Attachment 3 -Lake Alva CG SOW amendment 2.pdf
PDF 262 KB Posted
- Attached to
- Lake Alva Campground Improvements
- Solicitation number
- 1240LU26Q0055
About this file
This document is Section C (Description and Specifications) of a solicitation for the Lake Alva Campground Water System Improvements project on the Seeley Ranger District in Montana. The project involves replacing the existing water system, electrical system, and repaving a loop road at Lake Alva Campground. Water system work includes installing new pressure tanks, flow meter, pressure relief valves, and appurtenances in the well pumphouse, along with new 2-inch HDPE water main throughout the campground while abandoning the existing main in place. Electrical upgrades encompass demolishing existing equipment, installing new grounding equipment, low-voltage power conductors and cables, cable conduit, box connectors, couplers, power outlet pedestals, and circuit breakers. Optional Item #1 includes repaving asphalt road sections, patching areas where the new water main intersects the road, and replacing existing wheel stops in designated parking areas.
The project is located 11.3 miles north of Seeley Lake, Montana on MT-83. The estimated budget range is $500,000 to $1,000,000, with work scheduled to begin July 15, 2027 and conclude December 1, 2028. A mandatory site visit is scheduled for May 13, 2026 at 10 a.m. at the Seeley Lake Ranger District, with inquiries directed to Brian Story at (406) 529-8534 or brian.story@usda.gov. No pre-bid conference is scheduled. Contractors intending to close the campground during August and September construction must notify the Forest Service by March 1. No government-furnished property will be provided. Technical specifications for this project are included separately in the solicitation and will be incorporated into any resulting contract.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lake Alva Campground Water System Improvements Section C - Description and Specifications
C- 1 Description of Work
a) Description of Work: This project replaces the existing water system, electrical system, and re-paves a loop of the Lake Alva Campground on the Seeley Ranger District. Project work includes replacing all water system components in the well pumphouse including new pressure tanks, flow meter, pressure relief, and all valves and appurtenances. Outside the pumphouse the project includes installing new 2” HDPE water main throughout the campground, and abandoning the existing water main in place. Aside from the water system upgrades, there will also be electrical upgrades throughout the campground including demolishing some existing equipment, new grounding equipment, low-voltage power conductors and cables, cable conduit and miscellaneous box connectors, couplers, etc., installing new power outlet pedestals, and new circuit breakers.
Option Item #1 includes repaving sections of the campground asphalt road, patching areas where the new water main intersects the road, and replacing some existing wheel stops in designated parking areas.
b) Project Location: From Seeley Lake, Montana head north on MT-83 for 11.3 miles.
Campground will be on the left.
c) Price Range: Between $500,000 and $1,000,000
d) Site Visit. A site visit is scheduled for May 13, 2026 at 10 am at the Seeley Lake Ranger District. Questions regarding the project may be directed to Brian Story at (406) 529-8534 or brian.story@usda.gov
e) Pre-Bid Conference. No formal pre-bid conference is scheduled.
f) Start Work: It is estimated that work will begin July 15, 2027. Notify FS by 1 March if intending to close campground for construction during August and September.
g) Period of Performance: July 15, 2027 – December 1, 2028 C- 2 Government-Furnished Property None
C- 3 Standard Specifications
Technical Specifications have been generated for this specific project and included in this solicitation. The requirements contained in these Specifications are hereby made a part of this solicitation and any resultant contract.
mailto:brian.story@usda.gov jcurry Highlight jcurry Highlight jcurry Highlight
| Lake Alva Campground Water System Improvements |
| C- 2 Government-Furnished Property |
| C- 3 Standard Specifications |
File details come from the government source that posted it. Updated .