Attachment 2 Buoy_Anchor_3pgs.pdf

PDF 493 KB Posted

Attached to
SRD Buoy Inspection and Maintenance
Solicitation number
1240BF26Q0003
Issued by

About this file

This document contains technical design specifications and detailed drawings for buoy maintenance and anchor systems for the Sitka Ranger District of the Tongass National Forest.

The document consists of three detailed engineering drawings specifying components and construction requirements for a typical buoy and anchor system. The first drawing illustrates the overall buoy and anchor system configuration, showing a ring assembly with dual lifting pad eyes secured with stainless steel wire shackle pins, connected via zinc-coated chain of variable length to a concrete anchor block on the sea floor. The second drawing provides specifications for a small concrete anchor block with dimensions of 4 feet by 3 feet by 3 feet, detailing three hoops (Hoops A, B, and C) and an anchor bail. Key concrete specifications include a compressive strength of 3,000 PSI at 28 days (Class A concrete per ASTM C150 Type II), with reinforcing steel of FY 60,000 PSI that must be epoxy-coated and galvanized per AASHTO specifications. The anchor bail is fabricated from ASTM A36 steel. The third drawing provides detailed dimensions for the hoops and anchor bail components, including Hoop A (4 required per anchor), Hoop B (3 required per anchor), Hoop C (4 required per anchor), and the anchor bail with specified radii and overall dimensions. All exposed structural steel must be galvanized, and the dry weight of the anchor is approximately 2.4 tons, with an available anchorage force of approximately 1.4 tons when installed in salt water.

View the file

Other files

File Type Posted
Attachment 10 - 2024 State of the Buoys.xlsx XLSX spreadsheet
Brents Beach.zip ZIP file
Mud Bay.zip ZIP file
Samsing.zip ZIP file
Allan Point.zip ZIP file
Silver Bay.zip ZIP file
Attachment 11 - 2022 Contractor Report.pdf PDF
Neva.zip ZIP file
Redoubt.zip ZIP file
Moser.zip ZIP file
Amendment 1240BF26Q0003 A00001 SRD Buoy Inspection SF 30.pdf PDF
Response to questions.pdf PDF
Appleton.zip ZIP file
Seven Fathom.zip ZIP file
Piper Island.zip ZIP file
Kanga Bay.zip ZIP file
Attachment 9 - Exhibit 1 - SRD Buoy Details.pdf PDF
Attachment 12 - Topper_buoy drawing.pdf PDF
Freds Creek.zip ZIP file
Solicitation 1240BF26Q0003 SRD Buoy Inspection SF 1449.pdf PDF
Attachment 4 FredsCreekAnchorDrawing.pdf PDF
Attachment 7 WD 2004-0047 R17 Apr 2026.pdf PDF
Attachment 1 SRD Buoy Inspection and Maintenance PWS.pdf PDF
1240BF26Q0003 Bouy Inspection Scedule of Items Offer.xlsx XLSX spreadsheet
Attachment 6 FSH 4209 Contract Diving.pdf PDF
Attachment 3 MapMooringBuoys.pdf PDF
Attachment 5 FredsCreekAnchorPadeyePhoto.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTES:

ALL SHACKLE PINS SECURED WITH

STAINLESS STEEL WIRE.

RING ASSEMBLY --

LIFTING PAD EYE, TYP OF 2 ---

,......,.,...---LL:I.....,.

CHAIN LENGTH AND ANCHOR DEPTH VARIES.

ANCHOR CONNECTION

ASSEMBLY

ZINC ----

CONCRETE ANCHOR BLOCK

\_ SEA FLOOR

WATER SURFACE

DESIGNED: T. LAURENT DATE: 4/09

DRAWN: T. LAURENT DATE: 4/09

2021 SRD BUOY MAINTENANCE TYPICAL BUOY $ ANCHOR SYSTEM

REVIEWED: M. MURPHY DATE: 05/09

TONGASS NATIONAL FOREST

SITKA RANGER DISTICT - TONGA55 NF SRD _Buoy_ Ma1nt _ T yp .dwg SH._l_of _3_

Attachment 1

File details come from the government source that posted it. Updated .