This document is a technical specification for Air Coils (Section 23 82 16) for a construction project at the VAMC Miami, Florida. The specification covers detailed requirements for heating and cooling coils used in air handling units and duct applications, with stringent technical specifications including materials, construction, and performance standards. Key technical requirements include:
Coil materials and construction specifications mandate seamless copper tubing with minimum 16 mm diameter, aluminum or copper fins, and specific corrosion-resistant treatments for high humidity locations. The specification requires epoxy immersion coating with multi-stage corrosion resistance, including UV protection, with quality control standards for salt spray resistance, humidity resistance, and impact resistance. Coils must conform to ASTM and AHRI standards, with specific pressure ratings for water, steam, and refrigerant coils. The document also outlines installation, startup, testing, commissioning, and training requirements, including a four-hour manufacturer's technical representative training session for VA personnel.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 1
May 31, 2024
CONSTRUCT A NEW BOILER BUILDING AND
CONTROLS IN THE OLD INCENERATOR AREA
EXPAND/MOVE GRAPHIC CONTROL
VAMC MIAMI, FLORIDA
546-22-110 23 82 16-1
SECTION 23 82 16
AIR COILS
PART 1 - GENERAL
1.1 DESCRIPTION
A. Heating and cooling coils for air handling unit and duct applications
1.2 RELATED WORK
A. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES
B. Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS
C. Section 23 05 11, COMMON WORK RESULTS FOR HVAC
D. Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS
E. Section 23 09 23, DDC SYSTEMS for HVAC
F. Section 23 31 00, HVAC DUCTS AND CASINGS
G. Section 23 36 00, AIR TERMINAL UNITS: Reheat coils for VAV/CV terminals.
H. Section 23 73 00, INDOOR CENTRAL-STATION AIR-HANDLING UNITS.
I. Section 23 82 00, CONVECTION HEATING AND COOLING UNITS
1.3 QUALITY ASSURANCE
A. Refer to paragraph, QUALITY ASSURANCE, Section 23 05 11, COMMON WORK RESULTS
FOR HVAC.
B. Unless specifically exempted by these specifications, heating and cooling coils shall be tested, rated, and certified in accordance with AHRI Standard 410 and shall bear the AHRI certification label.
1.4 SUBMITTALS
A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and
SAMPLES.
B. Manufacturer's Literature and Data for Heating and Cooling Coils: Submit type, size, arrangements and performance details. Present application ratings in the form of tables, charts or curves.
C. Provide installation, operating and maintenance instructions.
D. Certification Compliance: Evidence of listing in current ARI Directory of Certified Applied Air Conditioning Products.
E. Coils may be submitted with Section 23 36 00, AIR TERMINAL UNITS, Section 23 73 00, INDOOR CENTRAL-STATION AIR-HANDLING UNITS, or Section 23 82 00, CONVECTION
HEATING AND COOLING UNITS.
F. Completed System Readiness Checklists provided by the Commissioning Agent and completed by the contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 23 08 00 COMMISSIONING OF HVAC
SYSTEMS.
1.5 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. Air Conditioning and Refrigeration Institute (AHRI):
Directory of Certified Applied Air Conditioning Products
AHRI 410-2001 Forced-Circulation Air-Cooling and Air-Heating Coils
CONSTRUCT A NEW BOILER BUILDING AND
546-22-110 23 82 16-2
C. American Society for Testing and Materials (ASTM):
B75/75M-2020 Standard Specifications for Seamless Copper
Tube
D. National Fire Protection Association (NFPA):
70-2020 National Electric Code
E. National Electric Manufacturers Association (NEMA):
250-2020 Enclosures for Electrical Equipment (1,000
Volts Maximum)
F. Underwriters Laboratories, Inc. (UL):
1996-2009(r2020) Electric Duct Heaters
PART 2 - PRODUCTS
2.1 HEATING AND COOLING COILS
A. Conform to ASTM B75 and AHRI 410.
B. High Humidity Locations: For air-handling unit mounted coils provide the following corrosion treatment:
1. Epoxy Immersion Coating – Electrically Deposited: The multi-stage corrosion-resistant coating application comprises of cleaning (heated alkaline immersion bath) and reverse-osmosis immersion rinse prior to the start of the coating process. The coating thickness shall be maintained between 0.6-mil and 1.2-mil. Before the coils are subjected to high-temperature oven cure, they are treated to permeate immersion rinse and spray. Where the coils are subject to UV exposure, UV protection spray treatment comprising of UV-resistant urethane mastic topcoat shall be applied. Provide complete coating process traceability for each coil and minimum five years of limited warranty.
2. The coating process shall such that uniform coating thickness is maintained at the fin edges. The quality control shall be maintained by ensuring compliance to the applicable ASTM Standards for the following:
a. Salt Spray Resistance (Minimum 6,000 Hours)
b. Humidity Resistance (Minimum 1,000 Hours)
c. Water Immersion (Minimum 260 Hours)
d. Cross-Hatch Adhesion (Minimum 4B-5B Rating)
e. Impact Resistance (Up to 160 Inch/Pound)
C. Tubes: Minimum 16 mm (0.625 inch) tube diameter; Seamless copper tubing.
D. Fins: 0.1397 mm (0.0055 inch) aluminum or 0.1143 mm (0.0045 inch) copper mechanically bonded or soldered or helically wound around tubing.
E. Headers: Copper, welded steel or cast iron. Provide seamless copper tubing or resistance welded steel tube for volatile refrigerant coils.
F. "U" Bends, Where Used: Machine die-formed, silver brazed to tube ends.
G. Coil Casing: 1.6 mm (l6 gage) galvanized steel with tube supports at 1200 mm (48 inch) maximum spacing. Construct casing to eliminate air bypass and moisture carry-over. Provide duct connection flanges.
H. Pressures kPa (PSIG):
Pressure Water Coil Steam Coil Refrigerant Coil
Test 2070 (300) 1725 (250) 2070 (300)
Working 1380 (200) 520 (75) 1725 (250)
CONSTRUCT A NEW BOILER BUILDING AND
546-22-110 23 82 16-3
I. Protection: Unless protected by the coil casing, provide cardboard, plywood, or plastic material at the factory to protect tube and finned surfaces during shipping and construction activities.
J. Vents and Drain: Coils that are not vented or drainable by the piping system shall have capped vent/drain connections extended through coil casing.
K. Cooling Coil Condensate Drain Pan: Section 23 73 00, INDOOR CENTRAL-STATION AIR- HANDLING UNITS or Section 23 74 13, PACKAGED, OUTDOOR, CENTRAL-STATION AIR-
HANDLING UNITS.
L. Steam Distributing Coils: Conform to ASTM B75 and ARI 410. Minimum 9.5 mm (3/8-inch) steam distributing tubing installed concentrically in 25 mm (one-inch) OD condensing coil tubes.
M. Dampers: Interlocking opposed blades to completely isolate coil from air flow when unit is in bypass position; 1.6 mm (l6 gage) steel, coated with factory applied corrosion resistant baked enamel finish. Provide damper linkage and electric operators. Damper operators shall be of same manufacturer as controls furnished under Section 23 09 23, DIRECT-DIGITAL
CONTROL SYSTEM FOR HVAC.
2.2 REHEAT COILS, DUCT MOUNTED
A. The coils shall be continuous circuit booster type for steam or hot water as shown on drawings. Use the same coil material as listed in Article 2.1.
2.3 WATER COILS, INCLUDING GLYCOL-WATER
A. Use the same coil material as listed in Paragraphs 2.1.
B. Drainable Type (Self Draining, Self Venting); Manufacturer standard:
1. Cooling, all types.
2. Heating or preheat.
3. Runaround energy recovery. ARI certification of capacity adjustment is waived. See Section 23 72 00, AIR-TO-AIR ENERGY RECOVERY EQUIPMENT.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Follow coil manufacturer's instructions for handling, cleaning, installation and piping connections.
B. Comb fins, if damaged. Eliminate air bypass or leakage at coil sections.
3.2 STARTUP AND TESTING
A. The Commissioning Agent will observe startup and contractor testing of selected equipment.
Coordinate the startup and contractor testing schedules with the COR and Commissioning Agent. Provide a minimum of 7 days prior notice.
3.3 COMMISSIONING
A. Provide commissioning documentation in accordance with the requirements of Section 23 08 00 – COMMISSIONING OF HVAC SYSTEMS and as required by Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for all inspection, start up, and contractor testing required above and required by the System Readiness Checklist provided by the Commissioning Agent.
B. Components provided under this section of the specification will be tested as part of a larger system. Refer to Section 23 08 00 – COMMISSIONING OF HVAC SYSTEMS and related sections for contractor responsibilities for system commissioning.
3.4 DEMONSTRATION AND TRAINING
A. Provide services of manufacturer’s technical representative for four hours to instruct VA personnel in operation and maintenance of units.
CONSTRUCT A NEW BOILER BUILDING AND
546-22-110 23 82 16-4
B. Submit training plans and instructor qualifications in accordance with the requirements of Section 23 08 00 – COMMISSIONING OF HVAC SYSTEMS.
END OF SECTION