Attachment 2.b COST ESTIMATE SUMMARY SHEET (Sample Project).xlsx

XLSX spreadsheet 47 KB Posted

Attached to
Multiple Award Task Order Contract (MATOC) for Hawaii Federal contract opportunity
Solicitation number
W912CN-23-R-0002
Issued by
Department of the Army Materiel Command Army Contracting Command

About this file

This document contains a sample cost estimate template for a federal contract opportunity. The template provides instructions and worksheets for contractors to submit pricing for direct labor, materials, equipment, subcontracts, overhead costs, and profit. The cost estimate summary sheet automatically calculates totals rolled up from detailed cost elements. The related federal contract opportunity is a Multiple Award Task Order Contract for services in Hawaii, solicited by the Department of the Army Materiel Command Army Contracting Command. Contractors must use the template format or their own form including all requested cost information when submitting proposals in response to the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Task Order Contract (MATOC) for Hawaii, newest first.
File Type Posted
23-R-0002 P00003 SF 30 Final.pdf PDF
23-R-0002 P00003 Conformed Final.pdf PDF
RFI Attachments.pdf PDF
23-R-0002 P00002 Conformed.pdf PDF
23-R-0002 P00002 SF 30.pdf PDF
23-R-0002 P00001 Conformed.pdf PDF
23-R-0002 P00001 SF 30 Amendment 9.22.23.pdf PDF
ATTACHMENT 2.a. PROPOSAL COST BREAKDOWN INSTRUCTIONS (Sample project) rev.docx DOCX document
W912CN 23-R-0002 HI MATOC RFI Responses.pdf PDF
W912CN-23-R-0002 SF1442 FINAL.pdf PDF
Attachment 2 - MATOC SAMPLE PROJECT.pdf PDF
ATTACHMENT 3 PAST PERFORMANCE INFORMATION.docx DOCX document
Attachment 1 COST ESTIMATE SUMMARY SHEET PROPOSED RATES.xlsx XLSX spreadsheet
ATTACHMENT 4. PAST PERFORMANCE EVALUATION QUESTIONNAIRE.docx DOCX document
ATTACHMENT 2.a. PROPOSAL COST BREAKDOWN INSTRUCTIONS (Sample project).docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS

Instructions

The offeror shall submit a cost proposal in the format enclosed. The offeror may modify the spreadsheet or use their own form with all the information stated.

Summary Sheet
This is a summary of all direct and indirect costs of the prime contractor and subcontractor(s) leading to the total cost of the project.
Insert your organization's name in cell A2 and the RFP No. in cell A3.
Some of the totals from each cost element page are automatically carried forward to the Summary worksheet.
Cost Breakdown of Direct Costs
The cost breakdown for direct costs shall be filled out for the prime work and all subcontractor(s) work. Breakdown should be in sufficient detail to permit itemizing of all direct costs. If the offeror is using a cost estimating tool (RSMeans, UPB, etc.) indicate what tool you are using and if any indirect costs such as overhead, profit, tax, etc. are included in the unit cost.
Work Schedule
Provide a work schedule for the project. This is an estimated time line showing events from estimated award date to completion date. See Block 11 of the solicitation and 52.211.10 for the period of performance.

SUMMARY

SUMMARY OF PROPOSED COSTS
Contractor's Name**
RFP NO.**
PercentageDollar ValueSubtotal
LABOR$0.00
MATERIAL$0.00
EQUIPMENT$0.00
OTHER DIRECT$0.00
TOTAL DIRECT$0.00
OVERHEAD0.00%$0.00
Subtotal$0.00

PRIME PROFIT 0.00% $0.00

PRIME SUBTOTAL $0.00

SUBCONTRACTOR
LABOR$0.00
MATERIAL$0.00
EQUIPMENT$0.00
OTHER DIRECT$0.00
TOTAL DIRECT$0.00
OVERHEAD0.00%$0.00
Subtotal$0.00
SUBCTR PROFIT0.00%$0.00
Subtotal$0.00
SUBCTR HI STATE TAX0.00%$0.00$0.00

