Attachment 2 - Price List - Corrosion Control_23Julv2.xlsx
XLSX spreadsheet 22 KB Posted
- Solicitation number
- FA524026Q0017
About this file
This is a pricing template attachment for an Indefinite Delivery Indefinite Quantity (IDIQ) contract solicitation for corrosion control repair and paint services on AGE and MUNS trailers for the 36th Maintenance Expeditionary Group (MXG) located on Guam. The solicitation number is FA524026Q0017, issued by the Department of the Air Force Pacific Air Forces as a small business set-aside.
Offerors must complete all green-boxed cells on the Price List tab with unit prices for five equipment size categories (Extra Small, Small, Medium, Large, and Extra Large) across two repair levels and five one-year ordering periods (September 7, 2026 through September 6, 2031). Repair Level 1 addresses surface corrosion with maximum depth of 0.001 inches and includes surface removal, sanding, preparation, minor hardware replacement, and coating application. Repair Level 2 addresses moderate corrosion with depth up to 0.010 inches and includes limited fabrication, welding, sheet metal repair, and multi-layer composite repairs. Offerors must also provide fully-burdened hourly rates for six separate labor categories (Welding, Fabrication, Sanding, Spraying, Painting, and Finishing) for each ordering period. All prices must be rounded to two decimal places and include all direct costs, indirect costs, and profit. The government will evaluate pricing using a Total Evaluated Price (TEP) calculation based on historical requirements of 150 Level 1 repairs, 150 Level 2 repairs, and 400 separate labor hours across the five-year contract period. The template prohibits offerors from modifying existing formulas and requires accurate, complete, and balanced pricing submission.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Instructions | |
| Step 1 | Offerors are required to complete all cells within the green boxes on the tab entitled "Price List" |
Step 2 Offerors shall NOT modify the formulas used on any of the tabs of this spreadsheet. If there is no formula, then the offeror may input a formula.
| Step 3 | Offerors shall round EACH Repair Level and EACH Hourly Rate to 2 decimal places |
| Step 4 | Offerors shall fully burden each proposed hourly rate to inlcude all direct costs, indirect costs, and profit. |
| Step 5 | Offerors are required to ensure that the pricing submitted is accurate, complete, and balanced. The Government will not verify offeror input formulas. |
| NOTE | The Government will evaluate price for award by calculating a Total Evaluated Price (TEP) for each Quoter. TEP is for evaluation purposes only; the TEP will be calculated for each Quoter utilizing quoted rates for equipment size, repair levels, and separate labor categories during the period of performance. Quoters shall complete the cells within the green boxes on the tab entitled "Price List". The TEP spreadsheet will calculate the TEP. The historical requirements on the TEP tab are only utilized for the purposes of determining TEP. |
REPAIR LEVELS will be categorized in three different severity zones as follows:
REPAIR LEVEL 1 (TYPICALLY CORROSION CATEGORY 1 OR 2): Level 1 repairs address surface corrosion and require minor restoration that does not affect structural integrity. This level is characterized by corrosion damage, such as staining, etching, or pitting, with a maximum depth of 0.001 inches. Level 1 repairs shall not require fabrication, welding, or structural component replacement.
The scope for Level 1 repairs may include the following work:
| • | Surface corrosion removal and sanding |
| • | Composite material repairs in accordance with PWS 3.6 |
| • | Surface preparation |
| • | Replacement of minor hardware (fasteners, clips, brackets) |
| • | Replacement of decals, stencils, reflective materials, and placards |
| • | Application of all required coatings. |
REPAIR LEVEL 2 (TYPICALLY CORROSION CATEGORY 3): Level 2 repairs address moderate corrosion characterized by severe pitting, etching or scaling with a depth up to 0.010 inches. This level requires limited structural restoration, including minor fabrication and welding, to ensure the asset is serviceable. Multiple moderate repair actions on a single asset shall be classified collectively as one Level 2 repair.
The scope for Level 2 repairs may include the following work:
| • | All work defined under Level 1 |
| • | Moderate corrosion removal involving pitting, etching or scaling |
| • | Limited sheet metal repair or patching |
| • | Fabrication or reinforcement of non-load-bearing structural components |
| • | Replacement of small panels or non-structural brackets |
| • | Disassembly of panels or housings to access corrosion |
| • | Multi-layer composite repairs in accordance with PWS 3.6. |
PRICE LIST
ATTACHMENT 2 - PRICE LIST
| Indefinite Delivery Indefinite Quantity | |||
| Contract/Solicitation: FA524026Q0012 | |||
| 36 MXG AGE and MUNS Trailer Corrosion Control Repair and Paint Services | |||
| CLIN | SLIN | VEHICLE/EQUIPMENT | |
| SIZE: | DESCRIPTION | ORDERING PERIOD 1 (7 Sep 2026-6 Sep 2027) | |
| UNIT PRICE | ORDERING PERIOD 2 (7 Sep 2027-6 Sep 2028) | ||
| UNIT PRICE | ORDERING PERIOD 3 (7 Sep 2028-6 Sep 2029) | ||
| UNIT PRICE | ORDERING PERIOD 4 (7 Sep 2029-6 Sep 2030) | ||
| UNIT PRICE | ORDERING PERIOD 4 (7 Sep 2030-6 Sep 2031) |
UNIT PRICE
| 0001 | 000101 | EXTRA SMALL | LEVEL 1 REPAIR |
| 0001 | 000102 | EXTRA SMALL | LEVEL 2 REPAIR |
| 0002 | 000201 | SMALL | LEVEL 1 REPAIR |
| 0002 | 000202 | SMALL | LEVEL 2 REPAIR |
| 0003 | 000301 | MEDIUM | LEVEL 1 REPAIR |
| 0003 | 000302 | MEDIUM | LEVEL 2 REPAIR |
| 0004 | 000401 | LARGE | LEVEL 1 REPAIR |
| 0004 | 000402 | LARGE | LEVEL 2 REPAIR |
| 0005 | 000501 | EXTRA LARGE | LEVEL 1 REPAIR | |
| 0005 | 000502 | EXTRA LARGE | LEVEL 2 REPAIR | |
| 0006 | Level 3 and individual repairs per PWS 2.3 | |||
| Note: Hourly rates are established/Labor hours will be negotiated | ORDERING PERIOD 1 | |||
| PRICE PER HOUR | ORDERING PERIOD 2 | |||
| PRICE PER HOUR | ORDERING PERIOD 3 | |||
| PRICE PER HOUR | ORDERING PERIOD 4 | |||
| PRICE PER HOUR | ORDERING PERIOD 5 |
PRICE PER HOUR
| 000601 | WELDING | Hourly Rate |
| 000602 | FABRICATION | Hourly Rate |
| 000603 | SANDING | Hourly Rate |
| 000604 | SPRAYING | Hourly Rate |
| 000605 | PAINTING | Hourly Rate |
| 000606 | FINISHING | Hourly Rate |
&A Page &P of &N
TEP
| Total Evaluated Price | |||||||||
| Historical Requirement #1 | |||||||||
| DESCRIPTION | QUANTITY: | ||||||||
| UNITS OR HOURS | ORDERING PERIOD 1 | ||||||||
| FFP | ORDERING PERIOD 2 | ||||||||
| FFP | ORDERING PERIOD 3 | ||||||||
| FFP | ORDERING PERIOD 4 | ||||||||
| FFP | ORDERING PERIOD 5 | ||||||||
| FFP | Totals | ||||||||
| EXTRA SMALL: LEVEL 1 REPAIR | 50 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| SMALL: LEVEL 1 REPAIR | 35 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| MEDIUM: LEVEL 1 REPAIR | 25 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| LARGE: LEVEL 1 REPAIR | 20 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| EXTRA LARGE: LEVEL 1 REPAIR | 20 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Totals | 150 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Historical Requirement #2 | |||||||||
| DESCRIPTION | QUANTITY: | ||||||||
| UNITS OR HOURS | ORDERING PERIOD 1 | ||||||||
| FFP | ORDERING PERIOD 2 | ||||||||
| FFP | ORDERING PERIOD 3 | ||||||||
| FFP | ORDERING PERIOD 4 | ||||||||
| FFP | ORDERING PERIOD 5 | ||||||||
| FFP | Totals | ||||||||
| EXTRA SMALL: LEVEL 2 REPAIR | 50 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| SMALL: LEVEL 2 REPAIR | 35 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| MEDIUM: LEVEL 2 REPAIR | 25 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| LARGE: LEVEL 2 REPAIR | 20 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| EXTRA LARGE: LEVEL 2 REPAIR | 20 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Totals | 150 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Historical Requirement #3 | |||||||||
| DESCRIPTION | QUANTITY: | ||||||||
| UNITS OR HOURS | ORDERING PERIOD 1 | ||||||||
| FFP | ORDERING PERIOD 2 | ||||||||
| FFP | ORDERING PERIOD 3 | ||||||||
| FFP | ORDERING PERIOD 4 | ||||||||
| FFP | ORDERING PERIOD 5 | ||||||||
| FFP | Totals | ||||||||
| SEPARATE LABOR CATEGORY: WELDING | 15 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| SEPARATE LABOR CATEGORY: FABRICATION | 25 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| SEPARATE LABOR CATEGORY: SANDING | 20 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| SEPARATE LABOR CATEGORY: SPRAYING | 10 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| SEPARATE LABOR CATEGORY: PAINTING | 10 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| SEPARATE LABOR CATEGORY: FINISHING | 20 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Totals | 400 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TOTALS | ORDERING PERIOD 1 | |||||||
| FFP | ORDERING PERIOD 2 | |||||||
| FFP | ORDERING PERIOD 3 | |||||||
| FFP | ORDERING PERIOD 4 | |||||||
| FFP | ORDERING PERIOD 5 | |||||||
| FFP | TOTAL | |||||||
| TOTAL PRICE: Historical Requirement #1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| TOTAL PRICE: Historical Requirement #2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| TOTAL PRICE: Historical Requirement #3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| TOTAL EVALUATED PRICE | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
File details come from the government source that posted it. Updated .