Questions and Answers 20 Sept 2021.docx
DOCX document 16 KB Posted
- Attached to
- J063--Card Access System Upgrade Federal contract opportunity
- Solicitation number
- 36C24421Q1142
About this file
This solicitation requests quotes for card access system upgrade services at the Corporal Michael J. Crescenz Veterans Affairs Medical Center in Philadelphia, Pennsylvania. The Department of Veterans Affairs seeks to replace approximately 612 card readers and upgrade the Lenel access control system over a 21-day period of performance. The solicitation is set aside for service-disabled veteran-owned small businesses and has a response deadline of September 1, 2021. Offerors must register in the System for Award Management and direct any questions to the contracting officer by August 27. The wage determination incorporated into the contract is Service Contract Act Wage Determination No. 2015-4233 Rev 19.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 852.219-77.docx | DOCX document | |
| Amendment 0005.docx | DOCX document | |
| 36C24421Q1142 0005.docx | DOCX document | |
| Attachment 2 SOW Upgrade Identicard 9000 9-20-2021.docx | DOCX document | |
| 36C24421Q1142 0004_1.docx | DOCX document | |
| Amendment 0004.docx | DOCX document | |
| Amendment 0003.docx | DOCX document | |
| 36C24421Q1142 0003.docx | DOCX document | |
| 36C24421Q1142 0002.docx | DOCX document | |
| Amendment 0002.docx | DOCX document | |
| Questions and answers.docx | DOCX document | |
| 36C24421Q1142 0001_1.docx | DOCX document | |
| Amendment 0001.docx | DOCX document | |
| Attachment 2b ICRA.docx | DOCX document | |
| Attachment 1 P03 FAR6_JA_OVER_SAT_Redacted.pdf | ||
| Attachment 4 Quote submission_eval_clauses_provisions.docx | DOCX document | |
| 36C24421Q1142_1.docx | DOCX document | |
| Attachment 3 WG 2015-4233 Rev 19 dtd7-21-2021.pdf | ||
| Attachment 2a - Bldg 21 Basement.pdf | ||
| Attachment 2 SOW Upgrade Identicard 9000 15 July 2021.docx | DOCX document |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Do we need escorts for any areas? If so, how much notice do, we need to provide?
A construction Control Inspector will be assigned to this project and will be COR. Contractor to provide a schedule to COR within 10 days of award.
1. Are there any areas that we can only work after hours?
Surgery Suite and PACU – 3rd floor
1. Is everything on the Lenel side currently up and working 100%?
Has the Lenel ever been powered up/commissioned?
Is there a commissioning report from the Lenel system?
Based on the 612 Readers to be replaced, how many of them have been confirmed active and functioning as designed.
VA has not commissioned the Lenel system. We have tied the following systems into the Lenel utilizing this same process as defined in SOW, They are operational All doors in Bldg 3 Research Bldg (#21) front door Bldg 1 Morgue door
1. Would you like daily or weekly reports?
Daily
1. Do we need to lower the card readers and exit buttons to ADA height?
This contract does not include correction previously installed equipment for ADA. Any newly installed readers must comply with ADA
1. If there is any patching and painting needed who will be handling it?
Contractor to patch all walls to match existing. Contractor to provide the list of patched walls to COR and VA will paint these areas
1. If there is a DPS built into the maglock, will it be ok to remove the extra door contact?
Yes
1. If there are devices in the field not tied into the existing access control panels who will be removing the devices from the door and patching the holes?
Contractor to remove those devices and provide metal plate. Contractor to provide the list of these locations to COR.
1. Areas that have had construction done and the cabling is no longer in place who will be installing the cabling?
Any current construction areas are outside the scope of this contract.
1. Does the hospital want the removed devices, or will the contractor dispose the equipment?
Contractor to provide removed devices to VA COR
1. If a board fails the flashing process, what will be the process to replace that board? Should a contingency be added?
VA will replace any existing boards that fail when flashing process reveals failure
1. Can the hospital guarantee that each door is properly wired and has been tested to verify?
11. If not, what’s the contingency?
Doors cannot currently be tested and verified as they are not tied into Lenel system.