Attachment 2 - Drawings.pdf

PDF 6 MB Posted

Attached to
SXHT 23-1030 Repair HVAC B535
Solicitation number
FA252125B0003
Issued by

About this file

The provided file is a comprehensive set of 100% design drawings for a HVAC repair project at Building 535 on Patrick Space Force Base. The drawings, prepared by rhodes + brito Architects for Space Launch Delta 45, cover multiple disciplines including architectural, mechanical, electrical, and environmental plans for a two-floor facility.

The design drawings detail the complete renovation of the building's HVAC system, including demolition and installation of new air handling units (AHU-6 and AHU-7), variable air volume (VAV) terminal units, ductwork, electrical systems, and associated infrastructure. The project involves replacing existing mechanical and electrical equipment, with careful consideration of environmental factors such as potential heavy metal and PCB coatings. The drawings provide detailed floor plans, mechanical and electrical installation plans, demolition plans, and environmental sampling results, indicating a thorough approach to the facility upgrade.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S T

A

TE

R O

A D

A

A

ACCESS ROAD

REDSTONE R OAD

RECREATION ROAD

U N

KN

O W

N

CONTROL R OAD

UN KNOW N

CONTROL R OAD

UN

KNOW

N

U N

K N O W

N

A CCE SS ROAD

ACCESS ROAD

PEQUOT TRAI L

A

CCES

S R O

AD

F O R

EC

A ST

LA

N

E

ATLAS AVENUE

F A

LC

O N

AV

EN

U E

SOUTH TECH ROAD

COUGAR RU N

SAND OLLAR COVE

ENDEAVOR ROAD

ACCESS ROAD

TI

T

AN

R

O A

D

PORPOI SE COVE

T U

SK

E

G

EE

A

IR

M

EN

D R

IVE

U N

KN

OW

N

SP

A

CE

L IF

T A

VE

N

U E

O M

AL

LE

Y D

R

ACCESS ROAD

NORTH D RIVE

N C

O C

LUB

SO

U

T H PA

R

KIN

G

UTE TRAIL

SEQUOI A TRAIL

JAGUAR AVENUE

DU SKY RUN

PHAR MACY DRIVE

ACCESS ROAD

PANTHER RUN

D E

LT

A

D

RI

V E

SHOSHONI TRAI L

C A

N

IN

E D

R

IV

E

JU PITER STREET

ACCESS ROAD THUNDER LANE

THOR STREET

EDW ARD H. WHITE II

JUPITER STREET

CHALL ENGER STREET

MATADOR STREET

BREAKERS LANE

PERSH ING PLAC E

R E

SC

U

E R

OA

D

REL AY STATION ROAD

MACE R OAD

SATURN ROAD

6 TH HO LE SUNSET BLVD

G R

EE

NSK

EEP

E

R

LA

NE

STATE ROAD 404

STATE ROAD 404 (ONRAMP)

A C

CE

S

S R O

A D

H A

BI TAT

R

U N

C O

NT

RO

L R

O A

D R

I V

ER

S

ID

E

TR

AI

L

R

IV

ER

S

ID

E TR

AIL

UNKNOWN

U N

KN

OW

N

S O

U

TH

P

AT

R

IC

K D

RI

V

E

ACCESS ROAD

ACCESS ROAD

SCHOOL AVENUE

S C

H O

O

L AV

E N

U E

ARAP AHO

TRAIL

AN

GE

L

FIS

H

CO

VE

C O

NT

RO

L R

O A

D C

O

NT

RO

L

R O

A D

CH ICKASAW

TRAIL

CH OCKTAW

TRAIL

W E

S T

T E

CH

R

O A

D

JUPITER STREET

M

A IN

T

EN

A

NC

E R O

A D

COYOTE RUN

COYOTE RUN

R E

EF

C

O U R

T

ACCESS ROAD

S E

Q

UO

IA

T R

AIL

IR OQUIS TRAI L

IR OQUIS TRAI L

BEAR RUN

BEAR RUN

ALLIGATOR RUN

ALLIGATOR RUN

U N

KN

OW

N

MINUTEMAN STREET

R E

SC

U

E R O

AD

R

ES

C U

E R

O A

D

R

EE

F C

O U R

T

UN KNOW N

CONTROL ROAD

CO NTRO L R

OAD

S O

U T H

P A

T

RI

C K

D

RI

V E

S O

U

TH

P A T

RI C

K D

RIV

E

ANVIL ROAD

ANVIL ROAD

ACCESS ROAD

RE

SC

UE R

OA

D

R E

S C U

E R

O A

D

CHEROKEE

TRAIL

A C

C E

S S

RO

A

D

A C

C

ES

S R

O

AD

A C

C

ES

S R

O A

D

U N

K N

OW

N

T15

SOQ5

TBD

SOQ6

TBD

T7

Unknown

T968

SOQ2

SOQ4

TBD

PAV4

PAV5

PAV1

SOQ3

T13

T-Golon10

PAV9

T14

926926

TBD 932

PAV6

PAV8

10992

SOQ7

PAV2

T1619

T12

T6

10985

TBD

PB8

TBD

TBD

10990

10989

10991

SOQ1

TBD

ANT1

TBD

T A

X

IW

A Y

B200' X 4000'

TAXIW

AY M

T A X

IW

A Y

J

T A

X

IW

A Y

A

T A

X

IW

A Y

B

RUN-U

P PAD

TAXIWAY D

290 HEADING

TAXIWAY B

T A

X

IW

A Y

Z

TAXIWAY G

TAXIWAY L

RUNWAY 11/29

T A

X

IW

A Y

A

IN

S

T R

U M

E N

T R

U N

W A

Y

/2

T R

U E

A Z

IM

U T

H

.9

T R

U E

A Z

IM

U T

H

.9

TAXIW

AY M

' X

' F

IE

L D

E L E

V

TAXIWAY E

T A

X

IW

A Y

B

TAXIWAY C

TAXIWAY C

ARM/DE-ARM &

A C

C

ES

S R

O A

D A

C C

E S

S R O

A D

SCALE:

STATE OF FLORIDA

NONE

MIAMI

TAMPA

ORLANDO

TALLAHASSEE

JACKSONVILLE

PINEDA EXPRESSWAY

SOUTH GATE (PERSONNEL ONLY)

B A

N A

N A

R

IV

E R

B A

N A

N A

R

IV

E R

A T

L A

N T

IC

O

C E

A N

TRUCK

DELIVERY ONLY

BUILDING 423-CONTRACTING OFFICER

BUILDING 535-45TH CES

MAIN GATE (PERSONNEL ONLY)

S.R. A1A

B A

N A

N A

R

IV

E R

A T

L A

N T

IC

O

C E

A N

GOLF COURSE

PATRICK SPACE

FORCE STATION

JACKSONVILLE

TALLAHASSEE

TAMPA

MIAMI

MAIN GATE

PROJECT LOCATION

SXHT 23-1030

BLDG 535

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

SHEET OF

C O

N T

R A

C T

N O

D R

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

DESIGN DRAWINGS

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

A A rh o d e s b ri to

A

C

H

I

E

P

A C

E L

A U

N C

H D

E L T

A

C C

S F

S F

L

/2

/2

:2

:1

P

M

R E

P A

IR

H

V A

C B

U

IL

D

IN

G

S

IG

N

A

IR

F O

R C

E S

E R

V

IC

E S

A C

T

IV

IT

Y

G-000

C O

V E

R S

H E

E T

S X

H T

-1

G G

-0

F A

-1

D

-0

A p ri l

F A

F

F A

-1 D

-0

D e s ig n e r

A u th o r

A p p ro v e r

C h e c k e r

100%

SXHT 23-1030

REPAIR HVAC BUILDING 535

100% DESIGN

AIR FORCE SERVICES ACTIVITY

1 : 6000G-000

A1 LOCATION PLAN PATRICK SFS

PLAN NORTH

PERMIT(S)/ENVIRONMENTAL ACTIONS

REQUIRED PRIOR TO CONSTRUCTION

ERP/STORMWATER

ERP/WETLANDS/DREDGE & FILL

FDEP/DRINKING WATER

FDEP/DOM. WASTE WATER ARCHEO./HISTORICAL

SURVEY/WILDLIFE

OTHER

NONE

FDEP/IND. WASTE WATER

IRP

FDEP/FUEL TANK

NOI/SWPPP

ASBESTOS

HEAVY METALS

YES NO

LEAD

PCB

NOT

VERIFIED

HAZARDOUS MATERIALS

NOTE: IF IT IS SUSPECTED THAT ANY HAZARDOUS MATERIAL NOT

IDENTIFIED ON THESE DRAWINGS IS REQUIRED TO BE DISTURBED IN

ORDER TO PERFORM THE CONTRACT WORK, LEAVE MATERIAL

UNDISTURBED AND IMMEDIATELY INFORM THE CONTRACTING OFFICER.

GENERAL

Current Revision

Sheet Number Sheet Name

G-000 COVER SHEET

G-001 SHEET INDEX

G-002 PROJECT DATA

ARCHITECTURAL

A-101 FIRST FLOOR PLAN

A-102 SECOND FLOOR PLAN

AD-121 FIRST FLOOR DEMOLITION REFLECTED CEILING

PLAN

AD-122 SECOND FLOOR DEMO REFLECTED CEILING PLAN

A-121 FIRST FLOOR REFLECTED CEILING PLAN

A-122 SECOND FLOOR REFLECTED CEILING PLAN

MECHANICAL

M-001 MECHANICAL GENERAL NOTES & ABBREVIATIONS

M-002 MECHANICAL LEGEND

MD-101 FIRST FLOOR MECHANICAL DEMOLITION PLAN

MD-102 SECOND FLOOR MECHANICAL DEMOLITION PLAN

M-103 FIRST FLOOR MECHANICAL INSTALLATION PLAN

M-104 SECOND FLOOR MECHANICAL INSTALLATION PLAN

M-501 MECHANICAL DETAILS I

M-502 MECHANICAL DETAILS II

M-601 MECHANICAL CONTROLS

M-701 MECHANICAL SCHEDULES

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES, LEGEND, AND

ABBREVIATIONS

ED-101 ELECTRICAL DEMOLITION COMPOSITE PLANS

E-102 ELECTRICAL INSTALLATION PLANS

E-701 ELECTRICAL PANEL SCHEDULES

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

SHEET OF

C O

N T

R A

C T

N

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

DESIGN DRAWINGS

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

S P

A C

E L

A U

N C

H D

E L T

A

P S

F S

F

L

A A rh o d e s b ri

/2

/2

:2

:1

P

M

R E

P A

IR

H

V A

C B

U

IL

D

IN

G

S

IG

N

A

IR

F O

R C

E S

E R

V

IC

E S

A C

T

IV

IT

Y

G-001

S H

E E

T I

N D

E X

S X

H T

-1

G -0

F A

-1

D

-0

A p ri l

F A

F

F A

-1 D

-0

D e s ig n e r

A u th o r

A p p ro v e r

C h e c k e r

100%

HAZMAT

H-001 GENERAL NOTES, SYMBOLS, AND LEGENDS

H-101 FIRST FLOOR ENVIRONMENTAL PLAN

H-102 SECOND FLOOR ENVIRONMENTAL PLAN

DRAWING ABBREVIATIONS

A ---------------------

A LABELCLASS A DOOR

A/C AIR CONDITION

A/C UNITAIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AB ANCHOR BOLT

ACC ACCESSIBLE

ACS AUTOMATIC CONTROL SYSTEM

ACS DR ACCESS DOOR

ACS PNLACCESS PANEL

ACT ACOUSTICAL CEILING TILE

ADA AMERICANS WITH DISABILITIES ACT

ADMIN ADMINISTRATION

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGGR AGGREGATE

AHU AIR HANDLING UNIT

AIB AIR INFILTRATION BARRIER

ALT ALTERNATE

ALUM ALUMINUM

ANOD ANODIZE

APC ACOUSTICAL PANEL CEILING

APPROX APPROXIMATE

AR AS REQUIRED

ARCH ARCHITECT

ASC ABOVE SUSPENDED CEILING

ASSY ASSEMBLY

ATC ACOUSTICAL TILE CEILING

AVG AVERAGE

AW ARCHITECTURAL WOODWORK

AWT ACOUSTICAL WALL TREATMENT

B ---------------------

B LABELCLASS B DOOR

BALC BALCONY

BB BASEBOARD

BC BOOKCASE

BD BOARD

BDRY BOUNDARY

BFF BELOW FINISH FLOOR

BHMA BUILDER'S HARDWARE MANUFACTURER'S

ASSOCIATION

BLDG BUILDING

BLKG BLOCKING

BLT IN BUILT-IN

BN BULLNOSE

BOS BOTTOM OF STEEL

BOT BOTTOM

BP BUILDING PAPER

BRKT BRACKET

BSMT BASEMENT

BTWN BETWEEN

BUR BUILT-UP ROOFING

C ---------------------

C CONC CAST CONCRETE

C LABELCLASS C DOOR

CAB CABINET

CATW CATWALK

CAV CAVITY

CBB CEMENTITIOUS (BACKER) BOARD

CD CONSTRUCTION DOCUMENTS

CDW CHILLED DRINKING WATER

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED/CONTRACTOR

INSTALLED

CFE CONTRACTOR FURNISHED EQUIPMENT

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CORNER GUARD

CI CAST IRON

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLG DIFF CEILING DIFFUSER

CLG HT CEILING HEIGHT

CLL COLUMN LINE

CLO CLOSET

CLR COLOR

CLRM CLASSROOM

CMU CONCRETE MASONRY UNIT

CNDS CONDENSATE

CDR CARD READER

CO CLEANOUT

COL COLUMN

COMM COMMUNICATION

CONC CONCRETE

CONC FLR CONCRETE FLOOR

CONF CONFERENCE

CONT CONTINUE

COORD COORDINATE

CORR CORRIDOR

CP CONCRETE PIPE

CPT CARPET

CR CONTROL ROOM

CS CAST STONE

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTR CENTER

CU FT CUBIC FEET

CW CASEMENT WINDOW

D ---------------------

D DEPTH

D LABELCLASS D DOOR

DBL DOUBLE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DIA DIAMETER

DIR DIRECTION

DIST DISTANCE

DOC DOCUMENT

DR DOOR

DS DOWNSPOUT

E ---------------------

E LABEL CLASS E DOOR

EA EACH

EF EACH FACE

EIFS EXTERIOR INSULATION AND FINISH SYSTEM

EJ EXPANSION JOINT

ES EACH SIDE

EL ELEVATION

ELEV ELEVATOR

ENTR ENTRANCE

EPS EXPANDED POLYSTYRENE BOARD

(INSULATION)

EQ EQUAL

EWC ELECTRIC WATER COOLER

EXP EXPOSED

EXT EXTERIOR

EXT EXTINGUISHER

EXT GR EXTERIOR GRADE

GB GRAB BAR

GFCI GOVERNMENT FURNISHED CONTRACTOR

INSTALLED

GFGI GOVERNMENT INSTALLED FURNISHED

INSTALLED BY GOVERNMENT

GFRG GLASS-FIBER-REINFORCED GYPSUM

GLZ GLAZING

GR FL GROUND FLOOR

GUT GUTTER

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

H -------------

HB HOSE BIBB

HDPE HIGH DENSITY POLYETHYLENE

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HORIZ HORIZONTAL

HT HEIGHT

HYDR HYDRAULIC

F ---------------------

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FAS BD FASCIA BOARD

FC BRK FACE BRICK

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FED FEDERAL

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FF INSUL FOIL BACKED INSULATION

FGL FIBERGLASS

FH FIRE HOSE

FHP FULL HEIGHT PARTITION

FIN FINISH

FIN BS FINISH BOTH SIDES

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIXT FIXTURE

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLMT FLUSH MOUNT

FLR FLOOR

FM FACTORY MUTUAL

FOC FACE OF CONCRETE

FOM FACE OF MASONRY

FR FIRE RESISTANT

FRG FIBER REINFORCED GYPSUM

FRMG FRAMING

FRP FIBERGLASS REINFORCED PLASTIC

FRTW FIRE RETARDANT TREATED WOOD

FS FEDERAL SPECIFICATION

FSTNR FASTENER

FT FEET

FTG FOOTING

FWC FABRIC WALLCOVERING

G ---------------------

G NATURAL GAS

GALV GALVANIZED

GB GRAB BAR

GFCI GOVERNMENT FURNISHED CONTRACTOR

INSTALLED

GFGI GOVERNMENT INSTALLED FURNISHED

INSTALLED BY GOVERNMENT

GFRG GLASS-FIBER-REINFORCED GYPSUM

GLZ GLAZING

GR FL GROUND FLOOR

GUT GUTTER

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

H ---------------------

HB HOSE BIBB

HDPE HIGH DENSITY POLYETHYLENE

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HORIZ HORIZONTAL

HT HEIGHT

HYDR HYDRAULIC

I ---------------------

IBC INTERNATIONAL BUILDING CODE

INSUL INSULATION

INT INTERIOR

ILO IN LIEU OF

J ---------------------

JAN JANITOR

K ---------------------

KPD KEYPAD

KIT KITCHEN

KPL KICKPLATE

L ---------------------

LAM LAMINATE

LAV LAVATORY

LBR LUMBER

LBS POUND

LDG LANDING

LF LINEAR FEET (FOOT)

LIB LIBRARY

LIN LINEAR

LKR LOCKER

LOC LOCATION

LT LIGHT

LVDR LOUVER DOOR

LVR LOUVER

M ---------------------

MACH RM MACHINE ROOM

MATL MATERIAL

MAX MAXIMUM

MC MOISTURE CONTENT

MD METAL DECK

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MEMB MEMBRANE

MF MILL FINISH

MFR MANUFACTURER

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM, MINUTE

MIRR MIRROR

MISC MISCELLANEOUS

MLDG MOLDING (MOULDING)

MO MASONRY OPENING

MOD MODIFY

MB MOISTURE BARRIER

MTG MOUNTING

MTL METAL

MVBL MOVABLE

MWP MEMBRANE WATERPROOFING

N ---------------------

N NORTH

NA NOT APPLICABLE

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NP NO PAINT

NRC NOISE REDUCTION COEFFICIENT

NTS NOT TO SCALE

O -------------------

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OFF OFFICE

OGL OBSCURE GLASS

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPQ OPAQUE

OWSJ OPEN WEB STEEL JOIST

OPR OPERABLE

ORD OVERFLOW ROOF DRAIN

ORIG ORIGINAL

P --------------------

PA PUBLIC ADDRESS

PAR PARAPET

PAT PATTERN

PB PULL BOX

PBD PARTICLEBOARD

PCC PRECAST CONCRETE

PCF POUNDS PER CUBIC FOOT

PCT PERCENT

PERF PERFORATED

PERIM PERIMETER

PH PHASE

PIL PILASTER

PL PROPERTY LINE

PL GL PLATE GLASS

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLBG PLUMBING

PLG PILING

PLYWD PLYWOOD

PNL PANEL

PP PL PUSH/PULL PLATE

PR PAIR

PRCST PRECAST

PRKG PARKING

PS CONC PRESTRESSED CONCRETE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

PTDR PAPER TOWEL DISPENSER AND RECEPTACLE

PTN PARTITION

PWR POWER

Q --------------------

QT QUARRY TILE

QTY QUANTITY

R --------------------

RB RESILIENT BASE

RBM REINFORCED BRICK MASONRY

RBR RUBBER

RC REINFORCED CONCRETE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

RDG INS RIGID INSULATION, SOLID

REC RECESSED

REC ROOM RECREATION ROOM

REF REFERENCE

REM REMOVABLE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

REST RESTROOM

RF RESILIENT FLOORING

RFG ROOFING

RH ROOF HATCH

RHR RIGHT HAND REVERSE

RL ROOF LEADER

RLG RAILING

RM ROOM

RO ROUGH OPENING

RSD ROLLING STEEL DOOR

RV ROOF VENT

RVL REVEAL

S --------------------

SB SPLASH BLOCK

SCHED SCHEDULE

SD SMOKE DETECTOR

SF SQUARE FOOT (FEET)

SFTWD SOFTWOOD

SGL SINGLE

SHT MTL FLASH SHEET METAL (FLASHING)

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SJ SCORED JOINT

SKLT SKYLIGHT

SLNT SEALANT

SMK SMOKE

SMLS SEAMLESS

SP EL SPOT ELEVATION

SPEC SPECIFICATION

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SST STAINLESS STEEL

ST STAIRS

STD STANDARD

STL JST STEEL JOIST

STL RF DK STEEL ROOF DECK

STOR STORAGE

STR STRINGERS

STRB/HRN STROBE/HORN

SUB FL SUBFLOOR

SV SHEET VINYL

SW SIDEWALK

T --------------------

T TREAD

T/S TUB/SHOWER

TC TERRA COTTA

TD TRENCH DRAIN

TEL TELEPHONE

TEMP TEMPORARY

TER TERRAZZO

TFF TOP OF FINISH FLOOR

THK THICKNESS

TK BD TACKBOARD

TMPD GL TEMPERED GLASS

TN TRUE NORTH

TOF TOP OF FOOTING

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOPO TOPOGRAPHY

TOS TOP OF SLAB

TRANS TRANSOM

TRTD TREATED

TV TELEVISION

GENERAL NOTES

GENERAL INSTALLATION NOTES:

1. ALL MATERIALS AND WORKMANSHIP SHALL COMPLY WITH PROJECT

DRAWINGS AND SPECIFICATIONS; FOR PURPOSES OF CLARIFICATION

THE WORD 'PROVIDE' MEANS PROVIDE AND U.O.N UNLESS OTHERWISE

NOTED.

2. ALL DETAILS AND SECTIONS SHOWN ON THE DRAWINGS ARE INTENDED

TO BE TYPICAL AND SHALL BE CONSTRUED TO APPLY TO ANY SIMILAR

SITUATION ELSEWHERE ON THE PROJECT, EXCEPT WHERE A

DIFFERENT DETAIL IS SHOWN.

3. ALL REFERENCES TO MANUFACTURER NAMES ARE FOR IDENTIFICATION

ONLY; THE REFERENCES ARE NOT INTENDED TO LIMIT SELECTION OF

SIMILAR ITEMS FROM OTHER MANUFACTURERS WITH APPROVAL OF

CONTRACTING OFFICER.

4. THE STRUCTURAL INTEGRITY OF THE COMPLETED STRUCTURE

DEPENDS UPON THE INTERACTION OF VARIOUS CONNECTED

COMPONENTS. PROVIDE ADEQUATE BRACING, SHORING, AND OTHER

TEMPORARY SUPPORTS AS REQUIRED TO SAFELY COMPLETE THE

WORK.

5. WHERE REQUIRED, ALL NEW STEEL STRUCTURAL MEMBERS SHALL BE

ASTM A36.

6. WHERE REQUIRED AND NOT OTHERWISE SPECIFIED, ALL WELDING

SHALL BE DONE BY AWS CERTIFIED WELDERS.

7. ALL CONSTRUCTION REQUIREMENTS INCLUDING ENVIRONMENTAL

ASBESTOS AND HEAVY METAL DEMOLITION SHALL BE COORDINATED

WITH THE CONTRACTING OFFICER.

8. AFTER COMPLETION OF CONSTRUCTION WORK, ALL WORK AREAS

SHALL BE LEFT CLEAN AND FREE OF ANY EXTRANEOUS JOINT

COMPOUND, PLASTER, STUCCO, PAINT SMEARS OR SPLATTERS AND

STAINS.

9. THE CONTRACTOR SHALL PROVIDE ADEQUATE PROTECTION,

WHEREVER WORK IS TO BE PERFORMED IN FINISHED/OCCUPIED

SPACES TO PREVENT DAMAGE TO ADJACENT AREAS, EQUIPMENT, OR

FURNISHINGS; TO PREVENT ACCIDENTAL INJURY TO BUILDING

OCCUPANTS AND THE PUBLIC; TO PREVENT THE SPREADING OF DUST,

DIRT, DEBRIS, AND MOISTURE FROM THE AREA WHERE WORK IS BEING

PERFORMED; AND TO PREVENT DUST, DIRT, DEBRIS, AND MOISTURE

FROM GETTING ON OR IN THE BUILDING OCCUPANTS FURNISHINGS OR

EQUIPMENT. CONTRACTOR SHALL PROVIDE METHOD/CONSTRUCTION

OF DUST CONTROL/BARRIER TO THE CONTRACTING OFFICER FOR

APPROVAL PRIOR TO START OF DEMO WORK.

10. THE CONTRACTOR SHALL REPAIR, AT NO COST TO THE OWNER, ANY

DAMAGE DONE BY HIMSELF OR HIS EMPLOYEES. CONTRACTOR SHALL

ALSO BE RESPONSIBLE FOR ALL CUTTING AND PATCHING REQUIRED TO

PROPERLY INSTALL ITS WORK.

11. SUBMIT A CONSTRUCTION LIGHT MANAGEMENT PLAN THROUGH THE

PROJECT ENGINEER AND SLD 45 CES ENVIRONMENTAL (45 CES/CEIE) AT

LEAST 65 DAYS PRIOR TO NIGHT WORK COMMENCEMENT IF NIGHT

WORK IS REQUIRED FROM 1 MAY TO 31 OCTOBER BETWEEN 2100 AND

0600 HOURS

DISSIMILAR METALS:

CONTRACTOR SHALL PROVIDE ADEQUATE SEPARATION OF DISSIMILAR METALS

BY APPROPRIATE MEANS, SUCH AS 15# SEPARATION FELT AND ASPHALTIC

TAPE OR ASPHALTIC PAINT AS REQUIRED.

ALL CONNECTORS, FASTENERS, BOLTS, ETC., SHALL BE SELECTED IN ORDER

TO PREVENT OR MINIMIZE ANY GALVANIC REACTION BETWEEN DISSIMILAR

METALS. AND UNLESS OTHERWISE NOTED PROVIDE STAINLESS STEEL.

SEQUENCING OF WORK:

CONTRACTOR SHALL SEQUENCE DEMO AND NEW WORK TO FULLY COMPLETE

ALL REQUIRED CONSTRUCTION WORK. WORK IS TO BE COMPLETED IN TWO

PHASES. PHASES TO BE SEQUENCED BY FLOOR TO BEST FACILITATE HVAC

SYSTEM INSTALLATION. CONTRACTOR SHALL PROVIDE ADEQUATE PROTECTION

OF NEW AND EXISTING ASSEMBLIES AGAINST INCLEMENT WEATHER AND

CONSTRUCTION DAMAGE.

PROJECT SPECIFIC NOTES:

1. ALL METALS/FASTENERS ARE TO BE NON-CORROSIVE OR COATED

ACCORDINGLY TO MEET STANDARDS FOR A COASTAL APPLICATION.

INDEX OF DRAWINGS

NUMBERING SYSTEM:

A-210/01

DISCIPLINE:

C - CIVIL

L - LANDSCAPE

A - ARCHITECTURE

M - MECHANICAL

E - ELECTRICAL

P - PLUMBING

S - STRUCTURAL

ID - INTERIOR DESIGN

SERIES NUMBER

SHEET NUMBER WITHIN

SERIES

NUMBER OF PLAN, DETAIL,

ETC. ON SHEET

LEGEND

CONCRETE/ PRECAST

CONCRETE

SOIL

SAND, EIFS FINISH COAT,

OR CEMENT PLASTER

SPRAY FOAM INSULATION

GYPSUM BOARD

EXTERIOR GYPSUM

SHEATHING

EXTERIOR CEMENT

BOARD

COATED GLASS MAT

WATER RESISTANT

GYP BD

PLYWOOD

MATERIALS

ANNOTATION CALLOUTS/DRAWING SYMBOLS

GRID / COLUMN

LINE

DESIGNATOR

DOOR NUMBER

INTERIOR ELEVATION

1i

WALL TYPE

WINDOW TYPE

A1

A101

SIM

SECTION

Room name

101 ROOM NAME/NUMBER

A101

A1 Ref

A101

A1 Ref

EXTERIOR ELEVATION

1 REVISION TAG

A-101

A1

SIM

PLAN, BLOW-UP

DETAIL

PLAN NORTH

NORTH ARROW w/

TRUE NORTH

INDICATION

SPOT ELEVATION

Name

Elevation

FLOOR LEVEL & NAME

PLATE NUMBER WHERE

SECTION/DETAIL IS

DRAWN

PLATE NUMBER WHERE

SECTION/DETAIL IS

DRAWN

PLATE NUMBER WHERE

SECTION/DETAIL IS

DRAWN

PLATE NUMBER WHERE

SECTION/DETAIL IS

DRAWN

A

EGRESS ROUTE ID

AND SECTION

LENGTH

1 HR FIRE

FIRE RATED WALL SYMBOLS:

SHEET KEYNOTE

Room

Rm_Occupancy

150 SF

EGRESS :Egress_ID

Egress_Length

ROOM OCCUPANCY

& AREA

MINERAL FIBER

BLANKET INSULATION

U -------------------

UC UNDERCUT

UCD UNDERCUT DOOR

UFD UNDERFLOOR DUCT

UGND UNDERGROUND

UH UNIT HEATER

UL UNDERWRITERS LABORATORIES

ULT ULTIMATE

UN UNLESS NOTED

UNEX UNEXCAVATED

UNIF UNFINISHED

UNO UNLESS NOTED OTHERWISE

UNIV UNIVERSAL

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER SUPPLY

UR URINAL

UTIL UTILITY

UV ULTRAVIOLET

UWT UNIT WEIGHT

V --------------------

V VOLT

VA VOLT AMPERE

VAC VACUUM, VACUUM LINE

VAN VANITY

VAR VARIES, VARIATION

VAV VARIABLE AIR VOLUME

VB VACUUM BREAKER, VALVE BOX, VINYL BASE

VCO VACUUM CLEANER OUTLET

VCT VINYL COMPOSITION TILE

VD VOLUME DAMPER, VOLTAGE DROP

VEH VEHICLE

VENT VENTILATION, VENTILATOR

VERT VERTICAL

VEST VESTIBULE

VFAT VINYL FACED ACOUSTICAL TILE

VFR VOLUMETRIC FLOW RATE

VG VERTICAL GRAIN

VIC VICINITY

VID VIDEO

VIF VERIFY IN FIELD

VIS VISUAL

VIT VITREOUS

VNR VENEER

VOC VOLITILE ORGANIC COMPOUND

VOL VOLUMNE

VP VAPOR PRESSURE, VENEER PLASTER

VR VAPOR RETARDER

VRFY VERIFY

VRNDA VERANDA

VS VENT STACK

VTR VENT THROUGH ROOF

W --------------------

W WASTE, WATT, WEST, WIDE

WCAB WALL CABINETS

W/ WITH

W/O WITHOUT

W/W WALL TO WALL

WAP WIRELESS ACCESS POINT

WARR WARRANTY

WB WOOD BASE

WBL WOOD BLOCKING

WBS WROUGHT BRASS

WC WATER CLOSET, WALL COVERING

WCLR WATER CHILLER

WCO WALL CLEANOUT

WD WOOD, WOOD DOOR

WDF WOOD DOOR AND FRAME

WDMA WINDOW AND DOOR MANUFACTURERS ASSOC

WDP WOOD PANELING

WDSP WASTE DISPOSAL

WDW WINDOW

WEA WEATHER

WF WIDE FLANGE, WASH FOUNTAIN

WF BM BEAM, WIDE FLANGE

WFAB WALL FABRIC

WFR WOOD FRAME

WFS WOOD FURRING STRIPS

WGL WIRED GLASS

WH WALL HUNG, WALL HYDRANT, WEEP HOLE

WHSE WAREHOUSE

WI WROUGHT IRON

WL WATER LINE, WIND LOAD

WLD WELDED

WM WATER METER

WO WHERE OCCURS, WORK ORDER

WP WATERPROOFING, WORKING POINT

WPM WATERPROOF MEMBRANE

WR WEATHER RESISTANT

WS WEATHERSTRIP

WSCT WAINSCOT

WSL WEATER SEAL

WT WATER TABLE, WEIGHT, WATER TIGHT

WT EL WATER ELEVATION

WTR WATER

WU WINDOW UNIT

WW WIREWAY, WARM WHITE, WASTE WATER

WWR WELDED WIRE REINFORCEMENT

X --------------------

XBRACE CROSS BRACE

X SECT CROSS SECTION

XBRA CROSS BRACING

XFER TRANSFER

XFMR TRANSFORMER

XPS EXTRUDED POLYSTYRENE BOARD

XXH DOUBLE EXTRA HEAVY

Y --------------------

YCO YARD CLEANOUT

YD YARD DRAIN, YARD, YARD DRAINAGE PIPE

YH YARD HYDRANT

YI YARD INLET

YR YEAR

Z --------------------

Z MODULUS OF SECTION

0 4' 8' 12'

GRAPHIC SCALE

S 1 HR FIRE AND SMOKE

2 HR FIRE

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

SHEET OF

C O

N T

R A

C T

N

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

DESIGN DRAWINGS

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

S P

A C

E L

A U

N C

H D

E L T

A

P S

F S

F

L

A A rh o d e s b ri

/1

/2

/2

:2

:1

P

M

R E

P A

IR

H

V A

C B

U

IL

D

IN

G

S

IG

N

A

IR

F O

R C

E S

E R

V

IC

E S

A C

T

IV

IT

Y

G-002

P R

O J E

C T

D A

T A

S X

H T

-1

G G

-0

F A

-1

D

-0

A p ri l

F A

F

F A

-1 D

-0

R R

G M

R R

D W

100%

UP

UP

UP

UP

UP

UP

FLOOR PLAN LEGEND

WALLS TO DECK

WALLS 4" ABOVE CEILING

MOVABLE PARTITION BELOW CEILING

MOVABLE PARTITION TO CEILING

THE BELOW EXISTING WALL TYPES HAVE BEEN IDENTIFIED.

NOTE: WALLS ARE BEING TAGGED FOR INFORMATIONAL PURPOSES ONLY.

NO SCOPE OF WORK MODIFYING EXISTING OR CREATING NEW PARTITONS

ARE PART OF THIS PROJECT.

321 4 6 7 8

B

C

C.4

D

A

CONFERENCE

KITCHEN

VAULT

SHARED OFFICE

ELECTRICAL

STOR

SHOWER

MECHANICAL

COMM

OFFICE

OFFICE

108MEN

1RR1

WOMEN

1RR2

OFFICE

OFFICE

OFFICE

SHARED OFFICE

OFFICES

110A OFFICE

KITCHEN / STOR

OFFICE

CORRIDOR

1HALL1

MECH

1MECH1

B.8

22 33 3

3 1 1

1 1

2 2

NEW DUCT OPENING

ABOVE CEILING, SEE

DETAIL D3/A101

NEW OUTSIDE AIR

LOUVER IN EXPANDED

OPENING, SEE MECH.

FOR LOUVER SIZE AND

SHEET A-101 FOR

OPENING DETAILS

PROVIDE 8" HEADER COURSE W/

(1) - #4 CONT. AND POUR SOLID

WITH GROUT TYP.

TEMPORARY SHORING AS

REQUIRED

GROUT SOLID AROUND OPENING

PROVIDE 8" HEADER COURSE W/

(1) - #4 CONT. AND POUR SOLID

WITH GROUT, TYP.

#5 X 8" LG. DOWEL

BRG.

8"

C

O U

R S

E S

TEMPORARY SHORING

AS REQUIRED

BREAK OUT SIDE OF EXISTING

BLOCK AND GROUT SOLID W/

CONCRETE TO TOP FOUNDATION

(TYP AT BEARING WALLS)

GROUT LINTEL SOLID

PRECAST CONCRETE

LINTEL (SEE SCHEDULE)

PRECAST LINTEL SCHEDULE

SIZE BOTTOM

REINFORCING

CLEAR SPAN

2'-0" > SPAN ≤ 4'-0"8X8 2 - #5

< 6'-0"8X16 2 - #5

< 10'-0"8X24 2 - #5

GROUT TWO CELL EACH SIDE OF OPENINGS FOR

OPENING GREATER THAN 6'-0"

BRG.

8"

#5X8" LG. DOWEL

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

SHEET OF

C O

N T

R A

C T

N

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

DESIGN DRAWINGS

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

S P

A C

E L

A U

N C

H D

E L T

A

P S

F S

F

L

A A rh o d e s b ri s i n d ic a te d

/2

/2

:2

:0

P

M

R E

P A

IR

H

V A

C B

U

IL

D

IN

G

S

IG

N

A

IR

F O

R C

E S

E R

V

IC

E S

A C

T

IV

IT

Y

A-101

F

IR

S T

F L

O O

R P

L A

N

S X

H T

-1

A A

-1

F A

-1

D

-0

A p ri l

F A

F

F A

-1 D

-0

C K

C K

L G

L G

100%PLA

N N

O R

TH

GENERAL NOTES - FLOOR PLAN

A THE CONTRACTOR SHALL VISIT THE PROJECT SITE AND SHALL

VERIFY THESE DRAWINGS WITH THE EXISTING FIELD

CONDITIONS. THE CONTRACTOR SHALL NOTIFY THE

CONTRACTING OFFICER.

B CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND

NEW WORK. FOR ADDITIONAL GENERAL NOTES, LEGENDS,

AND SCHEDULES REFER TO SHEET G001.

C CONTRACTOR TO PROVIDE ENGINEERED SHOP DRAWINGS

AND FL PRODUCT APPROVALS FOR REVIEW BY THE DESIGN

TEAM PRIOR TO FABRICATION OF ALL ASSEMBLIES.

D COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH

OWNER PRIOR TO PERFORMING SHUT-DOWNS IN UTILITY

SERVICE.

E MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL

FIRE-RATED ASSEMBLIES (I.E. DOORS, GYPSUM ENCLOSURES,

SPRAYED FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW

LOCATIONS INCLUDING BUT NOT LIMITED TO STRUCTURAL

COLUMNS, BEAMS, AND FLOOR SLABS.

F CONTRACTOR SHALL COORDINATE WITH CONTRACTING

OFFICER CONCERNING THE PROPER REMOVAL OF ALL DEBRIS

ASSOCIATED WITH THE WORK.

0 4' 8' 12'

1/8" = 1'-0"A-101

A1 FIRST FLOOR

3/4" = 1'-0"A-101

D3 TYP OPENING DETAIL 2'-0" OR LESS

3/4" = 1'-0"A-101

D1 EXPANDED OPENING DETAIL

DN

DN

DN

FLOOR PLAN LEGEND

WALLS TO DECK

WALLS 4" ABOVE CEILING

MOVABLE PARTITION BELOW CEILING

MOVABLE PARTITION TO CEILING

THE BELOW EXISTING WALL TYPES HAVE BEEN IDENTIFIED.

NOTE: WALLS ARE BEING TAGGED FOR INFORMATIONAL PURPOSES ONLY.

NO SCOPE OF WORK MODIFYING EXISTING OR CREATING NEW PARTITONS

ARE PART OF THIS PROJECT.

321 4 6 7 8

B

C

C.4

D

A

WORKER / ADMIN

CONFERENCE

MEN

2RR1

WOMEN

2RR2

RESOURCE

LIBRARY

KITCHEN

202 MECH

2MECH1

OFFICE

WORKER / ADMIN

CORRIDOR

2HALL1

B.8

1 1

22 1

333 333

3333333

3333 3

33333

NEW OUTSIDE AIR

LOUVER IN EXPANDED

OPENING, SEE MECH.

FOR LOUVER SIZE AND

SHEET A-101 FOR

OPENING DETAILS

NEW DUCT OPENING

ABOVE CEILING, SEE

DETAIL D3/A101

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

SHEET OF

C O

N T

R A

C T

N

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

DESIGN DRAWINGS

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

S P

A C

E L

A U

N C

H D

E L T

A

P S

F S

F

L

A A rh o d e s b ri

/8

/2

/2

:2

:0

P

M

R E

P A

IR

H

V A

C B

U

IL

D

IN

G

S

IG

N

A

IR

F O

R C

E S

E R

V

IC

E S

A C

T

IV

IT

Y

A-102

S E

C O

N D

F L O

O R

P L A

N

S X

H T

-1

A A

-1

X X

X

F A

-1

D

-0

A p ri l

F A

F

F A

-1 D

-0

D e s ig n e r

A u th o r

A p p ro v e r fi le n a m e

C h e c k e r

100%PLA

N N

O R

TH

GENERAL NOTES - FLOOR PLAN

A THE CONTRACTOR SHALL VISIT THE PROJECT SITE AND SHALL

VERIFY THESE DRAWINGS WITH THE EXISTING FIELD

CONDITIONS. THE CONTRACTOR SHALL NOTIFY THE

CONTRACTING OFFICER.

B CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION AND

NEW WORK. FOR ADDITIONAL GENERAL NOTES, LEGENDS,

AND SCHEDULES REFER TO SHEET G001.

C CONTRACTOR TO PROVIDE ENGINEERED SHOP DRAWINGS

AND FL PRODUCT APPROVALS FOR REVIEW BY THE DESIGN

TEAM PRIOR TO FABRICATION OF ALL ASSEMBLIES.

D COORDINATE ALL SHUT-DOWNS IN UTILITY SERVICE WITH

OWNER PRIOR TO PERFORMING SHUT-DOWNS IN UTILITY

SERVICE.

E MAINTAIN THE CONTINUITY OF CONSTRUCTION OF ALL

FIRE-RATED ASSEMBLIES (I.E. DOORS, GYPSUM ENCLOSURES,

SPRAYED FIRE PROOFING, ETC.) AT ALL EXISTING AND NEW

LOCATIONS INCLUDING BUT NOT LIMITED TO STRUCTURAL

COLUMNS, BEAMS, AND FLOOR SLABS.

F CONTRACTOR SHALL COORDINATE WITH CONTRACTING

OFFICER CONCERNING THE PROPER REMOVAL OF ALL DEBRIS

ASSOCIATED WITH THE WORK.

0 4' 8' 12'

1/8" = 1'-0"A-102

1 SECOND FLOOR

321 4 6 7 8

B

C

C.4

D

A

B.8

KITCHEN

CONFERENCE

VAULT

ELECTRICAL

SHARED OFFICE

STOR

SHOWER

CORRIDOR

1HALL1

MEN

1RR1

WOMEN

1RR2

OFFICE

OFFICES

110A

OFFICE

MECHANICAL

COMM

OFFICE

OFFICE

MECH

1MECH1

OFFICE

OFFICE

SHARED OFFICE

OFFICE

KITCHEN / STOR

slope up slope

7'-11"

REFLECTED CEILING DEMO LEGEND

2'x2' RECESSED DIRECT / INDIRECT LED TROFFER

LIGHT FIXTURE TO BE REMOVED, AND HELD FOR

REINSTALLATION

CEILING MOUNTED EXIT SIGN TO BE REMOVED AND

HELD FOR REINSTALLATION

EXHAUST FAN

HVAC DIFFUSER

ACCESS PANEL

2x2 CEILING GRID AND TILES TO BE REMOVED AND

HELD FOR REINSTALLATION

NOTE: ALL EXISTING CEILING DEVICES MAY NOT BE INCLUDED IN THIS

LEGEND. IT IS THE INTENT THAT THESE BE SALVAGED AND REINSTALLED

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

SHEET OF

C O

N T

R A

C T

N

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

DESIGN DRAWINGS

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

S P

A C

E L

A U

N C

H D

E L T

A

P S

F S

F

L

A A rh o d e s b ri

/8

/2

/2

:1

:4

A

M

R E

P A

IR

H

V A

C B

U

IL

D

IN

G

S

IG

N

A

IR

F O

R C

E S

E R

V

IC

E S

A C

T

IV

IT

Y

AD-121

F

IR

S T

F L

O O

R D

E M

O L

IT

IO

N R

E F

L E

C T

E D

C E

IL

IN

G P

L A

N

S X

H T

-1

A D

-1

F A

-1

D

-0

A p ri l

F A

F

F A

-1 D

-0

D e s ig n e r

A u th o r

A p p ro v e r

C h e c k e r

100%

1/8" = 1'-0"AD-121

1 RCP - FIRST FLOOR - DEMO

PLA

N N

O R

TH

0 4' 8' 12'

GENERAL NOTES - CEILING DEMO PLAN

A SPECIFIC DEMOLITION ITEMS ARE NOT TO BE CONSIDERED

ALL INCLUSIVE OR COMPLETE IN THEMSELVES. PERFORM

ADDITIONAL DEMOLITION THAT MIGHT BE REASONABLY

REQUIRED FOR PREPARATION OF INSTALLATION OF NEW

WORK.

B DEMOLITION SHALL BE PERFORMED IN A MANNER THAT WILL

NOT DAMAGE ADJOINING SURFACES TO REMAIN. DAMAGED

ADJACENT SURFACES WILL BE PATCHED AND REPAIRED AT

THE CONTRACTOR'S EXPENSE.

C PRIOR TO BIDDING, THE CM SHALL VISIT THE FACILITY AND

THOROUGHLY FAMILIARIZE HIMSELF WITH EXISTING

CONDITIONS. NO CLAIMS FOR ADDITIONAL WORK DUE TO

OBSERVABLE CONDITIONS WILL BE CONSIDERED.

D CARRY OUT DEMOLITION WORK TO CAUSE AS LITTLE

INCONVENEINCE TO ADJACENT OCCUPIED BUILDING AREAS

AS POSSIBLE. DEMOLISH IN AN ORDERLY AND CAREFUL

MANNER AS REQUIRED TO ACCOMMODATE NEW WORK.

PERFORM DEMOLITION IN ACCORDANCE WITH APPLICABLE

AUTHORITIES HAVING JURISDICTION. TAKE CARE TO

PREVENT DAMAGE AND EXCESSIVE NOISE OR VIBRATION SO

AS NOT TO DISTURB ADJACENT OCCUPIED AREAS ANY

OPERATION THAT MAY CAUSE DISTURBANCE TO THE OWNER

SHALL BE COORDINATED WITH THE OWNER A MINIMUM OF

ONE (1) WEEK IN ADVANCE. .

E EXERCISE CARE DURING WORK TO PROTECT INTERIORS

REMAINING. REPAIR TO EXISTING CONSTRUCTION DUE TO

DAMAGE SHALL BE DONE AT NO COST TO THE OWNER.

F THE CM SHALL IMMEDIATELY REPORT ANY HAZARDOUS OR

TOXIC MATERIALS DISCOVERED TO THE ARCHITECT, OWNER,

AND AUTHORITIES HAVING JURISDICATION.

G REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR

EXTENT OF WORK IN THOSE DISCIPLINES.

C

C.4

D

A

B.8

WORKER / ADMIN

KITCHEN

MECH

2MECH1

OFFICE

RESOURCE

LIBRARY

CONFERENCE

WORKER / ADMIN

MEN

2RR1

WOMEN

2RR2

REFLECTED CEILING DEMO LEGEND

2'x2' RECESSED DIRECT / INDIRECT LED TROFFER

LIGHT FIXTURE TO BE REMOVED, AND HELD FOR

REINSTALLATION

CEILING MOUNTED EXIT SIGN TO BE REMOVED AND

HELD FOR REINSTALLATION

EXHAUST FAN

HVAC DIFFUSER

ACCESS PANEL

2x2 CEILING GRID AND TILES TO BE REMOVED AND

HELD FOR REINSTALLATION

NOTE: ALL EXISTING CEILING DEVICES MAY NOT BE INCLUDED IN THIS

LEGEND. IT IS THE INTENT THAT THESE BE SALVAGED AND REINSTALLED

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

SHEET OF

C O

N T

R A

C T

N

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

DESIGN DRAWINGS

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

S P

A C

E L

A U

N C

H D

E L T

A

P S

F S

F

L

A A rh o d e s b ri

/8

/2

/2

:1

:4

A

M

R E

P A

IR

H

V A

C B

U

IL

D

IN

G

S

IG

N

A

IR

F O

R C

E S

E R

V

IC

E S

A C

T

IV

IT

Y

AD-122

S E

C O

N D

F L O

O R

D E

M O

R E

F L E

C T

E D

C E

IL

IN

G P

L A

N

S X

H T

-1

A D

-1

F A

-1

D

-0

A p ri l

F A

F

F A

-1 D

-0

D e s ig n e r

A u th o r

A p p ro v e r

C h e c k e r

100%

1/8" = 1'-0"AD-122

1 RCP SECOND FLOOR - DEMO

PLA

N N

O R

TH

0 4' 8' 12'

GENERAL NOTES - CEILING DEMO PLAN

A SPECIFIC DEMOLITION ITEMS ARE NOT TO BE CONSIDERED

ALL INCLUSIVE OR COMPLETE IN THEMSELVES. PERFORM

ADDITIONAL DEMOLITION THAT MIGHT BE REASONABLY

REQUIRED FOR PREPARATION OF INSTALLATION OF NEW

WORK.

B DEMOLITION SHALL BE PERFORMED IN A MANNER THAT WILL

NOT DAMAGE ADJOINING SURFACES TO REMAIN. DAMAGED

ADJACENT SURFACES WILL BE PATCHED AND REPAIRED AT

THE CONTRACTOR'S EXPENSE.

C PRIOR TO BIDDING, THE CM SHALL VISIT THE FACILITY AND

THOROUGHLY FAMILIARIZE HIMSELF WITH EXISTING

CONDITIONS. NO CLAIMS FOR ADDITIONAL WORK DUE TO

OBSERVABLE CONDITIONS WILL BE CONSIDERED.

D CARRY OUT DEMOLITION WORK TO CAUSE AS LITTLE

INCONVENEINCE TO ADJACENT OCCUPIED BUILDING AREAS

AS POSSIBLE. DEMOLISH IN AN ORDERLY AND CAREFUL

MANNER AS REQUIRED TO ACCOMMODATE NEW WORK.

PERFORM DEMOLITION IN ACCORDANCE WITH APPLICABLE

AUTHORITIES HAVING JURISDICTION. TAKE CARE TO

PREVENT DAMAGE AND EXCESSIVE NOISE OR VIBRATION SO

AS NOT TO DISTURB ADJACENT OCCUPIED AREAS ANY

OPERATION THAT MAY CAUSE DISTURBANCE TO THE OWNER

SHALL BE COORDINATED WITH THE OWNER A MINIMUM OF

ONE (1) WEEK IN ADVANCE. .

E EXERCISE CARE DURING WORK TO PROTECT INTERIORS

REMAINING. REPAIR TO EXISTING CONSTRUCTION DUE TO

DAMAGE SHALL BE DONE AT NO COST TO THE OWNER.

F THE CM SHALL IMMEDIATELY REPORT ANY HAZARDOUS OR

TOXIC MATERIALS DISCOVERED TO THE ARCHITECT, OWNER,

AND AUTHORITIES HAVING JURISDICATION.

G REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR

EXTENT OF WORK IN THOSE DISCIPLINES.

C

C.4

D

A

KITCHEN

CONFERENCE

VAULT

ELECTRICAL

SHARED OFFICE

STOR

SHOWER

CORRIDOR

1HALL1

MEN

1RR1

WOMEN

1RR2

OFFICE

OFFICES

110A

OFFICE

MECHANICAL

COMM

OFFICE

109 OFFICE

MECH

1MECH1

OFFICE

OFFICE

SHARED OFFICE

OFFICE

KITCHEN / STOR

B.8 slope

A 7'-11"

A 9'-5"

A 8'-0"

A 8'-0"

A 7'-11"

A 7'-11"

A 9'-9"

A 9'-9"

A 7'-8"

A 8'-11"

A 7'-11"

A 7'-11"

A 7'-11" A 7'-11"

A 7'-9"

A 9'-10"

A 7'-11"

A 9'-9"

A 7'-11"

A 7'-11" A 7'-11"

A 9'-9"

A 9'-9"

A 7'-11"

A 7'-11"A 7'-11"

A 9'-10"

OCS

slope

REFLECTED CEILING LEGEND

SALVAGED 2'x2' RECESSED DIRECT / INDIRECT LED

TROFFER TO BE REINSTALLED

WALL MOUNTED

EXIT SIGN LIGHT FIXTURE

SALVAGED CEILING MOUNTED EXIT SIGN LIGHT TO BE

REINSTALLED

EXHAUST FAN

HVAC SUPPLY DIFFUSER

HVAC RETURN AIR DIFFUSER

SALVAGED ACCESS PANELS TO BE REINSTALLED

SALVAGED 2x2 CEILING GRID AND TILE TO BE

REINSTALLED

EXISTING GYP BD CEILING TO REMAIN

X

CEILING TYPE,

REFER TO SPECIFICATIONS

CEILING HEIGHT ABOVE

FINISHED FLOOR

X'-XX"

OPEN TO STRUCTUREOTS

NOTE: ALL EXISTING CEILING DEVICES MAY NOT BE SHOWN BUT IT IS THE INTENT

THAT THESE DEVICES BE REINSTALLED

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

SHEET OF

C O

N T

R A

C T

N

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

DESIGN DRAWINGS

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

S P

A C

E L

A U

N C

H D

E L T

A

P S

F S

F

L

A A rh o d e s b ri

/8

/2

/2

:2

:0

P

M

R E

P A

IR

H

V A

C B

U

IL

D

IN

G

S

IG

N

A

IR

F O

R C

E S

E R

V

IC

E S

A C

T

IV

IT

Y

A-121

F

IR

S T

F L O

O R

R E

F L E

C T

E D

C E

IL

IN

G P

L A

N

S X

H T

-1

A A

-1

F A

-1

D

-0

A p ri l

F A

F

F A

-1 D

-0

D e s ig n e r

A u th o r

A p p ro v e r

C h e c k e r

100%PLA

N N

O R

TH

0 4' 8' 12'

1/8" = 1'-0"A-121

1 RCP - FIRST FLOOR

C

C.4

D

A

WORKER / ADMIN

KITCHEN

MECH

2MECH1

OFFICE

RESOURCE

LIBRARY

CONFERENCE

WORKER / ADMIN

MEN

2RR1

WOMEN

2RR2

B.8

REFLECTED CEILING LEGEND

SALVAGED 2'x2' RECESSED DIRECT / INDIRECT LED

TROFFER TO BE REINSTALLED

WALL MOUNTED

EXIT SIGN LIGHT FIXTURE

SALVAGED CEILING MOUNTED EXIT SIGN LIGHT TO BE

REINSTALLED

EXHAUST FAN

HVAC SUPPLY DIFFUSER

HVAC RETURN AIR DIFFUSER

SALVAGED ACCESS PANELS TO BE REINSTALLED

SALVAGED 2x2 CEILING GRID AND TILE TO BE

REINSTALLED

EXISTING GYP BD CEILING TO REMAIN

X

CEILING TYPE,

REFER TO SPECIFICATIONS

CEILING HEIGHT ABOVE

FINISHED FLOOR

X'-XX"

OPEN TO STRUCTUREOTS

NOTE: ALL EXISTING CEILING DEVICES MAY NOT BE SHOWN BUT IT IS THE INTENT

THAT THESE DEVICES BE REINSTALLED

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

SHEET OF

C O

N T

R A

C T

N

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

DESIGN DRAWINGS

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

S P

A C

E L

A U

N C

H D

E L T

A

P S

F S

F

L

A A rh o d e s b ri

/8

/2

/2

:2

:0

P

M

R E

P A

IR

H

V A

C B

U

IL

D

IN

G

S

IG

N

A

IR

F O

R C

E S

E R

V

IC

E S

A C

T

IV

IT

Y

A-122

S E

C O

N D

F L O

O R

R E

F L E

C T

E D

C E

IL

IN

G P

L A

N

S X

H T

-1

A A

-1

F A

-1

D

-0

A p ri l

F A

F

F A

-1 D

-0

R R

G M

D W

C h e c k e r

100%PLA

N N

O R

TH

0 4' 8' 12'

1/8" = 1'-0"A-122

1 RCP SECOND FLOOR

1. OBTAIN APPROVAL FROM CONTRACTING OFFICER BEFORE CUTTING.

PRIOR APPROVALS DO NOT WAIVE THE OWNER'S RIGHT TO LATER

REQUIRE ADDITIONAL REMOVALS AND REPLACEMENTS OF

UNSATISFACTORY WORK.

2. PROVIDE LOCKOUT/TAGOUT PROGRAM TO ENSURE ALL IMPACTED

ELECTRICAL INFRASTRUCTURE IS DE-ENERGIZED PRIOR TO

CONSTRUCTION.

3. DO NOT ROUTE ANY NEW WET PIPING ABOVE ELECTRICAL EQUIPMENT.

4. ALL EXISTING CONDITIONS AS INDICATED ARE APPROXIMATIONS OF

ACTUAL CONDITIONS. VERIFY ALL DIMENSIONS AND EXISTING

CONDITIONS PRIOR TO STARTING WORK.

5. COORDINATE ALL MECHANICAL WORK AND EQUIPMENT WITH

STRUCTURAL MEMBERS, ELECTRICAL WORK, COMMUNICATION WIRING,

FIXTURES, ALL OTHER TRADES AND ALL EXISTING CONDITIONS.

6. PROVIDE INSULATED TRAPPED CONDENSATION DRAIN PIPING, WITH AIR

GAPS, FROM COOLING COIL DRAIN PANS TO FLOOR DRAIN, ROOF DRAIN,

OR OTHER TERMINATION.

7. PROVIDE ALL HVAC AND PLUMBING EQUIPMENT AS PER MANUFACTURER

REQUIREMENTS AND DIVISION 23 SPECIFICATIONS FOR THIS PROJECT.

8. DETERMINE FINAL LOCATIONS AND ORIENTATION OF ALL EQUIPMENT IN

THE FIELD.

9. COORDINATE FINAL EQUIPMENT/FIXTURE LOCATIONS WITH THE GENERAL

CONTRACTOR. LOCATIONS AS INDICATED ON THE DRAWINGS ARE

APPROXIMATE AND MUST BE FIELD VERIFIED.

10. CONDENSATE IS PUMPED. REFER TO MANUFACTURERS INSTALLATION

INSTRUCTIONS FOR CONNECTION REQUIREMENTS.

11. PROVIDE LABOR, MATERIALS, TOOLS, EQUIPMENT, AND DEVICES

NECESSARY TO PROVIDE COMPLETE AND OPERATIONAL SYSTEMS IN

ACCORDANCE WITH THE INTENT OF THE CONTRACT DRAWINGS. FULLY

TEST, CLEAN, AND LEAVE SYSTEMS IN A COMPLETE AND OPERATIONAL

STATUS.

12. ALL MATERIALS MUST BE INSTALLED IN A NEAT AND WORKMANLIKE

MANNER WITH THE COORDINATION OF ALL INVOLVED TRADES.

13. PROVIDE NEW, U.L. LISTED MATERIALS AND EQUIPMENT. INSTALL IN

ACCORDANCE WITH MANUFACTURER MAINTENANCE CLEARANCES.

14. EQUIPMENT AND DESIGN OF SYSTEMS INDICATED ON THE CONTRACT

DRAWINGS AND SPECIFICATIONS ARE TO ESTABLISH THE SPECIFIED

STANDARD OF QUALITY AND TO PROVIDE THE REQUIRED TYPE(S),

SIZE(S), AND CONFIGURATION.

15. USE PLASTIC COATED TYPE HANGERS FOR ALL COPPER PIPING.

16. SEAL OPENINGS AND PROTECT PIPES ACCORDING TO SPECIFICATIONS

WHERE PIPING IS ROUTED THRU A WALL OR FLOOR.

17. REFER TO ELECTRICAL SHEETS E-102 AND E-701 FOR NEW HVAC

ELECTRICAL SUPPLY INFORMATION.

18. PROVIDE ADEQUATE CONTAINMENT FOR DUST PRODUCING WORK.

PREVENT DUST MIGRATION FROM OCCUPIED SPACES AND ADJACENT

WORK AREAS. THIS INCLUDES BUT IS NOT LIMITED TO DRILLING, SAW

CUTTING AND DEMOLITION ACTIVITIES. PROTECT ALL EXISTING

EQUIPMENT TO REMAIN FROM DAMAGE, DUST AND MOISTURE.

19. IF ANY REMAINING SERVICES, PIPES, DUCTS, DUCT INSULATION OR

EQUIPMENT ARE DAMAGED IN APPEARANCE, OR BECOMES

UNSERVICEABLE DUE TO CONTRACTOR OPERATIONS, THE CONTRACTOR

SHALL REPLACE WITH NEW PRODUCTS OF EQUAL CAPACITY AND

QUALITY.

20. COORDINATE WITH THE CONTRACTING OFFICER FOR SCHEDULING SHUT

DOWNS, OUTAGES, CAPPING, OR ANY DISCONTINUATION OF UTILITY

SERVICES BEFORE PERFORMING ANY WORK.

21. COORDINATE WITH THE CONTRACTING OFFICER FOR ALL TEMPORARY

PARTITIONS AND MEANS OF EGRESS RESULTING FROM DEMOLITION

OPERATIONS.

22. COORDINATE WITH THE CONTRACTING OFFICER ALL DEMOLITION THAT

AFFECTS OCCUPIED PORTIONS OF THE FACILITY.

23. COORDINATE WITH THE CONTRACTING OFFICER ON MEANS OF

PROTECTION FOR ITEMS TO REMAIN AND ITEMS IN PATH OF WASTE

REMOVAL FROM THE FACILITY.

24. DETERMINE FINAL LOCATIONS AND ORIENTATION OF ALL EQUIPMENT IN

THE FIELD.

25. NOTIFY THE CONTRACTING OFFICER OF DISCREPANCIES BETWEEN

EXISTING CONDITIONS AND DRAWINGS BEFORE PROCEEDING WITH

DEMOLITION.

26. DEMOLISH AND REMOVE EXISTING CONSTRUCTION ONLY TO THE EXTENT

AS INDICATED. USE METHODS REQUIRED TO COMPLETE WORK WITHIN

LIMITATIONS OF GOVERNING REGULATIONS AND AS FOLLOWS:

A. HOLES IN WALLS AND FLOORS MUST BE CUT NEATLY WITH

STRAIGHT AND PLUMB EDGES. PROCEED WITH DEMOLITION

SYSTEMATICALLY; NEATLY CUT OPENINGS AND HOLES PLUMB;

AND SQUARE TRUE TO DIMENSIONS REQUIRED. USE CUTTING

METHODS LEAST LIKELY TO DAMAGE NEW CONSTRUCTION. USE

HAND TOOLS OR SMALL POWER TOOLS DESIGNED FOR SAWING

OR GRINDING. THE CONTRACTOR MUST MINIMIZE HAMMERING

AND CHOPPING TO REDUCE DISTURBANCE TO ADJACENT

SURFACES. TEMPORARILY COVER OPENINGS.

B. CUT OR DRILL FROM THE EXPOSED OR FINISHED SIDE INTO

CONCEALED SURFACES TO AVOID MARRING EXISTING FINISHED

SURFACES.

C. DO NOT USE CUTTING TORCHES OR GRINDING EQUIPMENT UNTIL

WORK AREA IS CLEARED OF FLAMMABLE MATERIALS. AT

CONCEALED SPACES, SUCH AS DUCT INTERIORS AND PIPE

INTERIORS, VERIFY CONDITIONS AND CONTENTS OF HIDDEN

SPACE BEFORE STARTING FLAME-CUTTING OR GRINDING

OPERATIONS. OBTAIN ALL REQUIRED BURN PERMITS BEFORE ANY

OF THIS WORK IS PERFORMED.

D. MAINTAIN ADEQUATE VENTILATION WHEN USING CUTTING

TORCHES AND GRINDING.

E. REMOVE DECAYED, VERMIN-INFESTED, OR OTHERWISE

DANGEROUS OR UNSUITABLE MATERIAL AND PROMPTLY DISPOSE

OF OFF-SITE.

MECHANICAL GENERAL NOTES: MECHANICAL CODES & STANDARDS:

1. CONFORM IN STRICT COMPLIANCE TO THE UNIFIED FACILITIES CRITERIA (UFC) AND

THE AMMENDMENTS WHICH ARE ENFORCED BY THE LOCAL AUTHORITY HAVING

JURISDICTION.

A. UFC 3-401-01 - MECHANICAL ENGINEERING, WITH CHANGE 1.

B. UFC 3-410-01 - HEATING, VENTILATING, AND AIR CONDITIONING SYSTEMS,

WITH CHANGE 8.

C. UFC 3-420-01 PLUMBING SYSTEMS

2. COMPLY WITH ALL OF THE REQUIREMENTS OF THE FEDERAL "RIGHT-TO-KNOW"

REGULATIONS AND THE FLORIDA "RIGHT-TO-KNOW" LAW AND PROVIDE

NOTIFICATION TO ALL PARTIES CONCERNED AS TO THE USE OF TOXIC SUBSTANCES.

3. AMERICAN SOCIETY OF HEATING, REFRIGERATION AND AIR-CONDITIONING

ENGINEERS (ASHRAE):

A. SAFETY STANDARD FOR REFRIGERATION SYSTEMS (ASHRAE 15 & 34) 2022

EDITION.

B. VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY (ASHRAE 62.1) 2022

EDITION.

C. ENERGY STANDARD FOR BUILDINGS (ASHRAE 90.1) 2022 2019 EDITION.

4. AIR FORCE INSTALLATION FACILITIES STANDARDS (IFS)

A. G10 SLD45 IFS HEATING, VENTILATION, & AIR CONDITIONING (HVAC)

STANDARDS 2023 EDITION.

B. G13 SLD45 IFS ENERGY MANAGEMENT & CONTROLS SYSTEMS (EMCS) 2024

EDITION.

F. DEMOLISHED MATERIAL AT ALL ELEVATIONS ABOVE FINISHED

FLOOR MUST BE LOWEREDTO GROUND BY METHODS SUITABLE

TO AVOID FREE FALL AND PREVENT GROUND IMPACT AND DUST

GENERATION.

G. AT ALL ELEVATIONS ABOVE FINISHED FLOOR, LOCATE

DEMOLISHED EQUIPMENT, DEBRIS AND MATERIALS SO AS NOT TO

IMPOSE EXCESSIVE LOADS ON SUPPORTING WALLS, FLOORS,

ROOFS OR FRAMING.

26. DO NOT ALLOW DEMOLISHED MATERIALS TO ACCUMULATE ON-SITE.

27. DISPOSAL: TRANSPORT DEMOLISHED MATERIALS OFF PROPERTY AND

LEGALLY DISPOSE OF DEBRIS.

28. CLEAN REMAINING AND ADJACENT SPACES AND STRUCTURES OF DUST,

DIRT, AND DEBRIS CAUSED BY DEMOLITION OPERATIONS.

29. OBTAIN APPROVAL FROM CONTRACTING OFFICER BEFORE CUTTING.

PRIOR APPROVALS DO NOT WAIVE THE OWNER'S RIGHT TO LATER

REQUIRE ADDITIONAL REMOVALS AND REPLACEMENTS OF

UNSATISFACTORY WORK.

30. WHERE PIPING IS REMOVED THROUGH A WALL OR FLOOR, THE

REMAINING OPENINGS WILL BE PATCHED AND SEALED.

31. REMOVE ALL PIPE SUPPORTS ASSOCIATED WITH ALL REMOVED PIPING.

32. DOCUMENT CONDITION OF EXISTING HVAC EQUIPMENT AND ASSOCIATED

COMPONENTS PRIOR TO CONSTRUCTION. FIELD MEASURE CAPACITIES

AND FLOW RATES OF EXISTING AHU'S. REPORT DATA TO CONTRACTING

OFFICER TO VERIFY THE PERFORMANCE REQUIREMENTS CAN BE

ACHIEVED.

33. CONTRACTOR SHALL INCLUDE AN ALLOWANCE FOR REPLACEMENT OF

UP TO 5% OF THE SUPPLY AIR DUCTWORK SHOWN AND UP TO 10% OF

THE SUPPLY AIR DUCTWORK INSULATION AS NECESSARY TO REPAIR

ISOLATED AREAS WHERE DUCT AND/OR INSULATION MAY HAVE BEEN

DAMAGED PRIOR TO CONTRACT. INSULATION REMOVAL WILL BE

PERFORMED IN ACCORDANCE WITH ASBESTOS HANDLING

SPECIFICATIONS.

34. PROVIDE ACCESS DOORS IN NEW DUCTWORK TO SERVICE DEVICES

WITHIN DUCTS NOT OTHERWISE ACCESSIBLE THROUGH

GRILLES/DIFFUSERS OR OPEN DUCT.

35. DUCT DIMENSIONS ARE INSIDE CLEAR DIMENSIONS.

36. CONNECTION TO EQUIPMENT MUST BE VERIFIED WITH MANUFACTURER'S

CERTIFIED DRAWINGS. TRANSITIONS TO ALL EQUIPMENT MUST BE

VERIFIED AND PROVIDED FOR EQUIPMENT FURNISHED.

37. DUCT WILL BE FABRICATED PER SMACNA=HVAC DUCT CONSTRUCTION

STANDARDS-METAL AND FLEXIBLE.

38. PROVIDE FLEXIBLE DUCT CONNECTIONS ON ALL DUCTWORK

CONNECTING TO FANS, AIR HANDLING UNITS, AND VAV UNITS.

39. DETERMINE FINAL LOCATIONS AND ORIENTATION OF ALL EQUIPMENT IN

THE FIELD.

40. FIRESTOP/SMOKESTOP ALL NEW PIPE PENETRATIONS THROUGH

FIRE/SMOKE RATED ASSEMBLIES TO MAINTAIN THE INTEGRITY OF THE

ASSEMBLY.

41. FOR NEW CONNECTION PROVIDE FLANGED PIPING CONNECTIONS AT

COILS TO ALLOW FOR TUBE/COIL REMOVAL/REINSTALLATION.

42. ALL MECHANICAL PENETRATIONS THROUGH PRESSURE BOUNDARIES

WILL BE CAULKED AND SEALED TO MINIMIZE LOSS OF SPACE

PRESSURIZATION.

43. FIRE DAMPER WILL BE PROVIDED AT ALL POINTS WHERE THE DUCTWORK

PENETRATES A FIRE BARRIER OF MORE THAN A ONE-HOUR RATING

UNLESS OTHERWISE INDICATED ON THE DRAWINGS.

44. ALL STEEL SHAPES (FABRICATIONS) WILL CONFORM TO ASTM-A-3C AND

ALL SHARP EDGES WILL BE ROUNDED. ALL BURRS WILL BE REMOVED.

45. HANGERS FOR ALL COPPER PIPING WILL BE PLASTIC-COATED TYPE.

46. FIELD VERIFY ALL EXISTING PIPE SIZES AND LOCATIONS. NEW TO

EXISTING CONNECTIONS WILL BE MADE USING THE SAME PIPE SIZE AS

EXISTING (UNLESS NOTED OTHERWISE).

47. WHERE PIPING IS ROUTED THROUGH A WALL OR FLOOR, THE OPENINGS

MUST BE SEALED AND THE PIPES PROTECTED ACCORDING TO THE

SPECIFICATIONS

48. UNLESS OTHERWISE NOTED, ALL EQUIPMENT AND VALVE DRAINS MUST

BE INDEPENDENTLY PIPED FULL SIZE TO THE NEAREST PLUMBING DRAIN.

49. ALL ENERGY MANAGEMENT CONTROL SYSTEM (EMCS) PRODUCTS SHALL

BE COMPATIBLE WITH SCHNEIDER ELECTRIC AND ITS SMARTSTRUXURE

ENTERPRISE SERVER PRODUCT IAW AFCEC/CNP DIRECTION WITH THEIR

AUTHORITY TO OPERATE (ATO) GRANTED ONLY FOR SCHNEIDER

ELECTRIC PRODUCTS AND END-ITEMS. WORK SHALL COMPLY WITH G13

SLD45 IFS 45CES ENERGY MANAGEMENT & CONTROLS SYSTEMS (EMCS).

NO OTHER BRAND NAME PRODUCT MAY CONNECT TO THE SYSTEM

WITHOUT ADDITIONAL COST INCURRED BY THE GOVERNMENT AND

AUTHORITY TO CONNECT BY AFCEC/CNP.

50. ALL FLEX DUCT MUST BE INSTALLED NO LONGER THAN 5 FEET IN LENGTH.

51. DO NOT USE FLEX DUCT FOR RETURN AIR CONNECTIONS.

MECHANICAL GENERAL NOTES

(CONT):

5. SMACNA DUCT CONSTRUCTION STANDARDS IN MECHANICAL CODES & STANDARDS

A A rh o d e s b ri

SHEET

IDENTIFICATION

1 2 3 4 5

D

C

B

A

C O

N T

R A

C T

N

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

P L

O T

S C

A L E

P L

O T

D A

T E

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

S P

A C

E L

A U

N C

H D

E L T

A

P

S F

B F

L

DESIGN DRAWINGS

/8

/2

/2

:1

:3

P

M

M-001

M E

C H

A N

IC

A

L G

E N

E R

A L

N O

T E

S

M E

C H

A N

IC

A

L M

-0

F A

-1

-D

A P

R

IL

W

R

F A

-1 -D

C

H A

L V

O R

S E

N

Y D

IT

E

N G

O

N E

L S

O N

E N

G

R

F A

U T

H

100%

S X

H T

-1

R E

P A

IR

H

V A

C B

L D

G

D E

S

IG

N D

R A

W

IN

G S

A

IR

F O

R C

E S

E R

V

IC

E S

A C

T

IV

IT

Y

CONDENSATE

CHILLED WATER RETURN

CONDENSER WATER SUPPLY

CHILLED WATER SUPPLY

CONDENSER WATER RETURN

CWS

CWR

CHWS

CHWR

CD

HEATING HOT WATER RETURN

HEATING HOT WATER SUPPLYHHWS

HHWR

PRESSURE GAUGE WITH SHUTOFF

CAP

ELBOW, 90°

ELBOW, 45°

45° PIPE RISE (R) / DROP (D)

PIPE ANCHORS

CONCENTRIC REDUCER

ECCENTRIC REDUCER

R R

FLANGES

UNION

THERMOMETER

RELIEF VALVE

TEST PLUG (PRESSURE/TEMPERATURE)

MANUAL VENT

P-TRAP

FLOW SWITCH

PRESSURE SWITCH

AUTOMATIC AIR VENT

HOSE CONNECTION

ANGLE GLOBE VALVE

REFRIGERANT LIQUID AND SUCTION LINESR

MANUAL BALANCING

DAMPER

MOTORIZED DAMPER

BACKDRAFT DAMPER

FIRE DAMPER W/ 1.5 OR 3

HOUR RATING AS

INDICATED

M

BD

FD-1.5

FLEXIBLE DUCT CONNECTION TO CEILING DEVICE

ACOUSTICALLY LINED DUCT

RECTANGULAR BEVELED BRANCH TAKEOFF

ROUND CONICAL BRANCH TAKEOFF

ROUND TAKEOFF

ROUND TAKEOFF WITH DAMPER

CONCENTRIC DUCT TRANSITION

ECCENTRIC DUCT TRANSITION

SQUARE TO ROUND DUCT TRANSITION

DUCT OR CEILING ACCESS PANEL

DN UP

SUPPLY OR OUTSIDE AIR DUCT DOWN (DN) OR UP

DN UP

EXHAUST AIR DUCT DOWN (DN) OR UP

DN UP

RETURN AIR DUCT DOWN (DN) OR UP

SQUARE DUCT ELBOW W/ TURNING VANES

SQUARE OR ROUND DUCT RADIUS ELBOW

CHANGE OF DUCT ELEVATION

CHANGE OF DUCT ELEVATION

UP

DN

EQUIPMENT

4" HOUSEKEEPING PAD TO

EXTEND 6" BEYOND

PERIMETER OF EQUIPMENT

UNLESS NOTED OTHERWISE

EQUIPMENT

CLEARANCE

DAMPERSDUCTWORK

EQUIPMENT

PIPING SYSTEMS

PIPING SYMBOLS

SYMBOLS

DIFFUSER, REGISTER, AND

GRILLE NOTIFICATION

36x24 SA 36ø RA

RECTANGULAR DUCT SIZE IN INCHES

(WIDTH x HEIGHT)

• SA = SUPPLY AIR

• RA = RETURN AIR

• EA = EXHAUST AIR

• OA = OUTSIDE AIR

ROUND DUCT SIZE IN INCHES

(DIAMETER)

• SA = SUPPLY AIR

• RA = RETURN AIR

• EA = EXHAUST AIR

• OA = OUTSIDE AIR

SD-1

DEVICE IDENTIFICATION

(REFER TO SCHEDULES)

AIRFLOW IN CFM

SUPPLY DIFFUSER / GRILLE

(REFER TO SCHEDULES FOR ADDITIONAL INFORMATION)

RETURN DIFFUSER / GRILLE

(REFER TO SCHEDULES FOR ADDITIONAL INFORMATION)

EXHAUST DIFFUSER / GRILLE

(REFER TO SCHEDULES FOR ADDITIONAL INFORMATION)

FLOW DIRECTION

BASIC MATERIALS

EXISTING

TO REMAIN

DEMOLISHED

NEW WORK

UNDERGROUND PIPING

CONDENSER WATER SUPPLY

UNIT REMOTE THERMOSTAT

POINT OF DISCONNECTION

POINT OF CONNECTION

KEY NOTE

T

ABBREVIATIONS

V

VOLTS, VOLTAGE

ODP OPEN DRIP PROOF

TEFC TOTALLY ENCLOSED FAN COOLED

TOTALLY ENCLOSED AIR OVERTEAO

ECO EXTERIOR CLEANOUT (GRADE CLEANOUT)

SHEETSHT

OUTSIDE AIR LOUVEROAL

TRANSFER AIR GRILLETAG

FIRE ALARM CONTROL PANELFACP

FAS FIRE ALARM SYSTEM

SEC SECOND

NOT IN CONTRACTNIC

HVAC HEATING, VENTILATION AND AIR CONDITIONING

AMERICAN SOCIETY OF MECHANICAL ENGINEERSASME

AND AIR CONDITIONING ENGINEERS

ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATION,

CONTRACTORS' NATIONAL ASSOCIATION

SHEET METAL AND AIR CONDITIONINGSMACNA

RH RELATIVE HUMIDITY

SEER SEASONAL ENERGY EFFICIENCY RATIO

ACCESS PANELAP

AF AIRFOIL

PRV PRESSURE REDUCING VALVE

BUILDING AUTOMATION SYSTEMBAS

BYPASSBYP

BPV BYPASS VALVE

BACKFLOW PREVENTERBFP

DP DIFFERENTIAL PRESSURE

SUPPLY AIR TEMPERATURESAT

SS

RETURN AIR TEMPERATURERAT

OAT OUTSIDE AIR TEMPERATURE

FPS FEET PER SECOND

FCU FAN COIL UNIT

POTABLE WATERPW

TYPICALTYP

VARIABLE FREQUENCY DRIVEVFD

EQUIPMENTEQUIP

DIFFERENTIALDIFF

MIN

FLOORFLR

DIRECT EXPANSIONDX

ACCESS DOORAD

BACKWARDLY INCLINEDBI

BOTTOM OF PIPEBOP

BRITISH THERMAL UNITBTU

ABOVE FINISHED GRADEAFG

AIR CONDITIONERAC

AIR CONDITIONINGA/C

REF REFRIGERANT

1000 BRITISH THERMAL UNITS PER HOUR

NATIONAL ELECTRIC CODE

NORMALLY OPEN

NATIONAL FIRE PROTECTION ASSOCIATION

MINIMUM CIRCUIT AMPACITY

NORMALLY CLOSED

POINT OF CONNECTION

RETURN AIR GRILLE

PRESSURE DROP

STATIC PRESSURE

REVOLUTION PER MINUTE

RATED LOAD AMPS

POUNDS PER SQUARE INCH

STAINLESS STEEL

VARIABLE AIR VOLUME

TOTAL STATIC PRESSURE

TOTAL SENSIBLE HEAT

OUTSIDE AIROA

EXHAUST FAN

EFFICIENCY

FACE AREA

FLEXIBLE

FLANGE

FEET

FORWARD CURVE

ENTERING WATER TEMPERATURE

ENERGY EFFICIENCY RATIO

EXTERNAL STATIC PRESSURE

DEGREES FAHRENHEIT

GALVANIZED

HORSEPOWER

HERTZ

INCHES

GALLONS PER MINUTE

HZ

IN

HP

GALV

GPM

°F

FLEX

FLG

FT

FC

FA

EFF

ESP

EWT

EER

EF

VAV

ROOMRM

TSP

TSH

TEMP

SP

RPM

SA

TEMPERATURE

SUPPLY AIR

RG

RLA

PSI

RA

POC

PH

PD

OC

RETURN AIR

ON CENTER

PHASE

CAPACITY

CHILLED WATER

CONNECTION

CONTINUE

DRY BULB

DIAMETER

CENTRIFUGAL

AIR HANDLING UNIT

AUTOMATIC FLOW CONTROL VALVE

BOTTOM OF DUCT

BRAKE HORSEPOWER

CUBIC FEET PER MINUTE

DIRECT DIGITAL CONTROL

DRAWING

DOWN

DB

DDC

DIA

DWG

DN

CHW

CONT

CONN

BOD

CAP

CFM

CENTRI

AFCV

BHP

AHU

MECHANICALMECH

NFPA

NTE

NOM

NO

NEC

NC

NOT TO EXCEED

NOMINAL

MINIMUM

MCA

MBH

MAT MIXED AIR TEMPERATURE

VERTICAL DRAW THRUVDT

SF SUPPLY FAN

W

WATT(S)

W/ WITH

LEAVING AIR TEMPERATURELAT

PUMPED CONDENSATEPC

SCHEDULESCH

DOOR GRILLEDG

DOOR LOUVERDL

SD SUPPLY DIFFUSER

EXISTING TO REMAINETR

CHILLED WATER SUPPLY / RETURNCHWS/R

CONTRACTOR FURNISHED, CONTRACTOR INSTALLEDCFCI

REG REGULATION

INSIDE DIMENSIONID

CONCRETECONC

DIVISIONDIV

KILOWATTSKW

POUNDS PER SQUARE INCH GAUGEPSIG

STANDARD CUBIC FEET PER MINUTESCFM

TEMPERATURE DRYBULBTDB

SEN SENSIBLE

FEET PER MINUTEFPM

REQ REQUIRED

NTS NOT TO SCALE

DPIT DIFFERENTIAL PRESSURE INDICATING TRANSMITTER

ABOVE FINISHED FLOORAFF

TEST ADJUST AND BALANCETAB

CONDENSATE DRAINCD

DAMPERDAMP

ELECTRIC, ELECTRICALELEC

MAX MAXIMUM

PRESS PRESSURE

RC REHEAT COIL

V

VOLTS ALTERNATING CURRENTVAC

W

HIGH PRESSUREHP

LOW PRESSURE LP

EXIST EXISTING

FIC FACILITY INTERFACE CABINET

ACOUSTICAL CEILING TILEACT

TRANSFER DUCTTD

NPT NATIONAL PIPE THREAD

DENOTE NEW(N)

PERCENTPCT

REMOTE SENSORRS

PS PRESSURE SENSOR

DISCHARGE AIR TEMPERATUREDAT

ROOFTOP UNITRTU

CLEANOUTCO

INVERTINV.

FF FINISHED FLOOR

ELEVATIONEL.

POLYVINYL CHLORIDEPVC

VENT TO ROOFVTR

AIR SEPARATORAS

ENERGY MANAGEMENT CONTROL SYSTEMEMCS

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

WCO WALL CLEANOUT

EA EXHAUST AIR

ODU OUTDOOR UNIT

INDOOR UNITIDU

TRANSFER AIRTA

VARIABLE REFRIGERANT FLOWVRF

WSHP WATER SOURCE HEAT PUMP

HW HOT WATER (HEATING)

HWS/R HOT WATER SUPPLY/RETURN

THERMOSTAT, TEMPERATURE SENSORT

PL PLACES

POINT OF DISCONNECTIONPOD

FLA FULL LOAD AMPS

A A rh o d e s b ri

IDENTIFICATION

1 2 3 4 5

D

C

B

A

C O

N T

R A

C T

N

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

P L

O T

S C

A L E

P L

O T

D A

T E

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

S P

A C

E L

A U

N C

H D

E L T

A

P

S F

B F

L

DESIGN DRAWINGS

/2

/2

:1

:4

P

M

M-002

A B

B R

E V

IA

T

IO

N

S

M E

C H

A N

IC

A

L L

E G

E N

D

M E

C H

A N

IC

A

L M

-0

F A

-1

-D

A P

R

IL

W

R

F A

-1 -D

C

H A

L V

O R

S E

N

Y D

IT

E

N G

O

N E

L S

O N

E N

G

R

F A

U T

H

100%

S X

H T

-1

R E

P A

IR

H

V A

C B

L D

G

D E

S

IG

N D

R A

W

IN

G S

A

IR

F O

R C

E S

E R

V

IC

E S

A C

T

IV

IT

Y

1 2 3 4 5 6 7 8 9 10

C.4

C

B.8

B

A

KITCHEN

VAULT

CONFERENCE

CORRIDOR

1HALL1

SHARED OFFICE

STOR

SHOWER

MECHANICAL

COMM

OFFICE

OFFICE

MECH

1MECH1

OFFICE

OFFICE

OFFICE

110 SHARED OFFICE

KITCHEN / STOR

OFFICE

OFFICES

110AOFFICE

108WOMEN

1RR2

MEN

1RR1

ELECTRICAL

AHU-6

VAV 4

VAV 4

VAV 4

TYP

VAV 4

VAV4

TYP

VAV4

VAV4 VAV 4

VAV4

A A rh o d e s b ri

IDENTIFICATION

1 2 3 4 5

D

C

B

A

C O

N T

R A

C T

N

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

D E

L

IV

E R

Y O

R D

E R

N O

C

K D

B Y x

P L

O T

S C

A L E

P L

O T

D A

T E

T R

A C

E S

T E

C H

N

IC

A L R

A N

G E

A R

C H

IT

E

C T

U R

A L E

N G

IN

E

E R

IN

G

S E

R V

IC

E

S

S P

A C

E L

A U

N C

H D

E L T

A

P

S F

B F

L

DESIGN DRAWINGS

/8

/2

/2

:1

:4

P

M

MD-101

F

IR

S T

F L

O O

R M

E C

H A

N

IC

A L

D E

M O

L

IT

IO

N

P L A

N

M E

C H

A N

IC

A

L M

D -1

F A

-1

-D

A P

R

IL

W

R

F A

-1 -D

C

H A

L V

O R

S E

N

Y D

IT

E

N G

O

N E

L S

O N

E N

G

R

F A

U T

H

100%

S X

H T

-1

R E

P A

IR

H

V A

C B

L D

G

D E

S

IG

N D

R A

W

IN

G S

A

IR

F O

R C

E S

E R

V

IC

E S

A C

T

IV

IT

Y

GENERAL NOTES:

0 4' 8' 16' 24'

SCALE: 1/8" = 1'-0"

PLAN NORTH

KEYNOTES:

1. DEMOLISH EXISTING AHU-6 AND ALL ASSOCIATED PIPING CONNECTIONS UP

TO ISOLATION VALVES LOCATED WITHIN THE MECHANICAL ROOM,

CONDENSATE DRAIN, DUCTWORK CONNECTIONS, CONTROLS AND WIRING.

DISCONECT EXISTING CONTROL SYSTEM FROM AHU. PREPARE CONTROL

SYSTEM FOR CONNECTION TO NEW AHU.

2. DEMOLISH OUTSIDE AIR DAMPER INDICATED ON PLAN, EXISTING LOUVER

TO REMAIN.

3. DEMOLISH DUCT HEATER AND ALL ASSOCIATED PIPING IN LOCATION

INDICATED ON PLAN. DEMOLISH DUCTWORK UP TO THE MAIN SUPPLY DUCT

TRUNK. REPAIR ANY…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .