UNPLANNED DOCK-SIDE (DS): USCGC WAESCHE (WMSL 751) FQ2 FY21 DS REPAIRS
Solicitation number
70Z08521QP4558300
Issued by

About this file

This solicitation is for dockside repairs aboard USCGC WAESCHE (WMSL 751). The scope of work includes ship repair and associated support work in accordance with the attached specification. The contractor shall furnish all necessary labor, materials, equipment, supplies, and facilities to perform dry-dock and repairs. The NAICS code is 336611 and it is set aside for small businesses with less than 1250 employees. Quotes are due by February 3, 2021 and award is expected on or about February 17, 2021. Work must be completed by August 13, 2021. The contract will be firm fixed price and awarded on an SF-1449. The contractor must be registered in SAM. Required documents to submit with quotes include the schedule of supplies and services, self certifications, signed amendments, representations and certifications, and a price, technical, and past performance quote as described in the attachment. Drawings are available upon request contingent on completing a non-disclosure agreement. Questions are due by January 27, 2021.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC WAESCHE (WMSL 751)

SPECIFICATION FOR DOCKSIDE REPAIRS

FY2021

Developed By: Adam M Davis

(Rev-3, 13 January 2021)

USCGC WAESCHE (WMSL-418) DOCKSIDE AVAILABILITY FY2021

ii (Rev-3)

TABLE OF CONTENTS

Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ............................................................................... xvi Consolidated List of Critical Inspection Items ......................................................................................... xvii Principal Characteristics .......................................................................................................................... xviii General Requirements WORK ITEM 1: Tanks (MP Fuel Stowage and Overflow), Clean and Inspect WORK ITEM 2: Tanks (Oily Waste), Clean and Inspect WORK ITEM 3: Reduction Gears Flexible Hoses, Renew WORK ITEM 4: Wave Guide Dryer Flexible Hoses, Renew WORK ITEM 5: Helo Hangar Door, Inspect and Test WORK ITEM 6: Helo Hangar Door Curtain Assembly, Preserve (100 %)--Optional WORK ITEM 7: Machinery Exhaust Stack Insulation, Inspect WORK ITEM 8: Reverse Osmosis, System Groom WORK ITEM 9: Tank Sounding Tube, Replace WORK ITEM 10: Main Gas Turbine (MGT) Water Wash Tank, Clean, Inspect And Hydro WORK ITEM 11: General Welding, Provide (Addition) WORK ITEM 12: Plate, Fair WORK ITEM 13: Structures (AMMR Uptake), Renew WORK ITEM 14: Structures, Inspect and Repair WORK ITEM 15: Structures (Stack Aft Above 03 Level), Renew WORK ITEM 16: Quick-Acting Watertight Scuttles, Renew --Optional WORK ITEM 17: Quick Acting Watertight Door, 36x66, Renew WORK ITEM 18: Watertight Hatch with Quick-Acting Water Tight Scuttle, Renew --Optional WORK ITEM 19: Watertight Door 18 x 36, Renew --Optional WORK ITEM 20: WTD 26 x 66, Renew --Optional WORK ITEM 21: Watertight Door (Fittings and Gaskets), Renew WORK ITEM 22: WTH and WTS (Fittings and Gaskets), Renew WORK ITEM 23: Main Propulsion Diesel Engine Intake And Exhaust, Inspect And Repair WORK ITEM 24: Electrical Repairs, Perform WORK ITEM 25: Piping Systems, Repair WORK ITEM 26: CPP Lube Oil, Flush WORK ITEM 27: Piping Insulation, Renew WORK ITEM 28: Ventilation Ducting, Repair WORK ITEM 29: Surfaces, Interior and exterior, Preserve WORK ITEM 30: Deck Covering (Slip-Resistant), Renew WORK ITEM 31: Bulkhead and/or Overhead Insulation, Renew WORK ITEM 32: Scaffolding, Provide WORK ITEM 33: Tenting, Provide WORK ITEM 34: Plate Renewal-Optional WORK ITEM 35: AMMR and Intake Filter Spaces, Clean iii (Rev-3)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

12/18/2020 1 15 Completely replaced Work Item 15, reducing scope of work

12/18/2020 1 34 Added optional plate renewal work item

12/18/2020 1 13 Completely replaced Work Item 13, changed scope of work

01/06/2021 2 25 Removed GFE from Work Item 25.

01/13/2021 3 35 Added Work Item 35.

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

iv (Rev-3)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.

All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.

COAST GUARD DRAWINGS

Coast Guard Drawing 418A-WMSL-100-001, Rev -, General Arrangements

Coast Guard Drawing 418A-WMSL 100-006, Rev -, Inboard and Outboard Profiles

Coast Guard Drawing 418A-WMSL 167-004, Rev -, Structural Door List, Ship Wide

Coast Guard Drawing 418A-WMSL-264-001, Rev -, RDCN GR/CPP GTRB LO Diagram

Coast Guard Drawing 418A-WMSL-432-002, Rev C, Integrated Voice Communications System Deck Plan

Coast Guard Drawing 418A-WMSL-434-002, Rev -, CCTV Surveillance & Tactical Video Cable Running Sheets

Coast Guard Drawing 418A-WMSL-440-014, Rev -, NAVMACS II/SMS AND AN/SSR-1 Antenna Arrangement

Coast Guard Drawing 418A-WMSL-440-015, Rev -, NAVMACS II/SMS AND AN/SSR-1 System Cabling Diagrams

Coast Guard Drawing 418A-WMSL-440-016, Rev -, NAVMACS II/SMS AND AN/SSR-1 Isometric Cable Routing

Coast Guard Drawing 418A-WMSL-441-017, Rev -, NAVMACS II/SMS AND AN/SSR-1 System Cable Running Sheets

Coast Guard Drawing 418A-WMSL-441-010, Rev A, UHF/VHF Radio COMM Block Diagram Material List & References

Coast Guard Drawing 418A-WMSL-506-001, Overflow / Air Escapes Sounding Tubes Diagram

Coast Guard Drawing 418A-WMSL-512-001, Rev A, HVAC System Diagram (ASC512001)

Coast Guard Drawing 418A-WMSL-523-001, Rev -, Diagram Washdown Counter Measure System

Coast Guard Drawing 418A-WMSL-528-001, Rev A, Plumbing and Interior Deck Drain Diagram

Coast Guard Drawing 418A-WMSL-530-001, Rev B, Potable Water Systems Diagram

Coast Guard Drawing 418A-WMSL-551-001, Rev J, Compressed Air Diagram (ASC551001)

Coast Guard Drawing 418A-WMSL-593-001, Rev A, Bilge & Oil Pollution Control System Diagram

Coast Guard Drawing 418A-WMSL-801-001, Rev -, Booklet of General Plans

Coast Guard Drawing 750-WMSL 085-003, Rev A, Compartment Areas & Volumes NSC 1 & NSC 2 (Only) (ASC085012)

Coast Guard Drawing 750 WMSL-100-001, Rev L, General Arrangements (ASC100001)

Coast Guard Drawing 750-WMSL-100-021, Rev F, Unit 2100 Structure – Inner Bottom – Fr 35 to Fr 44

(ASC100210)

v (Rev-3)

Coast Guard Drawing 750-WMSL-100-026, Rev H, Unit 2200 Structure – Inner Bottom – Fr 44 to Fr 52

(ASC100220)

Coast Guard Drawing 750-WMSL-100-027, Rev K, Unit 2210 Structure – 1st Platf to 2nd Deck – Fr 44 to Fr 52 (ASC100221)

Coast Guard Drawing 750-WMSL 100-028, Rev H, Unit 2220 Structure - 1st Platf to 2nd Deck - Fr 44 to Fr 52 (ASC100222)

Coast Guard Drawing 750-WMSL 100-029, Rev K, Unit 2230 Structure - 2nd Dk to Mn Dk - Fr 44 to Fr

52 (ASC100223)

Coast Guard Drawing 750-WMSL 100-030, Rev L, Unit 2240 Structure - Main Dk to 01 Lvl - Fr 44 to Fr

52 (ASC100224)

Coast Guard Drawing 750-WMSL 100-031, Rev J, Unit 2300 Structure - Inner Bottom - Fr 52 to Fr 64

(ASC100230)

Coast Guard Drawing 750-WMSL 100-032, Rev K, Unit 2310 Structure - Innerbottom to 1st Platform - Fr 52 to Fr 64 (ASC100231)

Coast Guard Drawing 750-WMSL 100-033, Rev H, Unit 2320 - 1st Platform to 2nd Deck - Fr 52 to Fr 64

(ASC100232)

Coast Guard Drawing 750-WMSL 100-034, Rev J, Unit 2330 Structure - 2nd Deck to Main Deck - Fr 52 to Fr 64 (ASC100233)

Coast Guard Drawing 750-WMSL 100-035, Rev K, Unit 2340 Structure Main Deck to 01 Level - Fr 52 to Fr 64 (ASC100234)

Coast Guard Drawing 750-WMSL-100-050, Rev J, Unit 4230 Structure - Mast (ASC100423)

Coast Guard Drawing 750-WMSL 100-051, Rev J, Unit 4310 Structure 01 Level to 02 Level - Fr 44 to Fr

52 (ASC100431)

Coast Guard Drawing 750-WMSL 100-052, Rev J, Unit 4320 Structure 02 Lvl and Above - Fr 48 to Fr 53

(ASC100432)

Coast Guard Drawing 750-WMSL 100-053, Rev J, Unit 4420 Structure - 01 Level and Abv - Fr 52 to Fr

67 (ASC100442)

Coast Guard Drawing 750-WMSL 100-054, Rev H, Stack - Fr 48 to Fr 57 (ASC100443)

Coast Guard Drawing 750-WMSL-100-055, Rev G, Unit 4130 - Structure - 03 Level - Pilot House

(ASC100413)

Coast Guard Drawing 750-WMSL-100-061, Rev A, Inboard & Outboard Profiles (AS3100002)

Coast Guard Drawing 750-WMSL-100-515, Rev A, Topside Configuration (NSC 2 SRD)

Coast Guard Drawing 750-WMSL 100-533, Rev -, Lifting Padeyes Aft Main Mchry Room 5-52-01-E & Uptake Stack Region

Coast Guard Drawing 750-WMSL-167-001, Rev J, Manhole List Installation and Fabrication Details Ship Wide (ASC167001)

Coast Guard Drawing 750-WMSL 167-002, Rev D, Structural Door List, Ship Wide Hulls 4911 and 4912 Only (ASC167002)

Coast Guard Drawing 750-WMSL 167-003, Rev C, Hatch & Scuttle List. Ship Wide (NSC 1 & 2 Only)

(ASC167003)

Coast Guard Drawing 750-WMSL 167-503, Rev A, Structural Door List

Coast Guard Drawing 750-WMSL-169-001, Rev E, HELO Hangar Door Installation (ASC169001)

Coast Guard Drawing 750-WMSL 180-022, Rev K, Fdn Arr Dwg Design Unit 2310 BKLT No. 1

Coast Guard Drawing 750-WMSL 180-023, Rev G, Fdn Arr Dwg Design Unit 2320 BKLT No. 1

Coast Guard Drawing 750-WMSL 180-024, Rev F, Fdn Arr Dwg Design Unit 2330 BKLT No. 1 vi (Rev-3)

Coast Guard Drawing 750-WMSL 180-025, Rev D, Fdn Arr Dwg Design Unit 2340 BKLT No. 1

Coast Guard Drawing 750-WMSL 180-101, Rev E, Main Engine Foundation Unit 2300

Coast Guard Drawing 750-WMSL 180-102, Rev F, Reduction and Combining Gear Foundation Unit

Coast Guard Drawing 750-WMSL 191-022, Rev E, Ballast/Emergency Dewatering Unit 2310

Coast Guard Drawing 750-WMSL 191-028, Rev C, Ballast/Emergency Dewatering Unit 2300

Coast Guard Drawing 750-WMSL-202-001, Rev C, MACH & ELECT PLANT CONT Monitoring Block Diagram (ASC202001) (UNSIGNED)

Coast Guard Drawing 750-WMSL-202-002, Rev D, Machinery Control & Monitoring SYS Deck Plan

(ASC202003) (UNSIGNED)

Coast Guard Drawing 750-WMSL-202-004, Rev C, Machinery Control & Monitoring System Cables Running Sheets (ASC202004)

Coast Guard Drawing 750-WMSL-202-023, Rev F, Propulsion Control, Transfer & Throttle Telegraph Sys Deck Plan (ASC202017) (UNSIGNED)

Coast Guard Drawing 750-WMSL-202-038, Rev B, MCMS Remote Terminal Units (RTU) Fire Zone NO. 1 Deck Plan (ASC202025) (UNSIGNED)

Coast Guard Drawing 750-WMSL-202-039, Rev D, MCMS Remote Terminal Units (RTU) Fire Zone NO. 2 Deck Plan (ASC202027) (UNSIGNED)

Coast Guard Drawing 750-WMSL-202-040, Rev E, MCMS Remote Terminal Units (RTU) Fire Zone NO. 3 Deck Plan (ASC202029) (UNSIGNED)

Coast Guard Drawing 750-WMSL-202-041, Rev A, MCMS Remote Terminal Units (RTU) Fire Zone NO. 4 Deck Plan (ASC202030) (UNSIGNED)

Coast Guard Drawing 750-WMSL 231-001, Rev B, Turbine bolting & Chocking Detail & L/M

Coast Guard Drawing 750-WMSL 231-002, Rev D, Main Engine Bolting and chocking Details and L/M

Coast Guard Drawing 750-WMSL 231-003, Rev D, Reduction Gear & Line Shaft Bearing Bolting & Chocking Details Unit 2320

Coast Guard Drawing 750-WMSL 231-004, Rev D, Diesel Generator Set Bolting & Chocking Details & L.M

Coast Guard Drawing 750-WMSL-243-002, Rev D, Misc Pressure Vessels Design Details and L/M

(ASC243003)

Coast Guard Drawing 750-WMSL-259-001, Rev H, Prpln Gas Turbine Air Intake / Exhaust Diagram

(ASC259001)

Coast Guard Drawing 750-WMSL-259-003, Rev G, Main Prop DSL/SS DSL Gen Air Intake/Exhaust Diagram (ASC259002)

Coast Guard Drawing 750-WMSL-259-006, Rev C, Turbine Combustion Exhaust Arrgt & Supports Details and L/M Blw 01 Lvl (ASC259004)

Coast Guard Drawing 750-WMSL-259-009, Rev A, Turbine Combustion Intake Arrgt & Supports, Details and L/M abv 01 Lvl (ASC259007)

Coast Guard Drawing 750-WMSL-259-010, Rev B, Turbine Combustion Exhaust Arrgt & Supports Dets & L/M above 01 Lvl (ASC259008)

Coast Guard Drawing 750-WMSL-259-011, Rev D, Main Engine Combustion Air Intake & Exhaust Arr, Dets & L/M Below 2nd Deck (ASC259009)

Coast Guard Drawing 750-WMSL-259-013, Rev B, Main Engine Combustion Air Intake & Exhaust Arr, Dets & L/M 2nd Deck Up - 02 Lvl (ASC259011) vii (Rev-3)

Coast Guard Drawing 750-WMSL-259-014, Rev C, Main Engine Combustion Air Intake & Exhaust Supports, Dets & L/M 2nd Deck Up - 02 Lvl (ASC259012)

Coast Guard Drawing 750-WMSL-259-015, Rev D, Mn Engine Comb Air Intake & Exh Arr, Dets & L/M Abv 02 Lvl (ASC259013)

Coast Guard Drawing 750-WMSL-259-016, Rev B, Main Engine Combustion Air Intake & Exhaust Supports, Dets & L/M Above a 02 Lvl (ASC259014)

Coast Guard Drawing 750-WMSL-259-019, Rev G, Incin & Dg Intake & Combustion Exhaust Arr, Dets & L/M, 2nd Dk - 02 Lvl (ASC259017)

Coast Guard Drawing 750-WMSL-259-020, Rev D, Incin & Dg Intake & Combustion Exhaust Sup, Dets & L/M 2nd Deck - 02 Lvl (ASC259018)

Coast Guard Drawing 750-WMSL-259-021, Rev C, Incin & Dg intake & Combn Exh Arr, Det & L/M Abv 02 Lvl (ASC259019)

Coast Guard Drawing 750-WMSL-259-022, Rev B, Incin & Dg Intake & Combustion Exhaust Sup, Dets & L/M Abv 02 Lvl (ASC259020)

Coast Guard Drawing 750-WMSL-259-503, Rev E, Main Engine Combustion Air Intake & Exhaust Arr, Dets & L/M below 2nd Deck (ASC259009)

Coast Guard Drawing 750-WMSL-264-002, Rev -, RDCN Gear/CPP and Gas Turbine Lube Oil System Description (ASC264001-02)

Coast Guard Drawing 750-WMSL-264-003, Rev B, RDCN GR/CPP GTRB L.O. System Unit 2220

(ASC264222-LO)

Coast Guard Drawing 750-WMSL-264-004, Rev -, RDCN GR/CPP GTRB L.O. System Unit 2230

(ASC264223-LO)

Coast Guard Drawing 750-WMSL-264-005, Rev D, RDCN GR CPP GTRB L.O. Unit 2300

Coast Guard Drawing 750-WMSL-264-006, Rev G, RDCN GR CPP GTRB L.O (ASC264231-LO). Unit

Coast Guard Drawing 750-WMSL-264-007, Rev E, RDCN GR/CPP GTRB L.O. SYS & Joint Ident Unit 2320 (P1 System)

Coast Guard Drawing 750-WMSL-264-008, Rev D, Lube Oil Service System Unit 2330 (ASC264233-

LO)

Coast Guard Drawing 750-WMSL-264-009, Rev B, RDCN GR / CPP GTRB L.O. System Unit 2240

Coast Guard Drawing 750-WMSL-264-021, Rev -, Diagram RDCN GR/CPP GTRB LO (ASC264001)*

Coast Guard Drawing 750-WMSL-264-500, Rev -, CPP HPU Tanks New Clean Out Access

Coast Guard Drawing 750-WMSL-300-002, Rev C, Electrical Standard Details (ASC300003)

Coast Guard Drawing 750-WMSL-300-003, Rev B, Cable Routing List of Points (ASC300007)

(UNSIGNED)

Coast Guard Drawing 750-WMSL 300-025, Rev A, Unit 2300 Inner Bottom Fr 52 to FR 64 Arr of Elect Eqpt

Coast Guard Drawing 750-WMSL 300-026, Rev G, Unit 2310 – 2nd Platform Fr 52 to FR 64 Arr of Elect Eqpt

Coast Guard Drawing 750-WMSL 300-027, Rev E, Unit 2320 – 1st Platform Fr 52 to FR 64 Arr of Elect Eqpt

Coast Guard Drawing 750-WMSL 300-028, Rev K, Unit 2330 – 2nd Dk Fr 52 to FR 64 Arr of Elect Eqpt

Coast Guard Drawing 750-WMSL-300-029, Rev G, UNIT 2340 Main Deck - FR 52 TO FR 64 ARR Of Electrical EQPT (ASC300234) (UNSIGNED) viii (Rev-3)

Coast Guard Drawing 750-WMSL-300-048, Rev C, Unit 4420 - 01 LVL - FR 52 FR 67 Arrangement of Electrical Equipment (AS3300442)

Coast Guard Drawing 750-WMSL-300-049, Rev C, Unit 4430 - Stack - FR 48 to FR 57 ARR of Elect Eqpt (ASC300443)

Coast Guard Drawing 750-WMSL 300-061, Rev F, Unit 4420 – 01 Level FR 52 to FR 67 Arr of Elect Eqpt

Coast Guard Drawing 750-WMSL-300-500, Rev -, SCIF SHIPALT - Multi-Cable Transit Block and Wireway Cover Installation

Coast Guard Drawing 750-WMSL-300-509, Rev -, 01 LVL FR52-67 ARR ELEC EQPT (ASC300442)

Coast Guard Drawing 750-WMSL-304-001, Rev -, Wireway Key Plan (AS3304001)

Coast Guard Drawing 750-WMSL 304-022, Rev -, Unit 2300 – 2nd Platf - FR 52 to FR 64 Wireway Arrangement and Details

Coast Guard Drawing 750-WMSL 304-022, Rev C, Unit 2320 – 1st Platf - Level FR 52 to FR 64 Wireway Arrangement and Details

Coast Guard Drawing 750-WMSL 304-023, Rev B, Unit 2310 – 2nd Platf - FR 52 to FR 64 Wireway Arrangement and Details

Coast Guard Drawing 750-WMSL 304-025, Rev D, Unit 2330 – 2nd Dk - Level FR 52 to FR 64 Wireway Arrangement and Details

Coast Guard Drawing 750-WMSL 304-026, Rev B, Unit 2340 – Main Dk - Level FR 52 to FR 64 Wireway Arrangement and Details

Coast Guard Drawing 750-WMSL 304-044, Rev C, Unit 4420 – 01 & 02 Lvl - Level FR 52 to FR 67 Wireway Arrangement and Detail

Coast Guard Drawing 750-WMSL-320-004, Rev D, Power Sys Deck Plan 1ST PLATF & BELOW, FWD

OF FR 36 & AFT OF FR 70 (ASC320003) (UNSIGNED)

Coast Guard Drawing 750-WMSL-320-006, Rev J, Power Sys Deck Plan - AMR, MMR (FWD & AFT), & PUMP ROOM (ASC320004) (UNSIGNED)

Coast Guard Drawing 750-WMSL-320-008, Rev E, Power Sys Deck Plan - Second DK, FWD OF FR 52

(ASC320005) (UNSIGNED)

Coast Guard Drawing 750-WMSL-320-010, Rev G, Power Sys Deck Plan - Second DK, AFT OF FR 52

(ASC320006) (UNSIGNED)

Coast Guard Drawing 750-WMSL-320-012, Rev G, Power Sys Deck Plan - Main Deck FWD OF FR 52

(ASC320007) (UNSIGNED)

Coast Guard Drawing 750-WMSL-320-014, Rev H, Power Sys Deck Plan - Main Deck, AFT OF FR 52

(ASC320008) (UNSIGNED)

Coast Guard Drawing 750-WMSL-320-016, Rev F, Power Sys Deck Plan - 01 Level (ASC320009)

(UNSIGNED)

Coast Guard Drawing 750-WMSL-320-018, Rev H, Power Sys Deck Plan - 02 Level and Above

(ASC320010) (UNSIGNED)

Coast Guard Drawing 750-WMSL-320-020, Rev G, Power System HVAC Deck Plan (ASC320011)

Coast Guard Drawing 750-WMSL-320-025, Rev D Cathodic Protection System Deck Plan and Elementary Wiring Diagram

Coast Guard Drawing 750-WMSL-320-027, Rev K, Power System - Hook-Up Book (ASC320015)

(UNSIGNED)

Coast Guard Drawing 750-WMSL-320-030, Rev C, PWR Sys S/S Gen & SWBD INTCON Dk Plan & Elem Wrg Diag (ASC320018) ix (Rev-3)

Coast Guard Drawing 750-WMSL-320-039, Rev B, Electrical One Line Diagram (NSC2 - SRD)

(ASC320001B) (UNSIGNED)

Coast Guard Drawing 750-WMSL-330-005, Rev C, Lighting System Deck Plan AMR (UL & LL), MMR(FWD & AFT)(UL & LL) (ASC330004) (UNSIGNED)

Coast Guard Drawing 750-WMSL-330-013, Rev D, Lighting System Deck Plan Second Deck - AFT OF

FR 52 (ASC330008) (UNSIGNED)

Coast Guard Drawing 750-WMSL-330-017, Rev F, Lighting System Deck Plan Main Deck - AFT OF FR

52 (ASC330010) (UNSIGNED)

Coast Guard Drawing 750-WMSL-330-019, Rev E, Lighting System Deck Plan 01 LEVEL - FWD OF

FR 44 (ASC330011) (UNSIGNED)

Coast Guard Drawing 750-WMSL-330-021, Rev C, Lighting System Deck Plan 01 LEVEL, AFT OF FR

44 (ASC330012) (UNSIGNED)

Coast Guard Drawing 750-WMSL-330-023, Rev E, Lighting System Deck Plan 02 Level and Above

(ASC330013) (UNSIGNED)

Coast Guard Drawing 750-WMSL-432-007, Rev C, Sound Powered Phone Sys Cable Block Diagram

(ASC432005)

Coast Guard Drawing 750-WMSL-432-008, Rev A, Sound Powered Phone SYS Cable Running Sheets

(ASC432006) (UNSIGNED)

Coast Guard Drawing 750-WMSL-432-012, Rev A, Sound Power Phone Sys Cable Block Diagram

(NSC2-SRD) (ASC432005B)

Coast Guard Drawing 750-WMSL-433-003, Rev -, General ANCG, Flight Deck & INTERSHIP ANCG Sys Deck Plan

Coast Guard Drawing 750-WMSL-441-006, Rev B, GMDSS, NAVTEX & Inmarsat Cable Block Diagram

Coast Guard Drawing 750-WMSL-441-007, Rev B, GMDSS, NAVTEX, & Inmarsat Cable Running Sheets

Coast Guard Drawing 750-WMSL-441-505, Rev -, (UHF) WMSL 751 Black-Bbs Bypass Terminal Box Electrical Assy

Coast Guard Drawing 750-WMSL-441-511, Rev A, GMDSS, NAVTEX, & Inmarsat Cable Running Sheets (ASC441004)

Coast Guard Drawing 750-WMSL-485-001, Rev L, Sleeves – Pipe Structure Penetration (SP485000)

Coast Guard Drawing 750-WMSL-505-006, Rev D, List of Hoses

Coast Guard Drawing 750-WMSL-506-015, Rev C, Overfl / Airescapes / Sounding Tubes Unit 2100 (ASC506210-Ae)

Coast Guard Drawing 750-WMSL-506-016, Rev E, Ovrflw / Airescapes / Sounding Tubes Unit 2110 (ASC506211-Ae)

Coast Guard Drawing 750-WMSL-506-020, Rev D, Overfl / Air Escapes / Sounding Tubes Unit 2200 (ASC506220-Ae)

Coast Guard Drawing 750-WMSL-506-021, Rev C, Ovfl / Air Escapes / Sounding Tubes Unit 2210 (ASC506221-Ae)

Coast Guard Drawing 750-WMSL-506-022, Rev B, Ovrflw / Airescapes / Sounding Tubes Unit 2220 (ASC506222-Ae)

Coast Guard Drawing 750-WMSL-506-023, Rev C, Overflow / Air Escapes / Sounding Tubes Unit 2230 (ASC506223-Ae)

Coast Guard Drawing 750-WMSL 506-025, Rev C, Overflow/Air Escapes/Sounding Tubes - Unit 2300 x (Rev-3)

Coast Guard Drawing 750-WMSL 506-026, Rev C, Overflow/Air Escapes/Sounding Tubes - Unit 2330

Coast Guard Drawing 750-WMSL 506-039, Rev D, Overflow/Air Escapes/Sounding Tubes - Unit 2310

Coast Guard Drawing 750-WMSL 506-040, Rev B, Overflow/Air Escapes/Sounding Tubes - Unit 2320

Coast Guard Drawing 750-WMSL 506-041, Rev C, Overflow/Air Escapes/Sounding Tubes - Unit 2340

Coast Guard Drawing 750-WMSL 506-043, Rev A, Overflow/Air Escapes/Sounding Tubes Unit 4420

Coast Guard Drawing 750-WMSL-506-512, Ferrous Sounding Tube Replacement A & D

Coast Guard Drawing 750-WMSL-508-001, Rev C, Piping and Machinery Insulation Schedule and L/M

(ASC508001)

Coast Guard Drawing 750-WMSL-509-001, Rev A, HVAC Insulation Schedule and L/M (ASC509001)

Coast Guard Drawing 750-WMSL-512-004, Rev A, Vent and Air Conditioning Standard Instruction

(ASC512007)

Coast Guard Drawing 750-WMSL 512-007, Rev B, Vent & Air Cond Arr Mn Dk Unit 2330

Coast Guard Drawing 750-WMSL-512-012, Rev B, Vent & Air Cond Fan Rm 02 Lvl Unit 4420

(ASC512015)

Coast Guard Drawing 750-WMSL 512-031, Rev C, Vent & Air Cond Arr 2nd Platf Unit 2310

Coast Guard Drawing 750-WMSL-512-032, Rev C, Vent & Air Cond Arr 1st Platf Unit 2320

(ASC512232)

Coast Guard Drawing 750-WMSL-512-034, Rev B, Vent & Air Cond Arr Mn Dk Unit 2340

(ASC512234)

Coast Guard Drawing 750-WMSL-512-050, Rev D, Vent & Air Cond Arr 01 Lvl Unit 4420

(ASC512442)

Coast Guard Drawing 750-WMSL-516-002, Rev J, Chilled Water System Diagram (ASC516002)

Coast Guard Drawing 750-WMSL 516-013, Rev D, Chilled Water Unit 2330

Coast Guard Drawing 750-WMSL 516-014, Rev D, Chilled Water Unit 2340

Coast Guard Drawing 750-WMSL-516-025, Rev D, Chilled Water Unit 4420 (ASC516442-CW)

Coast Guard Drawing 750-WMSL-516-030, Rev C, Chilled Water Unit 2320 (ASC516232-CW)

Coast Guard Drawing 750-WMSL 520-010, Rev G, Salt Water Cooling Unit 2310

Coast Guard Drawing 750-WMSL-520-011, Rev F, Salt Water Cooling Unit 2320 (ASC520232-SW)

Coast Guard Drawing 750-WMSL 520-012, Rev -, Salt Water Cooling Unit 2330

Coast Guard Drawing 750-WMSL 520-015, Rev E, Salt Water Cooling Unit 2300

Coast Guard Drawing 750-WMSL 521-022, Rev D, Firemain Unit 2310

Coast Guard Drawing 750-WMSL 521-023, Rev C, Firemain Unit 2320

Coast Guard Drawing 750-WMSL 521-024, Rev D, Firemain Unit 2330

Coast Guard Drawing 750-WMSL 521-025, Rev D, Firemain Unit 2340

Coast Guard Drawing 750-WMSL 521-039, Rev D, Firemain Unit

Coast Guard Drawing 750-WMSL 521-040, Rev C, Firemain Unit 2300

Coast Guard Drawing 750-WMSL 522-015, Rev D, Mchry Space Water Mist Piping & Joint IdentUnit

Coast Guard Drawing 750-WMSL 522-016, Rev D, Mchry Space Water Mist Unit 2320

Coast Guard Drawing 750-WMSL 522-017, Rev B, Mchry Space Water Mist Unit 2330

Coast Guard Drawing 750-WMSL 522-027, Rev B, Magazine Sprinkling Unit 2330

Coast Guard Drawing 750-WMSL 522-028, Rev A, Magazine Sprinkling Unit 2340

Coast Guard Drawing 750-WMSL 522-032, Rev C, Magazine Sprinkling Unit 4420 xi (Rev-3)

Coast Guard Drawing 750-WMSL 523-001, Rev -, Wash Down Counter Measure System Schematic

Coast Guard Drawing 750-WMSL-523-018, Rev D, Washdown Countermeasure Unit 4420 (ASC523442-

CM)

Coast Guard Drawing 750-WMSL-523-019, Rev B, Washdown Countermeasure Unit 4430 (ASC523443-

CM)

Coast Guard Drawing 750-WMSL 523-023, Rev D, Washdown Countermeasure Unit 2320

Coast Guard Drawing 750-WMSL 523-024, Rev A, Washdown Countermeasure Unit 2330

Coast Guard Drawing 750-WMSL 526-017, Rev C, Weather Deck Drains Unit 2330

Coast Guard Drawing 750-WMSL-526-033, Rev C, Weather Deck Drains Unit 4420 (ASC526442-WD)

Coast Guard Drawing 750-WMSL 528-023, Rev E, Plumbing & Interior Dk Drains and Vent System – Unit 2330

Coast Guard Drawing 750-WMSL-528-040, Rev D, Plumbing & Interior Dk Drains and Vent System Unit 4420 (ASC523442-PD)

Coast Guard Drawing 750-WMSL 528-047, Rev A, Plumbing & Interior Dk Drains and Vent System – Unit 2340

Coast Guard Drawing 750-WMSL-530-016, Rev D, Potable Water Unit 2320 (ASC530232-PW)

Coast Guard Drawing 750-WMSL-530-017, Rev C, Potable Water Unit 2330 (ASC530233-PW)

Coast Guard Drawing 750-WMSL 530-018, Rev D, Potable Water Unit 2340

Coast Guard Drawing 750-WMSL-530-019, Rev D, Potable Water Unit 3120

Coast Guard Drawing 750-WMSL 530-030, Rev D, Potable Water Unit 4420

Coast Guard Drawing 750-WMSL 532-009, Rev C, Jacket Water Cooling Unit 2320

Coast Guard Drawing 750-WMSL 532-010, Rev B, Jacket Water Cooling Unit 2330

Coast Guard Drawing 750-WMSL 532-016, Rev E, Jacket Water Cooling Unit 2310

Coast Guard Drawing 750-WMSL 540-031, Rev B, Fuel Service Unit 2300

Coast Guard Drawing 750-WMSL 540-032, Rev E, Fuel Transfer Unit 2300

Coast Guard Drawing 750-WMSL 540-033, Rev C, Fuel Service Unit 2310

Coast Guard Drawing 750-WMSL 540-034, Rev D, Fuel Transfer Unit 2310

Coast Guard Drawing 750-WMSL 540-036, Rev F, Dsl Eng/Turb L.O Fill & Trans Unit 2310

Coast Guard Drawing 750-WMSL 540-037, Rev C, Fuel Service Unit 2320

Coast Guard Drawing 750-WMSL 540-038, Rev B, Fuel Transfer Unit 2320

Coast Guard Drawing 750-WMSL 540-039, Rev C, Dsl Eng/Turb L.O Fill & Trans Unit 2320

Coast Guard Drawing 750-WMSL 540-059, Rev C, Lube Oil Service Sys Unit 2300

Coast Guard Drawing 750-WMSL 542-008, Rev A, JP-5 System Unit 2320

Coast Guard Drawing 750-WMSL 542-009, Rev D, JP-5 System Unit 2340

Coast Guard Drawing 750-WMSL 551-021, Rev D, Compressed Air Unit 2310

Coast Guard Drawing 750-WMSL-551-022, Rev F, Compressed Air Piping & Joint Ident (P1 System) Unit 2320

Coast Guard Drawing 750-WMSL 551-023, Rev C, Compressed Air Unit 2330

Coast Guard Drawing 750-WMSL 551-037, Rev E, Compressed Air Unit 4420

Coast Guard Drawing 750-WMSL 555-020, Rev B, Foam System Unit 2330

Coast Guard Drawing 750-WMSL 555-022, Rev B, Foam System Unit 2340

Coast Guard Drawing 750-WMSL 555-044, Rev D, Foam System - Unit 2310

Coast Guard Drawing 750-WMSL 555-045, Rev A, Foam System - Unit 2320 xii (Rev-3)

Coast Guard Drawing 750-WMSL 556-027, Rev B, Glide Slope Ind & Hlcpter Capturing Sys Hydr PP – Unit 4420

Coast Guard Drawing 750-WMSL-593-001, Rev J, Bilge & Oil Pollution Control Sys Diagram

(ASC593002)

Coast Guard Drawing 750-WMSL 593-040, Rev C, Bilge & Oil Pollution Control Sys Unit 2300

Coast Guard Drawing 750-WMSL-593-041, Rev G, Bilge & Oil Pollution Control Unit 2310

(ASC593231-PC)

Coast Guard Drawing 750-WMSL 593-043, Rev B, Sewage System Unit 2320

Coast Guard Drawing 750-WMSL 593-045, Rev C, Sewage System Unit 2330

Coast Guard Drawing 750-WMSL 593-047, Rev C, Sewage System Unit 2340

Coast Guard Drawing 750-WMSL-593-083, Rev C, Bilge & Oil Pollution Control Sys Unit 2320

(ASC593232-PC)

Coast Guard Drawing 750-WMSL 593-088, Rev A, Sewage System Unit 4420

Coast Guard Drawing 750-WMSL 600-023, Rev B, Fab & Instl of Hull Outfit Design, Unit 2310

Coast Guard Drawing 750-WMSL 600-024, Rev D, Fab & Instl of Hull Outfit Design, Unit 2320

Coast Guard Drawing 750-WMSL 600-044, Rev G, Fab & Instl of Hull Outfit Design Unit 4420

Coast Guard Drawing 750-WMSL 612-502, Rev C, Fab & Install of Handgrabs iwo Hatches/Scuttles

Coast Guard Drawing 750-WMSL 623-001, Rev E, Incline Ladder List and Details, Ship Wide

Coast Guard Drawing 750-WMSL 623-001, Rev F, Vertical Ladder List and Ladder Rung list and Details Ship Wide

Coast Guard Drawing 750-WMSL-631-002, Rev P, Paint Schedule (ASC631002)

Coast Guard Drawing 750-WMSL 635-001, Rev -, Thermal & Acoustic Insulation (ASC635001)

Coast Guard Drawing 750-WMSL 635-002, Rev K, Insulation Arr & Details Thermal, Acoustic, & Fire

(ASC635002)

Coast Guard Drawing 750-WMSL 801-001, Rev A, Booklet of General Plans (ASC801001)

Coast Guard Drawing 750 WMSL-801-004, Rev B, Booklet of General Plans (ASC801001C)

NAVSEA Drawing 167-7379842, Rev A, Procedure & Welding Sequence for Non-Ballistic, Watertight & Airtight Quick Acting or Individually Dogged Personnel Doors

NAVSEA Drawing 803-1623056, Rev K, Scuttle, WT, Flush, Quick Acting, 21 Dia 17 psi-Arrangement

NAVSEA Drawing 805-1624089, Rev E, Hatch W.T. Raised, Individually Dogged, 36”x60”, with Scuttle-15 psi Arrangement

NAVSEA Drawing 803-6397261, Rev A, Doors Watertight, Individually Dogged Arrangement

NAVSEA Drawing 803-6397268, Rev B, Doors Watertight, Quick Acting Arrangement

NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation for Compartments Installation Details

NAVSEA Drawing 805-1624089, Rev E, Hatch W.T. Raised, Individually Dogged, 36”x60”, with Scuttle-15 psi Arrangement

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual xiii (Rev-3)

Coast Guard Technical Publication (TP) 7072A, 04 Feb 2016, Controllable Pitch Propeller (CPP) – Installation Manual

Coast Guard Technical Publication (TP) 7073, 26-SEPT-17, Reduction Gear - Type as 2/250-As 198F

Coast Guard Technical Publication (TP) 7094, 21-March-11, Reduction Gear Lube Oil Setting Tank Heater

Coast Guard Technical Publication (TP) 7107, SWBS 531, Jun 2007, Reverse Osmosis Water Purifier-

SW6994463CNG

Coast Guard Technical Publication (TP) 7153A, 29 Mar 2016, Controllable Pitch Propeller (CPP) – User Manual

Coast Guard Technical Publication (TP) 7181A, SWBS 169, Aug 2013, Helo-Hangar Doors - operation & Maintenance Manual

Coast Guard Technical Publication (TP) 7181, 02-OCT-07, Helo-Hangar Doors

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2018, Shipboard Electrical Cable Test

Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2018, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation

Surface Forces Logistics Center Standard Specification 3100 (SFLC Std Spec 3100), 2018, Inspect, Test and Recondition AC Synchronous Machines In-Place

Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2018, Auxiliary Machinery Systems

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures

Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2018, Install Interior Deck Covering Systems

USCG, HWSL Guidance/Fall Protection Plan, Working Aloft Aboard Cutter

OTHER REFERENCES

Air Capable Ship Aviation Bulletin 1L (2009)

American National Standards Institute/NSF International (ANSI/NSF) 61, 2015, Drinking Water System Components - Health Effects

American National Standards Institute/American Water Works Association (ANSI/AWWA) C651, 2014, Disinfecting Water Mains

American Society for Nondestructive Testing (ASNT), Recommended Practice No. SNT-TC-1A, 2016, Personnel Qualification and Certification in Nondestructive Testing

American Society for Nondestructive Testing (ASNT), Standard No. ANSI/ASNT CP-189-2016, 2016, ASNT Standard for Qualification and Certification of Nondestructive Testing Personnel

American Welding Society, AWS D1.2-96, 1996, Structural Welding Code, Steel

ANSI/EASA Standard AR100-2015: Recommended Practice for the Repair of Rotating Electrical Apparatus xiv (Rev-3)

ASTM International (ASTM) F683, 2003, Standard Practice for Selection and Application of Thermal Insulation for Piping and Machinery

ASTM International (ASTM) F1836M, Reapproved 2007, Standard Specification for Stuffing Tubes, Nylon and Packing Assemblies (Metric)

ASTM Internationals (ASTM) G46, 2018, Standard Guide for Examination and Evaluation of Pitting Corrosion

Code of Federal Regulations (CFR) Title 29, Part 1910, Jul 2017, Occupational Safety and Health Standards

Code of Federal Regulations (CFR) Title 29, Part 1915, Jul 2013, Occupational Safety and Health Standards for Shipyard Employment

Code of Federal Regulations (CFR) Title 40, Jul 2013, Protection of the Environment

Manufacturers Standardization Society of the Valve and Fittings Industry ANSI/MSS SP-58, 2018, Pipe Hangers and Supports - Materials, Design, Manufacture, Selection, Application, and Installation

MIL-DTL-24244, May 2000, Insulation Material, With Special Corrosion, Chloride, and Fluoride Requirements

MIL-DTL-24643, Aug 2007, Cables and Cords, Electric, Low Smoke, For Shipboard Use, General Specification for

MIL-I-16411, Nov 1988, Insulation Felt, Thermal, Glass Fiber

MIL-PRF-900, Mar 1991, Rubber Gasket Material, 45 Durometer Hardness

MIL-PRF-1149, Jun 1998, Gasket Materials, Synthetic Rubber, 50 and 65 Durometer Hardness

MIL-PRF-24176C, Oct 2004, Cement, Epoxy, Metal Repair and Hull Smoothing

MIL-PRF-24667C, May 2008, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering Application

MIL-PRF-32482A, Jan 2016, Watertight Door, Quick-Acting, Interior

MIL-STD-1310, Sep 2009, Shipboard Bonding, Grounding, and Other Techniques for Electromagnetic Compatibility and Safety

MIL-STD-1688A (SH), 1990, Fabrication, Welding and Inspection of HY80/100 Submarine Applications

MIL-STD-1689A, Nov 1990, Fabrication, Welding, and Inspection of Ships Structure

MIL-STD-2003-2, Sep 2009, Electric Plant Installation, Standard Methods for Surface Ships & Submarines (Equipment)

MIL-STD-2003-3, Sep 2009, Electric Plant Installation, Standard Methods for Surface Ships & Submarines (Penetrations)

MIL-Y-1140, Sep 1985, Yarn, Cord, Sleeving, Cloth, And Tape- Glass

Naval Sea Systems Command (NAVSEA) 0640-LP-111-4501, Apr 2012, NAVSEA OP 4 Rev 10, Ammunition And Explosives Safety Afloat

OSHA Regulations (Standards - 29 CFR), Part 1926 Safety and Health Regulations for Construction, Subpart M Fall Protection, Standard Number 1926.503 Training Requirements

Shell Plate Definition Guide for Ship Designers, 1994, Lamb, T., for The National Ship Building Research Program SP-4 (Design/Production Integration) Panel, of The Society of Naval Architects and Marine Engineers, Ship Production Comittee

Ship Structure Comitte (SSC) Summary Report No. 198 (SSC-198), 1969, Flame Straightening and Its Effect on Base Matal Properties

Study of Fitting and Fairing Aids of U.S. Shipyards Final Report (MARAD Contract No. MA-8O-SAC- O1O41), 1984, Maciel, J., Todd Pacific Shipyards Coporation

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning xv (Rev-3)

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.2 (SSPC-SP 2), 2004, Hand Tool Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2016, Bare Metal Power Tool Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10 (WAB)/NACE WAB-2, 2015, Near-White Metal Wet Abrasive Blast Cleaning

Tips and Techniques for Keeping WT Closures Shipshape, 2017, Juniper Industries, Inc.

xvi (Rev-3)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

17 N 36”x66”x8” Quick Acting

Watertight Door, Steel, 10-Dog, LH Swing, 15 psi (incl. coaming and fitting i.e. hasp & staple, hold back hook assy 20, hinge assy T, CRES label plate backing) Painted w/ Powder

Coating, White 17925

NSN : 2040-01-425-4480

(NAVSEA Dwg No.

803-6397268 Rev. -)

1 ea. $9,185.00 (incl. S&H)

24 Y ***AN / SSR-1 Antenna No.4, (Item 1 of Coast Guard Drawing 418A-

WMSL-440-014)

AN / SSR-1 1 $750.00

24 Y ***AN / SSR-1 Amplifier, Converter (Item 2 of Coast

Guard Drawing 750-

WMSL-440-014)

N/A 1 $250.00

24 Y ***Inmarsat Antenna,IC- 115 (Item 11 of Coast Guard Drawing 750-

WMSL-441-006) Furno Inc.

IC-115 1 $1595.00

24 N Switch, Level (1-PHS-LS-

002) (Item 233 of Coast

Guard Drawing 750-

WMSL-202-023)

3013-DSL-743412 1 $250.00

24 N Switch, Level (1-PHS-LS-

001) (Item 234 of Coast

Guard Drawing 750-

WMSL-202-023)

3013-DSL-743412 1 $250.00

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xvii (Rev-3)

CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):

Work Item

Title

1 Tanks (MP Fuel Stowage and Overflow), Clean and Inspect

2 Tanks (Oily Waste), Clean and Inspect

3 Reduction Gears Flexible Hoses, Renew

4 Wave Guide Dryer Flexible Hoses, Renew

5 Helo Hangar Door, Inspect and Test

7 Machinery Exhaust Stack Insulation, Inspect

8 Reverse Osmosis, System Groom

14 Structures, Inspect and Repair

16 Quick-Acting Watertight Scuttles, Renew

17 Quick Acting Watertight Door, 36x66, Renew

18 Watertight Hatch with Quick-Acting Water Tight Scuttle

19 Watertight Door 18 x 36, Renew

20 WTD 26 x 66, Renew

21 Watertight Door (Fittings and Gaskets), Renew

22 WTH and WTS (Fittings and Gaskets), Renew

23 Main Propulsion Diesel Engine Intake and Exhaust, Inspect and Repair

30 Deck Covering (Slip-Resistant), Renew xviii (Rev-3)

PRINCIPAL CHARACTERISTICS

418' WMSL

PHYSICAL

Length overall 418' 0" Length between perpendiculars 390' 0" Maximum beam 54' 0" Beam @ 01 level 47' 9-1/8" Depth (01 level @ side to baseline) 39' 2-3/4" 01 deck camber foredeck 1/4" in 1'-0" Minimum berth depth 20' 0" Height of highest projection Approximately 119' Draft, design 14.40' Design displacement 3925 long tons

MACHINERY

Two diesel engines MTU 20V, 20-cylinder 9,730 SHP each One gas turbine General Electric LM2500; 29,500 SHP Type of propulsion CODAG Electrical system 24 Volt DC Two controllable pitch propellers Rolls-Royce 5 blade, 14' 0" diameter; 229 RPM max Two reduction gears RENK One cross connect gear RENK

HULL

Hull material 5086 Aluminum HSLA-80 Steel ABS EH 36 Steel

ABS AH 36

Frame spacing FWD of FR 9 2' 3" FR 9 to FR 10 6' 9" FR 10 to FR 98 4' 1" FR 98 to FR 99 3'-8"

ELECTRICAL

Power Three 1360 kW, 450 V, 60 Hz, 3 Phase, 1800 RPM Caterpillar 3512B diesel engines with Baylor ship service generators Shore tie cable Seven MIL-C-24368/2 (NATO) shore power receptacles, 400 A each

TANK CAPACITIES

Diesel oil 220,359 gal Fresh water 12,454 gal JP-5 Fuel 35,182 gal

19 (Rev-3)

00000_0220_FLT

REC_00000_FLT_Commercial Project @ CG Facility (1212)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

20 (Rev-3)

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.

3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:

Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.

Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.

3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).

NOTE

Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.

3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.

3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project.

Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is 7690390037.

21 (Rev-3)

3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:

Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.

National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.

Air Emission Permit: Unit has an Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.

3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws.

Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.

3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).

3.5.6 Additional Requirements. The Contractor shall be aware of the following:

3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from

22 (Rev-3) the Coast Guard facility without COR or KO-approval.

3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.

3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154.

Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.

3.6 Local Policy. None.

3.7 SFLC Standard Specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2018 Edition Standard Specifications and supersede published content:

None.

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

23 (Rev-3)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

VESSEL NAME HULL # WORK

ITEM #

WORK ITEM TITLE

LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down

(maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max.

threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application.