Attachment 2_Alternate Design Drawings_Repair HVAC Systems.pdf
PDF 18 MB Posted
- Attached to
- Repair HVAC Systems, Gainesville, FL
- Solicitation number
- 1232SA26Q0704
About this file
This document is a design contract deliverable consisting of architectural and engineering drawings for HVAC system repairs at the Center for Medical Agricultural and Veterinary Entomology (CMAVE) facility in Gainesville, Florida, operated by the U.S. Department of Agriculture Agricultural Research Service.
The project encompasses phased construction work focused on Building 11, Phase 1, involving replacement of one air-cooled chiller, replacement of one air handling unit (AHU-1), replacement of existing perimeter fan coil units on first and second floors, replacement of existing pumps in the mechanical room, and associated electrical work to support mechanical equipment. Design Contract No. 12405B21D0003 and Design Order No. 1232SA25F0354 govern this work. The project location is 1600 SW 23rd Drive, Gainesville, FL 32608. Drawings include demolition plans, mechanical site plans, HVAC floor plans, mechanical details, equipment schedules (chillers, air handling units, fan coil units, and pumps), control system diagrams, and electrical plans with equipment schedules and panel layouts. Key mechanical equipment specified includes a Trane ACRC250 air-cooled screw chiller (250 tons, R513A refrigerant), a Trane CSAA030 central station air handling unit (18,100 CFM), and multiple Trane fan coil units in various sizes. The contractor must field-verify all existing conditions, protect existing finishes and equipment, conduct hazardous materials abatement per regulations, maintain building watertightness, and perform system balancing and cleaning. All work must comply with the Buy American Act, and equipment specifications establish quality standards while permitting equivalent manufacturer substitutions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EPM
REVISIONS
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
SAFETY & HEALTH
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
C :\U se rs
\T O
M
LO
V~ 1\
Ap pD at a\
Lo ca l\T em p\ Ac
Pu bl is h_
\T
-1
P 1.
dw g
M ay
3,
- 1
2:
pm
COR
TEL
E. WILSON
E. WILSON
TBD
TBD 5/04/2026
Agricultural
Service Research
USDA ARS
5601 SUNNYSIDE AVENUE
RM 3-2102
BELTVILLE MD 20705
REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL
AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -
GAINESVILLE, FLORIDA
BTD
JND
BUILDING 11 - PHASE 1
TITLE SHEET
LOCATION MAPVICINITY MAP NO SCALE
N
NO SCALE
U.S. DEPARTMENT OF AGRICULTURE
AGRICULTURAL RESEARCH SERVICE
REPAIR HVAC SYSTEMS, BUILDING 1 - BID ALTERNATE
DESIGN CONTRACT NO: 12405B21D0003
DESIGN ORDER NO: 1232SA25F0354
CENTER FOR MEDICAL AGRICULTURAL AND VETERINARY ENTOMOLOGY (CMAVE)
1600 SW 23RD DRIVE
GAINESVILLE, FL 32608
CENTER FOR MEDICAL AGRICULTURAL AND VETERINARY ENTOMOLOGY (CMAVE)
1600 SW 23RD DRIVE
GAINESVILLE, FL 32608
SW
RD
D
RI
VE
PROJECT LOCATION
PROJECT INFORMATION
MIAMI
TALLAHASSEE JACKSONVILLE
GAINESVILLE
ORLANDO
TAMPA
PENSACOLA
ST. PETERSBURG
KEY WEST
CANAL
POINT
SW
RD
D
RI
VE
HULL ROAD
IF
AS
R
ES
EA
RC
H
DR
IV
E
IF
AS
R
ES
EA
RC
H
DR
IV
E
PROJECT LOCATION
BUILDING 1
BUILDING 11
N
T-101
GENERAL NOTES:
1. THE CONTRACTOR MUST FIELD VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS PRIOR TO PERFORMING WORK, FABRICATION OR PURCHASE OF ANY EQUIPMENT, MATERIALS, AND ASSEMBLIES. ANY DISCREPANCIES MUST BE BROUGHT TO THE CONTRACTING OFFICER'S ATTENTION FOR RESOLUTION BEFORE PROCEEDING WITH ANY CONSTRUCTION, FABRICATION, OR EQUIPMENT PURCHASE.
2. CONTRACTOR MUST PERFORM A THOROUGH SURVEY OF THE BUILDING AND DOCUMENT ANY DEFICIENCIES IN BUILDING FINISHES, BUILDING EQUIPMENT AND BUILDING SYSTEMS PRIOR TO BEGINNING WORK. SUBMIT DOCUMENT WITH
PHOTOGRAPHS TO THE CONTRACTING OFFICER.
3. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO MOVE EXISTING FURNISHINGS TO ACCOMMODATE THE WORK.
PROTECT FINISHES AND FURNISHINGS DURING THE WORK.
