Attachment_2_-_IDIQ_SOO_-_Appendix_G.pdf
PDF 301 KB Posted
- Attached to
- RFP for Indian Health Service HIT Modernization Federal contract opportunity
- Solicitation number
- 140D0421R0050
About this file
This Request for Proposals (RFP) solicits Electronic Health Records (EHR) providers and/or integrators to establish a single-award Indefinite Delivery, Indefinite Quantity (IDIQ) contract to support the Indian Health Service's (IHS) Health Information Technology (HIT) modernization efforts. The Department of the Interior (DOI), Interior Business Center (IBC), Acquisition Services Directorate (AQD) issued the RFP on behalf of the Department of Health and Human Services (HHS) and IHS. Questions are due by August 11th, 2022 at 9:00am ET and Phase I proposals are due by September 1st, 2022 at 5:00pm ET. The solicitation was prepared in accordance with FAR 12.6 and supplemented with additional information. The RFP and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2022-06 effective April 26, 2022.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP No. 140D0421R0050
Appendix G – HHS Policy for Information Technology Procurements – Security and Privacy Language
Introduction
The Department of Health and Human Services (HHS) requires certain language relating to Security and Privacy to be included in all Information Technology procurements. The following content, or subsets thereof, may be applicable to Task Orders issued under this IDIQ, as appropriate to the scope of those Task Orders. Language in [brackets] indicates where additional IHS-specific detail may be added, depending on the Task Order. Offerors must understand that the solutions offered to IHS in response to this solicitation and subsequent award will need to be compliant with these requirements.
I. Procurements Requiring Information Security and/or Physical Access Security
1. Baseline Security Requirements
a. Applicability. The requirements herein apply whether the entire contract or modification (hereafter "contract"), or portion thereof, includes either or both of the following:
i. Access (Physical or Logical) to Government Information: A Contractor (and/or any subcontractor) will have or will be given the ability to have, routine physical (entry) or logical (electronic) access to government information.
ii. Operate a Federal System Containing Information: A Contractor (and/or any subcontractor) will operate a federal system and information technology containing data that supports the HHS mission.
In addition to the Federal Acquisition Regulation (FAR) Subpart 2.1 definition of "information technology" (IT), the term as used in this section includes computers, ancillary equipment (including imaging peripherals, input, output, and storage devices necessary for security and surveillance), peripheral equipment designed to be controlled by the central processing unit of a computer, software, firmware and similar procedures, services (including support services), and related resources.
b. Safeguarding Information and Information Systems. All government information and information systems must be protected in accordance with HHS/IHS policies and level of risk. At a minimum, the Contractor (and/or any subcontractor) must:
i. Protect the:
Confidentiality, which means preserving authorized restrictions on access and disclosure, based on the security terms found in this contract, including means for protecting personal privacy and proprietary information;
Integrity, which means guarding against improper information modification or destruction, and ensuring information non-repudiation and authenticity; and
Availability, which means ensuring timely and reliable access to and use of information.
ii. Categorize all information owned and/or collected/managed on behalf of HHS/IHS and information systems that store, process, and/or transmit HHS information in accordance with FIPS 199 and National Institute of Standards and Technology (NIST) Special Publication (SP) 800-60, Volume II: Appendices to Guide for Mapping Types of Information and Information Systems to Security Categories. Based on information provided by the ISSO, CISO, OpDiv SOP, or other representative, the impact level for each Security Objective (Confidentiality, Integrity, and Availability) and the Overall Impact Level, which is the highest watermark of the three factors of the information or information system are the following:
Confidentiality: [ ] Low [X] Moderate [ ] High Integrity: [ ] Low [ ] Moderate [X] High Availability: [ ] Low [ ] Moderate [X] High Overall Impact Level: [ ] Low [ ] Moderate [X] High
iii. Based on the agreed-upon level of impact, implement the necessary safeguards to protect all information systems and information collected and/or managed on behalf of HHS/IHS regardless of location or purpose.
iv. Report any discovered or unanticipated threats or hazards by either the agency or contractor, or if existing safeguards have ceased to function immediately after discovery, within one (1) hour or less, to the government representative(s).
v. Adopt and implement all applicable policies, procedures, controls, and standards required by the HHS/IHS Information Security Program to ensure the confidentiality, integrity, and availability of government information and government information systems for which the Contractor is responsible under this contract or to which the Contractor may otherwise have access under this contract. Obtain all applicable security and privacy policies by contacting the CO/COR or HHS/IHS security and/or privacy officials.
c. Privacy Act. Comply with the Privacy Act requirements (when applicable), and tailor FAR and HHSAR clauses as needed.
d. Privacy Compliance. Comply with the E-Government Act of 2002, NIST SP 800-53, and applicable HHS/OpDiv privacy policies, and complete all the requirements below:
http://csrc.nist.gov/publications/nistpubs/800-60-rev1/SP800-60_Vol2-Rev1.pdf http://csrc.nist.gov/publications/nistpubs/800-60-rev1/SP800-60_Vol2-Rev1.pdf http://csrc.nist.gov/publications/nistpubs/800-60-rev1/SP800-60_Vol2-Rev1.pdf
i. Per the Office of Management and Budget (OMB) Circular A-130, Personally Identifiable Information (PII), is "information that can be used to distinguish or trace an individual's identity, either alone or when combined with other information that is linked or linkable to a specific individual." Examples of PII include, but are not limited to the following: Social Security number, date and place of birth, mother's maiden name, biometric records, etc.
ii. To ensure that the public's personal information is protected in a manner commensurate with the privacy risks, HHS uses a privacy analysis process to assess the risks associated with HHS's collection and maintenance of PII and to ensure information is handled in accordance with applicable legal, regulatory, and policy requirements.
PTAs analyze how information is handled in IT systems and electronic information collections and determines if the IT system or electronic information collection collects, disseminates, maintains, or disposes of PII. PIAs are used to assess the privacy risks of IT systems and electronic information collections that collect, disseminate, maintain, or dispose of PII about members of the public. PIAs also provide transparency into how HHS collects, disseminates, maintains, or disposes of the public's PII.
iii. The Contractor must support the agency with conducting a Privacy Threshold Analysis (PTA) for the information system and/or information handled under this contract to determine whether or not PII is collected, disseminated, maintained, or disposed as part of the contract. The PTA will determine if a full Privacy Impact Assessment (PIA) needs to be completed.
If the results of the PTA show that a full PIA is needed, the Contractor must support the agency with completing a PIA for the system or information within [IHS will provide timeline specific to Task Order as needed] after completion of the PTA and in accordance with HHS policy and OMB M-03- 22, Guidance for Implementing the Privacy Provisions of the E- Government Act of 2002.
The Contractor must support the agency in reviewing the PIA at least every three years throughout the system development lifecycle (SDLC)/information lifecycle, or when determined by the agency that a review is required based on a major change to the system, or when new types of PII are collected that introduces new or increased privacy risks, whichever comes first.
e. Controlled Unclassified Information (CUI). Executive Order 13556 defines CUI as "information that laws, regulations, or Government-wide policies require to have safeguarding or dissemination controls, excluding classified information." The Contractor (and/or any subcontractor) must comply with Executive Order 13556, Controlled Unclassified Information, (implemented at 3 CFR, part 2002) when handling CUI. 32 C.F.R. 2002.4(aa)
As implemented the term "handling" refers to "…any use of CUI, including but not limited to marking, safeguarding, transporting, disseminating, re-using, and disposing of the information." 81 Fed. Reg. 63323. The requirements below apply only to nonfederal systems that process, store, or transmit CUI, or that provide security protection for such components. All sensitive information that has been identified as CUI by a regulation or statute, handled by this solicitation/contract, must be:
i. Marked appropriately;
ii. Disclosed to authorized personnel on a Need-To-Know basis;
iii. Protected in accordance with NIST SP 800-53, Security and Privacy
Controls for Information Systems and Organizations applicable baseline if handled by a Contractor system operated on behalf of the agency, or NIST SP 800-171, Protecting Controlled Unclassified Information in Nonfederal Information Systems and Organizations if handled by internal Contractor system; and
iv. Returned to HHS control, destroyed when no longer needed, or held until otherwise directed. Information and/or data must be disposed of in accordance with NIST SP 800-88, Guidelines for Media Sanitization.
f. Protection of Sensitive Information. For security purposes, information is or may be sensitive because it requires security to protect its confidentiality, integrity, and/or availability. The Contractor (and/or any subcontractor) must protect all government information that is or may be sensitive by securing it with a solution that is validated with current FIPS 140 validation certificate from the NIST CMVP.
g. Confidentiality and Nondisclosure of Information. Any information provided to the contractor (and/or any subcontractor) by HHS or collected by the contractor on behalf of HHS must be used only for the purpose of carrying out the provisions of this contract and must not be disclosed or made known in any manner to any persons except as may be necessary in the performance of the contract. The Contractor assumes responsibility for protection of the confidentiality of Government records and must ensure that all work performed by its employees and subcontractors must be under the supervision of the Contractor. Each Contractor employee or any of its subcontractors to whom any HHS records may be made available or disclosed must be notified in writing by the Contractor that information disclosed to such employee or subcontractor can be used only for that purpose and to the extent authorized herein.
The confidentiality, integrity, and availability of such information must be protected in accordance with HHS and IHS policies. Unauthorized disclosure of information will be subject to the HHS/IHSsanction policies and/or governed by the following laws and regulations:
i. 18 U.S.C. 641 (Criminal Code: Public Money, Property or Records);
ii. 18 U.S.C. 1905 (Criminal Code: Disclosure of Confidential
Information); and
iii. 44 U.S.C. Chapter 35, Subchapter I (Paperwork Reduction Act).
h. Internet Protocol Version 6 (IPv6). All procurements using Internet Protocol must comply with OMB Memorandum M-05-22, Transition Planning for Internet Protocol Version 6 (IPv6).
i. Information and Communications Technology (ICT). ICT products and services from prohibited entities/sources must not be used/acquired in compliance with Public Law 115-232, Section 889 Parts A and B, FAR 4.21, FAR 52.204.23, FAR 52.204.24, and FAR 52.204.25. The contractor (and/or any subcontractor) must notify the government if they identify prohibited ICT products and/or services are used during the contract performance.
j. Government Websites. All new and existing public-facing government websites must be securely configured with Hypertext Transfer Protocol Secure (HTTPS) using the most recent version of Transport Layer Security (TLS). In addition, HTTPS must enable HTTP Strict Transport Security (HSTS) to instruct compliant browsers to assume HTTPS at all times to reduce the number of insecure redirects and protect against attacks that attempt to downgrade connections to plain HTTP. For internal-facing websites, HTTPS is not required, but it is highly recommended. Consult the HHS Policy for Internet and Email Security for additional information.
k. Contract Documentation. The Contractor must use provided templates, policies, forms and other agency documents [IHS will specify which documents/forms will be provided to contractor as appropriate to Task Order] to comply with contract deliverables as appropriate.
l. Standard for Encryption. The Contractor (and/or any subcontractor) must:
i. Comply with the HHS Standard for Encryption of Computing Devices and Information to prevent unauthorized access to government information.
ii. Encrypt all sensitive federal data and information (i.e., PII, protected health information [PHI], proprietary information, etc.) in transit (i.e., email, network connections, etc.) and at rest (i.e., servers, storage devices, mobile devices, backup media, etc.) with encryption solution that is validated with current FIPS 140 validation certificate from the
NIST CMVP.
iii. Secure all devices (i.e.: desktops, laptops, mobile devices, etc.) that store and process government information and ensure devices meet HHS and OpDiv-specific encryption standard requirements. Maintain a complete and current inventory of all laptop computers, desktop computers, and other mobile devices and portable media that store or process sensitive government information (including PII).
iv. Verify that the encryption solutions in use have been validated under the Cryptographic Module Validation Program to confirm compliance with current FIPS 140 validation certificate from the NIST CMVP. The Contractor must provide a written copy of the validation documentation to the COR [IHS will provide delivery date].
v. Use the Key Management system on the HHS personal identification verification (PIV) card or establish and use a key recovery mechanism to ensure the ability for authorized personnel to encrypt/decrypt information and recover encryption keys http://csrc.nist.gov/publications/. Encryption keys must be provided to the COR upon request and at the conclusion of the contract.
m. Contractor Non-Disclosure Agreement (NDA). Each Contractor (and/or any subcontractor) employee having access to non-public government information under this contract must complete the OpDiv non-disclosure agreement. [IHS will provide NDA document as needed], as applicable.
Contractors (and/or subcontractors) must submit a copy of each signed and witnessed NDA to the Contracting Officer (CO) and/or CO Representative (COR) prior to performing any work under this acquisition.
2. Training Requirements
a. Mandatory Training for All Contractor Staff. All Contractor (and/or any subcontractor) employees assigned to work on this contract must complete the applicable HHS/OpDiv Contractor Information Security Awareness, Privacy, and Records Management training (provided upon contract award) before performing any work under this contract. Thereafter, the employees must complete IHS Information Security Awareness, Privacy, and Records Management training at least annually, during the life of this contract. All provided training must be compliant with HHS training policies.
b. Role-based Training. All Contractor (and/or any subcontractor) employees with significant security responsibilities (as determined by the program manager) must complete role-based training annually commensurate with their role and responsibilities in accordance with HHS policy and the HHS Role-Based Training (RBT) of Personnel with Significant Security Responsibilities Memorandum.
c. Training Records. The Contractor (and/or any subcontractor) must maintain training records for all its employees working under this contract in accordance with HHS policy. A copy of the training records must be provided to the CO and/or COR within 30 days after contract award and annually thereafter or upon request.
3. Rules of Behavior
a. The Contractor (and/or any subcontractor) must ensure that all employees performing on the contract comply with the HHS Information Technology General Rules of Behavior, HHS Rules of Behavior for Privileged Users, and [IHS will provide IHS-specific rules as applicable].
b. All Contractor employees performing on the contract must read and adhere to the Rules of Behavior before accessing Department data or other information, systems, and/or networks that store/process government information, initially at the beginning of the contract and at least annually thereafter, which may be done as part of annual OpDiv Information Security Awareness Training. If http://csrc.nist.gov/publications/ the training is provided by the contractor, the signed ROB must be provided as a separate deliverable to the CO and/or COR per defined timelines above.
4. Incident Response
a. The Contractor (and/or any subcontractor) must respond to all alerts/Indicators of Compromise (IOCs) provided by HHS Computer Security Incident Response Center (CSIRC)/IHS IRT teams within 24 hours, whether the response is positive or negative. In accordance with FISMA and OMB M- 17-12, Preparing for and Responding to a Breach of Personally Identifiable Information (PII), an incident is "an occurrence that (1) actually or imminently jeopardizes, without lawful authority, the integrity, confidentiality, or availability of information or an information system; or (2) constitutes a violation or imminent threat of violation of law, security policies, security procedures, or acceptable use policies" and a privacy breach is "the loss of control, compromise, unauthorized disclosure, unauthorized acquisition, or any similar occurrence where (1) a person other than an authorized user accesses or potentially accesses personally identifiable information or (2) an authorized user accesses or potentially accesses personally identifiable information for an other than authorized purpose." For additional information on the HHS breach response process, please see the HHS Policy and Plan for Preparing for and Responding to a Breach of Personally Identifiable Information (PII)."
b. In the event of a suspected or confirmed incident or breach, the Contractor (and/or any subcontractor) must:
i. Protect all sensitive information, including any PII created, stored, or transmitted in the performance of this contract, with encryption solution that is validated with current FIPS 140 validation certificate from the
NIST CMVP.
ii. NOT notify affected individuals unless so instructed by the Contracting Officer or designated representative. If so instructed by the Contracting Officer or representative, the Contractor must send IHS-approved notifications to affected individuals [IHS will provide specific timeline, process, and format as appropriate to Task Order].
iii. Report all suspected and confirmed information security and privacy incidents and breaches to the OpDiv Incident Response Team (IRT) [IHS will provide contact information], COR, CO, OpDiv SOP (or his or her designee), and other stakeholders, including breaches involving PII, in any medium or form, including paper, oral, or electronic, as soon as possible and without unreasonable delay, no later than one (1) hour, and consistent with the applicable OpDiv and HHS policy and procedures, NIST standards and guidelines, as well as US-CERT notification guidelines. The types of information required in an incident report must include at a minimum: company and point of contact information, contact information, impact classifications/threat vector, and the type of information compromised. In addition, the Contractor must:
Cooperate and exchange any information, as determined by the Agency, necessary to effectively manage or mitigate a suspected or confirmed breach;
Not include any sensitive information in the subject or body of any reporting e-mail; and
Encrypt sensitive information in attachments to email, media, etc.
iv. Comply with OMB M-17-12, Preparing for and Responding to a Breach of Personally Identifiable Information, and HHS and IHS privacy breach response policies when handling PII breaches.
v. Provide full access and cooperate on all activities as determined by the Government to ensure an effective incident response, including providing all requested images, log files, and event information to facilitate rapid resolution of sensitive information incidents. This may involve disconnecting the system processing, storing, or transmitting the sensitive information from the Internet or other networks or applying additional security controls. This may also involve physical access to contractor facilities during a breach/incident investigation.
5. Position Sensitivity Designations
All Contractor (and/or any subcontractor) employees must obtain a background investigation commensurate with their position sensitivity designation that complies with Parts 1400 and 731 of Title 5, Code of Federal Regulations (CFR). The following position sensitivity designation levels apply to this solicitation/contract.
6. Homeland Security Presidential Directive (HSPD)-12
The Contractor (and/or any subcontractor) and its employees must comply with Homeland Security Presidential Directive (HSPD)-12, Policy for a Common Identification Standard for Federal Employees and Contractors; OMB M-05-24; OMB M-19-17; FIPS 201, Personal Identity Verification (PIV) of Federal Employees and Contractors; HHS HSPD-12 policy; and Executive Order 13467, Part 1 §1.2.
7. Roster
The Contractor (and/or any subcontractor) must submit a roster by name, position, e-mail address, phone number and responsibility, of all staff working under this acquisition where the Contractor will develop, have the ability to access, or host and/or maintain a government information system(s). The roster must be submitted to the COR and/or CO within 30 days [subject to revision by IHS] of the effective date of this contract or applicable Task Order. Any revisions to the roster as a result of staffing changes must be submitted within [time to be specified by IHS] of the change. The COR will notify the Contractor of the appropriate level of investigation required for each staff member. [IHS will supply reporting templates as needed.]
If the employee is filling a new position, the Contractor must provide a position description and the Government will determine the appropriate suitability level.
8. Contract Initiation and Expiration
a. General Security Requirements. The Contractor (and/or any subcontractor) must comply with information security and privacy requirements, Enterprise Performance Life Cycle (EPLC) processes, HHS Enterprise Architecture requirements to ensure information is appropriately protected from initiation to expiration of the contract. All information systems development or enhancement tasks supported by the contractor must follow the HHS EPLC framework and methodology or [others to be provided by IHS as specific to Task Orders] and in accordance with the HHS Contract Closeout Guide (2012).
b. System Documentation. Contractors (and/or any subcontractors) must follow and adhere to HHS System Development Life Cycle requirements, at a minimum, for system development and provide system documentation at designated intervals (specifically, at the expiration of the contract) within the EPLC that require artifact review and approval.
c. Sanitization of Government Files and Information. As part of contract closeout and at expiration of the contract, the Contractor (and/or any subcontractor) must provide all required documentation [IHS will detail as appropriate to Task Order] to the CO and/or COR to certify that, at the government's direction, all electronic and paper records are appropriately disposed of and all devices and media are sanitized in accordance with NIST SP 800-88, Guidelines for Media Sanitization.
d. Notification. The Contractor (and/or any subcontractor) must notify the CO and/or COR and system ISSO within [IHS will specify as appropriate to Task Order] before an employee stops working under this contract.
e. Contractor Responsibilities upon Physical Completion of the Contract.
The contractor (and/or any subcontractors) must return all government information and IT resources (i.e., government information in non-government-owned systems, media, and backup systems) acquired during the term of this contract to the CO and/or COR. Additionally, the Contractor must provide a certification that all government information has been properly sanitized and purged from Contractor-owned systems, including backup systems and media used during contract performance, in accordance with HHS and/or IHS policies.
f. The Contractor (and/or any subcontractor) must perform and document the actions identified in the IHS Contractor Employee Separation Checklist [IHS will provide links as appropriate] when an employee terminates work under this contract within [IHS will specify with Task Order] days of the employee's exit from the contract. All documentation must be available to the CO and/or COR upon request.
9. Records Management and Retention
a. The Contractor (and/or any subcontractor) must maintain all information in accordance with Executive Order 13556 -- Controlled Unclassified Information, National Archives and Records Administration (NARA) records retention policies and schedules and HHS Policy for Records Management and IHS policies and must not dispose of any records unless authorized by HHS/IHS.
b. In the event that a contractor (and/or any subcontractor) accidentally disposes of or destroys a record without proper authorization, he/she must document and report the incident in accordance with HHS/IHS policies.
10. High Value Asset (HVA) If a system is identified as HVA, the contractor must comply with the HHS Policy for the High Value Asset (HVA) Program and the DHS HVA Control Overlay in addition to the above requirements.
II. Requirements for Procurements Involving Privacy Act Records Privacy Act It has been determined that this contract is subject to the Privacy Act of 1974, because this contract provides for the design, development, or operation of a system of records about individuals from which records are retrieved by name or other identifying particular.
The System of Records Notice that is applicable to this contract is: [will be provided by IHS as needed].
The system of records design, development, or operation work the Contractor is to perform is: [will be provided by IHS as needed; see definitions in the FAR at 24.101 - Definitions].
The disposition to be made of the Privacy Act records upon completion of contract performance is: [will be provided by IHS as needed].
III. Procurements Involving Government Information Processed on GOCO or COCO Systems
1. Security Requirements for GOCO and COCO Resources
a. Federal Policies. The Contractor (and/or any subcontractor) must comply with applicable federal laws and HHS policies that include, but are not limited to, the HHS Information Security and Privacy Policy (IS2P), [IHS will specify others as appropriate to Task Order, e.g., HIPAA, 21st Century Cures Act]; Federal Information Security Modernization Act (FISMA) of 2014, (44 U.S.C. 101); National Institute of Standards and Technology (NIST) Special Publication (SP) 800-53, latest revision, Security and Privacy Controls for Information Systems and Organizations; Office of Management and Budget (OMB) Circular A-130, Managing Information as a Strategic Resource; and other applicable federal laws, regulations, NIST guidance, and Departmental policies.
b. Assessment and Authorization (A&A). A valid authority to operate (ATO) certifies that the Contractor's information system meets the contract's requirements to protect the agency data. If the system under this contract does not have a valid ATO, the Contractor (and/or any subcontractor) must work with the agency and supply the deliverables required to complete the ATO within the specified timeline(s) [IHS will specify as appropriate to Task Order]. The Contractor must conduct the A&A requirements in accordance with HHS IS2P, NIST SP 800-37, Guide for Applying the Risk Management Framework to Information Systems: A Security Life Cycle Approach (latest revision), NIST SP 800-53B, Control Baselines for Information Systems and Organizations, and the NIST SP 800-53A (latest revision).
IHS acceptance of the ATO does not alleviate the Contractor's responsibility to ensure the system security and privacy controls are implemented and operating effectively.
i. A&A Package Deliverables - The Contractor (and/or any subcontractor) must provide an A&A package within [IHS will specify timeline, process, and format for A&A package delivery] to the CO and/or COR. The following A&A deliverables are required to complete the A&A package:
System Security Plan (SSP) - due [IHS will specify timeline, process, and format after contract award]. The SSP must comply with the NIST SP 800-18, Guide for Developing Security Plans for Federal Information Systems, the Federal Information Processing Standard (FIPS) 200, Recommended Security Controls for Information Systems, and NIST SP 800- 53, Security and Privacy Controls for Federal Information Systems and Organizations applicable baseline requirements, and other applicable NIST guidance as well as HHS and IHS policies and other guidance. The SSP must be consistent with and detail the approach to IT security contained in the Contractor's bid or proposal that resulted in the award of this contract. The SSP must provide an overview of the system environment and security requirements to protect the information system as well as describe all applicable security controls in place or planned for meeting those requirements. It should provide a structured process for planning adequate, cost-effective security protection for a system. The Contractor must review and update the SSP at least annually thereafter and if requested, provide a copy of the updated SSP.
Security Assessment Plan/Report (SAP/SAR) - due [IHS will specify timeline, process and format after contract award.] The security assessment must be conducted by [IHS will specify type of assessment] assessor and be consistent with NIST SP 800-53A, NIST SP 800-30, and HHS and OpDiv policies. The assessor will document the assessment results in the SAR.
Thereafter, the Contractor, in coordination with IHS must [conduct or assist as specified by IHS] in the assessment of the security controls [IHS will specify timeline] and update the SAR at least annually. A copy of the updated SAR should be provided if requested.
Independent Assessment - due [IHS will specify timeline, process, and format after contract award]. The Contractor (and/or subcontractor) must have an independent third-party validate the security and privacy controls in place for the system(s) commensurate with the risk levels per NIST SP 800- 53B. The independent third party must review and analyze the Security Authorization package, and report on technical, operational, and management level deficiencies as outlined in NIST SP 800-53. The Contractor must address all "high" deficiencies [IHS may specify other deficiencies that require mitigation by Contractor as appropriate to Task Order] before submitting the package to the Government for acceptance and document all remaining deficiencies in a system Plan of Actions and Milestones (POA&M).
POA&M - due [IHS will specify timeline, process, and format after contract award]. All critical-risk weaknesses must be mitigated within [IHS will provide timeline], high-risk weaknesses must be mitigated within [IHS will provide timeline], medium weaknesses must be mitigated within [IHS will provide timeline], and low weaknesses must be mitigated within [IHS will provide timeline], from the date the weaknesses are formally identified and documented. IHS will determine the risk rating of vulnerabilities. Identified risks stemming from deficiencies related to the security control baseline implementation, assessment, continuous monitoring, vulnerability scanning, flaws and security defect in a system (that require to create a patch for remediation), and other security reviews and sources, as documented in the SAR, must be documented and tracked by the Contractor for mitigation in the POA&M document consistent with the HHS Standard for Plan of Action and Milestones and OpDiv policies. Depending on the severity of the risks, IHS may require designated POA&M weaknesses to be remediated before an ATO is issued. Thereafter, continue to remediate weaknesses throughout the contract. The POA&M document must be updated at least quarterly [IHS may modify timeline, process, and format if more frequent updates are needed].
Contingency Plan and Contingency Plan Test - due [IHS will provide timeline, process and format after contract award]. The Contingency Plan must be developed in accordance with NIST SP 800-34, Contingency Planning Guide for Federal Information Systems, and be consistent with HHS and OpDiv policies. Upon acceptance by the System Owner, the Contractor, in coordination with the System Owner, must test the Contingency Plan and prepare a Contingency Plan Test Report that includes the test results, lessons learned and any action items that need to be addressed. Thereafter, the Contractor must update and test the Contingency Plan at least annually.
E-Authentication Questionnaire - The contractor (and/or any subcontractor) must collaborate with government personnel to ensure that the E-Authentication requirements are implemented in accordance with OMB 04-04 and NIST SP 800-63 B.
Based on the level of assurance determined by the E-Auth, the Contractor (and/or subcontractor) must ensure appropriate authentication to the system, including remote authentication, is in-place in accordance with the assurance level determined by the E-Auth (when required) in accordance with HHS Guidance for Selection of e-Authentication Assurance Levels and any other applicable HHS policies.
ii. Information Security Continuous Monitoring. Upon the government issuance of an Authority to Operate (ATO), the Contractor (and/or subcontractor)-owned/operated systems that input, store, process, output, and/or transmit government information, must meet or exceed the information security continuous monitoring (ISCM) requirements in accordance with FISMA and NIST SP 800-137, Information Security Continuous Monitoring (ISCM) for Federal Information Systems and Organizations, HHS ISCM Strategy, and HHS IS2P.
iii. Annual Assessment/Penetration (Pen) Test - Assess the system security and privacy controls (or ensure an assessment of the controls is conducted) at least annually to determine the implemented security and privacy controls are operating as intended and producing the desired results (this involves penetration testing conducted by the agency or independent third-party [IHS will supply penetration testing requirements as appropriate to Task Order].) In addition, review all relevant A&A documentation (SSP, POA&M, Contingency Plan, etc.)
and provide updates by specified due date [IHS will provide].
iv. Asset Management - Using any available Security Content Automation Protocol (SCAP)-compliant automated tools for active/passive scans, provide an inventory of all information technology (IT) assets for hardware and software, (computers, servers, routers, databases, operating systems, etc.) that are processing HHS-owned information/data. It is anticipated that this inventory information will be required to be produced at least [IHS will provide timeframe specific to Task Order]. IT asset inventory information must include IP address, machine name, operating system level, security patch level, and SCAP-compliant format information.
The contractor must maintain a capability to provide an inventory of
100% of its IT assets using SCAP-compliant automated tools in accordance with the HHS Policy for Information Technology Asset Management (ITAM) and any other applicable HHS policy.
v. Configuration Management - Use available SCAP-compliant automated tools as per NIST IR 7511 and HHS Minimum Security Configurations Standards Guidance to scan all IT assets, including but not limited to: computers, servers, routers, databases, operating systems, application, etc., that store and process government information. Provide scan reports to HHS/IHS upon request [IHS may specify a schedule]. The contractor must maintain a capability to provide security configuration compliance information for 100% of its IT assets using SCAP-compliant automated tools.
vi. Vulnerability Management - Contractors must actively manage system vulnerabilities using automated tools and technologies where practicable and in accordance with HHS Policy for Vulnerability Management. Automated tools must be compliant with NIST-specified SCAP standards for vulnerability identification and management. The contractor must maintain a capability to provide security vulnerability scanning information for 100% of IT assets using SCAP-compliant automated tools and report to the agency at least [IHS will specify timeframe as appropriate to Task Order].
vii. Patching and Vulnerability Remediation - Install vendor released security patches and remediate critical and high vulnerabilities in systems processing government information in an expedited manner, within vendor and agency specified timeframes [IHS will specify timeframe as appropriate to Task Order].
viii. Secure Coding - Follow the HHS Policy for Software Development Secure Coding Practices and secure coding best practice requirements, as directed by United States Computer Emergency Readiness Team (US-CERT) specified standards and the Open Web Application Security Project (OWASP), that will limit system software vulnerability exploits.
ix. Boundary Protection - The contractor must ensure that government information, other than unrestricted information, being transmitted from federal government entities to external entities is routed through a Trusted Internet Connection (TIC).
c. Government Access for Security Assessment. In addition to the Inspection Clause in the contract, the Contractor (and/or any subcontractor) must afford the Government access to the Contractor's facilities, installations, operations, documentation, information systems, and personnel used in performance of this contract to the extent required to carry out a program of security assessment (to include vulnerability testing), investigation, and audit to safeguard against threats and hazards to the confidentiality, integrity, and availability of federal data or to the protection of information systems operated on behalf of HHS, including but are not limited to:
i. At any tier handling or accessing information, consent to and allow the Government, or an independent third party working at the Government's direction, without notice at any time during a weekday during regular business hours contractor local time, to access contractor and subcontractor installations, facilities, infrastructure, data centers, equipment (including but not limited to all servers, computing devices, and portable media), operations, documentation (whether in electronic, paper, or other forms), databases, and personnel which are used in performance of the contract.
The Government includes but is not limited to the U.S. Department of Justice, U.S. Government Accountability Office, and the HHS Office of the Inspector General (OIG). The purpose of the access is to facilitate performance inspections and reviews, security and compliance audits, and law enforcement investigations. For security audits, the audit may include but not be limited to such items as buffer overflows, open ports, unnecessary services, lack of user input filtering, cross site scripting vulnerabilities, SQL injection vulnerabilities, and any other known vulnerabilities.
ii. At any tier handling or accessing protected information, fully cooperate with all audits, inspections, investigations, forensic analysis, or other reviews or requirements needed to carry out requirements presented in applicable law or policy. Beyond providing access, full cooperation also includes, but is not limited to, disclosure to investigators of information sufficient to identify the nature and extent of any criminal or fraudulent activity and the individuals responsible for that activity. It includes timely and complete production of requested data, metadata, information, and records relevant to any inspection, audit, investigation, or review, and making employees of the contractor available for interview by inspectors, auditors, and investigators upon request. Full cooperation also includes allowing the Government to make reproductions or copies of information and equipment, including, if necessary, collecting a machine or system image capture.
Segregate Government protected information and metadata on the handling of Government protected information from other information. Commingling of information is prohibited.
Inspectors, auditors, and investigators will not be precluded from having access to the sought information if sought information is commingled with other information.
Cooperate with inspections, audits, investigations, and reviews.
d. End of Life Compliance. The Contractor (and/or any subcontractor) must use Commercial off the Shelf (COTS) software or other software that is supported by the manufacturer. In addition, the COTS/other software need to be within one major version of the current version; deviation from this requirement will only be allowed via the HHS waiver process (approved by HHS CISO if it impact enterprise-wide systems and services, or by the OpDiv CISO if it impact only the OpDiv). The contractor must retire and/or upgrade all software/systems that have reached end-of-life in accordance with HHS End of Life Operating Systems, Software and Application Policy.
e. Desktops, Laptops, and Other Computing Devices Required for Use by the Contractor. The Contractor (and/or any subcontractor) must ensure that all IT equipment (e.g., laptops, desktops, servers, routers, mobile devices, peripheral devices, etc.) used to process information on behalf of HHS are deployed and operated in accordance with approved security configurations and meet the following minimum requirements:
i. Encrypt equipment and sensitive information stored and/or processed by such equipment in accordance with HHS encryption standard and current FIPS 140 validation certificate from the NIST CMVP.
ii. Configure laptops and desktops in accordance with the latest applicable United States Government Configuration Baseline (USGCB), [IHS will specify security configuration baseline as appropriate], and HHS Minimum Security Configuration Standards;
iii. Maintain the latest operating system patch release and anti-virus software definitions [IHS will specify timeframe as appropriate to Task Order];
iv. Validate the configuration settings after hardware and software installation, operation, maintenance, update, and patching and ensure changes in hardware and software do not alter the approved configuration settings; and
v. Automate configuration settings and configuration management in accordance with HHS security policies, including but not limited to:
Configuring its systems to allow for periodic HHS vulnerability and security configuration assessment scanning; and
Using Security Content Automation Protocol (SCAP)-validated tools with capabilities to scan its systems at least on a monthly basis and report the results of these scans to the CO and/or COR, Project Officer, and any other applicable designated
POC.
f. Rights to Data. All contracts that require data to be produced, furnished, acquired, or used in meeting contract performance requirements, must contain terms that delineate the respective rights and obligations of the Government and the contractor regarding the use, reproduction, and disclosure of that data. Data rights clauses do not specify the type, quantity or quality of data that is to be delivered, but only the respective rights of the Government and the contractor regarding the use, disclosure, or reproduction of the data. Accordingly, the contract must specify the data to be delivered.
g. Information and Communications Technology (ICT) Cybersecurity Supply Chain Risk Management (C-SCRM) requirements. The Contractor (and/or any subcontractor) must secure their ICT supply chain in compliance with HHS Policy for Cyber Supply Chain Risk Management and Public Law 115-232 § 889. At a minimum, they must implement the following:
i. Develop rules for suppliers' development methods, techniques, or practices;
ii. Use of secondary market components;
iii. Prohibit counterfeit products;
iv. Dispose and/or retain elements such as components, data, or intellectual property securely;
v. Ensure adequate supply of components;
vi. Require external providers handling federal information or operating systems on behalf of the federal government to meet the same security and privacy requirements as federal agencies;
vii. Require external providers to express security and privacy requirements (including the controls for systems processing, storing, or transmitting federal information) in contracts or other formal agreements;
viii. Establish Service Level Agreements (SLAs), patching vehicles and disclosure requirements in the case of a security incident or new vulnerability being discovered; and
ix. Ensure that the supplier applies same contractual requirements to any sub-contractors/suppliers that they involve in the provision of the product or service to the customer; and
x. Prohibit the use of covered telecommunications and video surveillance equipment or services.
IV. Contracts Involving Cloud Services
1. HHS FedRAMP Privacy and Security Requirements
The Contractor (and/or any subcontractor) must be responsible for the following privacy and security requirements:
a. FedRAMP Compliant ATO. Comply with FedRAMP Assessment and Authorization (A&A) requirements and ensure the information system/service under this contract has a valid FedRAMP compliant (approved) authority to operate (ATO) in accordance with Federal Information Processing Standard (FIPS) Publication 199 defined security categorization. If a FedRAMP compliant ATO has not been granted, the Contractor must submit a plan to obtain a FedRAMP compliant ATO by [IHS will specify timeframe, process and format for contractor to submit ATO package and/or deliverables].
i. Implement applicable FedRAMP baseline controls commensurate with the agency-defined security categorization and the applicable FedRAMP security control baseline (www.FedRAMP.gov). The HHS Information Security and Privacy Policy (IS2P) and HHS Cloud Computing and Federal Risk and Authorization Management Program (FedRAMP) Guidance further define the baseline policies as well as http://www.fedramp.gov/ roles and responsibilities. The Contractor must also implement a set of additional controls identified by the agency when applicable.
ii. A security control assessment must be conducted by a FedRAMP third-party assessment organization (3PAO) for the initial ATO and annually thereafter or whenever there is a significant change to the system's security posture in accordance with the FedRAMP Continuous Monitoring Plan.
b. Data Jurisdiction. The contractor must store all information within the security authorization boundary, data at rest or data backup, within the Continental United States (CONUS).
c. Service Level Agreements. [when applicable to Task Order] The Contractor must understand the terms of the service agreements that define the legal relationships between cloud customers and cloud providers and work with IHS to develop and maintain an SLA.
d. Interconnection Agreements/Memorandum of Agreements. [when applicable to Task Order] The Contractor must establish and maintain Interconnection Agreements and or Memorandum of Agreements/Understanding in accordance with HHS/IHS policies.
2. Protection of Information in a Cloud Environment
a. If contractor (and/or any subcontractor) personnel must remove any information from the primary work area, they must protect it to the same extent they would the proprietary data and/or company trade secrets and in accordance with HHS/IHS policies:
https://www.hhs.gov/web/governance/digital-strategy/it-policy-archive/index.html.
b. HHS will retain unrestricted rights to federal data handled under this contract.
Specifically, HHS retains ownership of any user created/loaded data and applications collected, maintained, used, or operated on behalf of HHS and hosted on contractor's infrastructure, as well as maintains the right to request full copies of these at any time. If requested, data must be available to HHS within one (1) business day from request date or within the timeframe specified otherwise. In addition, the data must be provided at no additional cost to HHS.
c. The Contractor (and/or any subcontractor) must ensure that the facilities that house the network infrastructure are physically and logically secure in accordance with FedRAMP requirements and HHS policies.
d. The contractor must support a system of records in accordance with NARA-approved records schedule(s) and protection requirements for federal agencies to manage their electronic records in accordance with 36 CFR §
1236.20 & 1236.22 (ref. a), including but not limited to the following:
i. Maintenance of links between records and metadata, and
ii. Categorization of records to manage retention and disposal, either through transfer of permanent records to NARA or deletion of https://www.hhs.gov/web/governance/digital-strategy/it-policy-archive/index.html https://www.hhs.gov/web/governance/digital-strategy/it-policy-archive/index.html temporary records in accordance with NARA-approved retention schedules.
e. The disposition of all HHS data must be at the written direction of HHS/IHS.
This may include documents returned to HHS control; destroyed; or held as specified until otherwise directed. Items returned to the Government must be hand carried or sent by certified mail to the COR.
i. If the system involves the design, development, or…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .