Other files
| File |
Type |
Posted |
| ATTACHMENT 25 Addendum 1 Section 232113 Hydronic Pumps.pdf |
PDF |
|
| ATTACHMENT 18 Addendum 1 Section 238216 Air Coils.pdf |
PDF |
|
| ATTACHMENT 26 Addendum 1 Section 223500 Domestic Water Heat Exchangers.pdf |
PDF |
|
| ATTACHMENT 8 - Drawings 1 of 3.pdf |
PDF |
|
| ATTACHMENT 9 - Drawings 2 of 3.pdf |
PDF |
|
| ATTACHMENT 10 - Drawings 3 of 3.pdf |
PDF |
|
| ATTACHMENT 14 Yarway BlowOff Valve.pdf |
PDF |
|
| ATTACHMENT 27 - Addendum 2.pdf |
PDF |
|
| ATTACHMENT 36 C - SARGENT 10X Line Catalog.pdf |
PDF |
|
| ATTACHMENT 38 - ICRA.pdf |
PDF |
|
| SOLICITATION - 36C24825R0079 -.pdf |
PDF |
|
| ATTACHMENT 28 Addendum 2 Section 232213 Steam and Condensate Heating Piping.pdf |
PDF |
|
| ATTACHMENT 17 Addendum 1.pdf |
PDF |
|
| ATTACHMENT 23 Addendum 1 Section 232300 Refrigerant Piping.pdf |
PDF |
|
| ATTACHMENT 22 Addendum 1 Section 234000 HVAC Air Cleaning Devices.pdf |
PDF |
|
| ATTACHMENT 21 Addendum 1 Section 237300 Indoor Central Station Air Handling Units.pdf |
PDF |
|
| ATTACHMENT 6 - VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.pdf |
PDF |
|
| ATTACHMENT 7 - Site Map.pdf |
PDF |
|
| ATTACHMENT 11 - Site Specific Health and Safety Plan For Contaminated Soil Contact.pdf |
PDF |
|
| ATTACHMENT 12 - Soil Management and Dust Control Plan.pdf |
PDF |
|
| ATTACHMENT 16 - Physical Security Resiliency Design Manual - PSRDM.pdf |
PDF |
|
| ATTACHMENT 36 A - Electronic Key Project 546-23-106 Specs.pdf |
PDF |
|
| ATTACHMENT 36 D - Medeco CLIQ Brochure.pdf |
PDF |
|
| ATTACHMENT 37 - PCRA.pdf |
PDF |
|
| ATTACHMENT 30 VHA Master Specifications.pdf |
PDF |
|
| ATTACHMENT 20 Addendum 1 Section 238123 ComputerRoom AirConditioners.pdf |
PDF |
|
| ATTACHMENT 19 Addendum 1 Section 238200 Convection Heating and Cooling Units.pdf |
PDF |
|
| ATTACHMENT 24 Addendum 1 Section 232113 Hydronic Piping.pdf |
PDF |
|
| ATTACHMENT 2 - EMR.pdf |
PDF |
|
| ATTACHMENT 3 - Specialized Experience Form.pdf |
PDF |
|
| ATTACHMENT 5 - Base Offer Price Breakdown.xlsx |
XLSX spreadsheet |
|
| ATTACHMENT 13 - First Quarterly Groundwater Monitoring Report.pdf |
PDF |
|
| Attachment 32 - DERM Letter.pdf |
PDF |
|
| ATTACHMENT 34 - Miami Main Boiler Semi Annual Safety Device Testing Documentation.pdf |
PDF |
|
| ATTACHMENT 29 Addendum 2 Drawings.pdf |
PDF |
|
| ATTACHMENT 31 Section 099100 Painting.pdf |
PDF |
|
| ATTACHMENT 1 - Wage Determination.pdf |
PDF |
|
| ATTACHMENT 4 - Past Performance Forms.pdf |
PDF |
|
| ATTACHMENT 33 - Boiler Safety Device Interim Safety Measure Form.pdf |
PDF |
|
| ATTACHMENT 36 B - SARGENT 10X Line Sell Sheet.pdf |
PDF |
|
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated .