The file's text, extracted by GovTribe without its formatting.
ATTACHMENT 2 – SCHEDULE OF SUPPLIES/SERVICES
RFP NO. 70Z08521QP4558300
USCGC WAESCHE UPDS FQ2 FY21 (WMSL 751)
B.1 CGC WAESCHE (WMSL 751)
CLINS 0001 & 0002 - DEFINITE ITEMS
These are the items that, if there is an award at all, will be awarded. The proposal shall be evaluated on the total proposed price for all items.
WORKITEM
NO.
| DESCRIPTION |
| QTY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| D-01 |
| Tanks (MP Fuel Stowage and Overlow), Clean |
and Inspect
| D-02 |
| Tanks, (Oily Waste), Clean and Inspect |
| 1 |
| JB |
| $ |
| $ |
| D-03 |
| Reduction Gears Flexible Hoses, Renew |
| 1 |
| JB |
| $ |
| $ |
| D-04 |
| Wave Guide Dryer Flexible Hoses, Renew |
| 1 |
| JB |
| $ |
| $ |
| D-05 |
| Helo Hangar Doors, Inspect and Test |
| 1 |
| JB |
| $ |
| $ |
| D-07 |
| Machinery Exhaust Stack Insulation, Inspect |
| 1 |
| JB |
| $ |
| $ |
| D-08 |
| Reverse Omosis, Groom |
| 1 |
| JB |
| $ |
| $ |
| D-09 |
| Tank Sounding Tube, Replace |
| 1 |
| JB |
| $ |
| $ |
| D-10 |
| Main Gain Turbine (MGT) Water Wash Tank, Clean Inspect and Hydro |
| 1 |
| JB |
| $ |
| $ |
| D-12 |
| Plate, Fair |
| 1 |
| JB |
| $ |
| $ |
| D-13 |
| Structure (AMMR Uptake), Renew |
| 1 |
| JB |
| $ |
| $ |
| D-14 |
| Structure, Inspect and Repair |
| 1 |
| JB |
| $ |
| $ |
| D-15 |
| Structure (Stack, Aft), Renew |
| 1 |
| JB |
| $ |
| $ |
| D-17 |
| Quick-Acting Watertight Door, 36 x 66, Renew |
| 1 |
| JB |
| $ |
| $ |
| D-21 |
| Watertight Door (Fittings and Gaskets), Renew |
| 1 |
| JB |
| $ |
| $ |
| D-22 |
| WTH and WTS (Fitting and Gaskets), Renew |
| 1 |
| JB |
| $ |
| $ |
| D-23 |
| Main Propulsion Diesel Engine Intake and |
Exhaust, Inspect and Repair
| D-24 |
| Electrical Repairs, Perform |
| 1 |
| JB |
| $ |
| $ |
| D-25 |
| Piping Systems, Repair |
| 1 |
| JB |
| $ |
| $ |
| D-26 |
| CPP Lube Oil, Flush |
| 1 |
| JB |
| $ |
| $ |
| D-27 |
| Piping Insulation, Renew |
| 1 |
| JB |
| $ |
| $ |
| D-28 |
| Ventilation Ducting, Repair |
| 1 |
| JB |
| $ |
| $ |
| D-29 |
| Surfaces, Interior and Exterior, Preserve |
| 1 |
| JB |
| $ |
| $ |
| D-30 |
| Deck Covering (Slip Resistant), Renew |
| 1 |
| JB |
| $ |
| $ |
| D-31 |
| Bulkhead and/or Overhead Insulation, Renew |
| 1 |
| JB |
| $ |
| $ |
| D-32 |
| Scaffolding, Provide |
| 1 |
| JB |
| $ |
| $ |
| D-33 |
| Tenting, Provide |
| 1 |
| JB |
| $ |
| $ |
| D-35 |
| AMMR and Intake Filter Spaces, Clean |
| 1 |
| JB |
| $ |
| $ |
| TOTAL AMOUNT OF ALL DEFINITE ITEMS |
| $ |
CLIN 0003 – OPTIONAL ITEMS - These are the items which may be awarded if inspection reports reveal the necessity for activation, or if funds become available. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s). See ATTACHMENT 3, entitled “OPTIONAL ITEMS.”
WORK
ITEM
NO.
| DESCRIPTION |
| QTY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| O – 6 |
| Helo Hanger Door Curtain Assembly, Preserve (100%) |
| O-6A |
| Port Helo Hangar Door |
| 1 |
| JB |
| $ |
| $ |
| O-6B |
| Starboard Helo Hangar Door |
| 1 |
| JB |
| $ |
| $ |
| O – 11 |
| General Welding, Provide |
| 5 |
| 25/1 sq inch |
| $ |
| $ |
| O – 16 |
| Quick-Acting Watertight Scuttles, Renew |
| O-16A |
| FQAWTS, 03-54-1 |
| 1 |
| JB |
| $ |
| $ |
| O-16B |
| FQAWTS, 03-54-2 |
| 1 |
| JB |
| $ |
| $ |
| O – 18 |
| Watertight Hatch with Quick-Acting Water Tight |
Scuttle, Renew
| O – 19 |
| Watertight Door 18 x 36, Renew |
| O-19A |
| WTD, 03-57-1 |
| 1 |
| JB |
| $ |
| $ |
| O-19B |
| WTD, 03-57-2 |
| 1 |
| JB |
| $ |
| $ |
| O – 20 |
| WTD 26 x 66, Renew |
| 1 |
| JB |
| $ |
| $ |
| O – 34 |
| Plate Renewal-Optional |
| O-34A |
| Item 1 on Table 1 of this Work Item |
| 1 |
| JB |
| $ |
| $ |
| O-34B |
| Item 2 on Table 1 of this Work Item |
| 1 |
| JB |
| $ |
| $ |
| O-34C |
| Item 3 on Table 1 of this Work Item |
| 1 |
| JB |
| $ |
| $ |
| O-34D |
| Item 4 on Table 1 of this Work Item |
| 1 |
| JB |
| $ |
| $ |
| O-34E |
| Item 5 on Table 1 of this Work Item |
| 1 |
| JB |
| $ |
| $ |
| O-34F |
| Item 6 on Table 1 of this Work Item |
| 1 |
| JB |
| $ |
| $ |
| O-34G |
| Item 7 on Table 1 of this Work Item |
| 1 |
| JB |
| $ |
| $ |
| O-34H |
| Item 8 on Table 1 of this Work Item |
| 1 |
| JB |
| $ |
| $ |
| TOTAL AMOUNT OF OPTIONAL ITEMS |
| $ |
| TOTAL AMOUNT OF DEFINITE & OPTIONAL ITEMS OF CGC WAESCHE |
| $ |
CLIN – 0003 – COMPOSITE LABOR HOUR RATE APPLICABLE TO CONTRACT CHANGES
The following labor hour rate shall be used in pricing all contract changes in accordance with ATTACHMENT 3, entitled “COMPOSITE LABOR HOUR RATE.”
| Labor Hour Rate |
| Estimated Hours |
| Extended Amount |
$________/HR
8751 hours
*NOTE: The estimated quantity and extended amount indicated above are for evaluation of offers only. The Composite Labor Hour Rate provided above will apply to all changes involving additional work under this contract regardless of the actual total hours required.