4. THE BUILDING WILL BE UNOCCUPIED FOR CONSTRUCTION AND THE ENTIRE BUILDING WILL BE AVAILABLE FOR THE
DURATION OF THE CONSTRUCTION.
HAZARDOUS MATERIALS INFORMATION:
1. REFER TO THE HAZARDOUS MATERIALS SURVEY REPORT IN THE SPECIFICATIONS. CONTRACTOR MUST ABIDE BY ALL GOVERNING REGULATIONS IN REGARDS TO DISTURBANCE, REMOVAL AND DISPOSAL OF HAZARDOUS MATERIALS
(REFERENCE SAID REPORT).
2. CONTRACTOR MUST ASSUME THAT ALL EXISTING PAINT COATINGS ON BUILDING MATERIALS AND SYSTEMS CONTAINS SOME LEVEL OF LEAD. ANY MATERIALS TO BE DISPOSED OF WITH PAINT COATINGS INTACT, MAY BE DISPOSED OF AS NORMAL CONSTRUCTION WASTE. THE CONTRACTOR MUST PROVIDE WORKER PROTECTION IN ACCORDANCE WITH OSHA
FOR ANY DISTURBANCE OF EXISTING PAINT COATINGS.
3. THE HAZARDOUS MATERIALS SURVEY TOOK SAMPLES OF SUSPECT ASBESTOS-CONTAINING MATERIALS. LABORATORY ANALYSIS OF THE SAMPLES DID NOT TEST POSITIVE FOR ASBESTOS. SHOULD THE CONTRACTOR DISCOVER MATERIALS THEY REASONABLY BELIEVE TO CONTAIN ASBESTOS, THE WORK MUST STOP AND THE CONTRACTING OFFICER MUST BE
NOTIFIED IMMEDIATELY.
PROTECTION OF EXISTING FACILITIES:
1. CONTRACTOR MUST PROTECT ALL EXISTING CONSTRUCTION DURING WORK INCLUDING, BUT NOT LIMITED TO, FINISHES, EQUIPMENT, DOORS, WINDOWS, FURNISHINGS AND SEATING. ANY DAMAGE TO EXISTING CONSTRUCTION MUST BE
REPAIRED OR REPLACED NEW, LIKE-IN-KIND.
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
SAFETY & HEALTH
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
J:
\g re en w oo d\
J ob s\
U
SD
A B1
B
H
VA
C
R ep ai r G ai ne sv ille
F L\
W or ki ng F ol de r\T itl e\ B1
P1
\T -1
P
1.
dw g M ay
4,
- 4 :1
6p m
COR
TEL
E. WILSON
E. WILSON
TBD
TBD 5/04/2026
Agricultural
Service Research
USDA ARS
5601 SUNNYSIDE AVENUE
RM 3-2102
BELTVILLE MD 20705
REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL
AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -
GAINESVILLE, FLORIDA
BTD
T-102
BUILDING 11 - PHASE 1
DRAWING LISTJND
INDEX OF DRAWINGS
DRAWING NO. SHEET NO. TITLE
GENERAL
T-101 1 OF 28 BUILDING 11 - PHASE 1 TITLE SHEET
T-102 2 OF 28 BUILDING 11 - PHASE 1 DRAWING LIST
CIVIL
C-101 3 OF 28 BUILDING 11 - PHASE 1 MECHANICAL SITE PLAN
HVAC
M-001 4 OF 28 BUILDING 11 - PHASE 1 GENERAL HVAC NOTES
M-002 5 OF 28 BUILDING 11 - PHASE 1 HVAC SYMBOL LEGEND
MD101 6 OF 28 BUILDING 11 - PHASE 1 FIRST FLOOR HVAC DEMO
MD102 7 OF 28 BUILDING 11 - PHASE 1 SECOND FLOOR HVAC DEMO
MD103 8 OF 28 BUILDING 11 - PHASE 1 EXISTING MECHANICAL SITE PLAN DEMO
MD401 9 OF 28 BUILDING 11 - PHASE 1 ENLARGED MECHANICAL ROOM DEMO
M-101 10 OF 28 BUILDING 11 - PHASE 1 FIRST FLOOR HVAC
M-102 11 OF 28 BUILDING 11 - PHASE 1 SECOND FLOOR HVAC
M-103 12 OF 28 BUILDING 11 - PHASE 1 MECHANICAL SITE PLAN
M-401 13 OF 28 BUILDING 11 - PHASE 1 ENLARGED MECHANICAL ROOM
M-501 14 OF 28 BUILDING 11 - PHASE 1 MECHANICAL DETAILS
M-502 15 OF 28 BUILDING 11 - PHASE 1 MECHANICAL DETAILS
