This is a Schedule of Items pricing template for a federal construction contract for Lake Alva Campground water system improvements located in Missoula County, Montana, within the Lolo National Forest, Seeley Lake Ranger District, on Highway 83.

The contract comprises base items and optional items requiring bidders to submit unit prices and total prices. Base items include mobilization (lump sum), construction survey and staking (lump sum), and water distribution improvements totaling approximately 5,323 linear feet of various pipe types and surface restoration work, including 2" HDPE water main installation (2,480 each), 1" PE water service (430 linear feet), three types of surface restoration (asphalt, aggregate, and lawn/seed), irrigation boxes, hydrant pads, valve removal, and drain installations. Additional base work includes pump house improvements and electrical improvements, both bid as lump sums. Optional items focus on parking area improvements: aggregate surface course (8 cubic yards), asphalt tack coat (212 gallons), pavement saw cutting (24 linear feet), asphalt concrete (227 tons), and wheelstop work (17 removals/resets and 6 new precast concrete units). The template specifies that bond premium payments must be included in the mobilization line item in accordance with FAR Clause 52.232-5 and that payment will be made on actual work performed unless otherwise noted. Bidders must calculate and enter unit prices and total prices for all line items, with separate totals for base items, optional items, and combined totals.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B-1 SCHEDULE OF ITEMS - BASE ITEMS

ITEM

NO.

DESCRIPTION PAY UNIT

EST.

QTY.

UNIT PRICE TOTAL PRICE

01010-1 Mobilization Lump Sum 1 $________ $________

0 Construction Survey and Staking Lump Sum 1 $________ $________

Water Distribution

02221-1 Type A Surface Restoration (Asphalt) Linear Foot 333 $________ $________

02221-2 Type B Surface Restoration (Aggregate) Linear Foot 1867 $________ $________

02221-3 Type C Surface Restoration (Lawn & Seed) Linear Foot 540 $________ $________

02232-1 Clearing and Grubbing Lump Sum 1 $________ $________

02525-1 Replace Well Cap Each 1 $________ $________

02660-1 Junction Vault with Tee, Valves, and Blow Out

Assembly Lump Sum 1 $________ $________

02660-2 1" PE Water Service Linear Foot 430 $________ $________

02660-3 Irrigation Box w/ Isolation Valve Each 6 $________ $________

02660-4 New Hydrant Pad, Wooden Post, Piping, and

Appurtenances Each 6 $________ $________

02660-5 Host Site Hydrant w/ Backflow Prevention Each 2 $________ $________

02660-6 Connect to Existing Water Main Each 1 $________ $________

02660-7 Remove and Dispose of Existing Valve Boxes Each 6 $________ $________

02660-8 Low Point Drain Each 2 $________ $________

02665-1 2" HDPE Water Main Each 2480 $________ $________

Pump House Improvements

02615 Pump House Improvements Lump Sum 1 $________ $________

Electrical Improvements

16000 Electrical Improvements Lump Sum 1 $________ $________

Missoula County, Montana

PART I - SCHEDULE OF ITEMS

SECTION B - SERVICES AND PRICES

LAKE ALVA CAMPGROUND - WATER SYSTEM IMPROVEMENTS

ROAD NO. HWY 83 - M.P.

Lolo National Forest

Seeley Lake Ranger District

Total Base Items = $______________________

B-2 SCHEDULE OF ITEMS - OPTIONAL ITEMS

ITEM

NO.

DESCRIPTION PAY UNIT

EST.

QTY.

UNIT PRICE TOTAL PRICE

02240-1 Aggregate Surface Course, 3/4" - Minus, Compaction

Method 1 (Commercial Source) Cubic Yard* 8 $________ $________

02502-1 Asphalt Tack Coat, Grade SS-1 Gallon 212 $________ $________

02510-1 Saw cutting Pavement Linear Foot 24 $________ $________

02510-2 Asphalt Concrete, Montana DOT, Type 1, PG 58-28 Ton 227 $________ $________

03226-1 Remove and Reset Wheelstops Each 17 $________ $________

03226-2 New Precast Concrete Wheelstops Each 6 $________ $________

B-2 NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction

Contracts, shall not be in addition to the contract price. Include bond payments under 01010-1 Mobilization.

Payment will be made on actual work performed unless otherwise noted.

Total Base + Optional Items =

Total Optional Items = $______________________