ATTACHMENT 17 Addendum 1.pdf
PDF 9 MB Posted
- Solicitation number
- 36C24825R0079
About this file
This set of construction documents details a VA project to construct a new boiler building and controls building (Building 44) at the Miami VA Medical Center. The project involves comprehensive mechanical, electrical, and plumbing upgrades, including installing three new 13,800 lbs/hr fire tube boilers with low NOx burners, a steam system with pressure reduction stations, chilled water pumps, fan coil units, air handling units, and associated control systems. The new building will be located in the old incinerator area and includes modifications to existing infrastructure, with key systems designed for redundancy and efficiency, such as duplex pump configurations and variable frequency drives for pumps and fans.
The project scope encompasses detailed mechanical, electrical, and plumbing system designs, including steam and condensate return systems, chilled water piping, heating hot water systems, and comprehensive control strategies. The design incorporates modern features like building automation system integration, energy-efficient equipment, and sophisticated control sequences for systems like boiler plant ventilation, chilled water pumps, and air handling units. The project is fully sprinklered and includes provisions for future expansion, with careful coordination between mechanical, electrical, and plumbing disciplines to ensure optimal system performance and reliability.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCT A NEW BOILER BUILDING AND CONTROLS BUILDING NO. 44
IN THE OLD INCENERATOR AREA EXPAND/MOVE
GRAPHIC CONTROL
VAMC MIAMI, FL PROJECT NO. 546-22-110
Above Group, Inc. Page 1 of 3
ADDENDUM NO. 1
to the
CONSTRUCTION DOCUMENTS
MAY 31, 2024
General The following changes, additions or deletions shall be made to the following Contract Documents. All other conditions shall remain the same.
I. SPECIFICATIONS
A. SECTION 22 34 00 – FUEL-FIRED DOMESTIC WATER HEATERS: REMOVED Section.
B. SECTION 22 35 00 – DOMESTIC WATER HEAT EXCHANGERS: ADDED Section.
C. SECTION 23 21 13 – HYDRONIC PIPING: ADDED water flow measuring devices, water-to-water heat exchangers, water treatment, and other various hydronic modifications.
D. SECTION 23 21 23 – HYDRONIC PUMPS: REVISED Section to include base-mounted, end-suction pumps and other requirements.
E. SECTION 23 23 00 – REFRIGERANT PIPING: ADDED Section.
F. SECTION 23 40 00 – HVAC AIR CLEANING DEVICES: ADDED Section.
G. SECTION 23 73 00 – INDOOR CENTRAL STATION AIR-HANDLING UNITS: ADDED Section.
H. SECTION 23 81 00 – DECENTRALIZED UNITARY HVAC EQUIPMENT: REMOVED Section.
I. SECTION 23 81 23 – COMPUTER-ROOM AIR-CONDITIONERS: ADDED Section for electrical room units.
J. SECTION 23 82 00 – CONVECTION HEATING AND COOLING UNITS: ADDED Section.
K. SECTION 23 82 16 – AIR COILS: ADDED Section.
II. DRAWINGS
PLUMBING
A. PS112 – RELOCATED sanitary to emergency eye-wash/shower.
B. PS121 – REVISED water heater requirements. REMOVED vent and flue from water heater.
C. PS122 – REVISED Trench drain locations and MOVED emergency eye-wash and shower.
D. PS132 – REVISED 2” V location.
E. PP121 – REVISED piping.
F. PP122 – REVISED Trench drain locations and MOVED emergency eye-wash and shower.
G. P-401 – REVISED water heater requirements.
H. P-502 – ADDED Steam Water Heater Detail.
I. P-601 – REVISED gravity piping.
J. P-602 – REVISED gravity piping.
K. P-801 – REVISED Domestic Water Heater (Steam) Schedule, Plumbing Fixture schedule, and Hot
Water Recirc. Pump Schedule.
MECHANICAL
A. MH112 – REVISED cooling units from DX to CHW Fan Coils.
B. MH122 – REVISED plan to show CHW piping, ductwork, and terminal unit adjustments related to use of CHW.
C. MH131 – REVISED AHU ductwork.
Above Group, Inc. Page 2 of 3
D. MH132 – REVISED AHU ductwork and AHU and FCU layout.
E. MH142 – REMOVED DX Equipment on roof.
F. MP112 – REMOVED DX Equipment and ADDED FCUs with chilled water and heating water piping.
G. MP114 – REVISED natural gas piping.
H. MP121- ADDED chilled water piping and pumps. ADDED steam and condensate to water heater.
REMOVED natural gas piping.
I. MP122 – ADDED chilled water piping in various areas, ADDED LPC piping. REVISED 44-FCU-2-
3.
J. MP124 – REMOVED natural gas piping.
K. MP132 – REVISED 44-AHU-3-1, ADDED chilled water and heating water piping, ADDED in-plant
(house) pressure reducing station, REVISED heating hot water heat exchanger, ADDED LPS piping.
L. MI501 – REMOVED control sequences.
M. MI602C – REVISED steam system P&ID to show in-plant (house) pressure reducing station and associated systems.
N. MI612 – REMOVED natural gas piping to water heater.
O. MI701 – REVISED control sequences to reflect FCU control.
P. MI702 – ADDED Water heater control for steam water heater. REVISED AHU sequence and diagrams.
Q. MI703 – ADDED Secondary Chilled Water Pump sequences, REVISED Boiler Room Ventilation sequences.
R. M-301 – REVISED sections to remove natural gas piping to water heater and to show steam and condensate piping to heating hot water system.
S. M-303 – REVISED sections to show ADDENDUM 01 elements.
T. M-304 – REVISED section to show ADDENDUM 01 elements.
U. M-504 – ADDED end suction pump detail.
V. M-601 – REMOVED natural gas service to water heater.
W. M-801 – REVISED AHU schedule to reflect change from DX to Chilled Water. REVISED mimi-split ductless heat pump schedule to reflect removal of all DX unit except electrical room unit.
X. M-802 – ADDED chilled water pumps, REVISED steam to HHW heat exchanger schedule.
Y. M-803 – ADDED steam valves to control valve schedule. REMOVED NG regulator for water heater.
ELECTRICAL
A. EP112 – DELETED IDU disconnect switches and REVISED IDUs to FCUs.
B. EP114 – DELETED IDU disconnect switches.
C. EP121 – REVISED coded note callout for junction at Column Line F-1 from 5 to 4 and coded note
2 verbiage to “NOT USED.”
D. EP121 – ADDED chilled water pump 44-CHWP-2-11A, 44-CHWP-2-11B, associated VFDs and coded note 6.
E. EP121 – DELETED extraneous equipment labels and coded notes at Column Line F - 2/3 and F –
3/4.
F. EP122 – ADDED junction boxes, circuits, and coded note 25 at Column Line G – 3/4.
G. EP122 – DELETED DOAS disconnect switches.
H. EP122 – REVISED DOAS unit to fan coil unit.
Above Group, Inc. Page 3 of 3
I. EP122 – ADDED coded note 25.
J. EP132 – REVISED designation of 44-AHU-3-1 disconnect switch.
K. EP132 - DELETED DOAS disconnect switch and REVISED DOAS units to fan coil units.
L. EP152 – DELETED ODUs and associated disconnect switches.
M. E-601 – ADDED DN-2UPB and REVISED DN-2UPC.
N. E-602 – ADDED DN-2UPB and chilled water pump circuit.
O. E-602 – ADDED chilled water pump circuit to DN-2UPC.
P. E-602 – REVISED DN-2UPC circuit breaker rating from 2225A to 225A.
Q. E-801 – REVISED panelboard circuits.
R. FA-122 – ADDED duct smoke detector and coded note 4.
END OF ADDENDUM
B7
B1
AREA BB44
F
STORAGE
11144
G H I J K
6" STO UP. ROUTE 6" STO TO
SPLASHBLOCK. REFER TO DETAIL
DUPLEX SEWAGE
EJECTOR. REFER TO
DETAIL 6/P-502
2" SAN UP
4" PD UP FROM
SEWAGE
EJECTOR PUMPS
4" PD
6" FD-R
3" V UP
4" V UP
3" V DN
2" SAN UP 4" SAN UP
4" V UP
M A
T C
H
LI
N E
R
E F
E R
T O
P
LA
N
/ P S
F O
R C
O N
T
IN
U A
T
IO
N
3" V UP
MATCHLINE - REFER TO PLAN 1/ PS114 FOR CONTINUATION
44-SP-1-2
8" SAN UP
8" & 4" SAN DN TO
SEWAGE EHECTOR
6" FCO
44-SP-1-3
6" V UP
4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
2" SAN
2" SAN
4" SAN
8" SAN
4" PD 4" PD
CO
CO
CO
CO
CO
CO
CO
B.O.P. 8' - 0"
4" SAN
M-303
M-304
P-301
P-302
4" SAN UP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /2
.0
V A
M ia m i
H V
A C
S y s te m U p g ra d e a n d
E x p a n s io n B
/0
V A
M ia m i U p g ra d e H
V A
C
E x p
B
-R
D iv
,2
.r v t
/3
/2
:0
:1
P
M
PS112
PLUMBING GRAVITY - FIRST FLOOR
PLAN AREA B - NEW WORK
Construct a New Boiler Building and Controls in the Old Incinerator Area
Expand/Move Graphic Control
MIAMI, FLORIDA
546-22-110
B44
ERNESTO A. CABRERA
03/14/2024 GSC AJZ
BID SET
Geoffrey Chenoweth, P.E.
PE License #PE085290
CODED NOTES:
0 2' 4' 8' 12'
1/4" = 1'-0"
N
4" SAN UP TO FD/TD
N.T.S.
KEYPLAN - B44 - AREA B
1/4" = 1'-0"
PLUMBING GRAVITY PLAN - FIRST FLOOR AREA B - NEW WORK
Revisions Date
1 ADDENDUM 01 5/31/2024
AREA A B44
A B C C.5 D E F
MECHANICAL
20144
CORRIDOR
20444
FIRE PUMP
20344
TOILET
20244A
BOILER
20444
P-502
P-402 P-103
3" FD-C
P-701
TOILET
20744
LOCKER
ROOM
20844
HAC
20644
STORAGE
20544
EX FD
EX FD
EX FD
EX HDEX ESH
EX SH
EX L
EX WC
EX FD
EX FD
EX FD
EX FD
EX FD
EX FD
EX FD
EX FD
EX FD
EX 1 1/2" SAN DN
EX 1 1/2" V UP
EX 4" SAN UP/DN
EX 2" V DN
2" V DN
EX 2" V
EX 2" V DN
EX 4" SAN DN
EX 2" V UP
EX 2" V DN
EX 4" V UP
EX 3" V DN
EX 4" SAN DN
EX 4" SAN UP
EX 2" V
EX 3" V
EX 4" VEX 2" V
PROVIDE NEW FD GRATE
ON EX 4" FD BODY
4" FD-M
2" V DN
P-204
EX 6" ST UP
CONNECT
TO 8" ST DN
6" ST
M A
T C
H
LI
N E
R
E F
E R
T O
P
LA
N
/ P S
F O
R C
O N
T
IN
U A
T
IO
N
2" V
6" ST
343.5 GPM
ELECTRICAL
20944
LOCKER
ROOM
20244
EX 4" SAN
EX 6" ST UP/DN
EX 6" ST UP/DN. CONNECT
NEW 4" ST TO RISER
4" ST
2" V
M-303
P-301
44-SWH-2-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /2
.0
V A
M ia m i
H V
A C
S y s te m U p g ra d e a n d
E x p a n s io n B
/0
V A
M ia m i U p g ra d e H
V A
C
E x p
B
-R
D iv
,2
.r v t
/3
/2
:0
:1
P
M
PS121
PLUMBING GRAVITY - SECOND FLOOR
PLAN AREA A - NEW WORK
Construct a New Boiler Building and Controls in the Old Incinerator Area
Expand/Move Graphic Control
MIAMI, FLORIDA
546-22-110
B44
ERNESTO A. CABRERA
03/14/2024 GSC AJZ
BID SET
Geoffrey Chenoweth, P.E.
PE License #PE085290
DRAWING NOTES:
1. SLOPE ALL VENT PIPING BACK TO SANITARY MAIN.
0 2' 4' 8' 12'
1/4" = 1'-0"
N
CODED NOTES:
1 3" SAN DN, 2" V UP. 3" SAN TO UR. 1 1/2" SAN TO LAV
REFER TO DETAIL ON DRAWING P502.
N.T.S.
KEYPLAN - B44 - AREA A
1/4" = 1'-0"
PLUMBING GRAVITY PLAN - SECOND FLOOR AREA A - NEW WORK
AREA BB44
F
CONTROL
ROOM
21344
STAIR 1-2
21044
BOILER
21144
P-707
G H I J K
P-402 P-103
P-524
4" FD-Z
4" FD-Z
4" FD-Z
4" FD-Z
6" STO UP/DN
P-531
4 3
4" V UP/DN
4" V UP/DN
4" FD-R
4" FD-B
8" FD-R
6" V DN
M A
T C
H
LI
N E
R
E F
E R
T O
P
LA
N
/ P S
F O
R C
O N
T
IN
U A
T
IO
N
6" V UP
ROUTE DRAIN FROM BACKFLOW
PREVENTERS TO FD. REFER TO
PP122 FOR INFORMATION ON
BACKFLOW PREVENTERS
4" FD-Z
4" FD-Z
4" FD-Z
4" FD-Z
4" FD-Z
3" V DN
2" V
2" V
2" V
6" ST
343.5 GPM
4" SAN UP
TO FD
4" SAN
2" V UP
4" ST UP
TO FD
4" ST
4" FD-S
6" ST UP ST TO CONNECT TO EX.
RISER ON THE EX. THIRD FLOOR.
M-303
M-304
P-301
P-302
4" FD-R
2" V UP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /2
.0
V A
M ia m i
H V
A C
S y s te m U p g ra d e a n d
E x p a n s io n B
/0
V A
M ia m i U p g ra d e H
V A
C
E x p
B
-R
D iv
,2
.r v t
/3
/2
:0
:2
P
M
PS122
PLUMBING GRAVITY - SECOND FLOOR
PLAN AREA B - NEW WORK
Construct a New Boiler Building and Controls in the Old Incinerator Area
Expand/Move Graphic Control
MIAMI, FLORIDA
546-22-110
B44
ERNESTO A. CABRERA
03/14/2024 GSC AJZ
BID SET
Geoffrey Chenoweth, P.E.
PE License #PE085290
DRAWING NOTES:
1. MECHANICAL EQUIPMENT SHOWN HALFTONE FOR REFERENCE ONLY. REFER TO MECHANICAL
PLANS.
2. THE SECOND FLOOR OF THE NEW ADDITION IS A DOUBLE HEIGHT SPACE. A MECHANICAL EQUIPMENT
MEZZANINE IS LOCATED IN THE SPACE. REFER TO ARCHITECTURAL DRAWINGS FOR MEZZANINE
LOCATION. COORDINATE ALL PIPING WITH MEZZANINE.
0 2' 4' 8' 12'
1/4" = 1'-0"
N
CODED NOTES:
1 BRINE TANK FOR WATER SOFTENER. ROUTE ALL DRAINS TO FD.
NEW CHEMICAL TREATMENT FOR BOILERS. MOUNT CHEMICALS ON A CHEMICAL SPILL CONTAINMENT PLATFORM. DESIGN BASIS OF CHEMICAL SPILL CONTAINMENT PLATFORM IS INTERSTATE PRODUCTS ULTRA-SPILL PALLET P2 - 1010 - 2 DRUM NO DRAIN. MOUNT CHEMICAL PUMPS ON A SHELF ABOVE CHEMICALS. CHEMICALS TO TREAT WATER TO BE OXYGEN SCAVENGER (AQUATROL 14640), ALKALINITY BOOSTER (AQUATROL 14555), INTERNAL TREATMENT/DEPOSITION CONTROL (AQUATROL 14120), AND
CONDENSATE/STEAMLINE CORROSION PREVENTION (AQUATROL 14780).
4" SAN DN, 2" V UP. 4" SAN TO WC
2" SAN DN, 1-1/2" V UP. 1-1/2" SAN TO FIXTURE
(2)NEW 30" WATER SOFTENERS. WATER SOFTENERS TO PRODUCE 46 GPM (95,000 GALLONS EVERY 1.4 DAYS). UNIT TO BE PROVIDED WITH A DIGITAL HEAD AND AN EXTERNAL FLOW METER. WATER SOFTENER
TO BE PIPID WITH A NORMALLY CLOSED BYPASS VALVE. ROUTE ALL DRAINS TO FD.
COORDINATE TRANCH DRAIN LOCATIONS WITH ACTUAL PAD DIMENSIONS INSTALLED AND WITH ACTUAL BOILER INSTALLED. ADJUSTMENT IN THE NORTH SOUTH EAST OR WEST DIRECTIONS IS ACCEPTABLE.
SUBMIT COORDINATED DRAWING FOR REVIEW SHOWING THIS HAS BEEN COORDINATED.
N.T.S.
KEYPLAN - B44 - AREA B
1/4" = 1'-0"1
PLUMBING GRAVITY PLAN - SECOND FLOOR AREA B - NEW WORK
AREA BB44
F
G H I J K
STAIR 1-2
21044
BOILER
21144
6" STO DN. OFFSET PIPING
AROUND STRUCTURAL FRAMING
WITH 45° ELBOWS AS REQUIRED.
3" ST
41.7 GPM
4" ST
92.4 GPM
6" ST
168.6 GPM
4" ST
122.9 GPM
3" STO
41.7 GPM
4" STO
92.4 GPM
6" STO
134.2 GPM
4" STO
122.9 GPM
1 2
4" V DN
4" V DN
6" ST
134.2 GPM
6" ST
209.3 GPM
4" V UP TO
6" VTR
4" V UP TO 6" VTR
6" ST DN. ST TO CONNECT
TO EX RISER ON THE EX
SECOND FLOOR
4" V
4" V
6" STO
168.6 GPM
6" ST
343.5 GPM
6" STO
209.3 GPM
6" STO
343.5 GPM
4" V DN
4" FD-C
4" FD-B
2" V DN
2" V DN
2" V
2" V
M-303
M-304
P-301
P-302
44-FCU-3-1
44-AHU-3-1
44-FCU-3-2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /2
.0
V A
M ia m i
H V
A C
S y s te m U p g ra d e a n d
E x p a n s io n B
/0
V A
M ia m i U p g ra d e H
V A
C
E x p
B
-R
D iv
,2
.r v t
/3
/2
:0
:2
P
M
PS132
PLUMBING GRAVITY - MEZZANINE PLAN
AREA B - NEW WORK
Construct a New Boiler Building and Controls in the Old Incinerator Area
Expand/Move Graphic Control
MIAMI, FLORIDA
546-22-110
B44
ERNESTO A. CABRERA
03/14/2024 GSC AJZ
BID SET
Geoffrey Chenoweth, P.E.
PE License #PE085290
DRAWING NOTES:
1. MECHANICAL EQUIPMENT SHOWN HALFTONE FOR REFERENCE ONLY. REFER TO MECHANICAL
PLANS.
2. THE SECOND FLOOR OF THE NEW ADDITION IS A DOUBLE HEIGHT SPACE. A MECHANICAL EQUIPMENT
MEZZANINE IS LOCATED IN THE SPACE. REFER TO ARCHITECTURAL DRAWINGS FOR MEZZANINE
LOCATION. COORDINATE ALL PIPING WITH MEZZANINE.
0 2' 4' 8' 12'
1/4" = 1'-0"
N
CODED NOTES:
1 3" ST AND 3" STO UP TO RD
4" ST AND 4" STO UP TO RD2
N.T.S.
KEYPLAN - B44 - AREA B
1/4" = 1'-0"1
PLUMBING GRAVITY PLAN - MEZZANINE PLAN AREA B - NEW WORK
AREA A B44
A B C C.5 D E F
MECHANICAL
20144
CORRIDOR
20444
FIRE PUMP
20344
TOILET
20244A
P-401
LOCATION FOR
RELOCATED CHILLED
WATER CHEMICAL
TREATMENT. ROUTE
DRAIN TO EX HD
SHOWN IN 1/P-121.
EX 3" CW DN
EX 1" CW
EX 3" CW
EX 2" CW
EX 2" CW
P-401
EX WC
EX L
EX SH
3/4" HWR
1 1/4" HW
EX ESH
HAC
20644
STORAGE
20544
LOCKER
ROOM
20844
TOILET
20744
M A
T C
H
LI
N E
R
E F
E R
T O
P
LA
N
/ P P
F O
R C
O N
T
IN
U A
T
IO
N
2" CW
1 1/4" CW
3/4" HWR
1 1/4" HW
1/2" CW
2" CW
LOCATION FOR RELOCATED
CHEMICALS FOR CHILLED
WATER SYSTEM. MOVE SPILL
CONTAINMENT PALLETS TO THIS
LOCATION.
EX 3" CWR
EX 3" CWS 3" CWS
3" CWR
2" CW
ELECTRICAL
20944
LOCKER
ROOM
20244
M-303
P-301
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /2
.0
V A
M ia m i
H V
A C
S y s te m U p g ra d e a n d
E x p a n s io n B
/0
V A
M ia m i U p g ra d e H
V A
C
E x p
B
-R
D iv
,2
.r v t
/3
/2
:0
:0
P
M
PP121
PLUMBING PRESSURE - SECOND FLOOR
PLAN AREA A - NEW WORK
Construct a New Boiler Building and Controls in the Old Incinerator Area
Expand/Move Graphic Control
MIAMI, FLORIDA
546-22-110
B44
ERNESTO A. CABRERA
03/14/2024 GSC AJZ
BID SET
Geoffrey Chenoweth, P.E.
PE License #PE085290
DRAWING NOTES:
1. REFER TO MECHANICAL SHEET MP121 & MP122 FOR ALL NATURAL GAS PIPING.
2. PROVIDE ALL PLUMBING FIXTURES RECEIVING HOT WATER WITH A MIXING VALVE. REFER TO P-801
FOR THERMOSTATIC MIXING VALVE TEMPERATURE SETTINGS.
0 2' 4' 8' 12'
1/4" = 1'-0"
N
CODED NOTES:
1 RELOCATED EX CHILLED WATER AND EQUIPMENT. CONNECT BACK TO EX PIPING AS SHOWN.
RELOCATED EX CHEMICALS AND CONTAINMENT SPILL PAD. INSTALL PUMPS ON A SHELF ABOVE
CHEMICALS.
RELOCATED EX WALL MOUNTED CONTROLS.
N.T.S.
KEYPLAN - B44 - AREA A
1/4" = 1'-0"1
PLUMBING PRESSURE PLAN - SECOND FLOOR AREA A - NEW WORK
Revisions Date
AREA BB44
CONTROL
ROOM
21344
STAIR 1-2
21044
BOILER
21144
G H I J K
P-707
3/4" HW
P-804
P-804
P-531
44-TP-2-1
44-TP-2-2
M A
T C
H
LI
N E
R
E F
E R
T O
P
LA
N
/ P P
F O
R C
O N
T
IN
U A
T
IO
N
3/4" HWR
P-401
2" CW
2" CW
1 1/4" HW
2" CW3/4" CW
3/4" HWR
CW & HW PIPING DN. OFFSET
PIPING AROUND MEZZANINE.
REFER TO ARCHITECTURAL
DRAWINGS FOR MORE
INFORMATION ON MEZZANINE.
HWR PIPING DN. OFFSET
PIPING AROUND MEZZANINE.
REFER TO ARCHITECTURAL
DRAWINGS FOR MORE
INFORMATION ON MEZZANINE.
44-TP-2-3
44-TP-2-49
BALANCING VALVE
SET TO 1 GPM.
M-303
M-304
P-301
P-302
TMV-2
3/4" HW
FD-Z
FD-Z
FD-Z
FD-Z
FD-Z
FD-Z
FD-Z
FD-Z
FD-Z
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /2
.0
V A
M ia m i
H V
A C
S y s te m U p g ra d e a n d
E x p a n s io n B
/0
V A
M ia m i U p g ra d e H
V A
C
E x p
B
-R
D iv
,2
.r v t
/3
/2
:0
:1
P
M
PP122
PLUMBING PRESSURE - SECOND FLOOR
PLAN AREA B - NEW WORK
Construct a New Boiler Building and Controls in the Old Incinerator Area
Expand/Move Graphic Control
MIAMI, FLORIDA
546-22-110
B44
ERNESTO A. CABRERA
03/14/2024 GSC AJZ
BID SET
Geoffrey Chenoweth, P.E.
PE License #PE085290
DRAWING NOTES:
1. REFER TO MECHANICAL DETAIL DRAWINGS FOR ALL CW AND MAKEUP WATER CONNECTION POINTS
FOR ALL MECHANICAL EQUIPMENT.
2. REFER TO MECHANICAL SHEET MP121 & MP122 FOR ALL NATURAL GAS PIPING.
3. PROVIDE ALL PLUMBING FIXTURES RECEIVING HOT WATER WITH A MIXING VALVE. REFER TO P-801
FOR THERMOSTATIC MIXING VALVE TEMPERATURE SETTINGS.
4. THE SECOND FLOOR OF THE NEW ADDITION IS A DOUBLE HEIGHT SPACE. A MECHANICAL EQUIPMENT
MEZZANINE IS LOCATED IN THE SPACE. REFER TO ARCHITECTURAL DRAWINGS FOR MEZZANINE
LOCATION. COORDINATE ALL PIPING WITH MEZZANINE.
0 2' 4' 8' 12'
1/4" = 1'-0"
N
CODED NOTES:
1 (2)2" REDUCED PRESSURE BACKFLOW PREVENTER FOR BOILER MAKE-UP WATER MOUNTED IN
PARALLEL. DESIGN BASIS WATTS 919-QT-S. PROVIDE A WATER METER WITH A BYPASS LINE AFTER
BACKFLOW PREVENTERS.
3/4" CW & HW DN TO FIXTURE
1-1/4" CW & HW DN TO TMV. MOUNT TMV TO COLUMN. ROUTE 1-1/2" TEPID WATER TO EMERGENCY SHOWER/EYE WASH. PROVIDE BALL VALVES AT MAIN. LABEL VALVES AND LOCK IN THE OPEN POSITION.
2" MAKE-UP WATER FOR BOILERS. PROVIDE A BALL VALVE AND A UNION ON PIPING. MECHANICAL CONTRACTOR TO INSTALL PIPING AFTER UNION TO BOILERS. REFER TO MECHANICAL PIPING PLANS FOR
CONTINUATION.
(2)NEW 30" WATER SOFTENERS. WATER SOFTENERS TO PRODUCE 46 GPM. UNIT TO BE PROVIDED WITH A DIGITAL HEAD AND AN EXTERNAL FLOW METER. WATER SOFTENER TO BE PIPED WITH A NORMALLY
CLOSED BYPASS VALVE.
BRINE TANK FOR WATER SOFTENER
NEW CHEMICAL TREATMENT FOR BOILERS. MOUNT CHEMICALS ON A CHEMICAL SPILL CONTAINMENT PLATFORM. DESIGN BASIS OF CHEMICAL SPILL CONTAINMENT PLATFORM IS INTERSTATE PRODUCTS ULTRA-SPILL PALLET P2 - 1010 - 2 DRUM NO DRAIN. MOUNT CHEMICAL PUMPS ON A SHELF ABOVE CHEMICALS. CHEMICALS TO TREAT WATER TO BE OXYGEN SCAVENGER (AQUATROL 14640), ALKALINITY BOOSTER (AQUATROL 14555), INTERNAL TREATMENT/DEPOSITION CONTROL (AQUATROL 14120), AND
CONDENSATE/STEAMLINE CORROSION PREVENTION (AQUATROL 14780).
3/4" CW DN TO PLUMBING FIXTURE.
1/2" CW DN TO TRAP PRIMER. 1/2" CW FROM TRAP PRIMER TO FLOOR DRAIN. CONNECT 1/2" CW TO VETICAL PIPE FROM DRAIN OUTLET ABOVE P-TRAP. PROVIDE A 24 V TRANSFORMER. WIRE TRAP PRIMER
TO 24 TRANSFORMER, AND THEN TO JUNCTION BOX. JUNCTION BOX PROVIDED BY ELECTRICAL
CONTRACTOR. COORDINATE JUNCTION BOX LOCATION WITH ELECTRICAL CONTRACTOR. REFER TO
DETAIL 8/P-502.
3/4" CW DN TO TRAP PRIMER. 1/2" CW FROM TRAP PRIMER TO FLOOR DRAINS. CONNECT 1/2" CW TO TRAP PRIMER CONNECTION OR VETICAL PIPE FROM DRAIN OUTLET ABOVE P-TRAP. REFER TO DETAIL 11/P-501.
COORDINATE PIPING TO AVOID STRUCTURAL ELEMENTS AND TO NOT ROUTE IN FRONT OF WINDOWS.
N.T.S.
KEYPLAN - B44 - AREA B
1/4" = 1'-0"
PLUMBING PRESSURE PLAN - SECOND FLOOR AREA B- NEW WORK
E
P-502
44-CP-2-1
TMV-3
44-ET-2-1
1 1/4" CW. REFER
TO PP121 FOR
CONTINUATION
1 1/4" CW
3/4" HWR & 1 1/4" HW.
REFER TO PP121
FOR CONTINUATION
3/4" HWR
1 1/4" HW
EX 2" CW. REFER
TO PP121 FOR
CONTINUATION
1 1/4" HW
EX 2" CW
EX 1" CW
EX 1" CW. REFER
TO PP121 FOR
CONTINUATION
44-SWH-2-1
F
P-402
P-103
P-701
P-204
1 1/4" HW
2" CW
1 1/2" CW
3/4" HW
3/4" HW
1 1/2" CW
3/4" HW & 2" CW.
REFER TO PP121
FOR CONTINUATION
3/4" HW & 2" CW.
REFER TO PP122
FOR CONTINUATION
1 1/4" HW
2" CW
H
P-402
P-103
P-524
1 1/4" HW
2" CW
3/4" HW & 2" CW.
REFER TO PP122
FOR CONTINUATION.
3/4" HW & 2" CW.
REFER TO PP122
FOR CONTINUATION.
3/4" HW
3/4" HW
1 1/4" CW
2" CW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /2
.0
V A
M ia m i
H V
A C
S y s te m U p g ra d e a n d
E x p a n s io n B
/0
V A
M ia m i U p g ra d e H
V A
C
E x p
B
-R
D iv
,2
.r v t
/3
/2
:0
:5
P
M
P-401
PLUMBING ENLARGED PLANS Construct a New Boiler Building and Controls in the Old Incinerator Area
Expand/Move Graphic Control
MIAMI, FLORIDA
546-22-110
B44
ERNESTO A. CABRERA
03/14/2024 GSC AJZ
BID SET
Geoffrey Chenoweth, P.E.
PE License #PE085290
1/2" = 1'-0"
ENLARGED PLUMBING PRESSURE 20644 HAC CLOSET
1/2" = 1'-0"
ENLARGED PLUMBING PRESSURE 20744 BATHROOM
DRAWING NOTES:
1. REFER TO MECHANICAL SHEET MP121 & MP122 FOR ALL NATURAL GAS PIPING.
2. PROVIDE ALL PLUMBING FIXTURES RECEIVING HOT WATER WITH A MIXING VALVE. REFER TO P-801
FOR THERMOSTATIC MIXING VALVE TEMPERATURE SETTINGS.
CODED NOTES:
1 1-1/4" CW, 1-1/4" HW, 3/4" HWR, & 3/4" G TO GWH. ROUTE 1-1/4" HW TO TMV MOUNTED ON WALL. PROVIDE A HW BYPASS AROUND THE TMV FOR THERMAL ERADICATION PURPOSES. ROUTE 1-1/4" HW FROM TMV
TO FIXTURES. REFER TO MP122 FOR NATURAL GAS ROUTING. REFER TO DETAIL 5/P-502.
3/4" CW & HW DN TO FIXTURE
NC VALVE
1-1/4" CW DN TO WATER CLOSET
3/4" HW LOOP. 1/2" CW DN. 1/2" CW & HW TO LAV.
1" CW DN TO UR
0 1' 2' 4' 6'
1/2" = 1'-0"
1/2" = 1'-0"
ENLARGED PLUMBING PRESSURE CONTROL ROOM BATHROOM
N
Revisions Date
1 ADDENDUM 01 5/31/2024
SHUT OFF
VALVE AND
CAP LINE
FINISHED FLOOR
FOR FIXTURE HEIGHT
SEE ARCHITECTURAL
DRAWINGS
1" [25mm] STOP
[56mm]
2 1/4"
[69mm]
2 3/4"
[119mm]
4 3/4"
/2
[6 3m m
1/
2"
C/L OF FIXTURE
FINISHED WALL
MANUAL FLUSH HANDLE
MANUAL FLUSH HANDLE
[200mm]
8"
[8 m m
F
O R
F
IX
T U
R E
H E
IG
H
T S
S
A R
C H
IT
E
C T
U R
A L
D R
A W
IN
G
S
FAUCET SEE SPECIFICATIONS
NOTE:
PROVIDE COVER FOR EXPOSED PIPING
OFFSET WASTE
LAMINAR FLOW
CONTROL DEVICE
LOOSE KEY STOP
ESCUTCHEON
FINISHED FLOOR
TRAP PARALLEL TO WALL
[2 m m
/4
GRAB BAR
24" [600mm]
SLIDE BAR
DRAIN
SOAP
DEPRESSION
SLOPE ENTIRE SHOWER FLOOR
(ASSUMES TOPPING SLAB) NOTE:
LINEAR TRENCH DRAIN AT
SHOWER ENTRANCE IS AN
ACCEPTABLE OPTION.
[1
0m m
6' -0
T O
C E
N T
E R
LI
N
E S
U P
P
LY
E
LL
5' -4
[1
0m m
[1
0m m
3' -4
[1
0m m
5' -6
[2
0m m
6' -8
[1
0m m
3' -6
[8 m m
2' -9
[150mm]
6"
[225mm]
9"
[8 m m
2' -9
INTEGRAL
VACUUM
BREAKER
SHOWER HEAD
CURTAIN ROD
SHOWER CONTROL
TYPE T/P
[225mm]
9"
[150mm]
6"
NOTE:
1. AT LAVS WITH FOOT PEDAL CONTROLS PROVIDE AN ADDITIONAL
16 GAGE GALVANIZED STEEL PLATE 12"x16" [300x600mm] SECURED
TO A MINIMUM OF 2 STUDS PER FOOT PEDAL.
2. PROVIDE 20 GAGE STUDS WHEN HEIGHT EXCEEDS 12'-0" [3600mm]
[9 m m
T
O F
LO
O
R
3' -3
PLAN
1/4" [6mm]∅ MOLLY BOLT HOLLOW
WALL ANCHOR (1 EA. SIDE OF LAV)
FOR FIXTURE HEIGHT SEE
ARCHITECTURA DRAWINGS
V A
R
IE
S
MINIMUM 16 GAGE GALVANIZED
STEEL PLATE 12"x48" [300x1200mm]
MIN. SECURED TO A MIN. 4 STUDS
PER LAVATORY
MIN. 5 1/4" [131mm]∅
GALV. MACHINE BOLTS
WELDED TO PLATE
MIN. (3) 1/4" [6mm]
MACHINE BOLTS
W/DOUBLE LOCK
NUTS ON BACK SIDE
A
STEEL HANGER
BY LAV MFGR
SECTION A
STEEL WALL
PLATE
WALL ANCHOR
STUDS
TYP. 1/8"
TYP. [3mm]
1/4"
[6mm]
WALL
SUPPLY 1 1/4" NPT FROM
THERMOSTATIC MIXING
VALVE
PROVIDE WITH MULTIPLE SETS OF
CONTRACTS FOR REMOTE
ACTIVATION ALARM SITES; 120 VAC, 60 HZ
POLISHED CHROME
DRENCH SHOWER HEAD
PULL ROD
FLOOR
FLANGE
PIPE EYEWASH
DRAIN TO FLOOR
NOTES:
1. ALL INFORMATION IS APPROXIMATE AND SHALL BE VERIFIED BY THE CONTRACTOR.
2. PROVIDE WALL MOUNTED DUPLEX PUMP CONTROL PANEL. FURNISH TO DIVISION 26 FOR INSTALLATION. REFER
TO FLOOR PLANS FOR LOCATION.
30" 6" WALLS 60"
D E
P T
H
FLOOR LEVEL
PUMP DISCHARGE 42
M A
X
IM
U M
4" PUMP DISCHARGE
8" SAN COORDINATE FINAL
LOCATION WITH EXISTING
BUILDING OUTLET
3" VENT. CONTINUE VENT TO
VENT STACK. REFER TO
FLOOR PLAN FOR LOCATION
HIGH WATER ALARM
SIGNAL TO BAS/EMS
HIGH WATER ALARM
SIGNAL TO BAS/EMS
3" VENT. CONTINUE VENT TO
VENT STACK. REFER TO
FLOOR PLAN FOR LOCATION
4" PUMP DISCHARGE
CO
CO
HIGH WATER ALARM
BALL VALVE
CHECK VALVE
FLOOR LEVEL
MOTOR
M A
X
IM
U M
TOP OF BASIN,
ELEV 0.00'
2"
FLOAT
PUMP
4" MINIMUM
BOTTOM BASIN, ELEV. -4.00'
4' -0
FLOOR DRAIN
P-TRAP
BALL VALVE
1/2" COLD WATER
FINISH FLOOR
1/2" TYPE "K" SOFT SEAMLESS COPPER
WITH NO JOINTS BELOW FLOOR SLAB.
SLOPE AT 1/8" PER FOOT MINIMUM TO
FLOOR DRAIN CONNECTION.
24 V ELECTRICAL
CONNECTION
24 V TRANSFORMER.
PROVIDED BY PLUMBING
CONTRACTOR
JUNCTION BOX.
PROVIDED BY
ELECTRICAL
CONTRACTOR
1/2" NPT CONNECTION
TIMER
1" AIR GAP
1/2" FEMALE NPT CONNECTION
SOLENOID VALVE
ELECTRONIC TRAP PRIMER
(DESIGN BASIS PRECISION
PLUMBING PRODUCTS
SMP-500-24V) SUITABLE FOR 1
TO 4 FLOOR DRAINS (WITH
OPTIONAL PRECISION
PLUMBING PRODUCTS DU-4)
SHUTOFF VALVE
UNION
SUMP PUMP
FINISHED
FLOOR
OIL MINDER
CONTROL
OIL SENSOR
SILENT CHECK
VALVE
ELEVATOR PIT
SECURE PIPING
TIGHT TO PIT WALL
DISCHARGE PIPE
CONTINUED ON PLAN
HIGH WATER
ALARM
REFER TO PLANS FOR LOCATION
OF CONTROL PANEL AND ALARM
2" PUMP DISCHARGE
COORDINATE EXACT LOCATION
OF DISCHARGE PIPING WITH
ELEVATOR INSTALLER
ELEVATOR
PIT FLOOR
BASIN AND PERFORATED
STEEL BASIN COVER
SEE FLOOR PLAN FOR PIPE SIZES
EXPANSION TANK
BALANCING VALVE VACUUM RELIEF VALVE
RECIRCULATION PUMP
FLOOR DRAIN WITH
FUNNEL
CD
STEAM
BALL VALVE
CONDENSATE TRAP W/VACUUM
BREAKER
STEAM SUPPLY LINE
CONDENSATE TRAP
Y STRAINER
STEAM VALVE
HEATER
WATER
DRAIN PAN
FULL SIZE OF RELIEF VALVE
DRAIN VALVE
T & P RELIEF VALVE
4" RAISE HOUSEKEEPING PAD
FULL SIZE BYPASS LINE
T
THERMOMETER
T
TEMPERATURE MIXING VALVE
CW
C W
HWR
H W
R HWHW 140°F
BALL VALVE (TYP)
CHECK VALVE (TYP)
CD
BY DIVISION 22
BY DIVISION 23
KEY NOTE:
1. COORDINATE INSTALLATION OF STEAM AND CONDENSATE PIPING,
VALVES, AND APPURTENANCES WITH MECHANICAL CONTRACTOR.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /2
.0
V A
M ia m i
H V
A C
S y s te m U p g ra d e a n d
E x p a n s io n B
/0
V A
M ia m i U p g ra d e H
V A
C
E x p
B
-R
D iv
,2
.r v t
/3
/2
:0
:5
P
M
P-502
PLUMBING DETAILS Construct a New Boiler Building and Controls in the Old Incinerator Area
Expand/Move Graphic Control
MIAMI, FLORIDA
546-22-110
ERNESTO A. CABRERA
03/14/2024 GSC AJZ
BID SET
Geoffrey Chenoweth, P.E.
PE License #PE085290
N.T.S.
WATER CLOSET DETAIL - MANUAL
N.T.S.
TYPICAL WHEELCHAIR LAVATORY DETAIL
N.T.S.
SHOWER DETAIL
1N.T.S.
LAVATORY MOUNTING DETAIL
N.T.S.
EMERGENCY SHOWER/EYEWASH
N.T.S.
DUPLEX SEWAGE EJECTOR DETAIL
N.T.S.
ELECTRONIC TRAP PRIMER - SINGLE DRAIN
N.T.S.
ELEVATOR SUMP PUMP DETAIL - BASIN IN SHAFT
Revisions Date
1 ADDENDUM 01 5/31/2024
N.T.S.
STEAM WATER HEATER
44-SP-1-1
2" V. REFER TO P-602
FOR CONTINUATION
2" V
2" V
2" V
2" V
3" SAN
4" SAN
3" SAN
1 1/2" SAN
2" V
4" SAN
3" SAN
4" FD-M
PROVIDE NEW FD
GRATE ON EX FD BODY
4" SAN
EX HD
EX FD
EX FD
EX FD
EX FD
EX 4" SAN
EX 4" SAN
EX 4" SAN
EX 4" SAN
EX 4" SAN
EX 4" SAN
EX 3" V
EX 2" V
EX 3" V
EX 2" V
EX 4" V
EX 2" V
EX 2" V
EX 3" V
EX 1 1/2" V
EX 2" SAN
EX 2" V
EX 4" V
EX 4" V
EX 4" V
P-701
2" FD-C
P-103
P-402 P-204
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /2
.0
V A
M ia m i
H V
A C
S y s te m U p g ra d e a n d
E x p a n s io n B
/0
V A
M ia m i U p g ra d e H
V A
C
E x p
B
-R
D iv
,2
.r v t
/3
/2
:0
:0
P
M
P-601
PLUMBING GRAVITY ISOMETRIC Construct a New Boiler Building and Controls in the Old Incinerator Area
Expand/Move Graphic Control
MIAMI, FLORIDA
546-22-110
ERNESTO A. CABRERA
03/14/2024 GSC AJZ
BID SET
Geoffrey Chenoweth, P.E.
PE License #PE085290
DRAWING NOTES:
1. ISOMETRICS PROVIDED FOR REFERENCE ONLY. REFER TO FLOOR PLANS FOR MORE INFORMATION.
N.T.S.
GRAVITY ISOMETRIC - AREA A
CODED NOTES:
1 EX PIPING TO OTHER AREAS. REFER TO FLOOR PLAN FOR CONTINUATION.
ROUTE EX ICE MACHINE DRAIN TO SINK AND TIE INTO PUMP SYSTEM. PROVIDE A CO IN AN ACCESSIABLE LOCATION ON SIDE OF ICE MACHINE ON PIPE THAT RUNS TO SINK DRAIN.CONNECT ICE MACHINE DRAIN
ABOVE P TRAP. ROUTE PIPING TIGHT TO BACK OF CABINETS.
ROUTE EX CHEMICAL FEED DRAIN TO SINK AND TIE INTO PUMP SYSTEM.
PROVIDE NEW PUMP UNDER SINK AND CONNECT TO EX PUMP PIPING. RECONNECT EX PD PIPING BACK
INTO THE EX SANITARY SYSTEM. RECONNECT EX V BACK INTO THE EX VENT SYSTEM.
Revisions Date
44-SP-1-3
44-SP-1-2
BACKWATER VALVE
6" FD-R
4" FCO
6" SAN
6" SAN
4" PD
4" PD
4" PD
8" SAN
CO
CO
EX 4" SAN
EX 8" SAN
4" SAN
3" V
3" V
3" V
6" V
6" V
2" V
2" V
6" VTR
2" V. REFER TO
P-601 FOR
CONTINUATION
4" SAN
4" SAN
4" SAN
2" SAN
2" SAN
4" SAN
2" V
1 1/2" V
2" V
4" V
4" V
4" FD-B
4" FD-R
8" FD-R
4" FD-Z
4" FD-Z
4" FD-Z
4" FD-Z
4" FD-Z
4" FD-Z
4" FD-Z
4" FD-Z
4" FD-Z
BRINE TANK, WATER
SOFTENER, AND
CHEMICAL TREATMENT
6" VTR
4" FD-S
4" V
4" SAN
2" V. REFER TO
P-603 FOR
CONNECTION POINT
4" FD-C
4" SAN
2" V
CO
CO
CO
CO
CO
CO
CO
CO
CO
CO
2" V
2" V
4" FD-R
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /2
.0
V A
M ia m i
H V
A C
S y s te m U p g ra d e a n d
E x p a n s io n B
/0
V A
M ia m i U p g ra d e H
V A
C
E x p
B
-R
D iv
,2
.r v t
/3
/2
:0
:0
P
M
P-602
PLUMBING GRAVITY ISOMETRIC Construct a New Boiler Building and Controls in the Old Incinerator Area
Expand/Move Graphic Control
MIAMI, FLORIDA
546-22-110
ERNESTO A. CABRERA
03/14/2024 GSC AJZ
BID SET
Geoffrey Chenoweth, P.E.
PE License #PE085290
DRAWING NOTES:
1. ISOMETRICS PROVIDED FOR REFERENCE ONLY. REFER TO FLOOR PLANS FOR MORE INFORMATION.
N.T.S.
GRAVITY ISOMETRIC - AREA B
CODED NOTES:
1 EX PIPING TO OTHER AREAS. REFER TO FLOOR PLAN FOR CONTINUATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /2
.0
V A
M ia m i
H V
A C
S y s te m U p g ra d e a n d
E x p a n s io n B
/0
V A
M ia m i U p g ra d e H
V A
C
E x p
B
-R
D iv
,2
.r v t
/3
/2
:0
:0
P
M
P-801
PLUMBING SCHEDULES Construct a New Boiler Building and Controls in the Old Incinerator Area
Expand/Move Graphic Control
MIAMI, FLORIDA
546-22-110
ERNESTO A. CABRERA
03/14/2024 GSC AJZ
BID SET
Geoffrey Chenoweth, P.E.
PE License #PE085290
PLUMBING FIXTURE SCHEDULE
MARK FIXTURE
BASIS OF DESIGN
MIXING VALVE NO.
CONNECTION SIZES FIXTURE UNITS FLUSH VALVE/FAUCET TYPE
FIXTURE
FAUCET/FLUSH
VALVE
WASTE PIPE
(INCHES)
VENT PIPE
(INCHES)
COLD WATER
(INCHES)
HOT WATER
(INCHES)
WASTE FIXTURE
UNITS
WATER FIXTURE
UNITS
COLD WATER
FIXTURE UNITS
HOT WATER
FIXTURE UNITS MANUAL HANDLE
HARD WIRED
SENSOR BATTERY SENSOR
FD-Z TRENCH DRAIN ZURN: Z886 DGC - N/A 4" 2" - - 4 - - - N/A - -
P-103 WATER CLOSET ZURN: Z5615-BWL SLOAN: ROYAL
111-1.28
N/A 4" 2" 1-1/4" - 4 10 10 - YES - -
P-204 URINAL ZURN: Z5755-U SLOAN: ROYAL
186-0.125
N/A 3" 2" 1" - 2 3 3 - YES - -
P-402 LAV ZURN: Z5318 ZURN:
Z831B4-XL-28F
TMV-1 1-1/2" 1-1/2" 1/2" 1/2" 1 2 1.5 1.5 YES - -
P-502 MOP SINK FIAT PRODUCTS:
TSB3000
FIAT PRODUCTS:
830-AA
TMV-4 3" 2" 3/4" 3/4" 2 4 3 3 YES - -
P-524 KITCHEN SINK ELKAY: CR3322 DELTA: 9113-DST TMV-4 1-1/2" 1-1/2" 3/4" 3/4" 3 2 1.5 1.5 YES - -
P-531 SINK ELKAY: SS8124R2 ELKAY:
LK940BP03T4S
TMV-4 2" 2" 3/4" 3/4" 3 4 3 3 YES - -
P-701 SHOWER - SYMMONS:
9603-PLR-1.5
N/A 2" 2" 3/4" 3/4" 2 4 3 3 YES - -
P-707 EMERGENCY SHOWER EYE & FACE WASH BRADLEY:
S19314AA1DBDB00
- TMV-2 - - 1-1/2" TEPID - - - - YES - -
P-804 HOSE BIBB ZURN: Z1341 - N/A - - 3/4" - - - - - YES - -
PUMP SCHEDULE
MARK MANUFACTURER MODEL NO. TYPE CAPACITY(GPM) HEAD(FEET) MOTOR HP MOTOR VOLTS/PHASE/HERTZ MOTOR RPM NOTES
44-SP-1-1 LIBERTY PUMPS 404 SIMPLEX SUMP MATCH
EXISTING
MATCH
EXISTING
1/3 115/1/60 3450 1
44-SP-1-2 AURORA 521A SIMPLEX SUMP 27 15 3/4 480/3/60 1725 2
44-SP-1-3 AURORA 521A SIMPLEX SUMP 27 15 3/4 480/3/60 1725 2
44-SP-1-4 STANCOR SV-100 SIMPLEX SUMP 50 19 1 115/1/60 3450 3
THERMOSTATIC MIXING VALVE SCHEDULE
MARK
BASIS OF DESIGN
OUTLET/TEMPERATURE INLET/OUTLET SIZE MIN. FLOW RATE LOCATIONMANUFACTURER MODEL NO.
TMV-1 BRADLEY S59-4007 110°F 1/2" / 1/2" 0.2 LAVS
TMV-2 BRADLEY S19-2250 85°F 1" / 1-1/4" 3.0 P-707
TMV-3 BRADLEY S59-3080 130°F 1" / 1-1/4" 2.0 MASTER @GWH
TMV-4 BRADLEY S59-4016 110°F 3/4" / 3/4" 0.5 PLUMBING FIXTURES
NOTES:
1. THERMOSTATIC MIXING VALVE SHALL BE PIPED PER MANUFACTURER RECOMMENDATIONS.
2. PROVIDE INLET PIPING WITH CHECK VALVES (IF NOT PROVIDED AS PART OF THE VALVE) AND SHUTOFF VALVES. PROVIDE OUTLET
PIPING WITH SHUT-OFF VALVES.
3. REFER TO PLUMBING FIXTURE SCHEDULE FOR EXACT MIXING VALVE FOR EACH PLUMBING FIXTURE.
4. PROVIDE TMV-3 WITH A BYPASS LINE TO ALLOW FOR THERMAL ERADICATION OF ALL HW PIPING.
NOTES:
1. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
2. REFER TO THERMOSTATIC MIXING VALVE SCHEDULE FOR MIXING VALVE DESIGN.
3. THERMOSTATIC MIXING VALVE FOR P-701 IS PROVIDED AS PART OF SHOWER. REFER TO SPECIFICATIONS FOR T/P VALVE SPECIFICATIONS.
DOMESTIC WATER HEATER (STEAM) SCHEDULE
MARK MANUFACTURER MODEL NO. STEAM INLET STEAM LB / HR
RECOVERY (GPH)
@70°F STORAGE (GALLONS) STORAGE TEMP (°F) SIZE (D"xH") VOLTS/PHASE/HERTZ MOCP OPERATING WEIGHT (LBS)
44-SWH-2-1 PVI QUICKDRAW 10 L 5A-ISD 1" 365 525 103 140 30" X 95" 120/1/60 20 AMPS 700
HOT WATER RECIRC. PUMP SCHEDULE
MARK MANUFACTURER MODEL NO. TYPE CAPACITY (GPM) HEAD (FEET) MOTOR (HP) MOTOR (VOLTS/PHASE/HERTZ)
44-CP-2-1 TACO 006-ST4 INLINE 1.5 3.31 1/40 115/1/60
EXPANSION TANK SCHEDULE
MARK
BASIS OF DESIGN
MANUFACTURER
BASIS OF DESIGN
MODEL NUMBER
TANK VOLUME
(GAL)
ACCEPTANCE
VOLUME (GAL) SIZE (D" x H") CONNECTION SIZE WEIGHT (LBS)
44-ET-2-1 TACO PAX25-150 6.6 4 12" x 20-5/8" 3/4" 86
NOTES:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
NOTES:
1. PROVIDE SINGLE POINT ELECTRICAL CONNECTION.
2. RECIRC PUMP SHALL BE PIPED PER MANUFACTURER'S RECOMMENDATIONS.
3. BALANCING VALVES SHALL BE PROVIDED FOR ALL CIRCULATING SYSTEMS, VALVES SHALL BE SET TO FLOW RATES SHOWN UNLESS NOTED OTHERWISE.
4. PROVIDE AQUASTAT AQS-1/2 FOR EACH PUMP LOCATION.
5. ELECTRICAL CONTRACTOR TO PROVIDE HAND/OFF/AUTO CONTROLLER. BAS CONNECTIONS TO BE COMPLETED BY DIVISION 23. REFER TO MECHANICAL
CONTROLS DRAWINGS FOR REQUIREMENTS AND COORDINATION.
NOTES:
1. PROVIDE SINGLE POINT ELECTRICAL CONNECTION.
2. DISCONNECT SWITCH PROVIDED BY ELECTRICAL. REFER TO ELECTRICAL DRAWINGS.
3. WATER HEATER AND ALL ASSOCIATED COMPONENTS SHALL BE PIPED PER MANUFACTURER RECOMMENDATIONS.
4. COORDINATE INTAKE AND EXHAUST PIPE SIZES WITH MANUFACTURER'S INSTRUCTIONS BASED ON NUMBER OF ELBOWS.
5. ROUTE T&P VALVE AND INDIRECT DISCHARGE TO FLOOR DRAIN.
6. OUTLET TEMPERATURE SHALL BE SET TO 140°F ON WATER HEATER.
7. WATER HEATER SHALL BE PLACED ON A 4" RAISED CONCRETE PAD.
8. ROUTE EXHAUST CONDENSATE DRAIN THROUGH A CONDENSATE NEUTRALIZATION KIT AND DISCHARCE TO A FLOOR DRAIN.
9. PROVIDE INTAKE AND EXHAUST WITH CONCENTRIC VENT KIT. FOLLOW ALL MANUFACTURER'S RECOMENDATIONS TO INSTALL THE CONCENTRIC VENT THROUGH THE ROOF.
10. WATER HEATER TO BE CAPABLE OF HEATING HOT WATER TO 180°F TO ALLOW FOR THERMAL ERADICATION PURPOSES PER VA DESIGN MANUAL.
ELECTRONIC TRAP PRIMER SCHEDULE
MARK BASIS OF DESIGN MANUFACTURER
BASIS OF DESIGN
MODEL NUMBER CW INLET CW OUTLET SIZE
MAX NUMBER OF
DRAINS SERVED
DIMENSIONS
(L" x W" x H")
ELECTRICAL
(V/P/HZ)
ELECTRICAL
WATTS NOTES
44-TP-1-1 PRECISION PLUMBING PRODUCTS SMP-500-24V 1/2" 1/2" 1 9" LENGTH 24V - 1, 2, 3
44-TP-2-1 PRECISION PLUMBING PRODUCTS PTS-4 3/4" 1/2" 4 16" x 14" x 3-3/8" 120/1/60 6 1, 2
44-TP-2-2 PRECISION PLUMBING PRODUCTS PTS-6 3/4" 1/2" 6 16" x 14" x 3-3/8" 120/1/60 6 1, 2
44-TP-2-3 PRECISION PLUMBING PRODUCTS PTS-6 3/4" 1/2" 6 16" x 14" x 3-3/8" 120/1/60 6 1, 2
44-TP-2-4 PRECISION PLUMBING PRODUCTS SMP-500-24V 1/2" 1/2" 1 9" LENGTH 24V - 1, 2, 3
NOTES:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. PROVIDE SINGLE POINT ELECTRICAL CONNECTION.
3. CONTRACTOR TO PROVIDE A 24V TRANSFORMER TO CONNECT TRAP PRIMER TO JUNCTION BOX
NOTES:
1. PROVIDE SINGLE POINT ELECTRICAL CONNECTION.
2. PROVIDE SINGLE POINT ELECTRICAL CONNECTION TO PUMP SYSTEM FROM NEMA 4X DUPLEX PUMP CONTROL PANEL.
3. PROVIDE SINGLE POINT ELECTRICAL CONNECTION TO SUMP PUMP THROUGH OIL MINDER, HIGH WATER ALARM, AND NEMA 4X SIMPLEX PUMP CONTROL PANEL.
WATER SOFTENER SYSTEM
MARK MANUFACTURER MODEL NO. LOCATION
FLOW RATE
(GPM)
PRESSURE LOSS
(PSI)
INLET WATER
HARDNESS
(PPM)
SALT USAGE
(LBS/REGEN)
REGENERATION
FREQUENCY
(GALS)
DIMENSIONS
(L"xW"xH") WEIGHT (LBS)
SW-01 / SW-02 BOILER 21144 46 95,000 126" x 58" x 60"
NOTES:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. WATER SOFTENER SYSTEM SHALL OPERATE UNDER CONSTANT AND MODULATING FLOW.
3. REFER TO SPECIFICATION 22 31 11 FOR ADDITIONAL SOFTENER PERFORMANCE AND INSTALLATION REQUIREMENTS.
4. BT-01 BRINE TANK TO BE SUPPLIED WITH WATER SOFTENER SYSTEM.
Revisions Date
1 ADDENDUM 01 5/31/2024
F
G H I J K
1.14.4
44-BOT-2-1
2T
T
STORAGE
11144
S3 500
M-303
M-304
M-502
-F
C U
-1 -2
-F
C U
-1 -3
-F
C U
-1 -4
-F
C U
-1 -1
1 1
T
T
T
B7
B1
AREA BB44
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /2
.0
V A
M ia m i
H V
A C
S y s te m U p g ra d e a n d
E x p a n s io n B
/0
V A
M ia m i U p g ra d e H
V A
C
E x p
B
-R
D iv
,2
.r v t
/3
/2
:0
:2
P
M
MH112
MECHANICAL HVAC - FIRST FLOOR
AREA B - NEW WORK
Construct a New Boiler Building and Controls in the Old Incinerator Area
Expand/Move Graphic Control
MIAMI, FLORIDA
546-22-110
B44
ERNESTO A. CABRERA
03/14/2024 GSC ZGC
BID SET
Geoffrey Chenoweth, P.E.
PE License #PE085290
1/4" = 1'-0"
MECHANICAL HVAC - FIRST FLOOR AREA B - NEW WORK
CODED NOTES:
N
0 2' 4' 8' 12'
1/4" = 1'-0"
FAN COIL UNIT SUSPENDED FROM STRUCTURE.
STORAGE 11144 INDEPENDENT THERMOSTAT WITH BACNET MS/TP COMMUNICATION FOR MONITORING
OF ROOM TEMPERATURE.
N.T.S.
KEYPLAN - B44 - AREA B
CONTROL
ROOM
21344
STAIR 1-2
21044
G H I J K
44-FHX-2-1
M
A T
C H
LI
N
E
R E
F E
R T
O P
LA
N
/ M
H
F
O R
C O
N T
IN
U
A T
IO
N
44-FHX-2-2
44-FHX-2-3
44-VAV-1-1
B 100
E1 125
S1 50
S2 225S2 225
S2 225S2 225
R2 275
R2 300
14x12 SA
16x16 SA UP
14x12 SA x1
S
A
12X10 RA DN
2 2
8x8 EA UP
44-PMAC-2-4
44-CST-2-1
44-PMAC-2-1
44-PMAC-2-2
44-PMAC-2-3
S4250
S4250
S4250
S4300 x1
S
A
20x12 SA x1
S
A x8 S
A44-CP-2-1
44-CP-2-2
44-CP-2-3
44-FWP-2-1
44-FWP-2-2
44-FWP-2-3
10ø RA UP 10ø RA UP
S4300
S4300
S4300
S4300
S4300
S4 300
S4 300
MOD
x1
S
A
16x16 SA UP
MOD
12x10 SA
12x10 SA
8x8 SA
8x8 SA
S4 300
MOD
12x10 SA
8x8 SA
S4 300
S4 300
S4 300
S4 300
BOILER
21144
FD
T H
44-AHU-3-1
M-301
S3 500
M-303
M-304
-F
C U
-2 -1
B7
B1
AREA BB44
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /2
.0
V A
M ia m i
H V
A C
S y s te m U p g ra d e a n d
E x p a n s io n B
/0
V A
M ia m i U p g ra d e H
V A
C
E x p
B
-R
D iv
,2
.r v t
/3
/2
:0
:3
P
M
MH122
MECHANICAL HVAC - SECOND FLOOR
AREA B - NEW WORK
Construct a New Boiler Building and Controls in the Old Incinerator Area
Expand/Move Graphic Control
MIAMI, FLORIDA
546-22-110
B44
ERNESTO A. CABRERA
03/14/2024 GSC ZGC
BID SET
Geoffrey Chenoweth, P.E.
PE License #PE085290
CODED NOTES:
1 BOILER COMBUSTION AIR LOUVERS. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
30"x20" SA DN TO 48" ABOVE FINISHED FLOOR. PROVIDE 1"x1" ALUMINUM WIRE MESH SCREEN AT DUCT
OPENING. PROVIDE MANUAL DAMPER IN VERTICAL DUCTWORK 6'-0" AFF.
24"Ø INTERNAL DIAMETER BOILER FLUE UP TO ECONOMIZER AND CONTINUED UP TO NEXT LEVEL.
BALANCE PLANT MASTER PANEL. PROVIDE SINGLE POINT 120V/1-PH POWER. PANEL CABINET SHALL HAVE MINIMUM 3" BASE SUPPORT STANDS. PANEL MOUNTED AIR CONDITIONING UNIT ON SIDE OF
PANEL.
BOILER CONTROL PANEL WITH DISCONNECT AND BLOWER VFD. PROVIDE SINGLE POINT 460V/3-PH POWER. PROVIDE INTEGRAL 120V TRANSFORMER FOR CONTROL PANEL. PANEL CABINET SHALL HAVE MINIMUM 3" BASE SUPPORT STANDS. PANEL MOUNTED AIR CONDITIONING UNIT ON SIDE OF PANEL.
SUPPLY GRILLE MOUNTED AT 8'-0" ABOVE FINISHED FLOOR.
PROVIDE 4" CONCRETE PAD. CONCRETE PAD SHALL EXTEND A MINIMUM OF 6" BEYOND PERIMETER OF
EQUIPMENT.
30"x20" 45° OFFSET OVER TO BE TIGHT TO WALL.
2 POSITION 24V MOTORIZED DAMPER.
SUPPLY GRILLE MOUNTED 4'-0" ABOVE BOILER PLATFORM.
SIEMENS BUILDING SYSTEM PANEL. PANEL SHOWN FOR SPACE ALLOCATION. CONTROLS CONTRACTOR
SHALL DETERMINE QUANTITIES OF PANELS.
OUTDOOR HEAT PUMP BUILDING MANAGEMENT SYSTEM INTEGRATION CONTROLLERS (44-ODU-4-1, 44-ODU-4-2, & 44-ODU-4-3.
1/4" = 1'-0"1
MECHANICAL HVAC - SECOND FLOOR AREA B - NEW WORK
N
0 2' 4' 8' 12'
1/4" = 1'-0"
N.T.S.
KEYPLAN - B44 - AREA B
GENERAL NOTES:
1. BRANCH DUCT AND FLEXIBLE DUCT FROM A DIFFUSER, REGISTER, OR GRILLE SHALL BE THE SAME
SIZE AS THE DEVICE NECK (AS SHOWN ON SCHEDULE M-802), UNLESS NOTED OTHERWISE.
SUBN-3UPF
SUBN-3UPE
SUBN-3UPE
F U
T U
R E
E X
P
SUBN-3UPA
SUBN-3UPC
F U
T U
R E
E X
P
SUBN-3UPC
F U
T U
R E
E X
P
F U
T U
R E
E X
P
F U
T U
R E
E X
P
MVSN-3UPCMVSN-3UPA
MVSN-3UPB
B7
B1
AREA A B44
A B C C.5 D E F
EX 11-3-PEF7
TRANSFORMER
3G101
TRANSFORMER
3G104
SWITCHGEAR
1G103
COMMUNICATIONS
3G102
TRANSFORMER
3G105
SWITCHGEAR
3G100
T
FD
M
INSULATED S.S. OA DUCTWORK
M
M-301
M-303
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /2
.0
V A
M ia m i
H V
A C
S y s te m U p g ra d e a n d
E x p a n s io n B
/0
V A
M ia m i U p g ra d e H
V A
C
E x p
B
-R
D iv
,2
.r v t
/3
/2
:0
:3
P
M
MH131
MECHANICAL HVAC - THIRD FLOOR
AREA A - NEW WORK
Construct a New Boiler Building and Controls in the Old Incinerator Area
Expand/Move Graphic Control
MIAMI, FLORIDA
546-22-110
B44
ERNESTO A. CABRERA
03/14/2024 GSC ZGC
BID SET
Geoffrey Chenoweth, P.E.
PE License #PE085290
DRAWING NOTES:
1. NOT ALL MECHANICAL SYSTEMS SHOWN. ONLY MECHANICAL SYSTEMS WITHIN SCOPE OF WORK ARE
SHOWN.
CODED NOTES:
1 EXISTING LOUVER WITH INTEGRAL MOTORIZED DAMPER.
EXISTING EXHAUST FAN (30,325 CFM).
PROVIDE NEW DUCTWORK THRU EXISTING WALL PENETRATION AND PROVIDE FIRE DAMPER.
LOUVERED PENTHOUSE, 44-LVP-4-1 (ON SHEET MH142), INTEGRAL MOTORIZED DAMPER SHALL BE INTERLOCKED WITH EXISTING EXHAUST FAN, EX 11-3-PEF7. EXISTING CONTROL SEQUENCE SHALL
REMAIN.
N
0 2' 4' 8' 12'
1/4" = 1'-0"
N.T.S.
KEYPLAN - B44 - AREA A
1/4" = 1'-0"
MECHANICAL HVAC - THIRD FLOOR AREA A - NEW WORK
AREA BB44
F
G H I J K
1.14.4
12X10 RA DN
3 2
10ø RA DN 10ø RA DN
14x12 DN
30x20 SA
30x20 SA x3
S
A
36x30 SA30x20 SA
30X20 DN
30X20 DN
30X20 SA DN
44-DA-3-1
24ø FE DN
24ø FE DN
14x14 RA x1
R
A x1
S
A
16x16 SA
16X16 SA DN
ø
F E ø
F E ø
F E
24ø FE DN
-H
X -3
-1
FD
FDFD
EX FIRE BRICK
x4
FE
S3 500
18x10 OA
10x8 SA
88x50 OA x1
O
A
M-303
M-304
44-FCU-3-1
40x18 SA
RX 40x18 RA
44-FCU-3-2
R X
0x
S
A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /2
.0
V A
M ia m i
H V
A C
S y s te m U p g ra d e a n d
E x p a n s io n B
/0
V A
M ia m i U p g ra d e H
V A
C
E x p
B
-R
D iv
,2
.r v t
/3
/2
:0
:4
P
M
MH132
MECHANICAL HVAC - MEZZANINE AREA
B - NEW WORK
Construct a New Boiler Building and Controls in the Old Incinerator Area
Expand/Move Graphic Control
MIAMI, FLORIDA
546-22-110
B44
ERNESTO A. CABRERA
03/14/2024 GSC ZGC
BID SET
Geoffrey Chenoweth, P.E.
PE License #PE085290
N
0 2' 4' 8' 12'
1/4" = 1'-0"
N.T.S.
KEYPLAN - B44 - AREA B
1/4" = 1'-0"
MECHANICAL HVAC - MEZZANINE AREA B - NEW WORK
CODED NOTES:
1 44-EF-4-1 EXHAUST INLET ROOF OPENING.
44-EF-4-2 EXHAUST INLET ROOF OPENING.
44-EF-4-3 EXHAUST INLET ROOF OPENING.
8"x8" EA UP TO 44-EF-4-4
UNIT MOUNTED ON MEZZANINE.
PROVIDE 4" CONCRETE PAD TO EXTEND 6" BEYOND PERIMETER OF EQUIPMENT.
PROVIDE 24" DEEP PLENUM AT LOUVER. PLENUM SHALL BE CONSTRUCTED OF ALUMINUM.
PLENUM SHALL BE SAME WIDTH AND HEIGHT OF LOUVER. LOUVER SHALL BE MINIMUM
13'-0" WIDE BY 8'-0" HIGH. LOUVER SHALL BE RATED FOR MIAMI-DADE COUNTY. REFER TO
ARCHITECTURAL DRAWINGS FOR LOUVER INFORMATION.
30"x20" SA DN TO 48" ABOVE MEZZANINE FINISHED FLOOR. PROVIDE 1"x1" ALUMINUM WIRE MESH
SCREEN AT DUCT OPENING. PROVIDE MANUAL DAMPER IN VERTICAL DUCTWORK 6'-0" AFF.
24"x48" BOILER FLUE BREECHING. BREECHING SHALL EXTEND INTO EXISTING CHIMNEY 6" BEYOND FIRE BRICK INSULATION. OPENING SHALL BE 2" GREATER THAN BREECHING DIMENSIONS IN EACH DIRECTION.
REUSE EXISTING MASONRY CHIMNEY FOR BOILER FLUE GAS EXHAUST. EXISTING STACK SHALL BE INTERNALLY INSPECTED, REPAIRED, AND THEN COATED WITH ACID RESISTANT SURFACE COATING FROM TOP TO BOTTOM ON ALL INTERIOR SURFACES. ESTIMATED SURFACE AREA IS 2,300 SF SPREAD ACROSS FOUR WALLS. INSTALL DRAIN AT BOTTOM OF CHIMNEY WITH ACID NEUTRALIZATION SYSTEM
AND CONNECT TO DRAIN. REFER TO PLUMBING DRAWINGS FOR ARRANGEMENT.
DISCHARGE PLENUM EQUAL TO SUPPLY CONNECTION OF 44-MAU-4-1 ON ROOF.
G H I J K
44-EF-4-3 44-EF-4-2 44-EF-4-1
44-ODU-4-1
44-EF-4-4
44-MAU-4-1
FD
4" VTR
4" VTR
4" VTR
1-1/2" VTR
2" VTR
6" VTR
12" STEAM SILENCER VTR
3/4" VTR
1-1/2" VTR
3/4" VTR
1-1/2" VTR
3/4" VTR
1-1/2" VTR
M-303
2" NG (VENT
THRU ROOF)
REF DN 5
EX CWR DN
B7
B1
AREA BB44
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /2
.0
V A
M ia m i
H V
A C
S y s te m U p g ra d e a n d
E x p a n s io n B
/0
V A
M ia m i U p g ra d e H
V A
C
E x p
B
-R
D iv
,2
.r v t
/3
/2
:0
:4
P
M
MH142
MECHANICAL HVAC - ROOF PLAN AREA
B - NEW WORK
Construct a New Boiler Building and Controls in the Old Incinerator Area
Expand/Move Graphic Control
MIAMI, FLORIDA
546-22-110
B44
ERNESTO A. CABRERA
03/14/2024 GSC ZGC
BID SET
Geoffrey Chenoweth, P.E.
PE License #PE085290
N
0 2' 4' 8' 12'
1/4" = 1'-0"
1/4" = 1'-0"1
MECHANICAL HVAC - ROOF PLAN AREA B - NEW WORK
N.T.S.
KEYPLAN - B44 - AREA B
CODED NOTES:
1 PROVIDE 26X24 FIRE DAMPER AND VOLUME DAMPER
TERMINATE 0' 6" ABOVE FINISHED ROOF WITH GOOSENECK
TERMINATE 6' 0" ABOVE FINISHED ROOF SURFACE
6" VTR, REFERENCE PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION
PIPING REPRESENTS REFRIGERANT SUCTION AND LIQUID LINES FROM OUTDOOR UNIT TO INDOOR UNITS. CONTRACTOR TO COORDINATE PIPE SIZE AND MATERIAL WITH VRF SYSTEM MANUFACTURER
BASED ON FIELD ROUTING PRIOR TO INSTALLATION.
Revisions Date
G H I J K
1.14.4
EX 14"
CWR UP
M A
T C
H
LI
N E
R
E F
E R
T O
P
LA
N
/ M P
F O
R C
O N
T
IN
U A
T
IO
N
4" G UP
6" G UP
3/4" LPG
23/4" LP UP
4" G UP
23/4" LP UP
4" G UP
3/4" LP UP
2 1/2" FOS
FOS UP
FOR UP
FOS UP
1 1/2" FOS UP
1 1/2" FOS UP
1 1/2" FOS UP
2" BO UP
2" BO UP
2" BO UP
1" BO UP
1" BO UP
1" BO UP
44-BOT-2-1
1 1/2" FOR UP
1 1/2" FOR UP
1 1/2" FOR UP
2" FOR
2" B
O
2" BO
2" BO
4" NG
6" NG
1" LPG
2" CBD UP
A/C CONDENSATE PIPING
DN TO FLOOR DRAIN.
3/ 4"
C D
3/ 4"
C D
3/4" CD
3/4" CD
2" BO
M-303
M-304
M-502
3/4" CHWS
1" CHWS
1" CHWS
3/4" CHWS
3/4" CHWS
3/4" CHWS
1-1/4"CHS/R UP
3/4" CD
3/4" CHWR
3/4" CD
3/4" CD
3" PC
1" CHWR
1" CHWR
44-FCU-1-4 44-FCU-1-3
44-FCU-1-244-FCU-1-11/2" HHWS
1/2" HHWR
1/2" HHWS
1/2" HHWR
1/2" HHWR
1/2" HHWS 1/2" HHWS
1/2" HHWR
3/4" CHWS
3/4" CHWR
3/4" CD
1" HHWS/R UP
1" HHWR
1" HHWS
1" HHWS
1" HHWR
3/4" HHWS
3/4" HHWR
2" BO
2" BO
2" BO
3/4" CHWR
3/4" CHWR
2" BO
1" HHWR
1" HHWS
1" HHWR
1" HHWS
B7
B1
AREA BB44
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /2
.0
V A
M ia m i
H V
A C
S y s te m U p g ra d e a n d
E x p a n s io n B
/0
V A
M ia m i U p g ra d e H
V A
C
E x p
B
-R
D iv
,2
.r v t
/3
/2
:0
:5
P
M
MP112
MECHANICAL PIPING - FIRST FLOOR
AREA B - NEW PLAN
Construct a New Boiler Building and Controls in the Old Incinerator Area
Expand/Move Graphic Control
MIAMI, FLORIDA
546-22-110
B44
ERNESTO A. CABRERA
03/14/2024 GSC ZGC
BID SET
Geoffrey Chenoweth, P.E.
PE License #PE085290
CODED NOTES:
1 EXISTING CONDENSER WATER PIPING SHALL REMAIN OPERATIONAL THROUGHOUT CONSTRUCTION.
GAS SHUTOFF. SHUTOFF SHALL BE ACCESSIBLE FROM VALVE BOX IN FLOOR ABOVE WITH ELONGATED
"T" STEM.
PROVIDE LPG & GAS DIRT LEG AT TRANSITION TO VERTICAL PIPE.
PROVIDE 3-WAY CHWR VALVE.
PROVIDE 3-WAY HHWR VALVE.
N 1/4" = 1'-0"
MECHANICAL PIPING - FIRST FLOOR AREA B - NEW PLAN
0 2' 4' 8' 12'
1/4" = 1'-0"
N.T.S.
KEYPLAN - B44 - AREA B
Revisions Date
1 ADDENDUM 01 5/31/2024
C C.5 D E F
1.14
1.13
1.A 1.B 1.C 1.D 1.D3 1.D6
G H I
1.14.4
M-301
MATCHLINE - REFER TO PLAN 1/ MP122 FOR CONTINUATION
6" NG
1" LPG
EX 6" NG
6" NG
2 1/2" MPC
4" MPC
2" MPC
2 1/2" CC
3" CC
2 1/2" CC
2" LPC
G-1-5
R-1-31
R-1-32
R-1-33
G-1-6R-1-34R-1-35
A-1-1
OFFSET DRAIN AT 45°
ANGLE DOWN INTO
UTILITY…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .