About this file

This set of construction documents details a VA project to construct a new boiler building and controls building (Building 44) at the Miami VA Medical Center. The project involves comprehensive mechanical, electrical, and plumbing upgrades, including installing three new 13,800 lbs/hr fire tube boilers with low NOx burners, a steam system with pressure reduction stations, chilled water pumps, fan coil units, air handling units, and associated control systems. The new building will be located in the old incinerator area and includes modifications to existing infrastructure, with key systems designed for redundancy and efficiency, such as duplex pump configurations and variable frequency drives for pumps and fans.

The project scope encompasses detailed mechanical, electrical, and plumbing system designs, including steam and condensate return systems, chilled water piping, heating hot water systems, and comprehensive control strategies. The design incorporates modern features like building automation system integration, energy-efficient equipment, and sophisticated control sequences for systems like boiler plant ventilation, chilled water pumps, and air handling units. The project is fully sprinklered and includes provisions for future expansion, with careful coordination between mechanical, electrical, and plumbing disciplines to ensure optimal system performance and reliability.

View the file

Other files

File Type Posted
SOLICITATION - 36C24825R0079 -.pdf PDF
ATTACHMENT 28 Addendum 2 Section 232213 Steam and Condensate Heating Piping.pdf PDF
ATTACHMENT 23 Addendum 1 Section 232300 Refrigerant Piping.pdf PDF
ATTACHMENT 22 Addendum 1 Section 234000 HVAC Air Cleaning Devices.pdf PDF
ATTACHMENT 21 Addendum 1 Section 237300 Indoor Central Station Air Handling Units.pdf PDF
ATTACHMENT 6 - VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.pdf PDF
ATTACHMENT 7 - Site Map.pdf PDF
ATTACHMENT 11 - Site Specific Health and Safety Plan For Contaminated Soil Contact.pdf PDF
ATTACHMENT 12 - Soil Management and Dust Control Plan.pdf PDF
ATTACHMENT 16 - Physical Security Resiliency Design Manual - PSRDM.pdf PDF
ATTACHMENT 36 A - Electronic Key Project 546-23-106 Specs.pdf PDF
ATTACHMENT 36 D - Medeco CLIQ Brochure.pdf PDF
ATTACHMENT 37 - PCRA.pdf PDF
ATTACHMENT 25 Addendum 1 Section 232113 Hydronic Pumps.pdf PDF
ATTACHMENT 18 Addendum 1 Section 238216 Air Coils.pdf PDF
ATTACHMENT 26 Addendum 1 Section 223500 Domestic Water Heat Exchangers.pdf PDF
ATTACHMENT 8 - Drawings 1 of 3.pdf PDF
ATTACHMENT 9 - Drawings 2 of 3.pdf PDF
ATTACHMENT 10 - Drawings 3 of 3.pdf PDF
ATTACHMENT 14 Yarway BlowOff Valve.pdf PDF
ATTACHMENT 27 - Addendum 2.pdf PDF
ATTACHMENT 35 - Common and Emergency Parts Inventory Recommendation and Tracking Sheet.pdf PDF
ATTACHMENT 36 C - SARGENT 10X Line Catalog.pdf PDF
ATTACHMENT 38 - ICRA.pdf PDF
ATTACHMENT 30 VHA Master Specifications.pdf PDF
ATTACHMENT 20 Addendum 1 Section 238123 ComputerRoom AirConditioners.pdf PDF
ATTACHMENT 19 Addendum 1 Section 238200 Convection Heating and Cooling Units.pdf PDF
ATTACHMENT 24 Addendum 1 Section 232113 Hydronic Piping.pdf PDF
ATTACHMENT 2 - EMR.pdf PDF
ATTACHMENT 3 - Specialized Experience Form.pdf PDF
ATTACHMENT 5 - Base Offer Price Breakdown.xlsx XLSX spreadsheet
ATTACHMENT 13 - First Quarterly Groundwater Monitoring Report.pdf PDF
Attachment 32 - DERM Letter.pdf PDF
ATTACHMENT 34 - Miami Main Boiler Semi Annual Safety Device Testing Documentation.pdf PDF
ATTACHMENT 29 Addendum 2 Drawings.pdf PDF
ATTACHMENT 31 Section 099100 Painting.pdf PDF
ATTACHMENT 1 - Wage Determination.pdf PDF
ATTACHMENT 4 - Past Performance Forms.pdf PDF
ATTACHMENT 33 - Boiler Safety Device Interim Safety Measure Form.pdf PDF
ATTACHMENT 36 B - SARGENT 10X Line Sell Sheet.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCT A NEW BOILER BUILDING AND CONTROLS BUILDING NO. 44

IN THE OLD INCENERATOR AREA EXPAND/MOVE

GRAPHIC CONTROL

VAMC MIAMI, FL PROJECT NO. 546-22-110

Above Group, Inc. Page 1 of 3

ADDENDUM NO. 1

to the

CONSTRUCTION DOCUMENTS

MAY 31, 2024

General The following changes, additions or deletions shall be made to the following Contract Documents. All other conditions shall remain the same.

I. SPECIFICATIONS

A. SECTION 22 34 00 – FUEL-FIRED DOMESTIC WATER HEATERS: REMOVED Section.

B. SECTION 22 35 00 – DOMESTIC WATER HEAT EXCHANGERS: ADDED Section.

C. SECTION 23 21 13 – HYDRONIC PIPING: ADDED water flow measuring devices, water-to-water heat exchangers, water treatment, and other various hydronic modifications.

D. SECTION 23 21 23 – HYDRONIC PUMPS: REVISED Section to include base-mounted, end-suction pumps and other requirements.

E. SECTION 23 23 00 – REFRIGERANT PIPING: ADDED Section.

F. SECTION 23 40 00 – HVAC AIR CLEANING DEVICES: ADDED Section.

G. SECTION 23 73 00 – INDOOR CENTRAL STATION AIR-HANDLING UNITS: ADDED Section.

H. SECTION 23 81 00 – DECENTRALIZED UNITARY HVAC EQUIPMENT: REMOVED Section.

I. SECTION 23 81 23 – COMPUTER-ROOM AIR-CONDITIONERS: ADDED Section for electrical room units.

J. SECTION 23 82 00 – CONVECTION HEATING AND COOLING UNITS: ADDED Section.

K. SECTION 23 82 16 – AIR COILS: ADDED Section.

II. DRAWINGS

PLUMBING

A. PS112 – RELOCATED sanitary to emergency eye-wash/shower.

B. PS121 – REVISED water heater requirements. REMOVED vent and flue from water heater.

C. PS122 – REVISED Trench drain locations and MOVED emergency eye-wash and shower.

D. PS132 – REVISED 2” V location.

E. PP121 – REVISED piping.

F. PP122 – REVISED Trench drain locations and MOVED emergency eye-wash and shower.

G. P-401 – REVISED water heater requirements.

H. P-502 – ADDED Steam Water Heater Detail.

I. P-601 – REVISED gravity piping.

J. P-602 – REVISED gravity piping.

K. P-801 – REVISED Domestic Water Heater (Steam) Schedule, Plumbing Fixture schedule, and Hot

Water Recirc. Pump Schedule.

MECHANICAL

A. MH112 – REVISED cooling units from DX to CHW Fan Coils.

B. MH122 – REVISED plan to show CHW piping, ductwork, and terminal unit adjustments related to use of CHW.

C. MH131 – REVISED AHU ductwork.

Above Group, Inc. Page 2 of 3

D. MH132 – REVISED AHU ductwork and AHU and FCU layout.

E. MH142 – REMOVED DX Equipment on roof.

F. MP112 – REMOVED DX Equipment and ADDED FCUs with chilled water and heating water piping.

G. MP114 – REVISED natural gas piping.

H. MP121- ADDED chilled water piping and pumps. ADDED steam and condensate to water heater.

REMOVED natural gas piping.

I. MP122 – ADDED chilled water piping in various areas, ADDED LPC piping. REVISED 44-FCU-2-

3.

J. MP124 – REMOVED natural gas piping.

K. MP132 – REVISED 44-AHU-3-1, ADDED chilled water and heating water piping, ADDED in-plant

(house) pressure reducing station, REVISED heating hot water heat exchanger, ADDED LPS piping.

L. MI501 – REMOVED control sequences.

M. MI602C – REVISED steam system P&ID to show in-plant (house) pressure reducing station and associated systems.

N. MI612 – REMOVED natural gas piping to water heater.

O. MI701 – REVISED control sequences to reflect FCU control.

P. MI702 – ADDED Water heater control for steam water heater. REVISED AHU sequence and diagrams.

Q. MI703 – ADDED Secondary Chilled Water Pump sequences, REVISED Boiler Room Ventilation sequences.

R. M-301 – REVISED sections to remove natural gas piping to water heater and to show steam and condensate piping to heating hot water system.

S. M-303 – REVISED sections to show ADDENDUM 01 elements.

T. M-304 – REVISED section to show ADDENDUM 01 elements.

U. M-504 – ADDED end suction pump detail.

V. M-601 – REMOVED natural gas service to water heater.

W. M-801 – REVISED AHU schedule to reflect change from DX to Chilled Water. REVISED mimi-split ductless heat pump schedule to reflect removal of all DX unit except electrical room unit.

X. M-802 – ADDED chilled water pumps, REVISED steam to HHW heat exchanger schedule.

Y. M-803 – ADDED steam valves to control valve schedule. REMOVED NG regulator for water heater.

ELECTRICAL

A. EP112 – DELETED IDU disconnect switches and REVISED IDUs to FCUs.

B. EP114 – DELETED IDU disconnect switches.

C. EP121 – REVISED coded note callout for junction at Column Line F-1 from 5 to 4 and coded note

2 verbiage to “NOT USED.”

D. EP121 – ADDED chilled water pump 44-CHWP-2-11A, 44-CHWP-2-11B, associated VFDs and coded note 6.

E. EP121 – DELETED extraneous equipment labels and coded notes at Column Line F - 2/3 and F –

3/4.

