Attachment 2 - Divisional Price Breakout.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- 687-24-112 Install Door Operators B143 Federal contract opportunity
- Solicitation number
- 36C26025R0079_0001
About this file
This is a pricing schedule breakdown template (Excel file) for federal contract opportunity RFQ 687-24-112, which involves installing door operators at Building 143 of the Walla Walla VA Medical Center located at 77 Wainwright Dr, Walla Walla, WA 99362. The template provides a structured format for contractors to submit fixed-price proposals broken down by construction industry divisions (CSI divisions), including general requirements, existing conditions, concrete, masonry, metals, openings, electrical, and other specialized categories, though all pricing fields are currently blank at $0.00.
The document establishes that awardees are responsible for formula accuracy and calculations, specifies that division breakdowns are for informational purposes only and do not constitute separate deliverables, and clarifies that field office overhead and general conditions represent the same cost category to be applied only once. The template includes sections for mobilization/demobilization, insurance/bonds, taxes, overhead rates, subcontract markup, profit rates, and other miscellaneous items, with spaces for contractors to input their period of performance in days. All pricing is fixed-price, and the breakdown must align with the architect's specification binders for accurate cost allocation across the various construction divisions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26025R0079 0003.pdf | ||
| Attachment-Bldg 143 ARCH as-builts .pdf | ||
| Updated SOW.pdf | ||
| 36C26025R0079 0002.pdf | ||
| Attachment 1 - SOW 687-24-112 Replace Door Installation REV 7.docx | DOCX document | |
| 36C26025R0079.pdf | ||
| Attachment 5 - Contractor Rules of Behavior.pdf | ||
| Attachment 3 - Limitations on Subcontracting 687-24-112 Replace Door Installation.docx | DOCX document | |
| Attachment 4 - WALLA WALLA WAGE DETERMINATIONS.pdf | ||
| Site Visit Information Amendment 36C26025R0079 0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| PRICE SCHEDULE BREAKDOWN INSTRUCTIONS | |
| INSTRUCTIONS | |
| 1 | Awardee is Responsible for determining accuracy of formulas to calcualte SubTotals and Contract Totals as well as accurately transposing totals to the Price Summary |
| 2 | The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record. |
| 3 | The contract line item price breakdown is for information purposes only and does not constitute separate billable deliverables. |
| 4 | Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable. |
| 5 | All pricing is fixed price. |
Proposal Price Schedule
| PRICE SCHEDULE BREAKDOWN |
| RFQ: 687-24-112 Install Door Operators at B143 |
Project Location: Walla Walla VA Medical Center, 77 Wainwright Dr, Walla Walla, WA 99362
| Rates | Base Item | |
| Price | ||
| Division 1 General Requirements | ||
| Division 2 Existing Conditions | ||
| Division 3 Concrete | ||
| Division 4 Masonry | ||
| Division 5 Metals | ||
| Division 6 Woods, Plastic and Composites | ||
| Division 7 Thermal and Moisture Protection | ||
| Division 8 Openings | ||
| Division 9 Finishes | ||
| Division 10 Specialties | ||
| Division 11 Equipment | ||
| Division 12 Furnishings | ||
| Division 13 Special Construction | ||
| Division 14 Conveying Equipment | ||
| Division 21 Fire Suppression | ||
| Division 22 Plumbing | ||
| Division 23 HVAC | ||
| Division 25 Integrated Automation | ||
| Divison 26 Electrical | ||
| Division 27 Communications | ||
| Divison 28 Electronic Safety and Security | ||
| Division 31 Earthwork | ||
| Division 32 Exterior Improvements | ||
| Division Item 33 Utilities |
SubTotals N/A $0.00
Period of Performance (FAR 52.211-10) ________ days
| Mobilization / Demobilization | ||
| Insurance / Bonds | ||
| Taxes / Other Fees (provide itemized list) | ||
| O&M Manuals and Red Line Drawings | ||
| Overhead | Rate _______% | |
| Overhead (daily rate) | Per Day $0.00 | |
| SubContract Mark-Up | Rate _______% | |
| Profit | Rate _______% | |
| SubTotals | $0.00 |
Other Items not Requested Above (provide itemized list) $0.00
CONTRACT TOTALS $0.00
File details come from the government source that posted it. Updated .