This document is a design contract deliverable consisting of architectural and engineering drawings for HVAC system repairs at the Center for Medical Agricultural and Veterinary Entomology (CMAVE) facility in Gainesville, Florida, operated by the U.S. Department of Agriculture Agricultural Research Service.

The project encompasses phased construction work focused on Building 11, Phase 1, involving replacement of one air-cooled chiller, replacement of one air handling unit (AHU-1), replacement of existing perimeter fan coil units on first and second floors, replacement of existing pumps in the mechanical room, and associated electrical work to support mechanical equipment. Design Contract No. 12405B21D0003 and Design Order No. 1232SA25F0354 govern this work. The project location is 1600 SW 23rd Drive, Gainesville, FL 32608. Drawings include demolition plans, mechanical site plans, HVAC floor plans, mechanical details, equipment schedules (chillers, air handling units, fan coil units, and pumps), control system diagrams, and electrical plans with equipment schedules and panel layouts. Key mechanical equipment specified includes a Trane ACRC250 air-cooled screw chiller (250 tons, R513A refrigerant), a Trane CSAA030 central station air handling unit (18,100 CFM), and multiple Trane fan coil units in various sizes. The contractor must field-verify all existing conditions, protect existing finishes and equipment, conduct hazardous materials abatement per regulations, maintain building watertightness, and perform system balancing and cleaning. All work must comply with the Buy American Act, and equipment specifications establish quality standards while permitting equivalent manufacturer substitutions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EPM

REVISIONS

DESCRIPTION

SHEET

DATEP.A.

FIRM

U

NO.

D

REAL PROPERTY

SAFETY & HEALTH

A

DATE

PROJECT NO.

SUSDA

BY

OF

THE

DESIGNER

PROJECT MGR

JOB #

CHECKED BY

A-E FIRM

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson-McAdams

ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT

C :\U se rs

\T O

M

LO

V~ 1\

Ap pD at a\

Lo ca l\T em p\ Ac

Pu bl is h_

\T

-1

P 1.

dw g

M ay

3,

- 1

2:

pm

COR

TEL

E. WILSON

E. WILSON

TBD

TBD 5/04/2026

Agricultural

Service Research

USDA ARS

5601 SUNNYSIDE AVENUE

RM 3-2102

BELTVILLE MD 20705

REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL

AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -

GAINESVILLE, FLORIDA

BTD

JND

BUILDING 11 - PHASE 1

TITLE SHEET

LOCATION MAPVICINITY MAP NO SCALE

N

NO SCALE

U.S. DEPARTMENT OF AGRICULTURE

AGRICULTURAL RESEARCH SERVICE

REPAIR HVAC SYSTEMS, BUILDING 1 - BID ALTERNATE

DESIGN CONTRACT NO: 12405B21D0003

DESIGN ORDER NO: 1232SA25F0354

CENTER FOR MEDICAL AGRICULTURAL AND VETERINARY ENTOMOLOGY (CMAVE)

1600 SW 23RD DRIVE

GAINESVILLE, FL 32608

CENTER FOR MEDICAL AGRICULTURAL AND VETERINARY ENTOMOLOGY (CMAVE)

1600 SW 23RD DRIVE

GAINESVILLE, FL 32608

SW

RD

D

RI

VE

PROJECT LOCATION

PROJECT INFORMATION

MIAMI

TALLAHASSEE JACKSONVILLE

GAINESVILLE

ORLANDO

TAMPA

PENSACOLA

ST. PETERSBURG

KEY WEST

CANAL

POINT

SW

RD

D

RI

VE

HULL ROAD

IF

AS

R

ES

EA

RC

H

DR

IV

E

IF

AS

R

ES

EA

RC

H

DR

IV

E

PROJECT LOCATION

BUILDING 1

BUILDING 11

N

T-101

GENERAL NOTES:

1. THE CONTRACTOR MUST FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO PERFORMING WORK, FABRICATION OR PURCHASE OF ANY EQUIPMENT, MATERIALS, AND ASSEMBLIES. ANY DISCREPANCIES MUST BE BROUGHT TO THE CONTRACTING OFFICER'S ATTENTION FOR RESOLUTION BEFORE PROCEEDING WITH ANY CONSTRUCTION, FABRICATION, OR EQUIPMENT PURCHASE.

2. CONTRACTOR MUST PERFORM A THOROUGH SURVEY OF THE BUILDING AND DOCUMENT ANY DEFICIENCIES IN BUILDING FINISHES, BUILDING EQUIPMENT AND BUILDING SYSTEMS PRIOR TO BEGINNING WORK. SUBMIT DOCUMENT WITH

PHOTOGRAPHS TO THE CONTRACTING OFFICER.

3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO MOVE EXISTING FURNISHINGS TO ACCOMMODATE THE WORK.

PROTECT FINISHES AND FURNISHINGS DURING THE WORK.

4. THE BUILDING WILL BE UNOCCUPIED FOR CONSTRUCTION AND THE ENTIRE BUILDING WILL BE AVAILABLE FOR THE

DURATION OF THE CONSTRUCTION.

HAZARDOUS MATERIALS INFORMATION:

1. REFER TO THE HAZARDOUS MATERIALS SURVEY REPORT IN THE SPECIFICATIONS. CONTRACTOR MUST ABIDE BY ALL GOVERNING REGULATIONS IN REGARDS TO DISTURBANCE, REMOVAL AND DISPOSAL OF HAZARDOUS MATERIALS

(REFERENCE SAID REPORT).

2. CONTRACTOR MUST ASSUME THAT ALL EXISTING PAINT COATINGS ON BUILDING MATERIALS AND SYSTEMS CONTAINS SOME LEVEL OF LEAD. ANY MATERIALS TO BE DISPOSED OF WITH PAINT COATINGS INTACT, MAY BE DISPOSED OF AS NORMAL CONSTRUCTION WASTE. THE CONTRACTOR MUST PROVIDE WORKER PROTECTION IN ACCORDANCE WITH OSHA

FOR ANY DISTURBANCE OF EXISTING PAINT COATINGS.

3. THE HAZARDOUS MATERIALS SURVEY TOOK SAMPLES OF SUSPECT ASBESTOS-CONTAINING MATERIALS. LABORATORY ANALYSIS OF THE SAMPLES DID NOT TEST POSITIVE FOR ASBESTOS. SHOULD THE CONTRACTOR DISCOVER MATERIALS THEY REASONABLY BELIEVE TO CONTAIN ASBESTOS, THE WORK MUST STOP AND THE CONTRACTING OFFICER MUST BE

NOTIFIED IMMEDIATELY.

PROTECTION OF EXISTING FACILITIES:

1. CONTRACTOR MUST PROTECT ALL EXISTING CONSTRUCTION DURING WORK INCLUDING, BUT NOT LIMITED TO, FINISHES, EQUIPMENT, DOORS, WINDOWS, FURNISHINGS AND SEATING. ANY DAMAGE TO EXISTING CONSTRUCTION MUST BE

REPAIRED OR REPLACED NEW, LIKE-IN-KIND.

DESCRIPTION

SHEET

DATEP.A.

FIRM

U

NO.

D

REAL PROPERTY

SAFETY & HEALTH

A

DATE

PROJECT NO.

SUSDA

BY

OF

THE

DESIGNER

PROJECT MGR

JOB #

CHECKED BY

A-E FIRM

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson-McAdams

ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT

J:

\g re en w oo d\

J ob s\

U

SD

A B1

B

H

VA

C

R ep ai r G ai ne sv ille

F L\

W or ki ng F ol de r\T itl e\ B1

P1

\T -1

P

1.

dw g M ay

4,

- 4 :1

6p m

COR

TEL

E. WILSON

E. WILSON

TBD

TBD 5/04/2026

Agricultural

Service Research

USDA ARS

5601 SUNNYSIDE AVENUE

RM 3-2102

BELTVILLE MD 20705

REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL

AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -

GAINESVILLE, FLORIDA

BTD

T-102

BUILDING 11 - PHASE 1

DRAWING LISTJND

INDEX OF DRAWINGS

DRAWING NO. SHEET NO. TITLE

GENERAL

T-101 1 OF 28 BUILDING 11 - PHASE 1 TITLE SHEET

T-102 2 OF 28 BUILDING 11 - PHASE 1 DRAWING LIST

CIVIL

C-101 3 OF 28 BUILDING 11 - PHASE 1 MECHANICAL SITE PLAN

HVAC

M-001 4 OF 28 BUILDING 11 - PHASE 1 GENERAL HVAC NOTES

M-002 5 OF 28 BUILDING 11 - PHASE 1 HVAC SYMBOL LEGEND

MD101 6 OF 28 BUILDING 11 - PHASE 1 FIRST FLOOR HVAC DEMO

MD102 7 OF 28 BUILDING 11 - PHASE 1 SECOND FLOOR HVAC DEMO

MD103 8 OF 28 BUILDING 11 - PHASE 1 EXISTING MECHANICAL SITE PLAN DEMO

MD401 9 OF 28 BUILDING 11 - PHASE 1 ENLARGED MECHANICAL ROOM DEMO

M-101 10 OF 28 BUILDING 11 - PHASE 1 FIRST FLOOR HVAC

M-102 11 OF 28 BUILDING 11 - PHASE 1 SECOND FLOOR HVAC

M-103 12 OF 28 BUILDING 11 - PHASE 1 MECHANICAL SITE PLAN

M-401 13 OF 28 BUILDING 11 - PHASE 1 ENLARGED MECHANICAL ROOM

M-501 14 OF 28 BUILDING 11 - PHASE 1 MECHANICAL DETAILS

M-502 15 OF 28 BUILDING 11 - PHASE 1 MECHANICAL DETAILS

M-601 16 OF 28 BUILDING 11 - PHASE 1 MECHANICAL SCHEDULES

M-602 17 OF 28 BUILDING 11 - PHASE 1 MECHANICAL SCHEDULES

M-603 18 OF 28 BUILDING 11 - PHASE 1 MECHANICAL SCHEDULES

M-701 19 OF 28 BUILDING 11 - DEDICATED OUTDOOR UNIT AHU-1 CONTROLS DIAGRAM

ELECTRICAL

E-001 20 OF 28 BUILDING 11 - PHASE 1 ELECTRICAL LEGEND

ED101 21 OF 28 BUILDING 11 - PHASE 1 FIRST FLOOR ELECTRICAL DEMO

ED102 22 OF 28 BUILDING 11 - PHASE 1 SECOND FLOOR ELECTRICAL DEMO

ED103 23 OF 28 BUILDING 11 - PHASE 1 EXISTING ELECTRICAL SITE PLAN DEMO

E-101 24 OF 28 BUILDING 11 - PHASE 1 FIRST FLOOR ELECTRICAL PLAN

E-102 25 OF 28 BUILDING 11 - PHASE 1 SECOND FLOOR ELECTRICAL PLAN

E-103 26 OF 28 BUILDING 11 - PHASE 1 ELECTRICAL SITE PLAN

E-501 27 OF 28 BUILDING 11 - PHASE 1 EQUIPMENT SCHEDULE

E-701 28 OF 28 BUILDING 11 - PANEL SCHEDULES

WORK PHASING INFORMATION

THIS IS PROJECT CONSISTS OF PHASED CONSTRUCTION. SUBMIT A SEPARATE, STAND ALONE BID FOR EACH WORK PHASE. THE WORK IN THIS SET OF PLANS PERTAINS TO BUILDING 11 PHASE 1. REFER TO THE SPECIFICATIONS FOR MORE INFORMATION.

THE SCOPE OF THIS PROJECT INCLUDES BUT IS NOT LIMITED TO:

1. REPLACE ONE OF THE EXISTING AIR COOLED CHILLERS.

2. REPLACE AHU-1 WHICH IS LOCATED IN THE INDOOR MECHANICAL ROOM. THE INTENT IS TO REPLACE THE AHU IN KIND.

THE REPLACEMENT AHU WILL CONNECT TO THE EXISTING DUCTWORK. MODIFY DUCTWORK AS REQUIRED TO

ACCOMMODATE THE REPLACEMENT AHU.

3. THE ROOF MOUNTED AIR HANDLERS AND FANS ARE EXISTING TO REMAIN. (SEE PHASE 2 DOCUMENTS)

4. REPLACE EXISTING PUMPS IN THE MECHANICAL ROOM.

5. REPLACE EXISTING PERIMETER FAN COIL UNITS ON THE FIRST AND SECOND FLOOR.

6. ELECTRICAL WORK IS PRIMARILY IN SUPPORT OF THE MECHANICAL WORK. DISCONNECT AND RECONNECT HVAC

EQUIPMENT AS SHOWN.

SW

RD

D

RI

VE

BUILDING 1

BUILDING 11

GREENHOUSE

EXIST. ACCH-2

EXIST. ACCH-1

TRANS.

G

EN

EPM

REVISIONS

DESCRIPTION

SHEET

DATEP.A.

FIRM

U

NO.

D

REAL PROPERTY

SAFETY & HEALTH

A

DATE

PROJECT NO.

SUSDA

BY

OF

THE

DESIGNER

PROJECT MGR

JOB #

CHECKED BY

A-E FIRM

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson-McAdams

ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT

J:

\g re en w oo d\

J ob s\

U

SD

A B1

B

H

VA

C

R ep ai r G ai ne sv ille

F L\

W or ki ng F ol de r\C iv il\ B1

1\ C

-1

P H

AS

E

1.

dw g M ay

4,

- 4 :3

3p m

COR

TEL

E. WILSON

E. WILSON

TBD

TBD 5/04/2026

Agricultural

Service Research

USDA ARS

5601 SUNNYSIDE AVENUE

RM 3-2102

BELTVILLE MD 20705

REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL

AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -

GAINESVILLE, FLORIDA

BTD

SCALE:

BUILDING 11 - PHASE 1

MECHANICAL SITE PLAN

NOT TO SCALE

C-101

JND

BUILDING 11 - PHASE 1

MECHANICAL SITE PLAN

C-101

GENERAL NOTES

1. THIS SHEET PROVIDED TO SHOW GENERAL SITE

CONDITIONS AND CONTRACTOR LAY DOWN AREAS. NO

CIVIL WORK IS REQUIRED FOR THIS PROJECT.

2. THE LAY DOWN AREAS SHOWN ARE FOR REFERENCE

ONLY AND ARE SUBJECT TO CHANGE. COORDINATE LAY

DOWN AREAS FOE EACH PHASE OF CONSTRUCTION WITH

SITE PERSONNEL AT TIME OF CONSTRUCTION.

LAY DOWN AREA FOR

BUILDING 1 WORK

LAY DOWN AREA FOR

BUILDING 1 WORK

LAY DOWN AREA FOR

BUILDING 11 WORK

DESCRIPTION

SHEET

DATEP.A.

FIRM

U

NO.

D

REAL PROPERTY

SAFETY & HEALTH

A

DATE

PROJECT NO.

SUSDA

BY

OF

THE

DESIGNER

PROJECT MGR

JOB #

CHECKED BY

A-E FIRM

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson-McAdams

ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT

J:

\g re en w oo d\

J ob s\

U

SD

A B1

B

H

VA

C

R ep ai r G ai ne sv ille

F L\

W or ki ng F ol de r\M ec h\ B1

P1

\M -0

-P

1.

dw g M ay

4,

- 4 :0

9p m

COR

TEL

E. WILSON

E. WILSON

TBD

TBD 5/04/2026

Agricultural

Service Research

USDA ARS

5601 SUNNYSIDE AVENUE

RM 3-2102

BELTVILLE MD 20705

REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL

AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -

GAINESVILLE, FLORIDA

BTD

JND

BUILDING 11 - PHASE 1

GENERAL HVAC NOTES

M-001

1. THIS PROJECT IS A RENOVATION OF AN EXISTING FACILITY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY ALL DIMENSIONS PRIOR TO FABRICATION OR PROCUREMENT OF EQUIPMENT, MATERIALS, AND ASSEMBLIES. ANY DEVIATIONS MUST BE BROUGHT TO THE CONTRACTING OFFICER'S ATTENTION FOR RESOLUTION BEFORE PROCEEDING WITH ANY

CONSTRUCTION, FABRICATION, OR EQUIPMENT PROCUREMENT.

2. INSTALLATION OF HVAC WORK MUST BE COORDINATED WITH OTHER TRADES BEFORE ANY WORK IS STARTED. DUCTWORK AND PIPING SHOWN ON PLANS IS SCHEMATIC. PROVIDE ALL TRANSITIONS, ELBOWS, REDUCERS, ETC. REQUIRED TO AVOID CONFLICTS & MAXIMIZE CEILING HEIGHTS. EQUIPMENT, PIPING OR DUCTWORK INTERFERING WITH OTHER TRADES MUST BE

RELOCATED AS REQUIRED AT NO ADDITIONAL COST TO THE OWNER.

3. COORDINATE MECHANICAL AND ELECTRICAL SUCH THAT MECHANICAL PIPING, DUCTWORK AND EQUIPMENT IS NOT LOCATED

OVER OR ABOVE ANY ELECTRICAL, COMMUNICATIONS, OR DATA EQUIPMENT.

4. AT START OF CONSTRUCTION, PREPARE TYPED LISTS OF EQUIPMENT THAT ARE SUPPLIED REQUIRING ELECTRICAL WORK, AND SEND LISTS TO THE ELECTRICAL CONTRACTOR FOR REVIEW AND COORDINATION.

5. WRITTEN DIMENSIONS ON DRAWINGS HAVE PRECEDENCE OVER SCALED DIMENSIONS. VERIFY DIMENSIONS ON SITE.

6. EQUIPMENT MUST BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S APPROVED CLEARANCE, AND INTERNATIONAL

BUILDING CODE / INTERNATIONAL MECHANICAL CODE.

7. INSTALLATION OF EQUIPMENT MUST PERMIT ACCESSIBILITY FOR SERVICE AND/OR REPLACEMENT WITHOUT NECESSITATING

REMOVAL OR MODIFICATION TO OTHER PIPING, WIRING, OR EQUIPMENT.

8. CEILING-MOUNTED EQUIPMENT MUST BE INSTALLED IN SUCH A MANNER THAT LIGHTS, PIPING, DUCTWORK, ETC. , DO NOT

BLOCK ACCESS TO EQUIPMENT AND RELATED ACCESSORIES.

9. SEAL WITH SILICONE ALL GAPS BETWEEN WALL, CEILING, AND FLOOR OPENINGS AND HVAC EQUIPMENT PENETRATIONS.

PATCH LARGE GAPS BEFORE SEALANT IS APPLIED.

10. DUCTWORK AIR DISTRIBUTION SYSTEMS MUST BE INSTALLED IN ACCORDANCE WITH SMACNA STANDARDS AND THE

PRESSURE CLASSIFICATION OF EACH INDIVIDUAL DUCTWORK SYSTEM.

11. VOLUME DAMPERS MUST BE PROVIDED AT EACH MAIN BRANCH TAKE-OFF, EACH TAKEOFF TO DIFFUSERS/GRILLS/REGISTERS, AND OTHER LOCATIONS WHERE REQUIRED TO PROPERLY BALANCE THE SYSTEM. ALL REQUIRED VOLUME DAMPERS MAY

NOT BE SHOWN ON PLANS.

12. INSTRUMENT TEST HOLES MUST BE PROVIDED IN AIR DISTRIBUTION SYSTEMS WHEREVER VOLUME DAMPERS ARE

INSTALLED. TEST HOLES MUST BE SEALED WITH RUBBER OR PLASTIC TEST HOLE PLUGS.

13. SQUARE ELBOWS MUST ONLY BE USED WHERE SPACE LIMITATIONS PREVENT USE OF 1-1/2 RADIUS ELBOW AND ONLY UPON APPROVAL OF CONTRACTING OFFICER. PROVIDE TURNING VANES IN ALL SQUARE ELBOWS GREATER THAN OR EQUAL TO 45°. TURNING VANES MUST BE SINGLE THICKNESS TYPE WITHOUT RAILING EDGE. TURNING VANES LONGER THAN 36 INCHES

MUST BE DOUBLE THICKNESS TYPE.

14. DUCTWORK RUNOUTS TO AIR DISTRIBUTION DEVICES MUST BE SAME DIAMETER AS AIR DISTRIBUTION DEVICE INLET

CONNECTION UNLESS OTHERWISE NOTED ON THE DRAWINGS.

15. FLEXIBLE DUCTWORK RUNOUTS FROM BRANCH DUCTS TO AIR DISTRIBUTION DEVICES MUST NOT EXCEED 5 FEET IN LENGTH.

BENDS IN FLEXIBLE DUCTWORK MUST NOT EXCEED A MAXIMUM OF 45 DEGREE CHANGE OF DIRECTION AND MUST BE SUPPORTED SUCH THAT THE BEND RADIUS IS NOT RESTRICTIVE TO AIR FLOW THROUGH THE DUCT. FLEXIBLE DUCTWORK

MUST NOT BE CRUSHED OR DISTORTED IN ITS FINAL CONFIGURATION.

16. PROVIDE SHEETMETAL TRANSITIONS AT AIR HANDLING UNITS, HEAT PUMP UNITS, FANS, AND OTHER SIMILAR HVAC EQUIPMENT. TRANSITION TO FULL SIZE OF CONNECTION ON UNIT. FLEXIBLE DUCT CONNECTORS MUST BE USED ON FINAL

CONNECTION TO AIR HANDLING EQUIPMENT.

17. TRANSFER DUCTS MUST BE SIZED FOR MAX VELOCITY ALLOWED OF 500 FPM. OPEN-ENDED TRANSFER DUCTS MUST HAVE

90° ELBOW FOR SOUND ATTENUATION.

18. LOUVERED SUPPLY AIR DIFFUSERS MUST BE 4-WAY FLOW UNLESS OTHERWISE SHOWN BY FLOW ARROWS ON THE DRAWINGS. LINEAR DIFFUSERS MUST BE ADJUSTABLE 2-WAY FLOW. PROVIDE BATT INSULATION ON DIFFUSER AND GRILLES

THAT ARE EXPOSED TO CEILING PLENUM.

19. EXACT LOCATIONS OF THERMOSTATS, CO2 SENSORS, AND EMCS SENSORS MUST BE COORDINATED WITH FINAL LOCATIONS OF WALL-MOUNTED ARCHITECTURAL AND ELECTRICAL EQUIPMENT. MOUNT THERMOSTATS AND CO2 SENSORS MINIMUM 48"

AFF.

20. SPECIFICATIONS TAKE PRECEDENCE OVER DRAWINGS. HOWEVER, ITEMS SHOWN ON DRAWING BUT NOT IN THE SPECIFICATIONS ARE REQUIRED WITHIN THE PROJECT SCOPE. IN ADDITION, SPECIFIC ITEMS SHOWN ON THE DRAWINGS TAKE PRECEDENCE OVER SPECIFICATIONS IN CASES WHERE THE SPECIFICATION HAS OPTIONS.

21. ALL EQUIPMENT MUST BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S APPROVED PUBLISHED LITERATURE.

22. DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS.

23. EXPOSED DUCTWORK, WITH THE EXCEPTION OF DUCTWORK IN MECHANICAL ROOMS MUST BE DOUBLE-WALL, DUCTWORK WITH COATING.

24. ALL THERMOSTATS MUST BE WALL MOUNTED AND WIRED.

25. ALL EQUIPMENT INSTALLED IN THIS PROJECT MUST COMPLY WITH THE "BUY AMERICAN ACT" (BAA). BASIS OF DESIGN

SHOWN ON SCHEDULES IS TO ESTABLISH A STANDARD OF QUALITY, NOT TO LIMIT COMPETITION. EQUIVALENT EQUIPMENT FROM ANOTHER MANUFACTURER IS ACCEPTABLE. MANUFACTURER NAME AND MODEL NUMBERS ARE BASIS OF DESIGN AND ARE SHOWN FOR INFORMATION ONLY AND MAY OR MAY NOT COMPLY WITH BAA. REFER TO

SPECIFICATIONS FOR COMPLETE REQUIREMENTS.

26. CONTROLS CONTRACTOR MUST PROVIDE ALL LOW VOLTAGE DEVICES, CONDUCTORS, AND PATHWAYS IN ACCORDANCE WITH THE REQUIREMENTS OF 26 20 00. INSTALL CONTROL WIRING IN CONDUIT. SEE DIVISION 26 SPECIFICATIONS FOR

REQUIREMENTS.

27. ALL WORK AT RISK OF CONTACT WITH LABORATORY CHEMICALS MUST BE PERFORMED IN ACCORDANCE WITH NFPA 45.

HVAC GENERAL NOTES:

1. THE DEMOLITION PLANS AND EXISTING CONDITIONS SHOWN ARE APPROXIMATE AND ARE TO BE FIELD VERIFIED. ITEMS TO

BE REMOVED ARE DENOTED BY HATCHING. ADDITIONAL ITEMS ARE LIKEY TO REQUIRE REMOVAL, RELOCATION AND/OR REINSTALLATION TO PERFORM THE WORK BUT REQUIRE VERIFICATION THRU C.O. BEFORE PERFORMING THE WORK.

2. DEMOLITION MUST INCLUDE, BUT IS NOT LIMITED TO, THE ITEMS IDENTIFIED. THE CONTRACTOR MUST COORDINATE ALL REQUIRED RENOVATION AND NEW CONSTRUCTION WITH THE EXISTING BUILDING TO IDENTIFY THE TOTAL EXTENT OF THE

DEMOLITION WORK REQUIRED.

3. THE CONTRACTOR IS RESPONSIBLE FOR THE DEMOLITION AND REMOVAL OF ALL EXISTING BUILDING COMPONENTS, MATERIALS, EQUIPMENT, AND APPURTENANCES AS REQUIRED TO PROVIDE ALL NEW CONSTRUCTION.

4. IN THE EVENT THE CONTRACTOR ENCOUNTERS MATERIAL REASONABLY BELIEVED TO BE ASBESTOS, LEAD-BASED PAINT, OR ANY OTHER HAZARDOUS MATERIAL WHICH HAS NOT BEEN RENDERED HARMLESS, THE CONTRACTOR MUST IMMEDIATELY

REPORT THE CONDITION TO THE CONTRACTING OFFICER IN WRITING.

5. THE CONTRACTOR IS RESPONSIBLE FOR THE ERECTION, MAINTENANCE, AND REMOVAL OF ALL CONSTRUCTION ASSISTANCE

DEVICES SUCH AS SCAFFOLDING AND BARRIERS.

6. THE BUILDING ENVELOPE MUST REMAIN WATERTIGHT THROUGHOUT THE CONSTRUCTION PROCESS.

7. IF IT BECOMES NECESSARY DURING DEMOLITION TO TEMPORARILY REMOVE ANY EXISTING WORK NOT SPECIFICALLY NOTED TO BE REMOVED OR RELOCATED (THEREBY IMPLYING THAT THEY ARE TO BE LEFT FOR FUTURE USE), THE CONTRACTOR

MUST REINSTALL SAID WORK TO FULLY OPERABLE CONDITION IN THEIR ORIGINAL LOCATIONS

8. CONTRACTOR MUST DEMOLISH ALL EQUIPMENT, PIPING, DUCTWORK, INSULATION, SUPPORTS, CONTROLS

THERMOSTATS, WIRING AND ALL APPURTENANCES WITH THE HVAC SYSTEM TO BE DEMOLISHED.

9. PROTECT EXISTING INTERIOR WALLS DURING REMOVAL AND CONSTRUCTION. PROVIDE TEMPORARY PROTECTION FROM DUST, NOISE, DAMAGE, ETC. AND CONSTRUCTION BARRIERS AND OTHER SITE PROTECTION REQUIREMENTS CONSISTENT

WITH THE SPECIFICATIONS SECTION, AND DIVISION 1, GENERAL REQUIREMENTS.

10. IN AREAS OF WORK, AT EXISTING FINISHES TO REMAIN, PATCH AND REPAIR ANY DAMAGE TO MATCH EXISTING FINISH.

PREPARE SURFACE TO RECEIVE NEW FINISHES.

11. FIXED ITEMS ON WALLS AND CEILINGS WILL REMAIN IN PLACE DURING CONSTRUCTION. CONTRACTOR MUST PROVIDE

PROTECTION OF EXISTING FIXED ITEMS.

12. ALL WORK AT RISK OF CONTACT WITH LABORATORY CHEMICALS MUST BE PERFORMED IN ACCORDANCE WITH NFPA 45.

HVAC GENERAL DEMOLITION NOTES:

ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT

J:

\g re en w oo d\

J ob s\

U

SD

A B1

B

H

VA

C

R ep ai r G ai ne sv ille

F L\

W or ki ng F ol de r\M ec h\ B1

P1

\M -0

-P

1.

dw g M ay

4,

- 4 :0

9p m

COR

TEL

E. WILSON

E. WILSON

TBD

TBD 5/04/2026

Agricultural

Service Research

USDA ARS

5601 SUNNYSIDE AVENUE

RM 3-2102

BELTVILLE MD 20705

REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL

AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -

GAINESVILLE, FLORIDA

BTD

JND

BUILDING 11 - PHASE 1

HVAC SYMBOL LEGEND

M-002

-10"

S1

ABBREVIATIONS:

@ AT

& AND

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

ARCH ARCHITECTURAL

AS AIR SEPARATOR

ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATING,

AND AIR CONDITIONING ENGINEERS

ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS

APD AIR PRESSURE DROP

BLDG BUILDING

BTU, BTUH BRITISH THERMAL UNITS, BTUs PER HOUR

C CONDENSATE RECEIVER

CD CONDENSATE DRAIN

CFM CUBIC FEET PER MINUTE

CHW CHILLED WATER

CHWP CHILLED WATER PUMP

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CLG COOLING

CMU CONCRETE MASONRY UNIT

CO CLEANOUT

CO2 CARBON DIOXIDE

CONC CONCRETE

COND STEAM CONDENSATE

CONN CONNECT, CONNECTING, CONNECTION

CONT CONTINUED

CONV STEAM CONVERTER

COP COEFFICIENT OF PERFORMANCE

COR CONTRACTING OFFICER'S (OWNER'S)

REPRESENTATIVE

CU CONDENSING UNIT

D DEPTH

D DIFFUSER

DISC DISCONNECT

DB, Tdb DRY BULB (TEMPERATURE) dBA DECIBELS

DCW DOMESTIC COLD WATER

DDC DIRECT DIGITAL CONTROLS

DEG F (°F) DEGREES FAHRENHEIT

DFCU DUCTLESS FAN COIL UNIT

DIA, Ø DIAMETER

DIV DIVISION

DN DOWN

DP DIFFERENTIAL PRESSURE

DWG DRAWING

DWH DOMESTIC WATER HEATER

DX DIRECT EXPANSION

(E) EXISTING

EA EXHAUST AIR

EAG EXHAUST AIR GRILLE

EAT ENTERING AIR TEMPERATURE

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EFF EFFICIENCY

ELEC ELECTRICAL

EMCS ENERGY MONITORING AND CONTROLS SYSTEM

ER EXHAUST REGISTER

ERV ENERGY RECOVERY VENTILATOR

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

ETR EXISTING TO REMAIN

EUH ELECTRIC UNIT HEATER

EWT ENTERING WATER TEMPERATURE

EXIST. EXISTING

EXT EXTERIOR

EXH EXHAUST

DEG EXISTING

FCU FAN COIL UNIT

FD FIRE DAMPER

FFE FINISHED FLOOR ELEVATION

FLA FULL LOAD AMPS

FPD FLUID PRESSURE DROP

FPM FEET PER MINUTE

FSD FIRE SMOKE DAMPER

FT FOOT, FEET

GA GAUGE

GALV GALVANIZED

GC GENERAL CONTRACTOR

GPM GALLONS PER MINUTE

GRD GRILLES, REGISTERS AND DIFFUSERS

HP HORSE POWER

HR HOUR

HTG HEATING

HTR HEATER

HTW HEATING WATER

HTWR HEATING WATER RETURN

HTWS HEATING WATER SUPPLY

HVAC HEATING, VENTILATING, AND AIR CONDITIONING

HWP HOT WATER PIPE

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

HZ HERTZ

IMC INTERNATIONAL MECHANICAL CODE

IN INCH, INCHES

IN WC INCHES WATER COLUMN

IN WG INCHES WATER GAUGE

IPLV INTEGRATED PART LOAD VALUE

KW KILOWATTS

L LENGTH, LOUVER (WALL)

LAT LEAVING AIR TEMPERATURE

LBD LINEAR BAR DIFFUSER

LB POUNDS

LD LINEAR DIFFUSER

LPR LOW PRESSURE RETURN

LPS LOW PRESSURE SUPPLY

LWT LEAVING WATER TEMPERATURE

M MOTORIZED

MA MIXED AIR

MAX MAXIMUM

MBH 1000 BRITISH THERMAL UNITS

MCA MINIMUM CIRCUIT AMPACITY

MECH MECHANICAL

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING VALUE

MIN MINIMUM

MOCP MAXIMUM OVER CURRENT PROTECTION

MSS SP MANUFACTURERS STANDARD SOCIETY STANDARD

PRACTICE

MTL METAL

N.C. NORMALLY CLOSED

NC NOISE CRITERIA

NG NATURAL GAS

NO. NUMBER

N.O. NORMALLY OPEN

NTS NOT TO SCALE

OA OUTSIDE AIR

PD PRESSURE DROP

PH PHASE

PLBG PLUMBING

PPM PARTS PER MILLION

PRV PRESSURE RELIEF VALVE

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH GAUGE

QTY QUANTITY

R/A RETURN AIR

RAG RETURN AIR GRILLE

REF REFER TO, REFERENCE

RF RADIO FREQUENCY

REQD REQUIRED

RH RELATIVE HUMIDITY, ROOF HOOD

RLD RECTANGULAR LINEAR DIFFUSER

RM ROOM

RPM REVOLUTIONS PER MINUTE

RR RETURN REGISTER

SA SUPPLY AIR

SAD SUPPLY AIR DIFFUSER

SAG SUPPLY AIR GRILLE

SD SMOKE DAMPER, SMOKE DETECTOR

SEER SEASONAL ENERGY EFFICIENCY RATIO

SF SUPPLY FAN

SHT SHEET

SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTOR'S

NATIONAL ASSOCIATION

SP STATIC PRESSURE

SS STAINLESS STEEL

SWR SIDEWALL REGISTER

T&P TEMPERATURE AND PRESSURE

TEMP TEMPERATURE

TSTAT THERMOSTAT

TYP TYPICAL

UH UNIT HEATER

UL UNDERWRITER'S LABORATORY

UMCS UTILITY MONITORING AND CONTROL SYSTEM

V VOLTAGE, VOLTS

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER

VFD VARIABLE FREQUENCY DRIVE

WG WATER GAUGE

WB WET BULB (TEMPERATURE)

WPD WATER PRESSURE DROP

W/O WITHOUT

MISCELLANEOUS LEGEND:

AIR DISTRIBUTION DEVICE TAGS

AIRFLOW (CFM)

NORTH ARROW

SD

SP

F

CO

DUCT SMOKE DETECTOR

CARBON MONOXIDE SENSOR

STATIC PRESSURE SENSOR

FIRESTAT

TEMPERATURE SENSORT

VARIABLE FREQUENCY DRIVEVFD

FLOW ARROW

RETURN AIR GRILLE

SUPPLY AIR DIFFUSER

FLOW ARROWS INDICATE AIR PATTERN.

NO FLOW ARROWS SHOWN INDICATES

4-WAY PATTERN.

EXHAUST AIR GRILLE

T THERMOSTAT

H HUMIDISTAT

TH THERMOSTAT/ HUMIDISTAT

HUMIDITY SENSORH

NECK SIZE

DP DIFFERENTIAL PRESSURE SENSOR

POINT OF RECONNECTION OR

EXTENT OF DEMOLITION

PIPING LEGEND:

EXISTING PIPING (EXIST.)

ITEMS TO BE DEMOLISHED

FLEXIBLE CONNECTION

THERMOMETER

PRESSURE REDUCING VALVE

MANUAL AIR VENT

PRESSURE/TEMPERATURE TAP WITH

BALL VALVE

PRESSURE SWITCH

PLUG VALVE

FLOW SWITCH

T&P RELIEF VALVE

AUTOMATIC AIR VENT

PRESSURE GAUGE WITH GAUGE COCK

PS

FS

BUTTERFLY VALVE

STRAINER WITH BLOWDOWN VALVE,

CAP, AND CHAIN

FLOW MEASURING/BALANCING/SHUT-

OFF VALVE

GATE VALVE

CHECK VALVE

BALL VALVE

CONCENTRIC REDUCER

DIRECTION OF FLOW

ECCENTRIC REDUCER

PIPE FLANGE

PIPE CAP

UNION

TEE OUTLET UP

BRANCH BOTTOM CONNECTION

BRANCH TOP CONNECTION

ELBOW UP

ELBOW DOWN

RISE OR DROP

TEE OUTLET DOWN

DUCTWORK LEGEND:

M

FIRE DAMPER

EXHAUST AIR DUCT DOWN

EXHAUST AIR DUCT UP

RETURN AIR DUCT DOWN

30"x14"

SQUARE TO ROUND DUCT BRANCH TAKE-OFF

WITH 45 DEGREE BRANCH INLET

ROUND DUCT BRANCH TAKE-OFF FROM

RECTANGULAR MAIN WITH CONICAL TAP

FLEXIBLE DUCT CONNECTION

DUCT SIZE TRANSITION

RECTANGULAR DUCT BRANCH TAKE-OFF

WITH 45 DEGREE BRANCH INLET

90 DEGREE DUCT ELBOW WITH TURNING VANES

24"Ø ROUND DUCT. DIAMETER INDICATED IN INCHES.

IN-LINE 90 DEGREE RISE/DROP IN

SUPPLY DUCT

FD

SD

DAMPER TYPE:

M - MOTORIZED DAMPER (ELECTRIC)

VD

SMOKE DAMPER

VOLUME/BALANCING DAMPER

(LABEL MAY BE OMITTED)

BD

BACKDRAFT DAMPER

(COUNTER-BALANCED UNLESS

OTHERWISE NOTED)

RADIUS DUCT ELBOW - ROUND OR

RECTANGULAR (MIN. 1.5 RADIUS UNLESS

OTHERWISE NOTED)

RECTANGULAR DUCT. SIZE INDICATED IN

INCHES, FIRST NUMBER IS SIDE SHOWN.

DASHED LINES INDICATE ACOUSTICAL LINER

FSD

COMBINATION

FIRE/SMOKE DAMPER

IN-LINE 90 DEGREE RISE/DROP IN

RETURN DUCT

DUCT SIZE TRANSITION RECTANGULAR TO

ROUND

RETURN AIR DUCT UP

SUPPLY OR OUTSIDE AIR DUCT DOWN

SUPPLY OR OUTSIDE AIR DUCT UP

IN-LINE 90 DEGREE RISE/DROP IN

EXHAUST DUCT

SD

DUCT MOUNTED SMOKE DETECTORGLOBE VALVEPLAN

NORTH

HATCHING INDICATES ITEMS TO

BE DISMANTLED AND REMOVED.

DEMOLITION LEGEND:

EXISTING EQUIPMENT

CH-1 (E) (E) AFTER AN EQUIPMENT

MARK INDICATES EXISTING

TRUE NORTH

DIFFUSER MARK (REFER

TO GRD SCHEDULE)

HEATING WATER RETURN (HTWR)

HEATING WATER SUPPLY (HTWS)

CHILLED WATER RETURN (CHWR)

CHILLED WATER SUPPLY (CHWS)

ABBREVIATION NOTES:

1. SOME ABBREVIATIONS SHOWN MAY NOT BE USED FOR THIS PROJECT.

2. SCHEDULED EQUIPMENT IS NOTED USING UNDERLINED TEXT SUCH AS AHU-1. THIS IS NOT AN

ABBREVIATION. IT IS AN EQUIPMENT MARK. REFER TO SCHEDULE SHEETS M-601 THRU M-699

FOR INFORMATION REGARDING SCHEDULED EQUIPMENT.

AHU-1

FC-168FC-169

FC-100

FC-101FC-102

FC-157FC-156FC-155FC-154FC-153FC-141FC-140FC-139FC-138FC-137FC-136FC-135FC-134

FC-118 FC-117 FC-116 FC-115 FC-114 FC-113

STORAGE

INSECT REARING LAB

STORAGE

COLD ROOM

INSECT REARING RM.

ENVIRONMENTAL RM.

123A

CORRIDOR

123B

INSECT REARING ROOM

STORAGE

OFFICE

LAB

CORRIDOR

STAIRWELL

MEN'S TOILET

WOMEN'S TOILET

MECH. RM.

OFFICE

OFFICE

135 OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CORRIDOR

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

C O

R R

ID

O

R

OFFICE

STORAGE

ELECTRICAL RM.

112A

HANDICAPPED TOILET - MEN

111A

HANDICAPPED TOILET - WOMEN

111B

MECHANICAL RM.

C O

R R

ID

O

R

MECHANICAL RM.

STORAGE

CORRIDOR

STORAGE

OFFICE

OFFICE

170 OFFICE

169 OFFICE

OFFICE

OFFICE

STORAGE

DARK RM.

DARK RM.

LIGHT RM.

RESEARCH SPACE

OFFICE

LAB

BREAK RM.

CORRIDOR

CORRIDOR

175A

CORRIDOR

C O

R R

ID

O

R

LAB

LAB

LAB

LAB

LAB

LAB

CORRIDOR

CONFERENCE RM.

177 COPY RM.

ELECTRICAL RM.

178MECHANICAL RM.

MEN'S

WOMEN'S

FREEZER RM.

LAB

LAB

LAB

LAB

LAB

196ALAB

LAB

LAB

LAB

LAB

MECHANICAL RM.

RESEARCH SPACE

190RESEARCH SPACE

190A

AN

TE

R O

O M

0B

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

JANITOR'S CLOSET

STAIRWELL

ELEVATOR LOBBY

RESEARCH

152A

OFFICE

152 RESEARCH

LAB

LAB

MECH. RM.

LAB

RESEARCH

C O

R R

ID

O

R

EPM

REVISIONS

DESCRIPTION

SHEET

DATEP.A.

FIRM

U

NO.

D

REAL PROPERTY

SAFETY & HEALTH

A

DATE

PROJECT NO.

SUSDA

BY

OF

THE

DESIGNER

PROJECT MGR

JOB #

CHECKED BY

A-E FIRM

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson-McAdams

ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT

J:

\g re en w oo d\

J ob s\

U

SD

A B1

B

H

VA

C

R ep ai r G ai ne sv ille

F L\

W or ki ng F ol de r\M ec h\ B1

P1

\M D

1-

P1 .d w g

M ay

4,

- 4

:0 9p m

COR

TEL

E. WILSON

E. WILSON

TBD

TBD 5/04/2026

Agricultural

Service Research

USDA ARS

5601 SUNNYSIDE AVENUE

RM 3-2102

BELTVILLE MD 20705

REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL

AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -

GAINESVILLE, FLORIDA

BTD

SCALE:

BUILDING 11 - PHASE 1

FIRST FLOOR HVAC DEMO

3/32" = 1'-0"

MD101

1 1

1 1

11111 11111111

111111

GENERAL NOTES

GRAPHIC SCALE

1'-0'

KEYED NOTESX

1. DISMANTLE AND REMOVE EXISTING FAN

COIL UNIT AND ALL APPURTENANCES. ALL

EXISTING DUCTWORK (WHERE APPLICABLE),

CHILLED WATER, AND HEATING WATER

PIPING, INSULATION, AND VALVES MUST BE

CAPPED AND REMAIN IN PLACE FOR

RECONNECTION.

2. DISMANTLE AND REMOVE EXISTING AIR

HANDLING UNIT AND ALL APPURTENANCES.

ALL EXISTING DUCTWORK, CHILLED WATER,

AND HEATING WATER PIPING, INSULATION,

AND VALVES MUST BE CAPPED AND REMAIN

IN PLACE FOR RECONNECTION.

DKM

BUILDING 11 - PHASE 1

FIRST FLOOR HVAC DEMO

MD101

A. THE DEMOLITION PLAN AND EXISTING

CONDITIONS ARE APPROXIMATE. ITEMS TO

BE REMOVED ARE DESIGNATED BY

HATCHING AND DASHED LINES. OTHER ITEMS

ARE INTENDED TO REMAIN IN PLACE UNLESS

NOTED OTHERWISE.

B. CONTRACTOR MUST PROTECT ALL EXISTING

HVAC EQUIPMENT, DUCTWORK, DIFFUSERS,

PIPING, VALVES, CONTROLS, INSULATION,

ETC. FROM ANY DAMAGE OR

CONTAMINATION. OPEN ENDS OF ALL

DUCTWORK MUST BE COVERED DURING

CONSTRUCTION.

C. ALL VAV BOXES AS WELL AS GENERAL

EXHAUST, HOOD EXHAUST, AND MAKE UP

AIR VALVES ARE EXISTING TO REMAIN.

D. THE SPECIFIC WORK REQUIRED FOR THIS

PHASE IS LISTED IN THE KEYED NOTES

BELOW. NO DEMOLITION WORK IS TO BE

PERFORMED ON ANY EQUIPMENT

DUCTWORK, PIPING, ETC. NOT SPECIFICALLY

LISTED IN THE KEYED NOTES.

ELEVATOR LOBBY

LOBBY

CONFERENCE ROOM

POINT OF DEMOLITION

EQUIPMENT TO BE DEMOLISHED

LEGEND

CORRIDOR

CORRIDOR

FC-208FC-209FC-210FC-211

FC-232 FC-233 FC-234 FC-235

SCALE:

BUILDING 11 - PHASE 1

SECOND FLOOR HVAC DEMO

3/32" = 1'-0"

MD102

GENERAL NOTES

GRAPHIC SCALE

1'-0'

06' 6'3'

SCALE: 3/16" =

KEYED NOTESX

1. DISMANTLE AND REMOVE EXISTING FAN

COIL UNIT AND ALL APPURTENANCES. ALL

EXISTING DUCTWORK (WHERE APPLICABLE),

CHILLED WATER, AND HEATING WATER

PIPING, INSULATION, AND VALVES MUST BE

CAPPED AND REMAIN IN PLACE FOR

RECONNECTION.

EPM

REVISIONS

DESCRIPTION

SHEET

DATEP.A.

FIRM

U

NO.

D

REAL PROPERTY

SAFETY & HEALTH

A

DATE

PROJECT NO.

SUSDA

BY

OF

THE

DESIGNER

PROJECT MGR

JOB #

CHECKED BY

A-E FIRM

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson-McAdams

ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT

J:

\g re en w oo d\

J ob s\

U

SD

A B1

B

H

VA

C

R ep ai r G ai ne sv ille

F L\

W or ki ng F ol de r\M ec h\ B1

P1

\M D

2-

P1 .d w g

M ay

4,

- 4

:0 9p m

COR

TEL

E. WILSON

E. WILSON

TBD

TBD 5/04/2026

Agricultural

Service Research

USDA ARS

5601 SUNNYSIDE AVENUE

RM 3-2102

BELTVILLE MD 20705

REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL

AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -

GAINESVILLE, FLORIDA

BTD

DKM

BUILDING 11 - PHASE 1

SECOND FLOOR HVAC DEMO

MD102

A. THE DEMOLITION PLAN AND EXISTING

CONDITIONS ARE APPROXIMATE. ITEMS TO

BE REMOVED ARE DESIGNATED BY

HATCHING AND DASHED LINES. OTHER ITEMS

ARE INTENDED TO REMAIN IN PLACE UNLESS

NOTED OTHERWISE.

B. CONTRACTOR MUST PROTECT ALL EXISTING

HVAC EQUIPMENT, DUCTWORK, DIFFUSERS,

PIPING, VALVES, CONTROLS, INSULATION,

ETC. FROM ANY DAMAGE OR

CONTAMINATION. OPEN ENDS OF ALL

DUCTWORK MUST BE COVERED DURING

CONSTRUCTION.

C. ALL VAV BOXES AS WELL AS GENERAL

EXHAUST, HOOD EXHAUST, AND MAKE UP

AIR VALVES ARE EXISTING TO REMAIN

D. THE SPECIFIC WORK REQUIRED FOR THIS

PHASE IS LISTED IN THE KEYED NOTES

BELOW. NO DEMOLITION WORK IS TO BE

PERFORMED ON ANY EQUIPMENT

DUCTWORK, PIPING, ETC. NOT SPECIFICALLY

LISTED IN THE KEYED NOTES.

1 1 1 1 1 1

1 1 1

WOMEN'S

ELEVATOR LOBBY

STORAGE

STAIRWELL

MEN'S

LIBRARY

LIBRARY

OFFICE

OFFICE

OFFICE

OFFICE

LAB

LAB

LAB

CORRIDOR

GLASS CLEANING RM.

LAB

LAB

STORAGE

JANITOR'S CLOSET

CORRIDOR

CENTRIFUGE RM.

RESEARCH

LAB

STORAGE

SHOWER RM.

ST

O

R

AG

E

STAIRWELL

ELEVATOR LOBBY

MEN'S

WOMEN'S

OFFICE

OFFICE

OFFICE

CONFERENCE RM.

CORRIDOR

LAB

LAB

237A

LAB

LAB

LAB

OFFICE

OFFICE

CORRIDOR

C O

R R

ID

O

R

LAB

OFFICE

OFFICE

LAB

OFFICE

GLASS CLEANING RM.

LAB

LAB

LAB

LAB

BREAK RM.

258A

C O

R R

ID

O

R

M

EC

H . R

M

OFFICE

EN

VI

R O

N M

EN

TA

L R

M

LAB

LAB

LAB

LAB

LAB

LAB

LAB

LAB

LAB

CORRIDOR

CORRIDOR

C O

R R

ID

O

R

M

EC

H . R

M

CORRIDOR

POINT OF DEMOLITION

EQUIPMENT TO BE DEMOLISHED

LEGEND

BUILDING 11

GREENHOUSE

EXIST. CHS

EXIST. CHR EXIST. CHS

EXIST. CHR

EXIST. ACCH-2

EXIST. ACCH-1

EXIST. 150 (6") CHILLED WATER PIPING TO REMAIN, 750 (30") BELOW GRADE

TRANS.

G

EN

EXIST. CHR

EXIST. CHSEXIST. CHR

EXIST. CHS

34'-1 1/2"

EXISTING THRUST

BLOCK TO REMAIN

EXISTING THRUST

BLOCK TO REMAIN

EXISTING THRUST

BLOCK TO REMAIN

SCALE:

BUILDING 11

EXISTING MECHANICAL SITE PLAN DEMO

3/32" = 1'-0"

MD103

GENERAL NOTES

GRAPHIC SCALE

1'-0'

KEYED NOTESX

1. DISMANTLE AND REMOVE EXISTING AIR

COOLED CHILLER. PREPARE EXISTING

PIPING FOR CONNECTION TO NEW CHILLER.

EXISTING CONCRETE PAD TO REMAIN.

EPM

REVISIONS

DESCRIPTION

SHEET

DATEP.A.

FIRM

U

NO.

D

REAL PROPERTY

SAFETY & HEALTH

A

DATE

PROJECT NO.

SUSDA

BY

OF

THE

DESIGNER

PROJECT MGR

JOB #

CHECKED BY

A-E FIRM

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson-McAdams

ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT

C :\U se rs

\T O

M

LO

V~ 1\

Ap pD at a\

Lo ca l\T em p\ Ac

Pu bl is h_

8\ M

D

3- P1

.d w g M ay

4,

- 4 :0

9p m

COR

TEL

E. WILSON

E. WILSON

TBD

TBD 5/04/2026

Agricultural

Service Research

USDA ARS

5601 SUNNYSIDE AVENUE

RM 3-2102

BELTVILLE MD 20705

REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL

AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -

GAINESVILLE, FLORIDA

BTD

DKM

BUILDING 11 - PHASE 1

EXISTING MECHANICAL SITE PLAN DEMO

MD103

A. THE DEMOLITION PLAN AND EXISTING

CONDITIONS ARE APPROXIMATE. ITEMS TO

BE REMOVED ARE DESIGNATED BY

HATCHING AND DASHED LINES. OTHER ITEMS

ARE INTENDED TO REMAIN IN PLACE UNLESS

NOTED OTHERWISE.

B. CONTRACTOR MUST PROTECT ALL EXISTING

HVAC EQUIPMENT, PIPING, VALVES,

INSULATION, CONTROLS, ETC. FROM ANY

DAMAGE OR CONTAMINATION.

C. THE SPECIFIC WORK REQUIRED FOR THIS

PHASE IS LISTED IN THE KEYED NOTES

BELOW. NO DEMOLITION WORK IS TO BE

PERFORMED ON ANY EQUIPMENT

DUCTWORK, PIPING, ETC. NOT SPECIFICALLY

LISTED IN THE KEYED NOTES.

POINT OF DEMOLITION

EQUIPMENT TO BE DEMOLISHED

H W

R

WH-1

AI

R

VA

C

REFRIGERATED AIR

DRYERS

COLD WATER MAKEUP TRAIN AND REDUCED

PRESSURE BACKFLOW PREVENTER, SEE

DETAIL 8, SHEET M-19, TYPICAL OF TWO THIS

SHEET

EXPANSION TANKS,

DIAPHRAGM TYPE

NEW CONTROL AIR

COMPRESSOR

LABORATORY AIR

COMPRESSOR

LABORATORY AIR

COMPRESSOR

LABORATORY

VACUUM PUMP

LABORATORY

VACUUM PUMP

DOMESTIC WATER

HEAT EXCHANGER HE-1

DOMESTIC HOT WATER

STORAGE TANK

CP-2

CP-1

2"

HWS

HWR

P-7

V-1

BOILER B-1

H W

R

HWS

HWS

HWS

V-2

AS-2

C H

R

C H

S

H W

S

H W

R

H W

S

H W

S

H W

S

CHR

CHS

CHS

AS-1

CHR

CHRCHR

CHS

CHS

CHR

C H

S

C H

R

P-8(E)

P-1(E)

P-2(E) P-3B(E)

P-3A(E)

P-5A(E)

P-5B(E)

P-6(E)

P-4(E)

EPM

REVISIONS

DESCRIPTION

SHEET

DATEP.A.

FIRM

U

NO.

D

REAL PROPERTY

SAFETY & HEALTH

A

DATE

PROJECT NO.

SUSDA

BY

OF

THE

DESIGNER

PROJECT MGR

JOB #

CHECKED BY

A-E FIRM

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson-McAdams

ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT

C :\U se rs

\T O

M

LO

V~ 1\

Ap pD at a\

Lo ca l\T em p\ Ac

Pu bl is h_

8\ M

D

1.

dw g M ay

4,

- 4 :0

9p m

COR

TEL

E. WILSON

E. WILSON

TBD

TBD 5/04/2026

Agricultural

Service Research

USDA ARS

5601 SUNNYSIDE AVENUE

RM 3-2102

BELTVILLE MD 20705

REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL

AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -

GAINESVILLE, FLORIDA

BTD

SCALE:

BUILDING 11 - PHASE 1

ENLARGED MECHANICAL ROOM DEMO

3/8" = 1'-0"

MD401

GENERAL NOTES

GRAPHIC SCALE

1'-0'

KEYED NOTESX

JND

BUILDING 11 - PHASE 1

ENLARGED MECHANICAL ROOM DEMO

MD401

POINT OF DEMOLITION

EQUIPMENT TO BE DEMOLISHED

STORAGE

ELECTRICAL RM.

112A

H

AN

D

IC

AP

PE

D T

O

IL

ET

M

EN

1A

H

AN

D

IC

AP

PE

D T

O

IL

ET

W O

M

EN

1B

MECHANICAL RM.

C O

R R

ID

O

R

1. DISMANTLE AND REMOVE EXISTING PUMP

AND ALL APPURTENANCES. ALL EXISTING

PIPING, INSULATION, AND VALVES MUST BE

CAPPED AND REMAIN IN PLACE FOR

RECONNECTION. EXISTING CONCRETE PAD

(IF APPLICABLE) MUST REMAIN.

A. THE DEMOLITION PLAN AND EXISTING

CONDITIONS ARE APPROXIMATE. ITEMS TO

BE REMOVED ARE DESIGNATED BY

HATCHING AND DASHED LINES. OTHER ITEMS

ARE INTENDED TO REMAIN IN PLACE UNLESS

NOTED OTHERWISE.

B. CONTRACTOR MUST PROTECT ALL EXISTING

HVAC EQUIPMENT, DUCTWORK, DIFFUSERS,

PIPING, VALVES, CONTROLS, INSULATION,

ETC. FROM ANY DAMAGE OR

CONTAMINATION. OPEN ENDS OF ALL

DUCTWORK MUST BE COVERED DURING

CONSTRUCTION.

C. THE SPECIFIC WORK REQUIRED FOR THIS

PHASE IS LISTED IN THE KEYED NOTES

BELOW. NO DEMOLITION WORK IS TO BE

PERFORMED ON ANY EQUIPMENT

DUCTWORK, PIPING, ETC. NOT SPECIFICALLY

LISTED IN THE KEYED NOTES.

FC-168FC-169

FC-100

FC-101FC-102

FC-157FC-156FC-155FC-154FC-153FC-141FC-140FC-139FC-138FC-137FC-136FC-135FC-134

FC-118 FC-117 FC-116 FC-115 FC-114 FC-113

AHU-1

SCALE:

BUILDING 11

FIRST FLOOR HVAC

3/32" = 1'-0"

M-101

GENERAL NOTES

GRAPHIC SCALE

1'-0'

KEYED NOTESX

1. PROVIDE FAN COIL UNIT AND ALL

APPURTENANCES IN PLACE OF EXISTING.

RECONNECT TO ALL EXISTING CAPPED

DUCTWORK (WHERE APPLICABLE), CHILLED

WATER, AND HEATING WATER PIPING.

2. PROVIDE AIR HANDLING UNIT AND ALL

APPURTENANCES IN PLACE. RECONNECT

TO ALL EXISTING CAPPED DUCTWORK,

CHILLED WATER, AND HEATING WATER

PIPING. MODIFY/REPLACE EXISTING

EQUIPMENT PAD AS NEEDED FOR AIR

HANDLER REPLACEMENT.

EPM

REVISIONS

DESCRIPTION

SHEET

DATEP.A.

FIRM

U

NO.

D

REAL PROPERTY

SAFETY & HEALTH

A

DATE

PROJECT NO.

SUSDA

BY

OF

THE

DESIGNER

PROJECT MGR

JOB #

CHECKED BY

A-E FIRM

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson-McAdams

ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT

J:

\g re en w oo d\

J ob s\

U

SD

A B1

B

H

VA

C

R ep ai r G ai ne sv ille

F L\

W or ki ng F ol de r\M ec h\ B1

P1

\M

1- P1

.d w g M ay

4,

- 4 :0

9p m

COR

TEL

E. WILSON

E. WILSON

TBD

TBD 5/04/2026

Agricultural

Service Research

USDA ARS

5601 SUNNYSIDE AVENUE

RM 3-2102

BELTVILLE MD 20705

REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL

AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -

GAINESVILLE, FLORIDA

BTD

DKM

BUILDING 11 - PHASE 1

FIRST FLOOR HVAC

M-101

A. CONTRACTOR MUST PROTECT ALL EXISTING

HVAC EQUIPMENT, DUCTWORK,

DIFFUSERS,PIPING, VALVES, CONTROLS,

INSULATION, ETC. FROM ANY DAMAGE OR

CONTAMINATION. OPEN ENDS OF ALL

DUCTWORK (EXISTING AND NEW) MUST BE

COVERED DURING CONSTRUCTION.

CONTRACTOR MUST MECHANICALLY CLEAN

ENTIRE HVAC SYSTEM IN WORK AREA TO

REMOVE ALL VISIBLE CONTAMINANTS, SUCH

THAT SYSTEMS ARE CAPABLE OF PASSING

NADCA CLEANING VERIFICATION TESTING

STANDARDS ONCE CONSTRUCTION IS

COMPLETE.

B. HVAC SYSTEMS AND EQUIPMENT SHOWN ON

THIS DRAWING ARE APPROXIMATE.

CONTRACTOR SHALL FIELD VERIFY ALL

EXISTING CONDITIONS.

C. CONTRACTOR MUST BALANCE THE AIRFLOW

OF THE DIFFUSERS AND GRILLES TO THE

VALUES SHOWN ON THE DRAWINGS.

CONTRACTOR MUST BALANCE VAV BOXES,

DAMPERS, AIR HANDLING UNIT, AND ALL

OTHER EQUIPMENT IMPACTED BY DIFFUSER

AND GRILLE BALANCING.

D. ALL VAV BOXES AS WELL AS GENERAL

EXHAUST, HOOD EXHAUST, AND MAKE UP

AIR VALVES ARE EXISTING TO BE ADJUSTED

FOR AIR BALANCING.

E. THE SPECIFIC WORK REQUIRED FOR THIS

PHASE IS LISTED IN THE KEYED NOTES

BELOW. ANY EQUIPMENT, DUCTWORK,

PIPING, ETC. NOT SPECIFICALLY LISTED IN

THE KEYED NOTES IS EXISTING.

1 1

1 1

11111 11111111

11111

POINT OF CONNECTION

LEGEND

STORAGE

INSECT REARING LAB

STORAGE

COLD ROOM

INSECT REARING RM.

ENVIRONMENTAL RM.

123A

CORRIDOR

123B

INSECT REARING ROOM

STORAGE

OFFICE

LAB

CORRIDOR

STAIRWELL

MEN'S TOILET

WOMEN'S TOILET

MECH. RM.

OFFICE

OFFICE

135 OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CORRIDOR

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

C O

R R

ID

O

R

OFFICE

STORAGE

ELECTRICAL RM.

112A

HANDICAPPED TOILET - MEN

111A

HANDICAPPED TOILET - WOMEN

111B

MECHANICAL RM.

C O

R R

ID

O

R

MECHANICAL RM.

STORAGE

CORRIDOR

STORAGE

OFFICE

OFFICE

170 OFFICE

169 OFFICE

OFFICE

OFFICE

STORAGE

DARK RM.

DARK RM.

LIGHT RM.

RESEARCH SPACE

OFFICE

LAB

BREAK RM.

CORRIDOR

CORRIDOR

175A

CORRIDOR

C O

R R

ID

O

R

LAB

LAB

LAB

LAB

LAB

LAB

CORRIDOR

CONFERENCE RM.

177 COPY RM.

ELECTRICAL RM.

178MECHANICAL RM.

MEN'S

WOMEN'S

FREEZER RM.

LAB

LAB

LAB

LAB

LAB

196ALAB

LAB

LAB

LAB

LAB

MECHANICAL RM.

RESEARCH SPACE

190RESEARCH SPACE

190A

AN

TE

R O

O M

0B

OFFICE

153 OFFICE

OFFICE

OFFICE

OFFICE

JANITOR'S CLOSET

STAIRWELL

ELEVATOR LOBBY

RESEARCH

152A

OFFICE

152 RESEARCH

LAB

LAB

149MECH. RM.

LAB

RESEARCH

C O

R R

ID

O

R

ELEVATOR LOBBY

LOBBY

CONFERENCE ROOM

CORRIDOR

CORRIDOR

FC-235FC-234FC-233FC-232

FC-211 FC-210 FC-209 FC-208 FC-207 FC-206

SCALE:

BUILDING 11

SECOND FLOOR HVAC

3/32" = 1'-0"

M-102

GENERAL NOTES

KEYED NOTESX

1. PROVIDE FAN COIL UNIT AND ALL

APPURTENANCES IN PLACE OF EXISTING.

RECONNECT TO ALL EXISTING CAPPED

DUCTWORK (WHERE APPLICABLE), CHILLED

WATER, AND HEATING WATER PIPING.

EPM

REVISIONS

DESCRIPTION

SHEET

DATEP.A.

FIRM

U

NO.

D

REAL PROPERTY

SAFETY & HEALTH

A

DATE

PROJECT NO.

SUSDA

BY

OF

THE

DESIGNER

PROJECT MGR

JOB #

CHECKED BY

A-E FIRM

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson-McAdams

ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT

J:

\g re en w oo d\

J ob s\

U

SD

A B1

B

H

VA

C

R ep ai r G ai ne sv ille

F L\

W or ki ng F ol de r\M ec h\ B1

P1

\M

2- P1

.d w g M ay

4,

- 4 :0

9p m

COR

TEL

E. WILSON

E. WILSON

TBD

TBD 5/04/2026

Agricultural

Service Research

USDA ARS

5601 SUNNYSIDE AVENUE

RM 3-2102

BELTVILLE MD 20705

REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL

AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -

GAINESVILLE, FLORIDA

BTD

DKM

BUILDING 11 - PHASE 1

SECOND FLOOR HVAC

M-102

A. CONTRACTOR MUST PROTECT ALL EXISTING

HVAC EQUIPMENT, DUCTWORK,

DIFFUSERS,PIPING, VALVES, CONTROLS,

INSULATION, ETC. FROM ANY DAMAGE OR

CONTAMINATION. OPEN ENDS OF ALL

DUCTWORK (EXISTING AND NEW) MUST BE

COVERED DURING CONSTRUCTION.

CONTRACTOR MUST MECHANICALLY CLEAN

ENTIRE HVAC SYSTEM IN WORK AREA TO

REMOVE ALL VISIBLE CONTAMINANTS, SUCH

THAT SYSTEMS ARE CAPABLE OF PASSING

NADCA CLEANING VERIFICATION TESTING

STANDARDS ONCE CONSTRUCTION IS

COMPLETE.

B. HVAC SYSTEMS AND EQUIPMENT SHOWN ON

THIS DRAWING ARE APPROXIMATE.

CONTRACTOR SHALL FIELD VERIFY ALL

EXISTING CONDITIONS.

C. CONTRACTOR MUST BALANCE THE AIRFLOW

OF THE DIFFUSERS AND GRILLES TO THE

VALUES SHOWN ON THE DRAWINGS.

CONTRACTOR MUST BALANCE VAV BOXES,

DAMPERS, AIR HANDLING UNIT, AND ALL

OTHER EQUIPMENT IMPACTED BY DIFFUSER

AND GRILLE BALANCING.

D. ALL VAV BOXES AS WELL AS GENERAL

EXHAUST, HOOD EXHAUST, AND MAKE UP

AIR VALVES ARE EXISTING TO BE ADJUSTED

FOR AIR BALANCING.

E. THE SPECIFIC WORK REQUIRED FOR THIS

PHASE IS LISTED IN THE KEYED NOTES

BELOW. ANY EQUIPMENT, DUCTWORK,

PIPING, ETC. NOT SPECIFICALLY LISTED IN

THE KEYED NOTES IS EXISTING.

1 1 1 1 1 1

1 1 1

GRAPHIC SCALE

1'-0'

POINT OF CONNECTION

EXIST. CHS

EXIST. CHR EXIST. CHS

EXIST. CHR

EXIST. ACCH-2

ACCH-1

EXIST. 150 (6") CHILLED WATER PIPING, 750 (30") BELOW GRADE

TRANS.

G

EN

EXIST. CHR

EXIST. CHSEXIST. CHR

EXIST. CHS

34'-1 1/2"

EXISTING THRUST BLOCK

EXISTING THRUST BLOCK

EXISTING THRUST BLOCK

SCALE:

BUILDING 11

MECHANICAL SITE PLAN

3/32" = 1'-0"

M-103

GENERAL NOTES

GRAPHIC SCALE

A. CONTRACTOR MUST PROTECT ALL EXISTING

HVAC EQUIPMENT, PIPING, VALVES,

CONTROLS, INSULATION, ETC. FROM ANY

DAMAGE OR CONTAMINATION.

B. HVAC SYSTEMS AND EQUIPMENT SHOWN ON

THIS DRAWING ARE APPROXIMATE.

CONTRACTOR SHALL FIELD VERIFY ALL

EXISTING CONDITIONS.

C. THE SPECIFIC WORK REQUIRED FOR THIS

PHASE IS LISTED IN THE KEYED NOTES

BELOW. ANY EQUIPMENT, DUCTWORK,

PIPING, ETC. NOT SPECIFICALLY LISTED IN

THE KEYED NOTES IS EXISTING.

1'-0'

KEYED NOTESX

EPM

REVISIONS

DESCRIPTION

SHEET

DATEP.A.

FIRM

U

NO.

D

REAL PROPERTY

SAFETY & HEALTH

A

DATE

PROJECT NO.

SUSDA

BY

OF

THE

DESIGNER

PROJECT MGR

JOB #

CHECKED BY

A-E FIRM

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson-McAdams

ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT

J:

\g re en w oo d\

J ob s\

U

SD

A B1

B

H

VA

C

R ep ai r G ai ne sv ille

F L\

W or ki ng F ol de r\M ec h\ B1

P1

\M

3- P1

.d w g M ay

4,

- 4 :0

9p m

COR

TEL

E. WILSON

E. WILSON

TBD

TBD 5/04/2026

Agricultural

Service Research

USDA ARS

5601 SUNNYSIDE AVENUE

RM 3-2102

BELTVILLE MD 20705

REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL

AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -

GAINESVILLE, FLORIDA

BTD

DKM

BUILDING 11 - PHASE 1

MECHANICAL SITE PLAN

M-103

1. PROVIDE AIR COOLED CHILLER AND ALL

APPURTENANCES ON EXISTING EQUIPMENT

PAD. RECONNECT TO EXISTING PIPING AND

CONTROLS TO ALLOW FOR A FULLY

FUNCTIONING CHILLED WATER SYSTEM.

POINT OF CONNECTION

H W

R

AI

R

VA

C

REFRIGERATED AIR

DRYERS (ETR)

EXPANSION

TANKS (ETR)

LABORATORY AIR

COMPRESSOR

(ETR)

LABORATORY AIR

COMPRESSOR

(ETR)

LABORATORY

VACUUM PUMP

(ETR)

LABORATORY

VACUUM PUMP

(ETR)

DOMESTIC WATER

HEAT EXCHANGER

(ETR)

DOMESTIC HOT WATER

STORAGE TANK

(ETR)

CP-2 (ETR)

CP-1 (ETR)

2"

HWS

HWR

P-7

V-1

(ETR)

BOILER B-1

H W

R

HWS

HWS

HWS

V-2

(ETR)

AS-2

(ETR)

C H

R

C H

S

H W

S

H W

R

H W

S

H W

S

H W

S

CHR

CHS

CHS

AS-1

CHR

CHRCHR

CHS

CHS

CHR

C H

S

C H

R

P-8

P-1

P-2 P-3B

P-3A

P-5A

P-5B

P-6

P-4

WH-1

(ETR)

EPM

REVISIONS

DESCRIPTION

SHEET

DATEP.A.

FIRM

U

NO.

D

REAL PROPERTY

SAFETY & HEALTH

A

DATE

PROJECT NO.

SUSDA

BY

OF

THE

DESIGNER

PROJECT MGR

JOB #

CHECKED BY

A-E FIRM

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson-McAdams

ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT

J:

\g re en w oo d\

J ob s\

U

SD

A B1

B

H

VA

C

R ep ai r G ai ne sv ille

F L\

W or ki ng F ol de r\M ec h\ B1

P1

\M -4

.d w g

M ay

4,

- 4

:0 9p m

COR

TEL

E. WILSON

E. WILSON

TBD

TBD 5/04/2026

Agricultural

Service Research

USDA ARS

5601 SUNNYSIDE AVENUE

RM 3-2102

BELTVILLE MD 20705

REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL

AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -

GAINESVILLE, FLORIDA

BTD

SCALE:

BUILDING 11

ENLARGED MECHANICAL ROOM DEMO

3/8" = 1'-0"

MD401

GRAPHIC SCALE

1'-0'

KEYED NOTESX

JND

BUILDING 11 - PHASE 1

ENLARGED MECHANICAL ROOM

M-401

STORAGE

ELECTRICAL RM.

112A

H

AN

D

IC

AP

PE

D T

O

IL

ET

M

EN

1A

H

AN

D

IC

AP

PE

D T

O

IL

ET

W O

M

EN

1B

MECHANICAL RM.

C O

R R

ID

O

R

1. PROVIDE PUMP AS SCHEDULED AND ALL

APPURTENANCES. CONNECT TO EXISTING

PIPING. PROVIDE FASTENERS AND

GASKETS. INSTALL PUMP ON EXISTING

CONCRETE PAD (IF APPLICABLE).

GENERAL NOTES

A. CONTRACTOR MUST PROTECT ALL EXISTING

HVAC EQUIPMENT, PIPING, VALVES,

CONTROLS, INSULATION, ETC. FROM ANY

DAMAGE OR CONTAMINATION.

B. HVAC SYSTEMS AND EQUIPMENT SHOWN ON

THIS DRAWING ARE APPROXIMATE.

CONTRACTOR SHALL FIELD VERIFY ALL

EXISTING CONDITIONS.

C. THE SPECIFIC WORK REQUIRED FOR THIS

PHASE IS LISTED IN THE KEYED NOTES

BELOW. ANY EQUIPMENT, DUCTWORK,

PIPING, ETC. NOT SPECIFICALLY LISTED IN

THE KEYED NOTES IS EXISTING.

POINT OF CONNECTION

1. PLENUM FAN

2. OPENING TOP 40x30

3. LIGHT SWITCH AND/OR RECEPTACLE RH

4. EXTERNAL VFD RH

5. EXTERNAL UNIT CONTROLLER LH

6. COOLING COIL

7. HEATING COIL

8. 1" N.P.T.E.

9. MARINE LIGHT

10. CARTRIDGE FILTERS

EPM

REVISIONS

DESCRIPTION

SHEET

DATEP.A.

FIRM

U

NO.

D

REAL PROPERTY

SAFETY & HEALTH

A

DATE

PROJECT NO.

SUSDA

BY

OF

THE

DESIGNER

PROJECT MGR

JOB #

CHECKED BY

A-E FIRM

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson-McAdams

ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT

J:

\g re en w oo d\

J ob s\

U

SD

A B1

B

H

VA

C

R ep ai r G ai ne sv ille

F L\

W or ki ng F ol de r\M ec h\ B1

P1

\M -5

-P

1.

dw g M ay

4,

- 4 :0

9p m

COR

TEL

E. WILSON

E. WILSON

TBD

TBD 5/04/2026

Agricultural

Service Research

USDA ARS

5601 SUNNYSIDE AVENUE

RM 3-2102

BELTVILLE MD 20705

REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL

AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -

GAINESVILLE, FLORIDA

BTD

DKM

BUILDING 11 - PHASE 1

MECHANICAL DETAILS

M-501

SCALE:

AIR COOLED CHILLER DETAIL

NO SCALE

M-501

PLAN

SOUTH ELEVATION EAST ELEVATIONWEST ELEVATION

POWER CONNECTION

(FAR SIDE)

6" INLET WATER

CONNECTION

6" OUTLET WATER

CONNECTION

28'-2 1/4"

7'-4"

OPERATOR INTERFACE

WATER CONNECTION

PLAN

SOUTH ELEVATION

SCALE:

AIR HANDLING UNIT DETAIL

NO SCALE

M-501

6 7

EXISTING

CONCRETE

PAD

ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT

J:

\g re en w oo d\

J ob s\

U

SD

A B1

B

H

VA

C

R ep ai r G ai ne sv ille

F L\

W or ki ng F ol de r\M ec h\ B1

P1

\M -5

-P

1.

dw g M ay

4,

- 4 :0

9p m

COR

TEL

E. WILSON

E. WILSON

TBD

TBD 5/04/2026

Agricultural

Service Research

USDA ARS

5601 SUNNYSIDE AVENUE

RM 3-2102

BELTVILLE MD 20705

REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL

AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -

GAINESVILLE, FLORIDA

BTD

DKM

BUILDING 11 - PHASE 1

MECHANICAL DETAILS

M-502

ROOF RAILS, REFER TO

ARCHITECTURAL DETAILS

1-5/8" x 12 GAUGE STRUT CHANNEL

EQUAL TO UNISTRUT P1000T

2 HOLE POST BASE EQUAL TO

UNISTRUT P2941

STRAP DUCT TO FRAME WITH

16 GA STRAPPING MINIMUM

STAINLESS STEEL EXHAUST

DUCT PER PLANS

ANGLE BRACKET EQUAL TO

UNISTRUT P1325. PROVIDE

CHANNEL NUTS AND BOLTS

ROOF

BIRD SCREEN

MOTOR

STAINLESS STEEL BACKDRAFT DAMPER

EXISTING EXHAUST DUCT

SECURE FAN TO CURB

ROOF

VIBRATION ABSORBING

MOUNT

DUCT

FASTENING

FLANGE

MANUFACTURER PROVIDED ROOF CURB

ACCESS PANEL

B O

T T O

M I

N

LE

T

BYPASS DAMPER

(22 wt ea)

ISOLATION DAMPER

(81 wt ea)

MOTOR COVER

BYPASS

WEATHERHOOD

W/ BIRD SCREEN

(97 wt ea)

BYPASS AIR PLENUM

(600 wt ea)

B O

T T O

M I

N

LE

T

ROOF CURB

(171 wt ea)

DISCONNECT SWITCH

DRAIN HOLE

1/2 INCH FPT

FAN WITH MOTOR

(785 wt Blower ea) (225 wt Motor ea) (27 wt Drive ea)

LIFTING LUG

NOZZLE

(108 wt ea)

ROOF RAILS, REFER TO

ARCHITECTURAL DETAILS

1-5/8" x 12 GAUGE STRUT CHANNEL

EQUAL TO UNISTRUT P1000T

2 HOLE POST BASE

EQUAL TO UNISTRUT

P2941

45°BRACKET EQUAL TO

UNISTRUT P1546

VARIABLE SPEED DRIVE

ENCLOSURE PER

EQUIPMENT SCHEDULES

MOUNT TOP OF VFD ENCLOSURE

AT 60" ABOVE ROOF SURFACE

ROOF TOP CONSTRUCTION

A. FABRICATION AND ERECTION SHALL BE GOVERNED BY THE

REQUIREMENTS OF THE AMERICAN INSTITUTE OF STEEL

CONSTRUCTION.

B. ALL STRUCTURAL STEEL SHALL CONFORM TO ASTM:

A36 - M,S,HP,C,MC,L-SHAPES

A500 B - TUBES (HSS)

C. ALL WELDING SHALL BE PERFORMED BY CERTIFIED WELDER

AND PERFORMED IN ACCORDANCE WITH AWS D1.1. WELDING

MATERIALS SHALL BE E70XX AND BE COMPATIBLE WITH BASE

METAL MATERIALS.

D. FIELD VERIFY ALL DIMENSIONS PRIOR TO BEGINNING

FABRICATION.

E. THE CONTRACTOR SHALL PROVIDE A FIRE WATCH DURING

ALL HOT WORK INCLUDING BUT NOT LIMITED TO WELDING

OPERATIONS. SUITABLE FIRE EXTINGUISHING EQUIPMENT

SHALL BE MAINTAINED IN A STATE OF READINESS FOR

INSTANT USE.

F. THE BUILDING SHALL REMAIN WATERTIGHT DURING AND

THROUGH THE COMPLETION OF CONSTRUCTION. THE

CONTRACTOR SHALL SEEK APPROVAL FROM THE BUILDING

OWNER FOR ANY WORK THAT INVOLVES A BUILDING

ENVELOPE PENETRATION.

G. PROVIDE EQUIPMENT MOUNTING WITH SEISMIC/VIBRATION

ISOLATI0N PER MANUFACTURER'S WRITTEN

RECOMMENDATIONS FOR THIS APPLICATION.

SCALE:

ROOF DUCT SUPPORT

NOT TO SCALE

M-502

SCALE:

DUPLEX LAB EXHAUST FAN DETAIL

NOT TO SCALE

M-502

SCALE:

DOWNBLAST ROOF EXHAUST FAN DETAIL

NOT TO SCALE

M-502

SCALE:

VFD SUPPORT DETAIL

NOT TO SCALE

M-502

AIR COOLED SCREW CHILLER SCHEDULE

MARK

BASIS OF DESIGN GENERAL DATA EVAPORATOR DATA COMPRESSOR DATA CONDENSER DATA ELECTRICAL DATA

OPERATING

WEIGHT

(LB)MFR MODEL NO.

NOMINAL

CAPACITY

(TONS)

REFRIGERANT

FLOW

(GPM) FLUID

MAX

PRESSURE

DROP

(FT H2O)

ENTERING

WATER

TEMPERATURE

(°F)

LEAVING

WATER

TEMPERATURE

(°F)

QUANTITY TYPE

MOTOR

CONTROL

TYPE

AMBIENT

TEMPERATURE

(°F)

FAN

QUANTITY VOLTAGE POWER

CONNECTIONS

UNIT

MCA

(AMPS)

UNIT

MOCP

(AMPS)

UNIT

SCCR

(AMPS)

ACCH-1 TRANE ACRC250 250 R513A 466 20% P.G. 8.5 56 43 2 VARIABLE

VOLUME VFD 95 12 460/3 1 486 600 65,000 16,500

NOTES

1. FACTORY MOUNTED CONTROL TRANSFORMER. CHILLER SHALL HAVE RAPID RESTART OPTION.

2. CHILLER SHALL HAVE A SHELL AND TUBE EVAPORATOR WITH 0.75" THICK INSULATION.

3. FACTORY MOUNTED SINGLE NON-FUSED DISCONNECT SWITCH WITH CIRCUIT BREAKER AND 115V FIELD POWERED CONVENIENCE OUTLET.

4. FACTORY MOUNTED BACNET INTERFACE CARD COMPATIBLE WITH EXISTING SITE ENERGY MANAGEMENT SYSTEM.

5. FACTORY MOUNTED CHILLED WATER FLOW SWITCH.

6. CHILLER CONTROL PANEL SHALL BE SELECTED FOR 125 F AMBIENT TEMPERATURE.

7. CHILLER SHALL HAVE VARIABLE SPEED CONTROL ON ALL CONDENSER FANS.

8. FACTORY MOUNTED COMPRESSOR HEATERS.

9. MECHANICAL CONTRACTOR SHALL INTERLOCK CHILLED WATER PUMPS WITH CHILLER.

10. PROVIDE CHILLER ELASTOMERIC ISOLATORS.

11. UNIT SHALL HAVE TWO REFRIGERANT CIRCUITS. EACH CIRCUIT SHALL INCLUDES COMPRESSOR SUCTION AND DISCHARGE SERVICE VALVES, LIQUID LINE SHUTOFF VALVE, REMOVABLE CORE FILTER, LIQUID LINE SIGHT GLASS, CHARGING PORT AND AN ELECTRONIC EXPANSION VALVE.

12. FACTORY START-UP. FIVE YEARS COMPLETE PARTS, REFRIGERANT, LABOR AND SERVICE WARRANTY.

13. CHILLER SHALL BE CERTIFIED BASED ON AHRI AND ASHRAE 90.1 STANDARDS.

14. CHILLER SHALL HAVE FACTORY MOUNTED PHASE PROTECTION WITH LED AND GROUND FAULT W/ GROUND FAULT PROTECTION FOR THE UNIT.

15. CHILLER MUST BE SHIPPED COMPLETELY WRAPPED IN HEAVY DUTY BAG TO PROTECT FROM ROAD DAMAGE, ROAD SALT, AND CONSTRUCTION DIRT.

16. CHILLER SHALL HAVE FACTORY MOUNTED COMPRESSOR AND CONDENSER FAN SOUND REDUCTION PACKAGE.

17. CHILLER SHALL BE SHIPPED FROM THE FACTORY WITH A FULL REFRIGERANT CHARGE.

NOTES:

1. PROVIDE SUPPLY AND RETURN SMOKE DETECTORS COMPATIBLE WITH EXISTING FIRE ALARM SYSTEM.

2. PROVIDE MIXING BOX SECTION WITH DAMPERS AND ACTUATORS COMPATIBLE WITH EXISTING BUILDING AUTOMATION SYSTEM, FILTER SECTION WITH MERV 8 PRE-FILTERS AND

MERV 13 SECONDARY FILTERS, PRE-HEAT SECTION, COOLING SECTION, HINGED AND LATCHED ACCESS SECTION, FAN SECTION AND DISCHARGE PLENUM. REFER TO ELEVATIONS

FOR CONFIGURATION DETAILS.

3. PROVIDE UNIT WITH HEAVY DUTY BASE RAIL. INSTALL ON 4" HIGH CONCRETE HOUSEKEEPING PAD.

4. UNIT SHALL BE SHIPPED IN MULTIPLE SECTIONS FOR FIELD ASSEMBLY TO ACCOMMODATE INSTALLATION IN BUILDING.

5. DOUBLE WALL CONSTRUCTION WITH FOAM INJECTED INSULATION.

6. PROVIDE STAINLESS STEEL SLOPED DRAIN PANS IN ALL COIL SECTIONS.

7. REUSE EXISTING VFD.

CENTRAL STATION AIR HANDLING UNIT SCHEDULE

MARK

BASIS OF DESIGN AIRFLOW DATA HOT WATER PRE-HEAT COIL DATA CHILLED WATER COOLING COIL DATA ELECTRICAL DATA

OPERATING

WEIGHT

(LB)

NOTES

MFR MODEL

NO.

SUPPLY

AIR FLOW

(CFM)

MINIMUM

OUTSIDE

AIR

(CFM)

ESP

(IN. WG)

TSP

(IN. WG)

FAN

QTY

FAN

MOTOR

POWER

(HP)

TOTAL

HEAT

(MBH)

ENTERING

WATER

TEMP

(°F)

LEAVING

WATER

TEMP

(°F)

WATER

FLOW

(GPM)

WATER

PRESSURE

DROP

(FT HD)

ENTERING

AIR

TEMP

(°F)

LEAVING

AIR

TEMP

(°F)

AIR

PRESSURE

DROP

(IN. WG)

TOTAL

COOLING

(MBH)

SENSIBLE

COOLING

(MBH)

ENTERING

WATER

TEMP

(°F)

LEAVING

WATER

TEMP

(°F)

WATER

FLOW

(GPM)

WATER

PRESSURE

DROP

(FT HD)

ENTERING

AIR

DRY BULB

(°F)

ENTERING

AIR

WET BULB

(°F)

LEAVING

AIR

DRY BULB

(°F)

LEAVING

AIR

WET BULB

(°F)

AIR

PRESSURE

DROP

(IN. WG)

VOLTAGE

(V/PH/Hz)

FLA

(AMPS)

MCA

(AMPS)

MAX

FUSE

(AMPS)

AHU-1 TRANE CSAA030 18,100 18,100 4.0 7.4 2 20 667 160 140 67 8 21 55 0.3 1592 872 44 59 222 14.6 98.2 79.3 55 54.9 1.9 460/3/60 52.65 65.65 110 4299 ALL

DKM

BUILDING 11 - PHASE 1

MECHANICAL SCHEDULES

M-601

EPM

REVISIONS

DESCRIPTION

SHEET

DATEP.A.

FIRM

U

NO.

D

REAL PROPERTY

SAFETY & HEALTH

A

DATE

PROJECT NO.

SUSDA

BY

OF

THE

DESIGNER

PROJECT MGR

JOB #

CHECKED BY

A-E FIRM

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson-McAdams

ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT

J:

\g re en w oo d\

J ob s\

U

SD

A B1

B

H

VA

C

R ep ai r G ai ne sv ille

F L\

W or ki ng F ol de r\M ec h\ B1

P1

\M -6

-P

1.

dw g M ay

4,

- 4 :0

9p m

COR

TEL

E. WILSON

E. WILSON

TBD

TBD 5/04/2026

Agricultural

Service Research

USDA ARS

5601 SUNNYSIDE AVENUE

RM 3-2102

BELTVILLE MD 20705

REPAIR HVAC…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .