Attachment 2a-TECH EXHIBIT E - WAGE RATE DETERMINATION BID SCHED.xlsx

XLSX spreadsheet 46 KB Posted

Attached to
CSC-21501 Maintenance of HVAC, Plumbing and and emergency power supply (EPS) systems
Solicitation number
SP4702-21-R-0012
Issued by

About this file

This document includes a solicitation for maintenance services for HVAC, plumbing and emergency power supply systems at a Defense Logistics Agency facility, as well as an attachment with wage rate tables. The solicitation is for a firm fixed price contract to provide qualified personnel, equipment, materials and services to perform operation, maintenance and repair of covered HVAC, plumbing and emergency power systems located in various buildings at the Defense Supply Center Columbus. The period of performance is 365 calendar days from notice to proceed. Questions are due by August 12th and proposals are due by August 20th, with award based on lowest price among technically acceptable offers. The attachment provides wage rate tables for required job titles for the base year and four option years.

The solicitation specifies work is to be performed per trade standards and qualified tradesmen are required. The Defense Supply Center Columbus is located in Franklin County, Ohio. The contract will require payment of prevailing Service Contract Act wage rates. The solicitation includes details on a pre-proposal site visit and center security requirements. The NAICS code is 561210 and it is set aside for small businesses with a size standard of $41.5M.

View the file

Other files

File Type Posted
Questions and Answers for SP4702-21-R-0012 Project-CSC-21501.pdf PDF
TECH EXHIBIT L - GREASE TRAP FREQ.xlsx XLSX spreadsheet
Amendment 02-SP4702-21-R-0012-SF30.pdf PDF
Continue sheet Amendment 02 SF30.pdf PDF
TECH EXHIBIT J - DISA MOP.docx DOCX document
TECH EXHIBIT K - DISA VAR.docx DOCX document
TECH EXHIBIT I - RICE Policy Signed 31JAN2019.pdf PDF
sec-TABLE OF CONTENTS updated 17AUG21.pdf PDF
Amendment 01-SP4702-21-R-0012-SF30 22JUL21.pdf PDF
TECH EXHIBIT B - EQUIPMENT LIST.xlsx XLSX spreadsheet
TECH EXHIBIT C - BACKFLOWS.docx DOCX document
TECH EXHIBIT D - PM CHECKLISTS_updated.xlsx XLSX spreadsheet
TECH EXHIBIT A - BUILDING LIST.docx DOCX document
Continue sheet SF30.pdf PDF
sec-TABLE OF CONTENTS updated 22JUL21.pdf PDF
Attachment 2b-TECH EXHIBIT F - LABOR BID SCHEDULE.xlsx XLSX spreadsheet
Attachment 2d-TECH EXHIBIT H - TRANSITION COST BID SCHEDULE.xlsx XLSX spreadsheet
Attachment 8-ENG FORM 93.pdf PDF
Attachment 5-Evaluation Factors Section L-M CSC-21501 Evaluation Factors.pdf PDF
Attachment 6-Clauses.pdf PDF
Attachment 2c-TECH EXHIBIT G-SUB MAT-DIRECT COST BID SCHED.xlsx XLSX spreadsheet
SP4702-21-R-0012.pdf PDF
Attachment 4-Quality Assurance Surveillance Plan.pdf PDF
Attachment 7-WDOL 15-4729.pdf PDF
Attachment 1-Section B-Pricing Spreadsheet.pdf PDF
Attachment 3-Performance Work Statement.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECH EXHIBIT E

Bid Schedule

Base Year

Table I
Base Period Hourly Rate Determination:

Required Job Titles For Project Occupation No. Wages Taxes & Insurance Fringe Benefits Subtotal Overhead % G&A % Subtotal Profit $ per hour Total Burdened Rate

PROJECT MANAGER
ADMIN ASSISTANT/MAINTENANCE SCHEDULER01300
HVAC TECHNICIAN23411
HVAC TECHNICIAN23411
HVAC TECHNICIAN23411
HVAC TECHNICIAN23411
MAINTENANCE PLUMBER23810
GENERAL MAINTENANCE HELPER23370

TECH EXHIBIT E Option 1 Bid Schedule

Option Year 1

Table I
Option Year 1 Period Hourly Rate Determination:

Required Job Titles For Project Occupation No. Wages Taxes & Insurance Fringe Benefits Subtotal Overhead % G&A % Subtotal Profit $ per hour Total Burdened Rate

PROJECT MANAGER
ADMIN ASSISTANT/MAINTENANCE SCHEDULER01300
HVAC TECHNICIAN23411
HVAC TECHNICIAN23411
HVAC TECHNICIAN23411
HVAC TECHNICIAN23411
MAINTENANCE PLUMBER23810
GENERAL MAINTENANCE HELPER23370

TECH EXHIBIT E Option 2 Bid Schedule

Option Year 2

Table I
Option Year 2 Period Hourly Rate Determination:

Required Job Titles For Project Occupation No. Wages Taxes & Insurance Fringe Benefits Subtotal Overhead % G&A % Subtotal Profit $ per hour Total Burdened Rate

PROJECT MANAGER
ADMIN ASSISTANT/MAINTENANCE SCHEDULER01300
HVAC TECHNICIAN23411
HVAC TECHNICIAN23411
HVAC TECHNICIAN23411
HVAC TECHNICIAN23411
MAINTENANCE PLUMBER23810
GENERAL MAINTENANCE HELPER23370

TECH EXHIBIT E Option 3 Bid Schedule

Option Year 3

Table I
Option Year 3 Period Hourly Rate Determination:

Required Job Titles For Project Occupation No. Wages Taxes & Insurance Fringe Benefits Subtotal Overhead % G&A % Subtotal Profit $ per hour Total Burdened Rate

PROJECT MANAGER
ADMIN ASSISTANT/MAINTENANCE SCHEDULER01300
HVAC TECHNICIAN23411
HVAC TECHNICIAN23411
HVAC TECHNICIAN23411
HVAC TECHNICIAN23411
MAINTENANCE PLUMBER23810
GENERAL MAINTENANCE HELPER23370

TECH EXHIBIT E Option 4 Bid Schedule

Option Year 4

Table I
Option Year 4 Period Hourly Rate Determination:

Required Job Titles For Project Occupation No. Wages Taxes & Insurance Fringe Benefits Subtotal Overhead % G&A % Subtotal Profit $ per hour Total Burdened Rate

PROJECT MANAGER
ADMIN ASSISTANT/MAINTENANCE SCHEDULER01300
HVAC TECHNICIAN23411
HVAC TECHNICIAN23411
HVAC TECHNICIAN23411
HVAC TECHNICIAN23411
MAINTENANCE PLUMBER23810
GENERAL MAINTENANCE HELPER23370

Sheet1 Bid Schedule

Table III Technical Exhibit E

Table III
Material and Direct Cost:

Item Cost Markup % Line Item Total

Sheet2

Sheet3

File details come from the government source that posted it. Updated .