36C26025R0079 0002.pdf

PDF 222 KB Posted

Attached to
687-24-112 Install Door Operators B143 Federal contract opportunity
Solicitation number
36C26025R0079_0001
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 20

About this file

This is a Standard Form 30 (SF-30) Amendment of Solicitation/Modification of Contract for a project to install door operators at the Jonathan M. Wainwright VA Medical Center in Vancouver, WA. The amendment provides key clarifications for the solicitation, including specific door measurements for exterior staff doors (90"H x 36"W), interior staff doors (80"H x 36"W), and restroom doors (83"H x 40.75"W). Electrical work has been removed from the Statement of Work, with the VA providing circuits, and contractors must specify the amperage draw for hardware. Hardware requirements stipulate that no specific manufacturer is required, staff door hardware must be compatible with PACS lockout, and all door operators must be wireless pushbutton operated.

View the file

Other files for this federal contract opportunity

Other files attached to 687-24-112 Install Door Operators B143, newest first.
File Type Posted
36C26025R0079 0003.pdf PDF
Attachment-Bldg 143 ARCH as-builts .pdf PDF
Updated SOW.pdf PDF
Attachment 2 - Divisional Price Breakout.xlsx XLSX spreadsheet
Attachment 1 - SOW 687-24-112 Replace Door Installation REV 7.docx DOCX document
36C26025R0079.pdf PDF
Attachment 5 - Contractor Rules of Behavior.pdf PDF
Attachment 3 - Limitations on Subcontracting 687-24-112 Replace Door Installation.docx DOCX document
Attachment 4 - WALLA WALLA WAGE DETERMINATIONS.pdf PDF
Site Visit Information Amendment 36C26025R0079 0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

687-24-112

36C260

Network Contracting Office 20

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661

To all Offerors/Bidders

36C26025R0079

X

X X

X

Project No.: 687-24-112 Install Door Operators at B143 – Jonathan M. Wainwright VAMC See Continuation Page

CONTINUATION OF SF 30 BLOCK 14:

The following clarifications are provided and shall be incorporated into the solicitation:

1. Door Measurements:

o Exterior Staff Doors: 90"H x 36"W; frame: 4" top, 3" sides + 2" overlap stop.

o Interior Staff Doors: 80"H x 36"W; frame: 2" top, 3" sides + 1" overlap stop.

o Restroom Doors: 83"H x 40.75"W; frame: 2" + 1" overlap stop.

2. Electrical Clarification:

o All electrical work will be removed from the SOW. VA will provide circuits.

Contractor must specify amperage draw for hardware to support correct breaker selection.

See Attached Updated SOW

3. Hardware Requirements:

o No specific model or manufacturer is required.

o Staff door hardware must be compatible with PACS lockout (VA will handle PACS interface).

o All door operators must be wireless pushbutton operated.

All other terms and conditions remain unchanged.

File details come from the government source that posted it. Updated .