SUBCTR SUBTOTAL $0.00

PRIME O/H ON SUBCTR 0.00% $0.00

SUBTOTAL (SUBCTR COST) $0.00

BONDING AND TAX

SUBTOTAL (line 16 and 35) $0.00

BOND PREMIUM0.00%0.00
Subtotal$0.00
HI STATE TAX0.00%$0.00$0.00
GRAND TOTAL PROJECT COST$0.00

LABOR - Hourly

COST BREAKDOWN OF LABOR AND PAYROLL TAX

Contractor's Name**
RFP NO.**
TOTAL
HOURLYTOTAL# OFNUMBERMANTOTALFICAFUTASUTAW/COTHERTOTAL
LABOR CLASSRATEFRINGE(C) + (D)MENHOURSHOURS(E) + (H)% of E% of E% of E% of E% OF EPayrollTax
1$0.00$0.00$0.000.000$0.00ERROR:#VALUE!
2$0.00$0.00$0.000.000$0.000.00%
3$0.00$0.00$0.000.000$0.000.00%
4$0.00$0.00$0.000.000$0.000.00%
5$0.00$0.00$0.000.000$0.000.00%
6$0.00$0.00$0.000.000$0.000.00%
7$0.00$0.00$0.000.000$0.000.00%
8$0.00$0.00$0.000.000$0.000.00%
9$0.00$0.00$0.000.000$0.000.00%
10$0.00$0.00$0.000.000$0.000.00%
11$0.00$0.00$0.000.000$0.000.00%
12$0.00$0.00$0.000.000$0.000.00%
13$0.00$0.00$0.000.000$0.000.00%
14$0.00$0.00$0.000.000$0.000.00%
$0.00
Column B. List all the labor class you will be using for this project
Column C & D. Must be in compliance with the current Davis Bacon Rates (see solicitation or http://www.wdol.gov/dba.aspx )
Column K - O. List the percentage of payroll taxes.
Column O. If column O is used, need to identify what it is.
Total man hours should correspond with hours stated on the estimated work schedule.

Materials

SUMMARY OF MATERIALS AND SUPPLIES
Contractor's Name**
RFP NO.**
Unit ofUnitUnit
ITEMMeasurePriceQuantitySubtotal
1$0.000$0.00
20.0000.00
30.0000.00
40.0000.00
50.0000.00
60.0000.00
70.0000.00
80.0000.00
90.0000.00
100.0000.00
110.0000.00
120.0000.00
130.0000.00
140.0000.00
150.0000.00
160.0000.00
170.0000.00
180.0000.00
190.0000.00
200.0000.00
210.0000.00
220.0000.00
230.0000.00
240.0000.00
250.0000.00
260.0000.00
270.0000.00
280.0000.00
290.0000.00
300.0000.00
TOTAL =$0.00
Column B. Enter description including brand name, model no., size, etc.
Supporting documentation may be requested at a later date

&24&USUMMARY OF MATERIALS AND SUPPLIES

Equipment

SUMMARY OF EQUIPMENT COSTS
Contractor's Name**
RFP NO.**
UnitUnit
ITEMPriceQuantityTotal
1$0.000$0.00
20.0000.00
30.0000.00
40.0000.00
50.0000.00
60.0000.00
70.0000.00
80.0000.00
90.0000.00
100.0000.00
110.0000.00
120.0000.00
130.0000.00
140.0000.00
150.0000.00
160.0000.00
170.0000.00
180.0000.00
190.0000.00
200.0000.00
210.0000.00
220.0000.00
230.0000.00
240.0000.00
250.0000.00
260.0000.00
270.0000.00
280.0000.00
290.0000.00
300.0000.00
TOTAL =$0.00
Column B. Enter description including make, model no., size, etc.
Supporting documentation may be requested at a later date.

&24&USUMMARY OF EQUIPMENT COSTS

Other Direct

SUMMARY OF OTHER DIRECT COSTS
Contractor's Name**
RFP NO.**
UnitUnit
ITEMPriceQuantityTotal
1$0.000$0.00
20.0000.00
30.0000.00
40.0000.00
50.0000.00
60.0000.00
70.0000.00
80.0000.00
90.0000.00
100.0000.00
110.0000.00
120.0000.00
130.0000.00
140.0000.00
150.0000.00
160.0000.00
170.0000.00
180.0000.00
190.0000.00
200.0000.00
210.0000.00
220.0000.00
230.0000.00
240.0000.00
250.0000.00
260.0000.00
270.0000.00
280.0000.00
290.0000.00
300.0000.00
TOTAL =$0.00
Column B. Enter description including make, model no., size, etc., and justification.
Supporting documentation may be requested at a later date.

&24&USUMMARY OF OTHER DIRECT COSTS

Subcontracts

SUMMARY OF SUBCONTRACTOR COSTS
Contractor's Name**
RFP NO.**
SUBCONTRACTORDESCRIPTION OF WORKTOTAL
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
TOTAL =
A complete breakdown and summary sheet for each proposed subcontractor must
be included with the prime proposal. The same format should be used for both
the prime and subcontractor proposals.

Work Schedule

ESTIMATED WORK SCHEDULE
Contractor's Name**
RFP NO.**
Period of Performance:
EstimateEstimate
EVENTStart DateEnd Date
Bonds
Insurance
APP
QC Plan
Each element of work should be scheduled to insure the required completion date can be met.
Column A. List events starting from Award date to Project Completion.
Coumn B. List the start date (or due date) from award date. See solicitation for the following:
Bonds, Material Submittals, Notice to Proceed, etc.
Column C & D. List the start date and end date of each event.

File details come from the government source that posted it. Updated .