Y$35.92 $47.23 $58.53LAUC-Z5-5Pipe Layer (including crock, metal pipe, multiplate or other conduits)

0-1,000 work hours $30.99 $39.83 $48.67

1,001-2,000 work hours $31.98 $41.32 $50.65

2,001-3,000 work hours $32.96 $42.78 $52.61

3,001-4,000 work hours $34.93 $45.74 $56.55

ChippewaCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Chippewa County

Last Updated

Classification Number

Laborer -Underground Open Cut, Class VI

X X X X X X X D Y$33.30 $43.30 $53.29LAUC-Z5-6Grouting man, top man assistant, audio visual television operations and all other operations in connection with closed circuit television inspection, pipe cleaning and pipe relining work & the installation and repair of water service pipe and appurtenance

0-1,000 work hours $29.03 $36.89 $44.75

1,001-2,000 work hours $29.88 $38.16 $46.45

2,001-3,000 work hours $30.74 $39.46 $48.17

3,001-4,000 work hours $32.45 $42.02 $51.59

Laborer -Underground Open Cut, Class VII

X X X X X X X D Y$31.41 $40.46 $49.51LAUC-Z5-7Restoration laborer, seeding, sodding, planting, cutting, mulching and topsoil grading and the restoration of property such as replacing mail boxes, wood chips, planter boxes, flagstones etc.

0-1,000 work hours $27.61 $34.76 $41.91

1,001-2,000 work hours $28.37 $35.90 $43.43

2,001-3,000 work hours $29.13 $37.04 $44.95

3,001-4,000 work hours $30.65 $39.32 $47.99

Operating Engineer - Marine Construction

H H H H H H H D N$52.81 $78.57 $104.32GLF DDiver/Wet Tender/Tender/Rov Pilot/Rov Tender

X X H H H H H D Y$78.97 $102.47 $125.97GLF-1Diver/Wet Tender, Engineer (hydraulic dredge)

Make up day allowed

1/7/2022

Subdivision of county all Great Lakes, islands therein, & connecting & tributary waters

X X H H H H H D Y$77.47 $100.22 $122.97GLF-2Crane/Backhoe Operator, 70 ton or over Tug Operator, Mechanic/Welder, Assistant Engineer (hydraulic dredge), Leverman (hydraulic dredge), Diver Tender

Make up day allowed

1/7/2022

Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters

X X H H H H H D Y$78.97 $102.47 $125.97GLF-2BFriction, Lattice Boom or Crane License Certification30

Make up day allowed

1/7/2022

Subdivision of county All Great Lakes, islands, therein, & connecting & tributary waters

StatewideCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Statewide County

Last Updated

Classification Number

X X H H H H H D Y$72.92 $93.40 $113.87GLF-3Deck Equipment Operator, Machineryman, Maintenance of Crane (over 50 ton capacity) or Backhoe (115,000 lbs or more), Tug/Launch Operator, Loader, Dozer on Barge, Deck Machinery

Make up day allowed

1/7/2022

Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters

X X H H H H H D Y$66.72 $84.10 $101.47GLF-4Deck Equipment Operator, (Machineryman/Fireman), (4 equipment units or more), Off Road Trucks, Deck Hand, Tug Engineer, & Crane Maintenance 50 ton capacity and under or Backhoe 115,000 lbs or less, Assistant Tug Operator

Make up day allowed

1/7/2022

Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters

Operating Engineer General Construction & Underground

X X H H H H H D N$61.10 $79.31 $97.51EN-324UP-120GUCrane 120' boom & jib

Double time after 12 hours Mon-Sat

Comment

12/10/2021

X X H H H H H D N$61.92 $80.54 $99.15EN-324UP-140GUCrane 140' boom & jib

Double time after 12 hours Mon-Sat

Comment

12/10/2021

X X H H H H H D N$65.22 $85.49 $105.75EN-324UP-400GUCrane with 400' or longer main boom & jib

Double time after 12 hours Mon-Sat

Comment

12/10/2021

X X H H H H H D N$57.80 $74.36 $90.91EN-324UP-AGUClass A- Regular equipment operator, crane, dozer, front end loader, pumpcrete, squeeze crete, job mechanic, welder, concrete pump, excavator, milling & pulverizing machines, & scraper (self-propelled & tractor drawn).

Double time after 12 hours Mon-Sat

Comment

12/10/2021

Apprentice Rates:

1st 6 months $49.16 $61.39 $73.63

2nd 6 months $50.60 $63.55 $76.51

3rd 6 months $52.04 $65.71 $79.39

4th 6 months $53.48 $67.87 $82.27

5th 6 months $54.92 $70.03 $85.15

6th 6 months $56.36 $72.19 $88.03

ChippewaCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Chippewa County

Last Updated

Classification Number

X X H H H H H D N$54.55 $69.48 $84.41EN-324UP-BGUClass B- Air-Trac Drill, boom truck (non-swing), concrete mixers, material hoist and tugger, pumps 6" and over, beltcrete, sweeping machine, trencher, head grease man, winches, well points and freeze systems

Double time after 12 hours Mon-Sat

Comment

12/10/2021

X X H H H H H D N$53.37 $67.71 $82.05EN-324UP-CGUClass C- Fork Truck, air compressor, conveyer, concrete saw, farm tractor(without attachments), generator, guard post driver, mulching machines, pumps under 6", welding machines, grease man

Double time after 12 hours Mon-Sat

Comment

12/10/2021

X X H H H H H D N$52.43 $66.30 $80.17EN-324UP-DGUClass D- Oiler, fireman, heater operator, brock concrete breaker, elevators (other than passenger), end dump & skid steer

Double time after 12 hours Mon-Sat

Comment

12/10/2021

X X H H H H H D N$40.65 $54.88 $69.11EN-324UP-EGUClass E - Fire watch for work performed by a mamber of the Operating Engineers, fueling of all poer-driven equipment when operatoed by a member of the Operating Engineers, ground man, hole watch for work performed by a member of the Operating Engineers, l

12/10/2021

X X H H H H H D N$62.21 $80.97 $99.73EN-324UP-GUCrane 220' boom & jib

Double time after 12 hours Mon-Sat

Comment

12/10/2021

X X H H H H H D N$62.10 $88.38 $114.66EN-324UP-MGUMechanic w/ truck & tools

Double time after 12 hours Mon-Sat

Comment

12/16/2021

Operating Engineer Steel Work

X X H H H H H D Y$67.06 $88.25 $109.43EN-324UP-120SCrane 120' boom & jib

Double time after 12 hours Mon-Sat

Comment

12/10/2021

X X H H H H H D Y$67.36 $88.70 $110.03EN-324UP-140SCrane 140' boom & jib

Double time after 12 hours Mon-Sat

Comment

12/10/2021

X X H H H H H D Y$67.95 $97.16 $126.36EN-324UP-220SCrane 220' boom & jib

Double time after 12 hours Mon-Sat

Comment

12/16/2021

ChippewaCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Chippewa County

Last Updated

Classification Number

X X H H H H H D Y$70.30 $93.11 $115.91EN-324UP-300SCrane with 300' boom & jib

Double time after 12 hours Mon-Sat

Comment Make up day allowed

12/10/2021

X X H H H H H D Y$72.08 $95.78 $119.47EN-324UP-400SCrane with 400' boom & jib

Double time after 12 hours Mon-Sat

Comment Make up day allowed

12/10/2021

X X H H H H H D Y$60.59 $78.54 $96.49EN-324UP-CWSCompressor, Welder & Forklift

Double time after 12 hours Mon-Sat

Comment

12/10/2021

X X H H H H H D Y$66.19 $86.94 $107.69EN-324UP-MSMechanic w/ truck & tools

Double time after 12 hours Mon-Sat

Comment

12/10/2021

X X H H H H H D Y$59.05 $76.23 $93.41EN-324UP-OFSOiler & Fireman

Double time after 12 hours Mon-Sat

Comment

12/10/2021

X X H H H H H D Y$64.41 $84.27 $104.13EN-324UP-OSOperator

Double time after 12 hours Mon-Sat

Comment

12/10/2021

Apprentice Rates:

1st 6 months $54.05 $68.73 $83.41

2nd 6 months $55.77 $71.31 $86.85

3rd 6 months $57.50 $73.90 $90.31

4th 6 months $59.23 $76.50 $93.77

5th 6 months $60.96 $79.10 $97.23

6th 6 months $62.68 $81.68 $100.67

ChippewaCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Chippewa County

Last Updated

Classification Number

Operating Engineer Underground

H H H H H H H D Y$60.93 $78.89 $96.85EN-324A2-UC1Class I Equipment - Backfiller Tamper, Backhoe, Batch Plant Operator, Clamshell, Concrete Paver 2 drums or larger, Conveyor Loader Euclid type, Crane (crawler, truck type or pile driving), Dozer, Dragline, Elevating Grader, endloader, gradall, grader, hyd

0-999 hours $49.19 $61.74 $74.29

1,000-1,999 hours $50.99 $64.44 $77.89

2,000-2,999 hours $52.78 $67.12 $81.47

3,000-3,999 hours $54.58 $69.82 $85.07

4,000-4,999 hours $56.37 $72.51 $88.65

5,000-5,999 hours $58.16 $75.19 $92.23

H H H H H H H D Y$56.04 $71.56 $87.07EN-324A2-UC2Class II Equipment - Boom Truck, Crusher, Hoist, Pump 6 inch discharge or larger, side boom tractor, Tractor (pneu-tired other than backhoe or front end loader), Trencher 8

ft. digging capcity and smaller, Vac Truck

H H H H H H H D Y$55.54 $70.81 $86.07EN-324A2-UC3Class III Equipment - Air Compressors 600 cfm or larger, Air Compressors 2 or more less than 600 dfm, Boom Truck non-swinging non-powered type boom, Concrete Breaker self-propelled or truck mounted, Concrete paver 1 drum 1/2 yd. or larger, Elevator other

H H H H H H H D Y$55.26 $70.39 $85.51EN-324A2-UC4Class IV Equipment - Boiler, Concrete Saw 40 hp or over, curing machine self propelled, end dumps, extend a boom forklift, farm tractor with attachment, finishing machine concrete, firemen, hydraulic pipe pushing machine, mulching equipment, oiler, pumps

ChippewaCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Chippewa County

Last Updated

Classification Number

Painter

H H H H H H H D N$37.65 $49.29 $60.92PT-1011Painter

1st 1000 hours $28.34 $35.32 $42.30

2nd 1000 hours $29.51 $37.08 $44.64

3rd 1000 hours $30.67 $38.82 $46.96

4th 1000 hours $31.83 $40.56 $49.28

5th 1000 hours $33.00 $42.31 $51.62

6th 1000 hours $34.16 $44.05 $53.94

7th 1000 hours $35.32 $45.79 $56.26

8th 1000 hours $36.49 $47.54 $58.60

Pipe and Manhole Rehab

H H H H H H H H N$28.20 $38.20 TM247General Laborer for rehab work or normal cleaning and cctv work-top man, scaffold man, CCTV assistant, jetter-vac assistant

4/17/2015

H H H H H H H H N$32.70 $44.95 TM247-2Tap cutter/CCTV Tech/Grout Equipment Operator: unit driver and operator of CCTV; grouting equipment and tap cutting equipment

H H H H H H H H N$31.45 $43.07 TM247-3CCTV Technician/Combo Unit Operator: unit driver and operator of cctv unit or combo unit in connection with normal cleaning and televising work

H H H H H H H H N$33.20 $45.70 TM247-4Boiler Operator: unit driver and operator of steam/water heater units and all ancillary equipment associated

H H H H H H H H N$33.20 $45.70 TM247-5Combo Unit driver & Jetter-Vac Operator

H H H H H H H H N$34.20 $47.20 TM247-6Pipe Bursting & Slip-lining Equipment Operator

StatewideCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Chippewa County

Last Updated

Classification Number

Plasterer

H H H H H H H D N$45.79 $60.94 $76.08CE514-P-UPPlasterer

1st Year $35.19 $45.04 $54.88

2nd Year $38.22 $49.58 $60.94

3rd Year $41.25 $54.12 $67.00

Plumber & Pipefitter

H H H H H H H D Y$63.63 $94.76 $125.88PL-111Plumber & Pipefitter 4 ten hour days may be worked only Monday-Thursday

Make up day allowed

1/7/2022

Apprentice Rates:

1st 6 months $31.81 $47.03 $62.24

2nd 6 months $33.66 $49.80 $65.94

3rd 6 months $48.86 $72.60 $96.34

4th 6 months $50.70 $75.36 $100.02

5th 6 months $52.55 $78.14 $103.72

6th 6 months $54.40 $80.91 $107.42

7th 6 months $56.24 $83.67 $111.10

8th 6 months $58.09 $86.44 $114.80

9th 6 months $59.94 $89.22 $118.50

Roofer

X X X X X X X D Y$41.46 $53.86 $66.26RO-149-UPCommercial Roofer

Make up day allowed

1/19/2022

Apprentice Rates:

Apprentice 1 $31.62 $39.59 $47.56

Apprentice 2 $33.03 $41.66 $50.29

Apprentice 3 $34.39 $43.66 $52.92

Apprentice 4 $35.76 $45.67 $55.58

Apprentice 5 $37.12 $47.67 $58.21

Apprentice 6 $37.92 $48.82 $59.72

ChippewaCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Statewide County

Last Updated

Classification Number

Sewer Relining

H H H H H H H D N$49.71 $67.42 $85.13SR-IClass I-Operator of audio visual CCTV system including remote in-ground cutter and other equipment used in conjunction with CCTV system.

0-6 months $39.05 $51.43 $63.81

6-12 months $42.83 $57.10 $71.37

H H H H H H H D N$47.67 $64.36 $81.05SR-IIClass II-Operator of hot water heaters and circulation system; water jetters; and vacuum and mechanical debris removal systems and those assisting.

Sheet Metal Worker

H H H H D D D D Y$61.69 $77.49 $93.28shm-7-5Sheet Metal Worker 4 10s allowed as consecutive days, M-Th

A make up day may be worked due to inclement weather, the make up hours shall be paid at the regular hourly rate of pay.

Comment Make up day allowed

1/14/2022

Apprentice Rates:

1st 6 months $35.94 $43.84 $51.74

2nd 6 months $35.94 $43.84 $51.74

3rd 6 months $38.25 $46.94 $55.62

4th 6 months $40.57 $50.04 $59.52

5th 6 months $42.90 $53.17 $63.43

6th 6 months $45.23 $56.28 $67.34

7th 6 months $47.55 $59.40 $71.24

8th 6 months $49.88 $62.51 $75.15

ChippewaCounty: zz alpha web rates

Time and a Half

Double Time

Name

Classification

Overtime ProvisionDescription

Chippewa County

Last Updated

Classification Number

Sprinkler Fitter

H H H H H H H D Y$60.34 $78.45 $96.56SP 669Sprinkler Fitter

Make up day allowed

11/16/2021

Apprentice Rates:

Class 1 $24.57 $32.72 $40.87

Class 2 $26.38 $35.43 $44.49

Class 3 $39.14 $49.10 $59.06

Class 4 $40.95 $51.82 $62.68

Class 5 $43.01 $54.78 $66.55

Class 6 $44.82 $57.49 $70.17

Class 7 $46.63 $60.21 $73.79

Class 8 $48.45 $62.94 $77.43

Class 9 $50.26 $65.65 $81.05

Class 10 $52.07 $68.37 $84.67

Tile, Terrazzo and Mosaic Finisher

H H H H H H H D N$42.34 $54.17 $65.99BR2-TFTile, Terrazzo and Mosaic Finisher

1st Period $35.25 $43.53 $51.81

2nd Period $36.43 $45.30 $54.17

3rd Period $37.61 $47.07 $56.53

4th Period $38.79 $48.84 $58.89

5th Period $39.97 $50.61 $61.25

6th Period $41.16 $52.39 $63.63

Truck Driver

H H H H H H H H Y$44.10 $48.81 TM-RB2of all trucks of 8 cubic yd capacity or over

1/12/2022

H H H H H H H H Y$44.00 $48.66 TM-RB2Aof all trucks of 8 cubic yard capacity or less (except dump trucks of 8 cubic yard capacity or over, tandem axle trucks, transit mix and semis, euclid type equipment, double bottoms and low boys)

6/7/2016

H H H H H H H H Y$44.25 $49.04 TM-RB2Bon euclid type equipment

6/7/2016

ChippewaCounty: zz alpha web rates

File details come from the government source that posted it. Updated .