F. EP122 – ADDED junction boxes, circuits, and coded note 25 at Column Line G – 3/4.

G. EP122 – DELETED DOAS disconnect switches.

H. EP122 – REVISED DOAS unit to fan coil unit.

Above Group, Inc. Page 3 of 3

I. EP122 – ADDED coded note 25.

J. EP132 – REVISED designation of 44-AHU-3-1 disconnect switch.

K. EP132 - DELETED DOAS disconnect switch and REVISED DOAS units to fan coil units.

L. EP152 – DELETED ODUs and associated disconnect switches.

M. E-601 – ADDED DN-2UPB and REVISED DN-2UPC.

N. E-602 – ADDED DN-2UPB and chilled water pump circuit.

O. E-602 – ADDED chilled water pump circuit to DN-2UPC.

P. E-602 – REVISED DN-2UPC circuit breaker rating from 2225A to 225A.

Q. E-801 – REVISED panelboard circuits.

R. FA-122 – ADDED duct smoke detector and coded note 4.

END OF ADDENDUM

B7

B1

AREA BB44

F

STORAGE

11144

G H I J K

6" STO UP. ROUTE 6" STO TO

SPLASHBLOCK. REFER TO DETAIL

DUPLEX SEWAGE

EJECTOR. REFER TO

DETAIL 6/P-502

2" SAN UP

4" PD UP FROM

SEWAGE

EJECTOR PUMPS

4" PD

6" FD-R

3" V UP

4" V UP

3" V DN

2" SAN UP 4" SAN UP

4" V UP

M A

T C

H

LI

N E

R

E F

E R

T O

P

LA

N

/ P S

F O

R C

O N

T

IN

U A

T

IO

N

3" V UP

MATCHLINE - REFER TO PLAN 1/ PS114 FOR CONTINUATION

44-SP-1-2

8" SAN UP

8" & 4" SAN DN TO

SEWAGE EHECTOR

6" FCO

44-SP-1-3

6" V UP

4" SAN

4" SAN

4" SAN

4" SAN

4" SAN

2" SAN

2" SAN

4" SAN

8" SAN

4" PD 4" PD

CO

CO

CO

CO

CO

CO

CO

B.O.P. 8' - 0"

4" SAN

M-303

M-304

P-301

P-302

4" SAN UP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /2

.0

V A

M ia m i

H V

A C

S y s te m U p g ra d e a n d

E x p a n s io n B

/0

V A

M ia m i U p g ra d e H

V A

C

E x p

B

-R

D iv

,2

.r v t

/3

/2

:0

:1

P

M

PS112

PLUMBING GRAVITY - FIRST FLOOR

PLAN AREA B - NEW WORK

Construct a New Boiler Building and Controls in the Old Incinerator Area

Expand/Move Graphic Control

MIAMI, FLORIDA

546-22-110

B44

ERNESTO A. CABRERA

03/14/2024 GSC AJZ

BID SET

Geoffrey Chenoweth, P.E.

PE License #PE085290

CODED NOTES:

0 2' 4' 8' 12'

1/4" = 1'-0"

N

4" SAN UP TO FD/TD

N.T.S.

KEYPLAN - B44 - AREA B

1/4" = 1'-0"

PLUMBING GRAVITY PLAN - FIRST FLOOR AREA B - NEW WORK

Revisions Date

1 ADDENDUM 01 5/31/2024

AREA A B44

A B C C.5 D E F

MECHANICAL

20144

CORRIDOR

20444

FIRE PUMP

20344

TOILET

20244A

BOILER

20444

P-502

P-402 P-103

3" FD-C

P-701

TOILET

20744

LOCKER

ROOM

20844

HAC

20644

STORAGE

20544

EX FD

EX FD

EX FD

EX HDEX ESH

EX SH

EX L

EX WC

EX FD

EX FD

EX FD

EX FD

EX FD

EX FD

EX FD

EX FD

EX FD

EX 1 1/2" SAN DN

EX 1 1/2" V UP

EX 4" SAN UP/DN

EX 2" V DN

2" V DN

EX 2" V

EX 2" V DN

EX 4" SAN DN

EX 2" V UP

EX 2" V DN

EX 4" V UP

EX 3" V DN

EX 4" SAN DN

EX 4" SAN UP

EX 2" V

EX 3" V

EX 4" VEX 2" V

PROVIDE NEW FD GRATE

ON EX 4" FD BODY

4" FD-M

2" V DN

P-204

EX 6" ST UP

CONNECT

TO 8" ST DN

6" ST

M A

T C

H

LI

N E

R

E F

E R

T O

P

LA

N

/ P S

F O

R C

O N

T

IN

U A

T

IO

N

2" V

6" ST

343.5 GPM

ELECTRICAL

20944

LOCKER

ROOM

20244

EX 4" SAN

EX 6" ST UP/DN

EX 6" ST UP/DN. CONNECT

NEW 4" ST TO RISER

4" ST

2" V

M-303

P-301

44-SWH-2-1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /2

.0

V A

M ia m i

H V

A C

S y s te m U p g ra d e a n d

E x p a n s io n B

/0

V A

M ia m i U p g ra d e H

V A

C

E x p

B

-R

D iv

,2

.r v t

/3

/2

:0

:1

P

M

PS121

PLUMBING GRAVITY - SECOND FLOOR

PLAN AREA A - NEW WORK

Construct a New Boiler Building and Controls in the Old Incinerator Area

Expand/Move Graphic Control

MIAMI, FLORIDA

546-22-110

B44

ERNESTO A. CABRERA

03/14/2024 GSC AJZ

BID SET

Geoffrey Chenoweth, P.E.

PE License #PE085290

DRAWING NOTES:

1. SLOPE ALL VENT PIPING BACK TO SANITARY MAIN.

0 2' 4' 8' 12'

1/4" = 1'-0"

N

CODED NOTES:

1 3" SAN DN, 2" V UP. 3" SAN TO UR. 1 1/2" SAN TO LAV

REFER TO DETAIL ON DRAWING P502.

N.T.S.

KEYPLAN - B44 - AREA A

1/4" = 1'-0"

PLUMBING GRAVITY PLAN - SECOND FLOOR AREA A - NEW WORK

AREA BB44

F

CONTROL

ROOM

21344

STAIR 1-2

21044

BOILER

21144

P-707

G H I J K

P-402 P-103

P-524

4" FD-Z

4" FD-Z

4" FD-Z

4" FD-Z

6" STO UP/DN

P-531

4 3

4" V UP/DN

4" V UP/DN

4" FD-R

4" FD-B

8" FD-R

6" V DN

M A

T C

H

LI

N E

R

E F

E R

T O

P

LA

N

/ P S

F O

R C

O N

T

IN

U A

T

IO

N

6" V UP

ROUTE DRAIN FROM BACKFLOW

PREVENTERS TO FD. REFER TO

PP122 FOR INFORMATION ON

BACKFLOW PREVENTERS

4" FD-Z

4" FD-Z

4" FD-Z

4" FD-Z

4" FD-Z

3" V DN

2" V

2" V

2" V

6" ST

343.5 GPM

4" SAN UP

TO FD

4" SAN

2" V UP

4" ST UP

TO FD

4" ST

4" FD-S

6" ST UP ST TO CONNECT TO EX.

RISER ON THE EX. THIRD FLOOR.

M-303

M-304

P-301

P-302

4" FD-R

2" V UP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /2

.0

V A

M ia m i

H V

A C

S y s te m U p g ra d e a n d

E x p a n s io n B

/0

V A

M ia m i U p g ra d e H

V A

C

E x p

B

-R

D iv

,2

.r v t

/3

/2

:0

:2

P

M

PS122

PLUMBING GRAVITY - SECOND FLOOR

PLAN AREA B - NEW WORK

Construct a New Boiler Building and Controls in the Old Incinerator Area

Expand/Move Graphic Control

MIAMI, FLORIDA

546-22-110

B44

ERNESTO A. CABRERA

03/14/2024 GSC AJZ

BID SET

Geoffrey Chenoweth, P.E.

PE License #PE085290

DRAWING NOTES:

1. MECHANICAL EQUIPMENT SHOWN HALFTONE FOR REFERENCE ONLY. REFER TO MECHANICAL

PLANS.

2. THE SECOND FLOOR OF THE NEW ADDITION IS A DOUBLE HEIGHT SPACE. A MECHANICAL EQUIPMENT

MEZZANINE IS LOCATED IN THE SPACE. REFER TO ARCHITECTURAL DRAWINGS FOR MEZZANINE

LOCATION. COORDINATE ALL PIPING WITH MEZZANINE.

0 2' 4' 8' 12'

1/4" = 1'-0"

N

CODED NOTES:

1 BRINE TANK FOR WATER SOFTENER. ROUTE ALL DRAINS TO FD.

NEW CHEMICAL TREATMENT FOR BOILERS. MOUNT CHEMICALS ON A CHEMICAL SPILL CONTAINMENT PLATFORM. DESIGN BASIS OF CHEMICAL SPILL CONTAINMENT PLATFORM IS INTERSTATE PRODUCTS ULTRA-SPILL PALLET P2 - 1010 - 2 DRUM NO DRAIN. MOUNT CHEMICAL PUMPS ON A SHELF ABOVE CHEMICALS. CHEMICALS TO TREAT WATER TO BE OXYGEN SCAVENGER (AQUATROL 14640), ALKALINITY BOOSTER (AQUATROL 14555), INTERNAL TREATMENT/DEPOSITION CONTROL (AQUATROL 14120), AND

CONDENSATE/STEAMLINE CORROSION PREVENTION (AQUATROL 14780).

4" SAN DN, 2" V UP. 4" SAN TO WC

2" SAN DN, 1-1/2" V UP. 1-1/2" SAN TO FIXTURE

(2)NEW 30" WATER SOFTENERS. WATER SOFTENERS TO PRODUCE 46 GPM (95,000 GALLONS EVERY 1.4 DAYS). UNIT TO BE PROVIDED WITH A DIGITAL HEAD AND AN EXTERNAL FLOW METER. WATER SOFTENER

TO BE PIPID WITH A NORMALLY CLOSED BYPASS VALVE. ROUTE ALL DRAINS TO FD.

COORDINATE TRANCH DRAIN LOCATIONS WITH ACTUAL PAD DIMENSIONS INSTALLED AND WITH ACTUAL BOILER INSTALLED. ADJUSTMENT IN THE NORTH SOUTH EAST OR WEST DIRECTIONS IS ACCEPTABLE.

SUBMIT COORDINATED DRAWING FOR REVIEW SHOWING THIS HAS BEEN COORDINATED.

N.T.S.

KEYPLAN - B44 - AREA B

1/4" = 1'-0"1

PLUMBING GRAVITY PLAN - SECOND FLOOR AREA B - NEW WORK

AREA BB44

F

G H I J K

STAIR 1-2

21044

BOILER

21144

6" STO DN. OFFSET PIPING

AROUND STRUCTURAL FRAMING

WITH 45° ELBOWS AS REQUIRED.

3" ST

41.7 GPM

4" ST

92.4 GPM

6" ST

168.6 GPM

4" ST

122.9 GPM

3" STO

41.7 GPM

4" STO

92.4 GPM

6" STO

134.2 GPM

4" STO

122.9 GPM

1 2

4" V DN

4" V DN

6" ST

134.2 GPM

6" ST

209.3 GPM

4" V UP TO

6" VTR

4" V UP TO 6" VTR

6" ST DN. ST TO CONNECT

TO EX RISER ON THE EX

SECOND FLOOR

4" V

4" V

6" STO

168.6 GPM

6" ST

343.5 GPM

6" STO

209.3 GPM

6" STO

343.5 GPM

4" V DN

4" FD-C

4" FD-B

2" V DN

2" V DN

2" V

2" V

M-303

M-304

P-301

P-302

44-FCU-3-1

44-AHU-3-1

44-FCU-3-2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /2

.0

V A

M ia m i

H V

A C

S y s te m U p g ra d e a n d

E x p a n s io n B

/0

V A

M ia m i U p g ra d e H

V A

C

E x p

B

-R

D iv

,2

.r v t

/3

/2

:0

:2

P

M

PS132

PLUMBING GRAVITY - MEZZANINE PLAN

AREA B - NEW WORK

Construct a New Boiler Building and Controls in the Old Incinerator Area

Expand/Move Graphic Control

MIAMI, FLORIDA

546-22-110

B44

ERNESTO A. CABRERA

03/14/2024 GSC AJZ

BID SET

Geoffrey Chenoweth, P.E.

PE License #PE085290

DRAWING NOTES:

1. MECHANICAL EQUIPMENT SHOWN HALFTONE FOR REFERENCE ONLY. REFER TO MECHANICAL

PLANS.

2. THE SECOND FLOOR OF THE NEW ADDITION IS A DOUBLE HEIGHT SPACE. A MECHANICAL EQUIPMENT

MEZZANINE IS LOCATED IN THE SPACE. REFER TO ARCHITECTURAL DRAWINGS FOR MEZZANINE

LOCATION. COORDINATE ALL PIPING WITH MEZZANINE.

0 2' 4' 8' 12'

1/4" = 1'-0"

N

CODED NOTES:

1 3" ST AND 3" STO UP TO RD

4" ST AND 4" STO UP TO RD2

N.T.S.

KEYPLAN - B44 - AREA B

1/4" = 1'-0"1

PLUMBING GRAVITY PLAN - MEZZANINE PLAN AREA B - NEW WORK

AREA A B44

A B C C.5 D E F

MECHANICAL

20144

CORRIDOR

20444

FIRE PUMP

20344

TOILET

20244A

P-401

LOCATION FOR

RELOCATED CHILLED

WATER CHEMICAL

TREATMENT. ROUTE

DRAIN TO EX HD

SHOWN IN 1/P-121.

EX 3" CW DN

EX 1" CW

EX 3" CW

EX 2" CW

EX 2" CW

P-401

EX WC

EX L

EX SH

3/4" HWR

1 1/4" HW

EX ESH

HAC

20644

STORAGE

20544

LOCKER

ROOM

20844

TOILET

20744

M A

T C

H

LI

N E

R

E F

E R

T O

P

LA

N

/ P P

F O

R C

O N

T

IN

U A

T

IO

N

2" CW

1 1/4" CW

3/4" HWR

1 1/4" HW

1/2" CW

2" CW

LOCATION FOR RELOCATED

CHEMICALS FOR CHILLED

WATER SYSTEM. MOVE SPILL

CONTAINMENT PALLETS TO THIS

LOCATION.

EX 3" CWR

EX 3" CWS 3" CWS

3" CWR

2" CW

ELECTRICAL

20944

LOCKER

ROOM

20244

M-303

P-301

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /2

.0

V A

M ia m i

H V

A C

S y s te m U p g ra d e a n d

E x p a n s io n B

/0

V A

M ia m i U p g ra d e H

V A

C

E x p

B

-R

D iv

,2

.r v t

/3

/2

:0

:0

P

M

PP121

PLUMBING PRESSURE - SECOND FLOOR

PLAN AREA A - NEW WORK

Construct a New Boiler Building and Controls in the Old Incinerator Area

Expand/Move Graphic Control

MIAMI, FLORIDA

546-22-110

B44

ERNESTO A. CABRERA

03/14/2024 GSC AJZ

BID SET

Geoffrey Chenoweth, P.E.

PE License #PE085290

DRAWING NOTES:

1. REFER TO MECHANICAL SHEET MP121 & MP122 FOR ALL NATURAL GAS PIPING.

2. PROVIDE ALL PLUMBING FIXTURES RECEIVING HOT WATER WITH A MIXING VALVE. REFER TO P-801

FOR THERMOSTATIC MIXING VALVE TEMPERATURE SETTINGS.

0 2' 4' 8' 12'

1/4" = 1'-0"

N

CODED NOTES:

1 RELOCATED EX CHILLED WATER AND EQUIPMENT. CONNECT BACK TO EX PIPING AS SHOWN.

RELOCATED EX CHEMICALS AND CONTAINMENT SPILL PAD. INSTALL PUMPS ON A SHELF ABOVE

CHEMICALS.

RELOCATED EX WALL MOUNTED CONTROLS.

N.T.S.

KEYPLAN - B44 - AREA A

1/4" = 1'-0"1

PLUMBING PRESSURE PLAN - SECOND FLOOR AREA A - NEW WORK

Revisions Date

AREA BB44

CONTROL

ROOM

21344

STAIR 1-2

21044

BOILER

21144

G H I J K

P-707

3/4" HW

P-804

P-804

P-531

44-TP-2-1

44-TP-2-2

M A

T C

H

LI

N E

R

E F

E R

T O

P

LA

N

/ P P

F O

R C

O N

T

IN

U A

T

IO

N

3/4" HWR

P-401

2" CW

2" CW

1 1/4" HW

2" CW3/4" CW

3/4" HWR

CW & HW PIPING DN. OFFSET

PIPING AROUND MEZZANINE.

REFER TO ARCHITECTURAL

DRAWINGS FOR MORE

INFORMATION ON MEZZANINE.

HWR PIPING DN. OFFSET

PIPING AROUND MEZZANINE.

REFER TO ARCHITECTURAL

DRAWINGS FOR MORE

INFORMATION ON MEZZANINE.

44-TP-2-3

44-TP-2-49

BALANCING VALVE

SET TO 1 GPM.

M-303

M-304

P-301

P-302

TMV-2

3/4" HW

FD-Z

FD-Z

FD-Z

FD-Z

FD-Z

FD-Z

FD-Z

FD-Z

FD-Z

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /2

.0

V A

M ia m i

H V

A C

S y s te m U p g ra d e a n d

E x p a n s io n B

/0

V A

M ia m i U p g ra d e H

V A

C

E x p

B

-R

D iv

,2

.r v t

/3

/2

:0

:1

P

M

PP122

PLUMBING PRESSURE - SECOND FLOOR

PLAN AREA B - NEW WORK

Construct a New Boiler Building and Controls in the Old Incinerator Area

Expand/Move Graphic Control

MIAMI, FLORIDA

546-22-110

B44

ERNESTO A. CABRERA

03/14/2024 GSC AJZ

BID SET

Geoffrey Chenoweth, P.E.

PE License #PE085290

DRAWING NOTES:

1. REFER TO MECHANICAL DETAIL DRAWINGS FOR ALL CW AND MAKEUP WATER CONNECTION POINTS

FOR ALL MECHANICAL EQUIPMENT.

2. REFER TO MECHANICAL SHEET MP121 & MP122 FOR ALL NATURAL GAS PIPING.

3. PROVIDE ALL PLUMBING FIXTURES RECEIVING HOT WATER WITH A MIXING VALVE. REFER TO P-801

FOR THERMOSTATIC MIXING VALVE TEMPERATURE SETTINGS.

4. THE SECOND FLOOR OF THE NEW ADDITION IS A DOUBLE HEIGHT SPACE. A MECHANICAL EQUIPMENT

MEZZANINE IS LOCATED IN THE SPACE. REFER TO ARCHITECTURAL DRAWINGS FOR MEZZANINE

LOCATION. COORDINATE ALL PIPING WITH MEZZANINE.

0 2' 4' 8' 12'

1/4" = 1'-0"

N

CODED NOTES:

1 (2)2" REDUCED PRESSURE BACKFLOW PREVENTER FOR BOILER MAKE-UP WATER MOUNTED IN

PARALLEL. DESIGN BASIS WATTS 919-QT-S. PROVIDE A WATER METER WITH A BYPASS LINE AFTER

BACKFLOW PREVENTERS.

3/4" CW & HW DN TO FIXTURE

1-1/4" CW & HW DN TO TMV. MOUNT TMV TO COLUMN. ROUTE 1-1/2" TEPID WATER TO EMERGENCY SHOWER/EYE WASH. PROVIDE BALL VALVES AT MAIN. LABEL VALVES AND LOCK IN THE OPEN POSITION.

2" MAKE-UP WATER FOR BOILERS. PROVIDE A BALL VALVE AND A UNION ON PIPING. MECHANICAL CONTRACTOR TO INSTALL PIPING AFTER UNION TO BOILERS. REFER TO MECHANICAL PIPING PLANS FOR

CONTINUATION.

(2)NEW 30" WATER SOFTENERS. WATER SOFTENERS TO PRODUCE 46 GPM. UNIT TO BE PROVIDED WITH A DIGITAL HEAD AND AN EXTERNAL FLOW METER. WATER SOFTENER TO BE PIPED WITH A NORMALLY

CLOSED BYPASS VALVE.

BRINE TANK FOR WATER SOFTENER

NEW CHEMICAL TREATMENT FOR BOILERS. MOUNT CHEMICALS ON A CHEMICAL SPILL CONTAINMENT PLATFORM. DESIGN BASIS OF CHEMICAL SPILL CONTAINMENT PLATFORM IS INTERSTATE PRODUCTS ULTRA-SPILL PALLET P2 - 1010 - 2 DRUM NO DRAIN. MOUNT CHEMICAL PUMPS ON A SHELF ABOVE CHEMICALS. CHEMICALS TO TREAT WATER TO BE OXYGEN SCAVENGER (AQUATROL 14640), ALKALINITY BOOSTER (AQUATROL 14555), INTERNAL TREATMENT/DEPOSITION CONTROL (AQUATROL 14120), AND

CONDENSATE/STEAMLINE CORROSION PREVENTION (AQUATROL 14780).

3/4" CW DN TO PLUMBING FIXTURE.

1/2" CW DN TO TRAP PRIMER. 1/2" CW FROM TRAP PRIMER TO FLOOR DRAIN. CONNECT 1/2" CW TO VETICAL PIPE FROM DRAIN OUTLET ABOVE P-TRAP. PROVIDE A 24 V TRANSFORMER. WIRE TRAP PRIMER

TO 24 TRANSFORMER, AND THEN TO JUNCTION BOX. JUNCTION BOX PROVIDED BY ELECTRICAL

CONTRACTOR. COORDINATE JUNCTION BOX LOCATION WITH ELECTRICAL CONTRACTOR. REFER TO

DETAIL 8/P-502.

3/4" CW DN TO TRAP PRIMER. 1/2" CW FROM TRAP PRIMER TO FLOOR DRAINS. CONNECT 1/2" CW TO TRAP PRIMER CONNECTION OR VETICAL PIPE FROM DRAIN OUTLET ABOVE P-TRAP. REFER TO DETAIL 11/P-501.

COORDINATE PIPING TO AVOID STRUCTURAL ELEMENTS AND TO NOT ROUTE IN FRONT OF WINDOWS.

N.T.S.

KEYPLAN - B44 - AREA B

1/4" = 1'-0"

PLUMBING PRESSURE PLAN - SECOND FLOOR AREA B- NEW WORK

E

P-502

44-CP-2-1

TMV-3

44-ET-2-1

1 1/4" CW. REFER

TO PP121 FOR

CONTINUATION

1 1/4" CW

3/4" HWR & 1 1/4" HW.

REFER TO PP121

FOR CONTINUATION

3/4" HWR

1 1/4" HW

EX 2" CW. REFER

TO PP121 FOR

CONTINUATION

1 1/4" HW

EX 2" CW

EX 1" CW

EX 1" CW. REFER

TO PP121 FOR

CONTINUATION

44-SWH-2-1

F

P-402

P-103

P-701

P-204

1 1/4" HW

2" CW

1 1/2" CW

3/4" HW

3/4" HW

1 1/2" CW

3/4" HW & 2" CW.

REFER TO PP121

FOR CONTINUATION

3/4" HW & 2" CW.

REFER TO PP122

FOR CONTINUATION

1 1/4" HW

2" CW

H

P-402

P-103

P-524

1 1/4" HW

2" CW

3/4" HW & 2" CW.

REFER TO PP122

FOR CONTINUATION.

3/4" HW & 2" CW.

REFER TO PP122

FOR CONTINUATION.

3/4" HW

3/4" HW

1 1/4" CW

2" CW

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /2

.0

V A

M ia m i

H V

A C

S y s te m U p g ra d e a n d

E x p a n s io n B

/0

V A

M ia m i U p g ra d e H

V A

C

E x p

B

-R

D iv

,2

.r v t

/3

/2

:0

:5

P

M

P-401

PLUMBING ENLARGED PLANS Construct a New Boiler Building and Controls in the Old Incinerator Area

Expand/Move Graphic Control

MIAMI, FLORIDA

546-22-110

B44

ERNESTO A. CABRERA

03/14/2024 GSC AJZ

BID SET

Geoffrey Chenoweth, P.E.

PE License #PE085290

1/2" = 1'-0"

ENLARGED PLUMBING PRESSURE 20644 HAC CLOSET

1/2" = 1'-0"

ENLARGED PLUMBING PRESSURE 20744 BATHROOM

DRAWING NOTES:

1. REFER TO MECHANICAL SHEET MP121 & MP122 FOR ALL NATURAL GAS PIPING.

2. PROVIDE ALL PLUMBING FIXTURES RECEIVING HOT WATER WITH A MIXING VALVE. REFER TO P-801

FOR THERMOSTATIC MIXING VALVE TEMPERATURE SETTINGS.

CODED NOTES:

1 1-1/4" CW, 1-1/4" HW, 3/4" HWR, & 3/4" G TO GWH. ROUTE 1-1/4" HW TO TMV MOUNTED ON WALL. PROVIDE A HW BYPASS AROUND THE TMV FOR THERMAL ERADICATION PURPOSES. ROUTE 1-1/4" HW FROM TMV

TO FIXTURES. REFER TO MP122 FOR NATURAL GAS ROUTING. REFER TO DETAIL 5/P-502.

3/4" CW & HW DN TO FIXTURE

NC VALVE

1-1/4" CW DN TO WATER CLOSET

3/4" HW LOOP. 1/2" CW DN. 1/2" CW & HW TO LAV.

1" CW DN TO UR

0 1' 2' 4' 6'

1/2" = 1'-0"

1/2" = 1'-0"

ENLARGED PLUMBING PRESSURE CONTROL ROOM BATHROOM

N

Revisions Date

1 ADDENDUM 01 5/31/2024

SHUT OFF

VALVE AND

CAP LINE

FINISHED FLOOR

FOR FIXTURE HEIGHT

SEE ARCHITECTURAL

DRAWINGS

1" [25mm] STOP

[56mm]

2 1/4"

[69mm]

2 3/4"

[119mm]

4 3/4"

/2

[6 3m m

1/

2"

C/L OF FIXTURE

FINISHED WALL

MANUAL FLUSH HANDLE

MANUAL FLUSH HANDLE

[200mm]

8"

[8 m m

F

O R

F

IX

T U

R E

H E

IG

H

T S

S

A R

C H

IT

E

C T

U R

A L

D R

A W

IN

G

S

FAUCET SEE SPECIFICATIONS

NOTE:

PROVIDE COVER FOR EXPOSED PIPING

OFFSET WASTE

LAMINAR FLOW

CONTROL DEVICE

LOOSE KEY STOP

ESCUTCHEON

FINISHED FLOOR

TRAP PARALLEL TO WALL

[2 m m

/4

GRAB BAR

24" [600mm]

SLIDE BAR

DRAIN

SOAP

DEPRESSION

SLOPE ENTIRE SHOWER FLOOR

(ASSUMES TOPPING SLAB) NOTE:

LINEAR TRENCH DRAIN AT

SHOWER ENTRANCE IS AN

ACCEPTABLE OPTION.

[1

0m m

6' -0

T O

C E

N T

E R

LI

N

E S

U P

P

LY

E

LL

5' -4

[1

0m m

[1

0m m

3' -4

[1

0m m

5' -6

[2

0m m

6' -8

[1

0m m

3' -6

[8 m m

2' -9

[150mm]

6"

[225mm]

9"

[8 m m

2' -9

INTEGRAL

VACUUM

BREAKER

SHOWER HEAD

CURTAIN ROD

SHOWER CONTROL

TYPE T/P

[225mm]

9"

[150mm]

6"

NOTE:

1. AT LAVS WITH FOOT PEDAL CONTROLS PROVIDE AN ADDITIONAL

16 GAGE GALVANIZED STEEL PLATE 12"x16" [300x600mm] SECURED

TO A MINIMUM OF 2 STUDS PER FOOT PEDAL.

2. PROVIDE 20 GAGE STUDS WHEN HEIGHT EXCEEDS 12'-0" [3600mm]

[9 m m

T

O F

LO

O

R

3' -3

PLAN

1/4" [6mm]∅ MOLLY BOLT HOLLOW

WALL ANCHOR (1 EA. SIDE OF LAV)

FOR FIXTURE HEIGHT SEE

ARCHITECTURA DRAWINGS

V A

R

IE

S

MINIMUM 16 GAGE GALVANIZED

STEEL PLATE 12"x48" [300x1200mm]

MIN. SECURED TO A MIN. 4 STUDS

PER LAVATORY

MIN. 5 1/4" [131mm]∅

GALV. MACHINE BOLTS

WELDED TO PLATE

MIN. (3) 1/4" [6mm]

MACHINE BOLTS

W/DOUBLE LOCK

NUTS ON BACK SIDE

A

STEEL HANGER

BY LAV MFGR

SECTION A

STEEL WALL

PLATE

WALL ANCHOR

STUDS

TYP. 1/8"

TYP. [3mm]

1/4"

[6mm]

WALL

SUPPLY 1 1/4" NPT FROM

THERMOSTATIC MIXING

VALVE

PROVIDE WITH MULTIPLE SETS OF

CONTRACTS FOR REMOTE

ACTIVATION ALARM SITES; 120 VAC, 60 HZ

POLISHED CHROME

DRENCH SHOWER HEAD

PULL ROD

FLOOR

FLANGE

PIPE EYEWASH

DRAIN TO FLOOR

NOTES:

1. ALL INFORMATION IS APPROXIMATE AND SHALL BE VERIFIED BY THE CONTRACTOR.

2. PROVIDE WALL MOUNTED DUPLEX PUMP CONTROL PANEL. FURNISH TO DIVISION 26 FOR INSTALLATION. REFER

TO FLOOR PLANS FOR LOCATION.

30" 6" WALLS 60"

D E

P T

H

FLOOR LEVEL

PUMP DISCHARGE 42

M A

X

IM

U M

4" PUMP DISCHARGE

8" SAN COORDINATE FINAL

LOCATION WITH EXISTING

BUILDING OUTLET

3" VENT. CONTINUE VENT TO

VENT STACK. REFER TO

FLOOR PLAN FOR LOCATION

HIGH WATER ALARM

SIGNAL TO BAS/EMS

HIGH WATER ALARM

SIGNAL TO BAS/EMS

3" VENT. CONTINUE VENT TO

VENT STACK. REFER TO

FLOOR PLAN FOR LOCATION

4" PUMP DISCHARGE

CO

CO

HIGH WATER ALARM

BALL VALVE

CHECK VALVE

FLOOR LEVEL

MOTOR

M A

X

IM

U M

TOP OF BASIN,

ELEV 0.00'

2"

FLOAT

PUMP

4" MINIMUM

BOTTOM BASIN, ELEV. -4.00'

4' -0

FLOOR DRAIN

P-TRAP

BALL VALVE

1/2" COLD WATER

FINISH FLOOR

1/2" TYPE "K" SOFT SEAMLESS COPPER

WITH NO JOINTS BELOW FLOOR SLAB.

SLOPE AT 1/8" PER FOOT MINIMUM TO

FLOOR DRAIN CONNECTION.

24 V ELECTRICAL

CONNECTION

24 V TRANSFORMER.

PROVIDED BY PLUMBING

CONTRACTOR

JUNCTION BOX.

PROVIDED BY

ELECTRICAL

CONTRACTOR

1/2" NPT CONNECTION

TIMER

1" AIR GAP

1/2" FEMALE NPT CONNECTION

SOLENOID VALVE

ELECTRONIC TRAP PRIMER

(DESIGN BASIS PRECISION

PLUMBING PRODUCTS

SMP-500-24V) SUITABLE FOR 1

TO 4 FLOOR DRAINS (WITH

OPTIONAL PRECISION

PLUMBING PRODUCTS DU-4)

SHUTOFF VALVE

UNION

SUMP PUMP

FINISHED

FLOOR

OIL MINDER

CONTROL

OIL SENSOR

SILENT CHECK

VALVE

ELEVATOR PIT

SECURE PIPING

TIGHT TO PIT WALL

DISCHARGE PIPE

CONTINUED ON PLAN

HIGH WATER

ALARM

REFER TO PLANS FOR LOCATION

OF CONTROL PANEL AND ALARM

2" PUMP DISCHARGE

COORDINATE EXACT LOCATION

OF DISCHARGE PIPING WITH

ELEVATOR INSTALLER

ELEVATOR

PIT FLOOR

BASIN AND PERFORATED

STEEL BASIN COVER

SEE FLOOR PLAN FOR PIPE SIZES

EXPANSION TANK

BALANCING VALVE VACUUM RELIEF VALVE

RECIRCULATION PUMP

FLOOR DRAIN WITH

FUNNEL

CD

STEAM

BALL VALVE

CONDENSATE TRAP W/VACUUM

BREAKER

STEAM SUPPLY LINE

CONDENSATE TRAP

Y STRAINER

STEAM VALVE

HEATER

WATER

DRAIN PAN

FULL SIZE OF RELIEF VALVE

DRAIN VALVE

T & P RELIEF VALVE

4" RAISE HOUSEKEEPING PAD

FULL SIZE BYPASS LINE

T

THERMOMETER

T

TEMPERATURE MIXING VALVE

CW

C W

HWR

H W

R HWHW 140°F

BALL VALVE (TYP)

CHECK VALVE (TYP)

CD

BY DIVISION 22

BY DIVISION 23

KEY NOTE:

1. COORDINATE INSTALLATION OF STEAM AND CONDENSATE PIPING,

VALVES, AND APPURTENANCES WITH MECHANICAL CONTRACTOR.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /2

.0

V A

M ia m i

H V

A C

S y s te m U p g ra d e a n d

E x p a n s io n B

/0

V A

M ia m i U p g ra d e H

V A

C

E x p

B

-R

D iv

,2

.r v t

/3

/2

:0

:5

P

M

P-502

PLUMBING DETAILS Construct a New Boiler Building and Controls in the Old Incinerator Area

Expand/Move Graphic Control

MIAMI, FLORIDA

546-22-110

ERNESTO A. CABRERA

03/14/2024 GSC AJZ

BID SET

Geoffrey Chenoweth, P.E.

PE License #PE085290

N.T.S.

WATER CLOSET DETAIL - MANUAL

N.T.S.

TYPICAL WHEELCHAIR LAVATORY DETAIL

N.T.S.

SHOWER DETAIL

1N.T.S.

LAVATORY MOUNTING DETAIL

N.T.S.

EMERGENCY SHOWER/EYEWASH

N.T.S.

DUPLEX SEWAGE EJECTOR DETAIL

N.T.S.

ELECTRONIC TRAP PRIMER - SINGLE DRAIN

N.T.S.

ELEVATOR SUMP PUMP DETAIL - BASIN IN SHAFT

Revisions Date

1 ADDENDUM 01 5/31/2024

N.T.S.

STEAM WATER HEATER

44-SP-1-1

2" V. REFER TO P-602

FOR CONTINUATION

2" V

2" V

2" V

2" V

3" SAN

4" SAN

3" SAN

1 1/2" SAN

2" V

4" SAN

3" SAN

4" FD-M

PROVIDE NEW FD

GRATE ON EX FD BODY

4" SAN

EX HD

EX FD

EX FD

EX FD

EX FD

EX 4" SAN

EX 4" SAN

EX 4" SAN

EX 4" SAN

EX 4" SAN

EX 4" SAN

EX 3" V

EX 2" V

EX 3" V

EX 2" V

EX 4" V

EX 2" V

EX 2" V

EX 3" V

EX 1 1/2" V

EX 2" SAN

EX 2" V

EX 4" V

EX 4" V

EX 4" V

P-701

2" FD-C

P-103

P-402 P-204

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /2

.0

V A

M ia m i

H V

A C

S y s te m U p g ra d e a n d

E x p a n s io n B

/0

V A

M ia m i U p g ra d e H

V A

C

E x p

B

-R

D iv

,2

.r v t

/3

/2

:0

:0

P

M

P-601

PLUMBING GRAVITY ISOMETRIC Construct a New Boiler Building and Controls in the Old Incinerator Area

Expand/Move Graphic Control

MIAMI, FLORIDA

546-22-110

ERNESTO A. CABRERA

03/14/2024 GSC AJZ

BID SET

Geoffrey Chenoweth, P.E.

PE License #PE085290

DRAWING NOTES:

1. ISOMETRICS PROVIDED FOR REFERENCE ONLY. REFER TO FLOOR PLANS FOR MORE INFORMATION.

N.T.S.

GRAVITY ISOMETRIC - AREA A

CODED NOTES:

1 EX PIPING TO OTHER AREAS. REFER TO FLOOR PLAN FOR CONTINUATION.

ROUTE EX ICE MACHINE DRAIN TO SINK AND TIE INTO PUMP SYSTEM. PROVIDE A CO IN AN ACCESSIABLE LOCATION ON SIDE OF ICE MACHINE ON PIPE THAT RUNS TO SINK DRAIN.CONNECT ICE MACHINE DRAIN

ABOVE P TRAP. ROUTE PIPING TIGHT TO BACK OF CABINETS.

ROUTE EX CHEMICAL FEED DRAIN TO SINK AND TIE INTO PUMP SYSTEM.

PROVIDE NEW PUMP UNDER SINK AND CONNECT TO EX PUMP PIPING. RECONNECT EX PD PIPING BACK

INTO THE EX SANITARY SYSTEM. RECONNECT EX V BACK INTO THE EX VENT SYSTEM.

Revisions Date

44-SP-1-3

44-SP-1-2

BACKWATER VALVE

6" FD-R

4" FCO

6" SAN

6" SAN

4" PD

4" PD

4" PD

8" SAN

CO

CO

EX 4" SAN

EX 8" SAN

4" SAN

3" V

3" V

3" V

6" V

6" V

2" V

2" V

6" VTR

2" V. REFER TO

P-601 FOR

CONTINUATION

4" SAN

4" SAN

4" SAN

2" SAN

2" SAN

4" SAN

2" V

1 1/2" V

2" V

4" V

4" V

4" FD-B

4" FD-R

8" FD-R

4" FD-Z

4" FD-Z

4" FD-Z

4" FD-Z

4" FD-Z

4" FD-Z

4" FD-Z

4" FD-Z

4" FD-Z

BRINE TANK, WATER

SOFTENER, AND

CHEMICAL TREATMENT

6" VTR

4" FD-S

4" V

4" SAN

2" V. REFER TO

P-603 FOR

CONNECTION POINT

4" FD-C

4" SAN

2" V

CO

CO

CO

CO

CO

CO

CO

CO

CO

CO

2" V

2" V

4" FD-R

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /2

.0

V A

M ia m i

H V

A C

S y s te m U p g ra d e a n d

E x p a n s io n B

/0

V A

M ia m i U p g ra d e H

V A

C

E x p

B

-R

D iv

,2

.r v t

/3

/2

:0

:0

P

M

P-602

PLUMBING GRAVITY ISOMETRIC Construct a New Boiler Building and Controls in the Old Incinerator Area

Expand/Move Graphic Control

MIAMI, FLORIDA

546-22-110

ERNESTO A. CABRERA

03/14/2024 GSC AJZ

BID SET

Geoffrey Chenoweth, P.E.

PE License #PE085290

DRAWING NOTES:

1. ISOMETRICS PROVIDED FOR REFERENCE ONLY. REFER TO FLOOR PLANS FOR MORE INFORMATION.

N.T.S.

GRAVITY ISOMETRIC - AREA B

CODED NOTES:

1 EX PIPING TO OTHER AREAS. REFER TO FLOOR PLAN FOR CONTINUATION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /2

.0

V A

M ia m i

H V

A C

S y s te m U p g ra d e a n d

E x p a n s io n B

/0

V A

M ia m i U p g ra d e H

V A

C

E x p

B

-R

D iv

,2

.r v t

/3

/2

:0

:0

P

M

P-801

PLUMBING SCHEDULES Construct a New Boiler Building and Controls in the Old Incinerator Area

Expand/Move Graphic Control

MIAMI, FLORIDA

546-22-110

ERNESTO A. CABRERA

03/14/2024 GSC AJZ

BID SET

Geoffrey Chenoweth, P.E.

PE License #PE085290

PLUMBING FIXTURE SCHEDULE

MARK FIXTURE

BASIS OF DESIGN

MIXING VALVE NO.

CONNECTION SIZES FIXTURE UNITS FLUSH VALVE/FAUCET TYPE

FIXTURE

FAUCET/FLUSH

VALVE

WASTE PIPE

(INCHES)

VENT PIPE

(INCHES)

COLD WATER

(INCHES)

HOT WATER

(INCHES)

WASTE FIXTURE

UNITS

WATER FIXTURE

UNITS

COLD WATER

FIXTURE UNITS

HOT WATER

FIXTURE UNITS MANUAL HANDLE

HARD WIRED

SENSOR BATTERY SENSOR

FD-Z TRENCH DRAIN ZURN: Z886 DGC - N/A 4" 2" - - 4 - - - N/A - -

P-103 WATER CLOSET ZURN: Z5615-BWL SLOAN: ROYAL

111-1.28

N/A 4" 2" 1-1/4" - 4 10 10 - YES - -

P-204 URINAL ZURN: Z5755-U SLOAN: ROYAL

186-0.125

N/A 3" 2" 1" - 2 3 3 - YES - -

P-402 LAV ZURN: Z5318 ZURN:

Z831B4-XL-28F

TMV-1 1-1/2" 1-1/2" 1/2" 1/2" 1 2 1.5 1.5 YES - -

P-502 MOP SINK FIAT PRODUCTS:

TSB3000

FIAT PRODUCTS:

830-AA

TMV-4 3" 2" 3/4" 3/4" 2 4 3 3 YES - -

P-524 KITCHEN SINK ELKAY: CR3322 DELTA: 9113-DST TMV-4 1-1/2" 1-1/2" 3/4" 3/4" 3 2 1.5 1.5 YES - -

P-531 SINK ELKAY: SS8124R2 ELKAY:

LK940BP03T4S

TMV-4 2" 2" 3/4" 3/4" 3 4 3 3 YES - -

P-701 SHOWER - SYMMONS:

9603-PLR-1.5

N/A 2" 2" 3/4" 3/4" 2 4 3 3 YES - -

P-707 EMERGENCY SHOWER EYE & FACE WASH BRADLEY:

S19314AA1DBDB00

- TMV-2 - - 1-1/2" TEPID - - - - YES - -

P-804 HOSE BIBB ZURN: Z1341 - N/A - - 3/4" - - - - - YES - -

PUMP SCHEDULE

MARK MANUFACTURER MODEL NO. TYPE CAPACITY(GPM) HEAD(FEET) MOTOR HP MOTOR VOLTS/PHASE/HERTZ MOTOR RPM NOTES

44-SP-1-1 LIBERTY PUMPS 404 SIMPLEX SUMP MATCH

EXISTING

MATCH

EXISTING

1/3 115/1/60 3450 1

44-SP-1-2 AURORA 521A SIMPLEX SUMP 27 15 3/4 480/3/60 1725 2

44-SP-1-3 AURORA 521A SIMPLEX SUMP 27 15 3/4 480/3/60 1725 2

44-SP-1-4 STANCOR SV-100 SIMPLEX SUMP 50 19 1 115/1/60 3450 3

THERMOSTATIC MIXING VALVE SCHEDULE

MARK

BASIS OF DESIGN

OUTLET/TEMPERATURE INLET/OUTLET SIZE MIN. FLOW RATE LOCATIONMANUFACTURER MODEL NO.

TMV-1 BRADLEY S59-4007 110°F 1/2" / 1/2" 0.2 LAVS

TMV-2 BRADLEY S19-2250 85°F 1" / 1-1/4" 3.0 P-707

TMV-3 BRADLEY S59-3080 130°F 1" / 1-1/4" 2.0 MASTER @GWH

TMV-4 BRADLEY S59-4016 110°F 3/4" / 3/4" 0.5 PLUMBING FIXTURES

NOTES:

1. THERMOSTATIC MIXING VALVE SHALL BE PIPED PER MANUFACTURER RECOMMENDATIONS.

2. PROVIDE INLET PIPING WITH CHECK VALVES (IF NOT PROVIDED AS PART OF THE VALVE) AND SHUTOFF VALVES. PROVIDE OUTLET

PIPING WITH SHUT-OFF VALVES.

3. REFER TO PLUMBING FIXTURE SCHEDULE FOR EXACT MIXING VALVE FOR EACH PLUMBING FIXTURE.

4. PROVIDE TMV-3 WITH A BYPASS LINE TO ALLOW FOR THERMAL ERADICATION OF ALL HW PIPING.

NOTES:

1. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

2. REFER TO THERMOSTATIC MIXING VALVE SCHEDULE FOR MIXING VALVE DESIGN.

3. THERMOSTATIC MIXING VALVE FOR P-701 IS PROVIDED AS PART OF SHOWER. REFER TO SPECIFICATIONS FOR T/P VALVE SPECIFICATIONS.

DOMESTIC WATER HEATER (STEAM) SCHEDULE

MARK MANUFACTURER MODEL NO. STEAM INLET STEAM LB / HR

RECOVERY (GPH)

@70°F STORAGE (GALLONS) STORAGE TEMP (°F) SIZE (D"xH") VOLTS/PHASE/HERTZ MOCP OPERATING WEIGHT (LBS)

44-SWH-2-1 PVI QUICKDRAW 10 L 5A-ISD 1" 365 525 103 140 30" X 95" 120/1/60 20 AMPS 700

HOT WATER RECIRC. PUMP SCHEDULE

MARK MANUFACTURER MODEL NO. TYPE CAPACITY (GPM) HEAD (FEET) MOTOR (HP) MOTOR (VOLTS/PHASE/HERTZ)

44-CP-2-1 TACO 006-ST4 INLINE 1.5 3.31 1/40 115/1/60

EXPANSION TANK SCHEDULE

MARK

BASIS OF DESIGN

MANUFACTURER

BASIS OF DESIGN

MODEL NUMBER

TANK VOLUME

(GAL)

ACCEPTANCE

VOLUME (GAL) SIZE (D" x H") CONNECTION SIZE WEIGHT (LBS)

44-ET-2-1 TACO PAX25-150 6.6 4 12" x 20-5/8" 3/4" 86

NOTES:

1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.

NOTES:

1. PROVIDE SINGLE POINT ELECTRICAL CONNECTION.

2. RECIRC PUMP SHALL BE PIPED PER MANUFACTURER'S RECOMMENDATIONS.

3. BALANCING VALVES SHALL BE PROVIDED FOR ALL CIRCULATING SYSTEMS, VALVES SHALL BE SET TO FLOW RATES SHOWN UNLESS NOTED OTHERWISE.

4. PROVIDE AQUASTAT AQS-1/2 FOR EACH PUMP LOCATION.

5. ELECTRICAL CONTRACTOR TO PROVIDE HAND/OFF/AUTO CONTROLLER. BAS CONNECTIONS TO BE COMPLETED BY DIVISION 23. REFER TO MECHANICAL

CONTROLS DRAWINGS FOR REQUIREMENTS AND COORDINATION.

NOTES:

1. PROVIDE SINGLE POINT ELECTRICAL CONNECTION.

2. DISCONNECT SWITCH PROVIDED BY ELECTRICAL. REFER TO ELECTRICAL DRAWINGS.

3. WATER HEATER AND ALL ASSOCIATED COMPONENTS SHALL BE PIPED PER MANUFACTURER RECOMMENDATIONS.

4. COORDINATE INTAKE AND EXHAUST PIPE SIZES WITH MANUFACTURER'S INSTRUCTIONS BASED ON NUMBER OF ELBOWS.

5. ROUTE T&P VALVE AND INDIRECT DISCHARGE TO FLOOR DRAIN.

6. OUTLET TEMPERATURE SHALL BE SET TO 140°F ON WATER HEATER.

7. WATER HEATER SHALL BE PLACED ON A 4" RAISED CONCRETE PAD.

8. ROUTE EXHAUST CONDENSATE DRAIN THROUGH A CONDENSATE NEUTRALIZATION KIT AND DISCHARCE TO A FLOOR DRAIN.

9. PROVIDE INTAKE AND EXHAUST WITH CONCENTRIC VENT KIT. FOLLOW ALL MANUFACTURER'S RECOMENDATIONS TO INSTALL THE CONCENTRIC VENT THROUGH THE ROOF.

10. WATER HEATER TO BE CAPABLE OF HEATING HOT WATER TO 180°F TO ALLOW FOR THERMAL ERADICATION PURPOSES PER VA DESIGN MANUAL.

ELECTRONIC TRAP PRIMER SCHEDULE

MARK BASIS OF DESIGN MANUFACTURER

BASIS OF DESIGN

MODEL NUMBER CW INLET CW OUTLET SIZE

MAX NUMBER OF

DRAINS SERVED

DIMENSIONS

(L" x W" x H")

ELECTRICAL

(V/P/HZ)

ELECTRICAL

WATTS NOTES

44-TP-1-1 PRECISION PLUMBING PRODUCTS SMP-500-24V 1/2" 1/2" 1 9" LENGTH 24V - 1, 2, 3

44-TP-2-1 PRECISION PLUMBING PRODUCTS PTS-4 3/4" 1/2" 4 16" x 14" x 3-3/8" 120/1/60 6 1, 2

44-TP-2-2 PRECISION PLUMBING PRODUCTS PTS-6 3/4" 1/2" 6 16" x 14" x 3-3/8" 120/1/60 6 1, 2

44-TP-2-3 PRECISION PLUMBING PRODUCTS PTS-6 3/4" 1/2" 6 16" x 14" x 3-3/8" 120/1/60 6 1, 2

44-TP-2-4 PRECISION PLUMBING PRODUCTS SMP-500-24V 1/2" 1/2" 1 9" LENGTH 24V - 1, 2, 3

NOTES:

1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.

2. PROVIDE SINGLE POINT ELECTRICAL CONNECTION.

3. CONTRACTOR TO PROVIDE A 24V TRANSFORMER TO CONNECT TRAP PRIMER TO JUNCTION BOX

NOTES:

1. PROVIDE SINGLE POINT ELECTRICAL CONNECTION.

2. PROVIDE SINGLE POINT ELECTRICAL CONNECTION TO PUMP SYSTEM FROM NEMA 4X DUPLEX PUMP CONTROL PANEL.

3. PROVIDE SINGLE POINT ELECTRICAL CONNECTION TO SUMP PUMP THROUGH OIL MINDER, HIGH WATER ALARM, AND NEMA 4X SIMPLEX PUMP CONTROL PANEL.

WATER SOFTENER SYSTEM

MARK MANUFACTURER MODEL NO. LOCATION

FLOW RATE

(GPM)

PRESSURE LOSS

(PSI)

INLET WATER

HARDNESS

(PPM)

SALT USAGE

(LBS/REGEN)

REGENERATION

FREQUENCY

(GALS)

DIMENSIONS

(L"xW"xH") WEIGHT (LBS)

SW-01 / SW-02 BOILER 21144 46 95,000 126" x 58" x 60"

NOTES:

1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.

2. WATER SOFTENER SYSTEM SHALL OPERATE UNDER CONSTANT AND MODULATING FLOW.

3. REFER TO SPECIFICATION 22 31 11 FOR ADDITIONAL SOFTENER PERFORMANCE AND INSTALLATION REQUIREMENTS.

4. BT-01 BRINE TANK TO BE SUPPLIED WITH WATER SOFTENER SYSTEM.

Revisions Date

1 ADDENDUM 01 5/31/2024

F

G H I J K

1.14.4

44-BOT-2-1

2T

T

STORAGE

11144

S3 500

M-303

M-304

M-502

-F

C U

-1 -2

-F

C U

-1 -3

-F

C U

-1 -4

-F

C U

-1 -1

1 1

T

T

T

B7

B1

AREA BB44

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /2

.0

V A

M ia m i

H V

A C

S y s te m U p g ra d e a n d

E x p a n s io n B

/0

V A

M ia m i U p g ra d e H

V A

C

E x p

B

-R

D iv

,2

.r v t

/3

/2

:0

:2

P

M

MH112

MECHANICAL HVAC - FIRST FLOOR

AREA B - NEW WORK

Construct a New Boiler Building and Controls in the Old Incinerator Area

Expand/Move Graphic Control

MIAMI, FLORIDA

546-22-110

B44

ERNESTO A. CABRERA

03/14/2024 GSC ZGC

BID SET

Geoffrey Chenoweth, P.E.

PE License #PE085290

1/4" = 1'-0"

MECHANICAL HVAC - FIRST FLOOR AREA B - NEW WORK

CODED NOTES:

N

0 2' 4' 8' 12'

1/4" = 1'-0"

FAN COIL UNIT SUSPENDED FROM STRUCTURE.

STORAGE 11144 INDEPENDENT THERMOSTAT WITH BACNET MS/TP COMMUNICATION FOR MONITORING

OF ROOM TEMPERATURE.

N.T.S.

KEYPLAN - B44 - AREA B

CONTROL

ROOM

21344

STAIR 1-2

21044

G H I J K

44-FHX-2-1

M

A T

C H

LI

N

E

R E

F E

R T

O P

LA

N

/ M

H

F

O R

C O

N T

IN

U

A T

IO

N

44-FHX-2-2

44-FHX-2-3

44-VAV-1-1

B 100

E1 125

S1 50

S2 225S2 225

S2 225S2 225

R2 275

R2 300

14x12 SA

16x16 SA UP

14x12 SA x1

S

A

12X10 RA DN

2 2

8x8 EA UP

44-PMAC-2-4

44-CST-2-1

44-PMAC-2-1

44-PMAC-2-2

44-PMAC-2-3

S4250

S4250

S4250

S4300 x1

S

A

20x12 SA x1

S

A x8 S

A44-CP-2-1

44-CP-2-2

44-CP-2-3

44-FWP-2-1

44-FWP-2-2

44-FWP-2-3

10ø RA UP 10ø RA UP

S4300

S4300

S4300

S4300

S4300

S4 300

S4 300

MOD

x1

S

A

16x16 SA UP

MOD

12x10 SA

12x10 SA

8x8 SA

8x8 SA

S4 300

MOD

12x10 SA

8x8 SA

S4 300

S4 300

S4 300

S4 300

BOILER

21144

FD

T H

44-AHU-3-1

M-301

S3 500

M-303

M-304

-F

C U

-2 -1

B7

B1

AREA BB44

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /2

.0

V A

M ia m i

H V

A C

S y s te m U p g ra d e a n d

E x p a n s io n B

/0

V A

M ia m i U p g ra d e H

V A

C

E x p

B

-R

D iv

,2

.r v t

/3

/2

:0

:3

P

M

MH122

MECHANICAL HVAC - SECOND FLOOR

AREA B - NEW WORK

Construct a New Boiler Building and Controls in the Old Incinerator Area

Expand/Move Graphic Control

MIAMI, FLORIDA

546-22-110

B44

ERNESTO A. CABRERA

03/14/2024 GSC ZGC

BID SET

Geoffrey Chenoweth, P.E.

PE License #PE085290

CODED NOTES:

1 BOILER COMBUSTION AIR LOUVERS. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

30"x20" SA DN TO 48" ABOVE FINISHED FLOOR. PROVIDE 1"x1" ALUMINUM WIRE MESH SCREEN AT DUCT

OPENING. PROVIDE MANUAL DAMPER IN VERTICAL DUCTWORK 6'-0" AFF.

24"Ø INTERNAL DIAMETER BOILER FLUE UP TO ECONOMIZER AND CONTINUED UP TO NEXT LEVEL.

BALANCE PLANT MASTER PANEL. PROVIDE SINGLE POINT 120V/1-PH POWER. PANEL CABINET SHALL HAVE MINIMUM 3" BASE SUPPORT STANDS. PANEL MOUNTED AIR CONDITIONING UNIT ON SIDE OF

PANEL.

BOILER CONTROL PANEL WITH DISCONNECT AND BLOWER VFD. PROVIDE SINGLE POINT 460V/3-PH POWER. PROVIDE INTEGRAL 120V TRANSFORMER FOR CONTROL PANEL. PANEL CABINET SHALL HAVE MINIMUM 3" BASE SUPPORT STANDS. PANEL MOUNTED AIR CONDITIONING UNIT ON SIDE OF PANEL.

SUPPLY GRILLE MOUNTED AT 8'-0" ABOVE FINISHED FLOOR.

PROVIDE 4" CONCRETE PAD. CONCRETE PAD SHALL EXTEND A MINIMUM OF 6" BEYOND PERIMETER OF

EQUIPMENT.

30"x20" 45° OFFSET OVER TO BE TIGHT TO WALL.

2 POSITION 24V MOTORIZED DAMPER.

SUPPLY GRILLE MOUNTED 4'-0" ABOVE BOILER PLATFORM.

SIEMENS BUILDING SYSTEM PANEL. PANEL SHOWN FOR SPACE ALLOCATION. CONTROLS CONTRACTOR

SHALL DETERMINE QUANTITIES OF PANELS.

OUTDOOR HEAT PUMP BUILDING MANAGEMENT SYSTEM INTEGRATION CONTROLLERS (44-ODU-4-1, 44-ODU-4-2, & 44-ODU-4-3.

1/4" = 1'-0"1

MECHANICAL HVAC - SECOND FLOOR AREA B - NEW WORK

N

0 2' 4' 8' 12'

1/4" = 1'-0"

N.T.S.

KEYPLAN - B44 - AREA B

GENERAL NOTES:

1. BRANCH DUCT AND FLEXIBLE DUCT FROM A DIFFUSER, REGISTER, OR GRILLE SHALL BE THE SAME

SIZE AS THE DEVICE NECK (AS SHOWN ON SCHEDULE M-802), UNLESS NOTED OTHERWISE.

SUBN-3UPF

SUBN-3UPE

SUBN-3UPE

F U

T U

R E

E X

P

SUBN-3UPA

SUBN-3UPC

F U

T U

R E

E X

P

SUBN-3UPC

F U

T U

R E

E X

P

F U

T U

R E

E X

P

F U

T U

R E

E X

P

MVSN-3UPCMVSN-3UPA

MVSN-3UPB

B7

B1

AREA A B44

A B C C.5 D E F

EX 11-3-PEF7

TRANSFORMER

3G101

TRANSFORMER

3G104

SWITCHGEAR

1G103

COMMUNICATIONS

3G102

TRANSFORMER

3G105

SWITCHGEAR

3G100

T

FD

M

INSULATED S.S. OA DUCTWORK

M

M-301

M-303

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /2

.0

V A

M ia m i

H V

A C

S y s te m U p g ra d e a n d

E x p a n s io n B

/0

V A

M ia m i U p g ra d e H

V A

C

E x p

B

-R

D iv

,2

.r v t

/3

/2

:0

:3

P

M

MH131

MECHANICAL HVAC - THIRD FLOOR

AREA A - NEW WORK

Construct a New Boiler Building and Controls in the Old Incinerator Area

Expand/Move Graphic Control

MIAMI, FLORIDA

546-22-110

B44

ERNESTO A. CABRERA

03/14/2024 GSC ZGC

BID SET

Geoffrey Chenoweth, P.E.

PE License #PE085290

DRAWING NOTES:

1. NOT ALL MECHANICAL SYSTEMS SHOWN. ONLY MECHANICAL SYSTEMS WITHIN SCOPE OF WORK ARE

SHOWN.

CODED NOTES:

1 EXISTING LOUVER WITH INTEGRAL MOTORIZED DAMPER.

EXISTING EXHAUST FAN (30,325 CFM).

PROVIDE NEW DUCTWORK THRU EXISTING WALL PENETRATION AND PROVIDE FIRE DAMPER.

LOUVERED PENTHOUSE, 44-LVP-4-1 (ON SHEET MH142), INTEGRAL MOTORIZED DAMPER SHALL BE INTERLOCKED WITH EXISTING EXHAUST FAN, EX 11-3-PEF7. EXISTING CONTROL SEQUENCE SHALL

REMAIN.

N

0 2' 4' 8' 12'

1/4" = 1'-0"

N.T.S.

KEYPLAN - B44 - AREA A

1/4" = 1'-0"

MECHANICAL HVAC - THIRD FLOOR AREA A - NEW WORK

AREA BB44

F

G H I J K

1.14.4

12X10 RA DN

3 2

10ø RA DN 10ø RA DN

14x12 DN

30x20 SA

30x20 SA x3

S

A

36x30 SA30x20 SA

30X20 DN

30X20 DN

30X20 SA DN

44-DA-3-1

24ø FE DN

24ø FE DN

14x14 RA x1

R

A x1

S

A

16x16 SA

16X16 SA DN

ø

F E ø

F E ø

F E

24ø FE DN

-H

X -3

-1

FD

FDFD

EX FIRE BRICK

x4

FE

S3 500

18x10 OA

10x8 SA

88x50 OA x1

O

A

M-303

M-304

44-FCU-3-1

40x18 SA

RX 40x18 RA

44-FCU-3-2

R X

0x

S

A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /2

.0

V A

M ia m i

H V

A C

S y s te m U p g ra d e a n d

E x p a n s io n B

/0

V A

M ia m i U p g ra d e H

V A

C

E x p

B

-R

D iv

,2

.r v t

/3

/2

:0

:4

P

M

MH132

MECHANICAL HVAC - MEZZANINE AREA

B - NEW WORK

Construct a New Boiler Building and Controls in the Old Incinerator Area

Expand/Move Graphic Control

MIAMI, FLORIDA

546-22-110

B44

ERNESTO A. CABRERA

03/14/2024 GSC ZGC

BID SET

Geoffrey Chenoweth, P.E.

PE License #PE085290

N

0 2' 4' 8' 12'

1/4" = 1'-0"

N.T.S.

KEYPLAN - B44 - AREA B

1/4" = 1'-0"

MECHANICAL HVAC - MEZZANINE AREA B - NEW WORK

CODED NOTES:

1 44-EF-4-1 EXHAUST INLET ROOF OPENING.

44-EF-4-2 EXHAUST INLET ROOF OPENING.

44-EF-4-3 EXHAUST INLET ROOF OPENING.

8"x8" EA UP TO 44-EF-4-4

UNIT MOUNTED ON MEZZANINE.

PROVIDE 4" CONCRETE PAD TO EXTEND 6" BEYOND PERIMETER OF EQUIPMENT.

PROVIDE 24" DEEP PLENUM AT LOUVER. PLENUM SHALL BE CONSTRUCTED OF ALUMINUM.

PLENUM SHALL BE SAME WIDTH AND HEIGHT OF LOUVER. LOUVER SHALL BE MINIMUM

13'-0" WIDE BY 8'-0" HIGH. LOUVER SHALL BE RATED FOR MIAMI-DADE COUNTY. REFER TO

ARCHITECTURAL DRAWINGS FOR LOUVER INFORMATION.

30"x20" SA DN TO 48" ABOVE MEZZANINE FINISHED FLOOR. PROVIDE 1"x1" ALUMINUM WIRE MESH

SCREEN AT DUCT OPENING. PROVIDE MANUAL DAMPER IN VERTICAL DUCTWORK 6'-0" AFF.

24"x48" BOILER FLUE BREECHING. BREECHING SHALL EXTEND INTO EXISTING CHIMNEY 6" BEYOND FIRE BRICK INSULATION. OPENING SHALL BE 2" GREATER THAN BREECHING DIMENSIONS IN EACH DIRECTION.

REUSE EXISTING MASONRY CHIMNEY FOR BOILER FLUE GAS EXHAUST. EXISTING STACK SHALL BE INTERNALLY INSPECTED, REPAIRED, AND THEN COATED WITH ACID RESISTANT SURFACE COATING FROM TOP TO BOTTOM ON ALL INTERIOR SURFACES. ESTIMATED SURFACE AREA IS 2,300 SF SPREAD ACROSS FOUR WALLS. INSTALL DRAIN AT BOTTOM OF CHIMNEY WITH ACID NEUTRALIZATION SYSTEM

AND CONNECT TO DRAIN. REFER TO PLUMBING DRAWINGS FOR ARRANGEMENT.

DISCHARGE PLENUM EQUAL TO SUPPLY CONNECTION OF 44-MAU-4-1 ON ROOF.

G H I J K

44-EF-4-3 44-EF-4-2 44-EF-4-1

44-ODU-4-1

44-EF-4-4

44-MAU-4-1

FD

4" VTR

4" VTR

4" VTR

1-1/2" VTR

2" VTR

6" VTR

12" STEAM SILENCER VTR

3/4" VTR

1-1/2" VTR

3/4" VTR

1-1/2" VTR

3/4" VTR

1-1/2" VTR

M-303

2" NG (VENT

THRU ROOF)

REF DN 5

EX CWR DN

B7

B1

AREA BB44

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /2

.0

V A

M ia m i

H V

A C

S y s te m U p g ra d e a n d

E x p a n s io n B

/0

V A

M ia m i U p g ra d e H

V A

C

E x p

B

-R

D iv

,2

.r v t

/3

/2

:0

:4

P

M

MH142

MECHANICAL HVAC - ROOF PLAN AREA

B - NEW WORK

Construct a New Boiler Building and Controls in the Old Incinerator Area

Expand/Move Graphic Control

MIAMI, FLORIDA

546-22-110

B44

ERNESTO A. CABRERA

03/14/2024 GSC ZGC

BID SET

Geoffrey Chenoweth, P.E.

PE License #PE085290

N

0 2' 4' 8' 12'

1/4" = 1'-0"

1/4" = 1'-0"1

MECHANICAL HVAC - ROOF PLAN AREA B - NEW WORK

N.T.S.

KEYPLAN - B44 - AREA B

CODED NOTES:

1 PROVIDE 26X24 FIRE DAMPER AND VOLUME DAMPER

TERMINATE 0' 6" ABOVE FINISHED ROOF WITH GOOSENECK

TERMINATE 6' 0" ABOVE FINISHED ROOF SURFACE

6" VTR, REFERENCE PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION

PIPING REPRESENTS REFRIGERANT SUCTION AND LIQUID LINES FROM OUTDOOR UNIT TO INDOOR UNITS. CONTRACTOR TO COORDINATE PIPE SIZE AND MATERIAL WITH VRF SYSTEM MANUFACTURER

BASED ON FIELD ROUTING PRIOR TO INSTALLATION.

Revisions Date

G H I J K

1.14.4

EX 14"

CWR UP

M A

T C

H

LI

N E

R

E F

E R

T O

P

LA

N

/ M P

F O

R C

O N

T

IN

U A

T

IO

N

4" G UP

6" G UP

3/4" LPG

23/4" LP UP

4" G UP

23/4" LP UP

4" G UP

3/4" LP UP

2 1/2" FOS

FOS UP

FOR UP

FOS UP

1 1/2" FOS UP

1 1/2" FOS UP

1 1/2" FOS UP

2" BO UP

2" BO UP

2" BO UP

1" BO UP

1" BO UP

1" BO UP

44-BOT-2-1

1 1/2" FOR UP

1 1/2" FOR UP

1 1/2" FOR UP

2" FOR

2" B

O

2" BO

2" BO

4" NG

6" NG

1" LPG

2" CBD UP

A/C CONDENSATE PIPING

DN TO FLOOR DRAIN.

3/ 4"

C D

3/ 4"

C D

3/4" CD

3/4" CD

2" BO

M-303

M-304

M-502

3/4" CHWS

1" CHWS

1" CHWS

3/4" CHWS

3/4" CHWS

3/4" CHWS

1-1/4"CHS/R UP

3/4" CD

3/4" CHWR

3/4" CD

3/4" CD

3" PC

1" CHWR

1" CHWR

44-FCU-1-4 44-FCU-1-3

44-FCU-1-244-FCU-1-11/2" HHWS

1/2" HHWR

1/2" HHWS

1/2" HHWR

1/2" HHWR

1/2" HHWS 1/2" HHWS

1/2" HHWR

3/4" CHWS

3/4" CHWR

3/4" CD

1" HHWS/R UP

1" HHWR

1" HHWS

1" HHWS

1" HHWR

3/4" HHWS

3/4" HHWR

2" BO

2" BO

2" BO

3/4" CHWR

3/4" CHWR

2" BO

1" HHWR

1" HHWS

1" HHWR

1" HHWS

B7

B1

AREA BB44

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120

FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904

PH: 321.345.9026

A u to d e s k D o c s /2

.0

V A

M ia m i

H V

A C

S y s te m U p g ra d e a n d

E x p a n s io n B

/0

V A

M ia m i U p g ra d e H

V A

C

E x p

B

-R

D iv

,2

.r v t

/3

/2

:0

:5

P

M

MP112

MECHANICAL PIPING - FIRST FLOOR

AREA B - NEW PLAN

Construct a New Boiler Building and Controls in the Old Incinerator Area

Expand/Move Graphic Control

MIAMI, FLORIDA

546-22-110

B44

ERNESTO A. CABRERA

03/14/2024 GSC ZGC

BID SET

Geoffrey Chenoweth, P.E.

PE License #PE085290

CODED NOTES:

1 EXISTING CONDENSER WATER PIPING SHALL REMAIN OPERATIONAL THROUGHOUT CONSTRUCTION.

GAS SHUTOFF. SHUTOFF SHALL BE ACCESSIBLE FROM VALVE BOX IN FLOOR ABOVE WITH ELONGATED

"T" STEM.

PROVIDE LPG & GAS DIRT LEG AT TRANSITION TO VERTICAL PIPE.

PROVIDE 3-WAY CHWR VALVE.

PROVIDE 3-WAY HHWR VALVE.

N 1/4" = 1'-0"

MECHANICAL PIPING - FIRST FLOOR AREA B - NEW PLAN

0 2' 4' 8' 12'

1/4" = 1'-0"

N.T.S.

KEYPLAN - B44 - AREA B

Revisions Date

1 ADDENDUM 01 5/31/2024

C C.5 D E F

1.14

1.13

1.A 1.B 1.C 1.D 1.D3 1.D6

G H I

1.14.4

M-301

MATCHLINE - REFER TO PLAN 1/ MP122 FOR CONTINUATION

6" NG

1" LPG

EX 6" NG

6" NG

2 1/2" MPC

4" MPC

2" MPC

2 1/2" CC

3" CC

2 1/2" CC

2" LPC

G-1-5

R-1-31

R-1-32

R-1-33

G-1-6R-1-34R-1-35

A-1-1

OFFSET DRAIN AT 45°

ANGLE DOWN INTO

UTILITY…

This is the start of the file's text. The full file is on GovTribe.