About this file

This document is an EMR (Experience Modification Rate) Form for Bidders/Offerors to complete and submit with a proposal. The form requires detailed safety and health information from potential contractors, including three years of workplace safety data from OSHA 300 Forms. Key evaluation criteria include: number of man hours, cases involving days away from work, Days Away, Restricted, or Transferred (DART) rate, and the number of serious, willful, or repeat OSHA violations. Contractors are disqualified if they have four serious violations, one repeat violation, or one willful violation, or if their Insurance Experience Modification Rate (EMR) is greater than 1.0. The form also requests the company's NAICS Code, contact information for the Safety and Health Program administrator, and requires attachments of OSHA 300 and 300a Forms.

View the file

Other files

File Type Posted
ATTACHMENT 29 Addendum 2 Drawings.pdf PDF
ATTACHMENT 31 Section 099100 Painting.pdf PDF
ATTACHMENT 1 - Wage Determination.pdf PDF
ATTACHMENT 4 - Past Performance Forms.pdf PDF
ATTACHMENT 33 - Boiler Safety Device Interim Safety Measure Form.pdf PDF
ATTACHMENT 36 B - SARGENT 10X Line Sell Sheet.pdf PDF
ATTACHMENT 25 Addendum 1 Section 232113 Hydronic Pumps.pdf PDF
ATTACHMENT 18 Addendum 1 Section 238216 Air Coils.pdf PDF
ATTACHMENT 26 Addendum 1 Section 223500 Domestic Water Heat Exchangers.pdf PDF
ATTACHMENT 8 - Drawings 1 of 3.pdf PDF
ATTACHMENT 9 - Drawings 2 of 3.pdf PDF
ATTACHMENT 10 - Drawings 3 of 3.pdf PDF
ATTACHMENT 14 Yarway BlowOff Valve.pdf PDF
ATTACHMENT 27 - Addendum 2.pdf PDF
ATTACHMENT 35 - Common and Emergency Parts Inventory Recommendation and Tracking Sheet.pdf PDF
ATTACHMENT 36 C - SARGENT 10X Line Catalog.pdf PDF
ATTACHMENT 38 - ICRA.pdf PDF
SOLICITATION - 36C24825R0079 -.pdf PDF
ATTACHMENT 28 Addendum 2 Section 232213 Steam and Condensate Heating Piping.pdf PDF
ATTACHMENT 17 Addendum 1.pdf PDF
ATTACHMENT 23 Addendum 1 Section 232300 Refrigerant Piping.pdf PDF
ATTACHMENT 22 Addendum 1 Section 234000 HVAC Air Cleaning Devices.pdf PDF
ATTACHMENT 21 Addendum 1 Section 237300 Indoor Central Station Air Handling Units.pdf PDF
ATTACHMENT 6 - VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.pdf PDF
ATTACHMENT 7 - Site Map.pdf PDF
ATTACHMENT 11 - Site Specific Health and Safety Plan For Contaminated Soil Contact.pdf PDF
ATTACHMENT 12 - Soil Management and Dust Control Plan.pdf PDF
ATTACHMENT 16 - Physical Security Resiliency Design Manual - PSRDM.pdf PDF
ATTACHMENT 36 A - Electronic Key Project 546-23-106 Specs.pdf PDF
ATTACHMENT 36 D - Medeco CLIQ Brochure.pdf PDF
ATTACHMENT 37 - PCRA.pdf PDF
ATTACHMENT 30 VHA Master Specifications.pdf PDF
ATTACHMENT 20 Addendum 1 Section 238123 ComputerRoom AirConditioners.pdf PDF
ATTACHMENT 19 Addendum 1 Section 238200 Convection Heating and Cooling Units.pdf PDF
ATTACHMENT 24 Addendum 1 Section 232113 Hydronic Piping.pdf PDF
ATTACHMENT 3 - Specialized Experience Form.pdf PDF
ATTACHMENT 5 - Base Offer Price Breakdown.xlsx XLSX spreadsheet
ATTACHMENT 13 - First Quarterly Groundwater Monitoring Report.pdf PDF
Attachment 32 - DERM Letter.pdf PDF
ATTACHMENT 34 - Miami Main Boiler Semi Annual Safety Device Testing Documentation.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EMR FORM FOR BIDDER/OFFEROR TO COMPLETE & SUBMIT WITH PROPOSAL

Pre-Award Contractor Evaluation Form Company Name:

Address: _____________________________________________________

Telephone: ______________________ Fax: ________________________

Email: _______________________________________________________

Contact: ______________________________________________________

1. Utilizing your OSHA 300 Forms, please complete the following information:

Category 2021 2022 2023

Number of man hours (job site and office)

The number of cases involving days away from work, restricted activity, or both (Columns H and I of OSHA 300).

Days away, restricted, or transferred rate (# of days away, restricted, or transferred cases x 200,000/# of man hours) (DART Rate).

The number of serious, willful, or repeat violations from OSHA within the last 3 years.

Please attach an explanation for any violations.

(Four serious, one repeat, or one willful disqualifies the contractor.)

Please attach copies of the following documents: OSHA 300 and 300a Forms. These forms can be accessed through the OSHA publications search page:

http://www.osha.gov/pls/publications/publication.html.

2. Provide your six-digit North American Industrial Classification System (NAICS) Code for this acquisition: __________________________________

3. Who administers your company’s Safety and Health Program?

4. Company’s Insurance Experience Modification Rate (EMR) for the past 3 years (an EMR of greater than 1.0 disqualifies the contractor): _____________

File details come from the government source that posted it. Updated .