This is a Pricing Breakdown Sheet template for the Installation of Electric Smart Meters project (VLSB-26-0077) at Shaw Air Force Base. The template is structured to capture detailed cost breakdowns across multiple line items, including site survey and data collection, demolition of old equipment, current transformers, electrical materials (EMT, 12 AWG THHN cabling, connectors), low voltage cabling, meter installation, and dumpster services. The pricing template requires contractors to input material costs, labor costs, labor hours per unit, average labor rates, and extended line totals for each item. The sheet includes summary sections for calculating total material costs, total labor costs, direct costs, overhead, profit, bond, and final contract price.

The template is designed for competitive small business set-asides under NAICS 238210 and corresponds to Air Force solicitation FA480326R0017 for the Replace Electric Meters project at Shaw AFB. Proposals utilizing this pricing breakdown are due by 4 May 2026 at 2:00 P.M. EST and must be submitted to 20 CONS/PKB. The project performance period is not to exceed 90 days after issuance of the Notice to Proceed. Prime contractors must attend the mandatory site visit scheduled for 14 April 2026 at 10:00 AM, with base access requests required by 6 April 2026 at 2:00 PM EST. Questions regarding requirements must be submitted in writing no later than 20 April 2026 at 10:00 A.M. EST, with answers posted by 23 April 2026 at 10:00 A.M. EST. All correspondence should be directed to Contracting Officer Zelda Williams or Contract Specialist Sarah Nieves.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

`FOR OFFICE USE ONLY
Project:VLSB -26-0077 Installation of Electric Smart MetersProject Engineer:Matthew Nelson
Location:Various (See SOW)Department:20 CES
Contractor:9-Feb-26
Address:
PR No.:
For Official Use Only
ReferenceLine No.ItemUnit of MeasureMaterial CostsLabor CostsDirect CostLine Total
Unit Cost (Means)TotalLabor Hours per Unit (Means)Labor Cost per Unit (Means)Labor-HoursAvg. Rate ($/hr)Total
ELECTRICAL
1Site survey/data collection/shop drawingsEa
2Demo old equipmentEa
3Current TransformersEa
4EMTLF
512 AWG THHNLF
6Connectors, couplings and strapslot
7Low Voltage CablingLF
8Install metersEa
9DumpsterMTH + DUMP
Project Managerdays$0.00
Totals:$0.00$0.00$0.00$0.00
Total Material Cost:
Total Labor Cost:
Direct Cost:$0.00
Total Line Item Cost:$0.00
Overhead:$0.00
Subtotal:$0.00
Profit:$0.00
Subtotal:
Bond:
Total Contract Price: