This statement of work and solicitation document outline requirements for upgrading an existing card access system at a Veterans Affairs medical center. The Department of Veterans Affairs is seeking proposals to replace the failed Identicard 9000 swipe card access system with an Identicard PremiSys Pro system at multiple buildings and locations. Proposals are due by September 1, 2021 with work expected to be completed within 21 days of award. Offerors must be registered in the System for Award Management and this procurement is set aside for service-disabled veteran-owned small businesses. The statement of work provides detailed requirements for installing proximity card readers, controllers, input/output boards, wiring, and commissioning the new system at various buildings and community-based outpatient clinics on the main hospital campus and nearby locations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 852.219-77.docx | DOCX document | |
| Amendment 0005.docx | DOCX document | |
| 36C24421Q1142 0005.docx | DOCX document | |
| Amendment 0004.docx | DOCX document | |
| 36C24421Q1142 0004_1.docx | DOCX document | |
| Questions and Answers 20 Sept 2021.docx | DOCX document | |
| Attachment 2 SOW Upgrade Identicard 9000 9-20-2021.docx | DOCX document | |
| Amendment 0003.docx | DOCX document | |
| 36C24421Q1142 0003.docx | DOCX document | |
| 36C24421Q1142 0002.docx | DOCX document | |
| Amendment 0002.docx | DOCX document | |
| Questions and answers.docx | DOCX document | |
| Amendment 0001.docx | DOCX document | |
| 36C24421Q1142 0001_1.docx | DOCX document | |
| Attachment 1 P03 FAR6_JA_OVER_SAT_Redacted.pdf | ||
| Attachment 3 WG 2015-4233 Rev 19 dtd7-21-2021.pdf | ||
| Attachment 2a - Bldg 21 Basement.pdf | ||
| Attachment 4 Quote submission_eval_clauses_provisions.docx | DOCX document | |
| 36C24421Q1142_1.docx | DOCX document | |
| Attachment 2b ICRA.docx | DOCX document |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Corporal Michael J Crescenz Veterans Affair VA Medical Center (CMJC VAMC) Upgrade Card Access System July 19, 2021
A. BACKGROUND
The Corporal Michael J. Crescenz Veterans Affairs VA Medical Center (CMJC VAMC) is requesting an emergency service for licensing and labor to make the current failed swipe card access system operational. In order to provide these emergency services, the Contractor shall furnish all services, tools, equipment, labor, facilities, transportation, and supervision.
B. CONTRACT LOCATIONS
The Contractor shall provide the manpower, materials, and equipment to replace the Identicard 9000 Swipe card access system located at:
1. Main Hospital 3900 Woodland Ave, Philadelphia PA 19104
2. Community Living Center (CLC) 3461 Civic Center Blvd. Philadelphia PA 19104
3. Leased Locations/Community Based Care (CBOC)
· Victor J Sarachi VA Outpatient Clinic (Montgomery County) 433 Caredean Drive Horsham, PA 19044
· Veterans Health Clinic, Burlington 3000 Lincoln Drive East Marlton, NJ 08053
· Camden Community Clinic 300 Broadway Suite 103 Camden, NJ 08103
· Dialysis Community Clinic 4129 Chestnut Street Philadelphia, PA 19104
· DOW Building Annex 100 South Independence Mall Philadelphia, PA 19106
C. PERIOD of PERFORMANCE
1. Period of performance is 21 days from award of the contract.
D. CONTRACTOR RESPONSIBILITIES
1. The contractor shall provide a minimum of (2) certified Identicard PremiSys Pro system who will be assigned to this facility during the length of the contract.
2. Work performed as a result of misuse, abuse, vandalism or negligence is the responsibility of the contractor.
3. Contractor shall comply with the following procedures:
a. The contractor shall check in with COR each time they arrive on site. No work can commence without authorization from COR.
b. Upon each departure, contractor shall serve notice of disposition of work to the COR or designee. The contractor shall furnish to COR a daily log of work performed each day to demonstrate progress.
E. WORK REQUIRED:
1. The medical center has an existing card access system, Identicard 9000 (“Swipe”) system, that has failed all areas as it is no longer supported by Original Equipment Manufacturer (OEM). This failure does not allow controlled access into numerous areas throughout the medical center. Without controlled access, these areas are not secure. These unsecure areas, under this contract, will be upgraded to the currently operational Indenticard PremiSys Pro system.
2. The medical center’s currently operational access control platform, Identacard PremiSys Pro, utilizes proximity card readers to communicate with the system. This system was put into place for all new access-controlled openings to phase out the failing Identicard 9000 system.
3. The medical center has determined a cost-effective approach to replace the failed Identicard 9000 “Swipe” system by converting the abandoned Lenel infrastructure via flashing the existing Lenel Mercury Controllers and I/O Modules to tie into and to communicate with the existing Identacard PremiSys Pro proximity card system.
4. The contractor shall provide materials, license, programming updates, and installation for each PremiSys controller and program each Input/Output (I/O) boards that will communicate with each newly installed proximity reader at each door in the areas identified under this contract.
5. Contractor shall provide onsite technician support for work for the duration of this project who shall be responsible for the performance of the work and validate operation of each door under this contract.
F. INVENTORY OF DOORS:
1. Building 21, Research, Floors Basement – 5th floor
a. There are additional openings, in the basement, which require access control to be installed. Provide and install cabling and all associated hardware for locations identified in Basement as indicated on Attachment A.
b. Provide and install (5) 24-port managed switches, (5) OEM Controller Licenses, and (27) OEM I/O board Licenses and programming and flashing for remaining existing doors with existing card “swipe” system
c. Contractor provide (70) Proximity readers
d. Provide (70) Exit Motion Sensors and Request to Exit Buttons
2. Building 2, Nuclear Medicine
a. Contractor provide: (1) 24-port managed switch, (1) OEM Controller License and (18) OEM I/O board Licenses and programming and flashing for remaining existing doors with existing card “swipe” system
3. Building 2, IT
a. Contractor provide: (1) 24-port managed switch, (1) OEM Controller License and (14) OEM I/O board Licenses and programming and flashing for remaining existing doors with existing card “swipe” system
4. Building 2, MICU
a. Contractor provide: (1) 24-port managed switch, (1) OEM Controller License and (6) OEM I/O board Licenses and programming and flashing for remaining existing doors with existing card “swipe” system
5. Building 1, Floors: Basement - 9
a. Contractor provide : (12) 24-port managed switches, (7) OEM Controller Licenses and (104) OEM I/O board Licenses and programming and flashing for remaining existing doors with existing card “swipe” system
b. Contractor provide (224) Proximity readers
c. Contractor provide (224) Exit Motion Sensors and Request to Exit Buttons
6. Building 2, Floors Subbasement – 8th Floor
a. Contractor provide: (10) 24-port managed switches, (8) OEM Controller Licenses and (97) OEM I/O board Licenses and programming and flashing for remaining existing doors with existing card “swipe” system
b. Contractor provide (210) Proximity readers
c. Contractor provide (210) Exit Motion Sensors and Request to Exit Buttons
7. Building 30 (CLC), Floors Basement – 2
a. Contractor provide: (2) 24-port managed switches, (2) OEM Controller Licenses and (27) OEM I/O board Licenses and programming and flashing for remaining existing doors with existing card “swipe” system
b. Contractor provide (58) Proximity readers
c. Contractor provide (58) Exit Motion Sensors and Request to Exit Buttons
8. Building 5 AND 15, 1st floor
a. Contractor provide : (2) 24-port managed switches, (2) OEM Controller Licenses and (4) OEM I/O board Licenses and programming and flashing for remaining existing doors with existing card “swipe” system
b. Contractor provide (12) Proximity readers
c. Contractor provide (12) Exit Motion Sensors and Request to Exit Buttons
9. CBOC – Dialysis , Chestnut Street
a. Contractor provide : (1) 24-port managed switches, (1) OEM Controller Licenses and (3) OEM I/O board Licenses and programming and flashing for remaining existing doors with existing card “swipe” system
b. Contractor provide (8) Proximity readers
c. Contractor provide (8) Exit Motion Sensors and Request to Exit Buttons
10. CBOC – Camden NJ
a. Contractor provide : (1) 24-port managed switches, (1) OEM Controller Licenses and (3) OEM I/O board Licenses and programming and flashing for remaining existing doors with existing card “swipe” system
b. Contractor provide (8) Proximity readers
c. Contractor provide (8) Exit Motion Sensors and Request to Exit Buttons
11. Annex – Phila PA
a. Contractor provide: (1) 24-port managed switches, (1) OEM Controller Licenses and (3) OEM I/O board Licenses and programming and flashing for remaining existing doors with existing card “swipe” system
b. Contractor provide (8) Proximity readers
c. Contractor provide (8) Exit Motion Sensors and Request to Exit Buttons
12. CBOC Horsham PA
a. Contractor provide: (1) 24-port managed switch, (1) OEM Controller Licenses and (2) OEM I/O board Licenses and programming and flashing for remaining existing doors with existing card “swipe” system
b. Contractor provide (6) Proximity readers
c. Contractor provide (6) Exit Motion Sensors and Request to Exit Buttons
13. CBOC – Burlington NJ
a. Contractor provide: (1) 24-port managed switch, (1) OEM Controller Licenses and (3) OEM I/O board Licenses and programming and flashing for remaining existing doors with existing card “swipe” system
b. Contractor provide (8) Proximity readers
c. Contractor provide (8) Exit Motion Sensors and Request to Exit Buttons
G. EQUIPMENT and SPECIFICATIONS:
1. Contractor shall provide and install Proximity Readers Specifications (or equal). Contractor provide and install:
a. Schlage Electronics Reader (or equal)
b. Model: MT15-485
c. Firmware: X14_21;X09_21
d. Config: CE-401-186
2. Contractor shall provide and install Exit Motion Sensor (or equal). Contractor provide and install:
a. Securitron (or equal)
b. Model: XMS
3. Contractor shall provide and install all wiring. Wiring specifications are as follows:
a. Push to Exit – 22 gauge , 4-wire
b. Card Readers – 18 gauge, 6-wire
c. Magnetic Lock – 18 gauge 4-wire
d. Contractor shall label/tag each cable run for each device. Contractor shall clearly indicate the room numbers and device type of all devices at the termination points. Labels will not be handwritten.
e. All wiring penetrating fire barriers must be sealed with UL listed materials. Submit the material to be utilized to Facilities Management for review and approval prior to application.
f. Any doors that are required to be tied into the fire alarm system must be coordinated between Safety and COR within (7 ) days after award of this contract. The contractor is not authorized to tie any door into fire alarm until there is validation that the fire alarm system will activate. The VA shall utilize their Fire Alarm control to coordinate with the contractor to ensure all life safety devices are operational.
g. Generation of dust is of major concern within the medical center. Where operations involve the generation of dust, contractor shall ensure all work activities eliminate airborne generated dust associated with construction. Contractor is required to coordinate with COR to obtain an ICRA permit through Infection Prevention prior to commencement of any work. Contractor shall provide labor and materials to support ICRA requirements as defined in Attachment B.
H. COMMISSIONING
1. Contractor shall test each door is operating through a witnessed test with COR, VA inspector, and Police.
2. Contractor shall verify and document that equipment is installed and started per manufacturer’s recommendations, industry accepted minimum standards, and the Contract Documents.
3. Contractor shall verify and document that equipment and systems receive complete operational checkout by installing contractors.
4. Contractor shall verify and document equipment and system performance.
I. SUBMITTALS:
1. Contractor to provide submittals to COR for review and approval prior to procurement.
2. Contractor to provide all submittals with 10 days of contract award.
J. REPORTS:
1. The Contractor shall provide a written report to the Contracting Officer’s Representative (COR) within ten (10) business days, validating the operation of each proximity reader, noting and addressing any discrepancies found and making specific recommendations toward future remedial action or upgrades. Any unsafe conditions encountered during the service call shall be reported immediately to the COR and indicated on the report.
K. LICENSES AND REGULATONS
1. Contractor is required to have staff who are performing work under this contract certified in the PremiSys Pro system. This includes the capability of both hardware and software trouble shooting and repair.
2. Contractor shall be required to be a current PremiSys Certified partner. Contractor shall maintain the PremiSys certification throughout the entire period of performance. Certifications of each staff member working under this contract must be provided with proposal. Contractor’s failure to submit evidence of certifications will be considered unresponsive and not eligible for award.
3. All Contractor’s employees working under this contract must hold OSHA 10 certification.
L. CONFORMITY TO REGULATIONS
The Contractor shall conform to all NFPA, Federal, State, and local regulations governing life safety.
M. HOURS OF OPERATION
The normal hours of operation for the facility are 8:00 am to 4:00 pm, Monday through Friday, excluding holidays. All contract work will commence during normal business hours.
N. POINT OF CONTACT
The Contracting Officer shall delegate the COR to monitor the Contractor’s performance. The COR/designee will support the vendor throughout each maintenance visit to the CMJC VAMC. They will provide access to all areas described in the SOW.
O. SERVICE VISIT/CALLS SIGN-IN
The Contractor shall sign in and out with performing any service. The COR shall provide instructions as to the locations of sign-in/out. All service visits/calls shall be documented.
P. SYSTEM FOR AWARD MANAGEMENT (SAM)
Federal Acquisition Regulations require that Federal Contractors register in the System for Award Management (SAM) database at http://www.sam.gov and enter all mandatory information into the system. Award cannot be made until the Contractor has completed registration. Bidders are encouraged to ensure that they are registered in SAM prior to submitting their bid.