M-601 16 OF 28 BUILDING 11 - PHASE 1 MECHANICAL SCHEDULES
M-602 17 OF 28 BUILDING 11 - PHASE 1 MECHANICAL SCHEDULES
M-603 18 OF 28 BUILDING 11 - PHASE 1 MECHANICAL SCHEDULES
M-701 19 OF 28 BUILDING 11 - DEDICATED OUTDOOR UNIT AHU-1 CONTROLS DIAGRAM
ELECTRICAL
E-001 20 OF 28 BUILDING 11 - PHASE 1 ELECTRICAL LEGEND
ED101 21 OF 28 BUILDING 11 - PHASE 1 FIRST FLOOR ELECTRICAL DEMO
ED102 22 OF 28 BUILDING 11 - PHASE 1 SECOND FLOOR ELECTRICAL DEMO
ED103 23 OF 28 BUILDING 11 - PHASE 1 EXISTING ELECTRICAL SITE PLAN DEMO
E-101 24 OF 28 BUILDING 11 - PHASE 1 FIRST FLOOR ELECTRICAL PLAN
E-102 25 OF 28 BUILDING 11 - PHASE 1 SECOND FLOOR ELECTRICAL PLAN
E-103 26 OF 28 BUILDING 11 - PHASE 1 ELECTRICAL SITE PLAN
E-501 27 OF 28 BUILDING 11 - PHASE 1 EQUIPMENT SCHEDULE
E-701 28 OF 28 BUILDING 11 - PANEL SCHEDULES
WORK PHASING INFORMATION
THIS IS PROJECT CONSISTS OF PHASED CONSTRUCTION. SUBMIT A SEPARATE, STAND ALONE BID FOR EACH WORK PHASE. THE WORK IN THIS SET OF PLANS PERTAINS TO BUILDING 11 PHASE 1. REFER TO THE SPECIFICATIONS FOR MORE INFORMATION.
THE SCOPE OF THIS PROJECT INCLUDES BUT IS NOT LIMITED TO:
1. REPLACE ONE OF THE EXISTING AIR COOLED CHILLERS.
2. REPLACE AHU-1 WHICH IS LOCATED IN THE INDOOR MECHANICAL ROOM. THE INTENT IS TO REPLACE THE AHU IN KIND.
THE REPLACEMENT AHU WILL CONNECT TO THE EXISTING DUCTWORK. MODIFY DUCTWORK AS REQUIRED TO
ACCOMMODATE THE REPLACEMENT AHU.
3. THE ROOF MOUNTED AIR HANDLERS AND FANS ARE EXISTING TO REMAIN. (SEE PHASE 2 DOCUMENTS)
4. REPLACE EXISTING PUMPS IN THE MECHANICAL ROOM.
5. REPLACE EXISTING PERIMETER FAN COIL UNITS ON THE FIRST AND SECOND FLOOR.
6. ELECTRICAL WORK IS PRIMARILY IN SUPPORT OF THE MECHANICAL WORK. DISCONNECT AND RECONNECT HVAC
EQUIPMENT AS SHOWN.
SW
RD
D
RI
VE
BUILDING 1
BUILDING 11
GREENHOUSE
EXIST. ACCH-2
EXIST. ACCH-1
TRANS.
G
EN
EPM
REVISIONS
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
SAFETY & HEALTH
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
J:
\g re en w oo d\
J ob s\
U
SD
A B1
B
H
VA
C
R ep ai r G ai ne sv ille
F L\
W or ki ng F ol de r\C iv il\ B1
1\ C
-1
P H
AS
E
1.
dw g M ay
4,
- 4 :3
3p m
COR
TEL
E. WILSON
E. WILSON
TBD
TBD 5/04/2026
Agricultural
Service Research
USDA ARS
5601 SUNNYSIDE AVENUE
RM 3-2102
BELTVILLE MD 20705
REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL
AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -
GAINESVILLE, FLORIDA
BTD
SCALE:
BUILDING 11 - PHASE 1
MECHANICAL SITE PLAN
NOT TO SCALE
C-101
JND
BUILDING 11 - PHASE 1
MECHANICAL SITE PLAN
C-101
GENERAL NOTES
1. THIS SHEET PROVIDED TO SHOW GENERAL SITE
CONDITIONS AND CONTRACTOR LAY DOWN AREAS. NO
CIVIL WORK IS REQUIRED FOR THIS PROJECT.
2. THE LAY DOWN AREAS SHOWN ARE FOR REFERENCE
ONLY AND ARE SUBJECT TO CHANGE. COORDINATE LAY
DOWN AREAS FOE EACH PHASE OF CONSTRUCTION WITH
SITE PERSONNEL AT TIME OF CONSTRUCTION.
LAY DOWN AREA FOR
BUILDING 1 WORK
LAY DOWN AREA FOR
BUILDING 1 WORK
LAY DOWN AREA FOR
BUILDING 11 WORK
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
SAFETY & HEALTH
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
J:
\g re en w oo d\
J ob s\
U
SD
A B1
B
H
VA
C
R ep ai r G ai ne sv ille
F L\
W or ki ng F ol de r\M ec h\ B1
P1
\M -0
-P
1.
dw g M ay
4,
- 4 :0
9p m
COR
TEL
E. WILSON
E. WILSON
TBD
TBD 5/04/2026
Agricultural
Service Research
USDA ARS
5601 SUNNYSIDE AVENUE
RM 3-2102
BELTVILLE MD 20705
REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL
AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -
GAINESVILLE, FLORIDA
BTD
JND
BUILDING 11 - PHASE 1
GENERAL HVAC NOTES
M-001
1. THIS PROJECT IS A RENOVATION OF AN EXISTING FACILITY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY ALL DIMENSIONS PRIOR TO FABRICATION OR PROCUREMENT OF EQUIPMENT, MATERIALS, AND ASSEMBLIES. ANY DEVIATIONS MUST BE BROUGHT TO THE CONTRACTING OFFICER'S ATTENTION FOR RESOLUTION BEFORE PROCEEDING WITH ANY
CONSTRUCTION, FABRICATION, OR EQUIPMENT PROCUREMENT.
2. INSTALLATION OF HVAC WORK MUST BE COORDINATED WITH OTHER TRADES BEFORE ANY WORK IS STARTED. DUCTWORK AND PIPING SHOWN ON PLANS IS SCHEMATIC. PROVIDE ALL TRANSITIONS, ELBOWS, REDUCERS, ETC. REQUIRED TO AVOID CONFLICTS & MAXIMIZE CEILING HEIGHTS. EQUIPMENT, PIPING OR DUCTWORK INTERFERING WITH OTHER TRADES MUST BE
RELOCATED AS REQUIRED AT NO ADDITIONAL COST TO THE OWNER.
3. COORDINATE MECHANICAL AND ELECTRICAL SUCH THAT MECHANICAL PIPING, DUCTWORK AND EQUIPMENT IS NOT LOCATED
OVER OR ABOVE ANY ELECTRICAL, COMMUNICATIONS, OR DATA EQUIPMENT.
4. AT START OF CONSTRUCTION, PREPARE TYPED LISTS OF EQUIPMENT THAT ARE SUPPLIED REQUIRING ELECTRICAL WORK, AND SEND LISTS TO THE ELECTRICAL CONTRACTOR FOR REVIEW AND COORDINATION.
5. WRITTEN DIMENSIONS ON DRAWINGS HAVE PRECEDENCE OVER SCALED DIMENSIONS. VERIFY DIMENSIONS ON SITE.
6. EQUIPMENT MUST BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S APPROVED CLEARANCE, AND INTERNATIONAL
BUILDING CODE / INTERNATIONAL MECHANICAL CODE.
7. INSTALLATION OF EQUIPMENT MUST PERMIT ACCESSIBILITY FOR SERVICE AND/OR REPLACEMENT WITHOUT NECESSITATING
REMOVAL OR MODIFICATION TO OTHER PIPING, WIRING, OR EQUIPMENT.
8. CEILING-MOUNTED EQUIPMENT MUST BE INSTALLED IN SUCH A MANNER THAT LIGHTS, PIPING, DUCTWORK, ETC. , DO NOT
BLOCK ACCESS TO EQUIPMENT AND RELATED ACCESSORIES.
9. SEAL WITH SILICONE ALL GAPS BETWEEN WALL, CEILING, AND FLOOR OPENINGS AND HVAC EQUIPMENT PENETRATIONS.
PATCH LARGE GAPS BEFORE SEALANT IS APPLIED.
10. DUCTWORK AIR DISTRIBUTION SYSTEMS MUST BE INSTALLED IN ACCORDANCE WITH SMACNA STANDARDS AND THE
PRESSURE CLASSIFICATION OF EACH INDIVIDUAL DUCTWORK SYSTEM.
11. VOLUME DAMPERS MUST BE PROVIDED AT EACH MAIN BRANCH TAKE-OFF, EACH TAKEOFF TO DIFFUSERS/GRILLS/REGISTERS, AND OTHER LOCATIONS WHERE REQUIRED TO PROPERLY BALANCE THE SYSTEM. ALL REQUIRED VOLUME DAMPERS MAY
NOT BE SHOWN ON PLANS.
12. INSTRUMENT TEST HOLES MUST BE PROVIDED IN AIR DISTRIBUTION SYSTEMS WHEREVER VOLUME DAMPERS ARE
INSTALLED. TEST HOLES MUST BE SEALED WITH RUBBER OR PLASTIC TEST HOLE PLUGS.
13. SQUARE ELBOWS MUST ONLY BE USED WHERE SPACE LIMITATIONS PREVENT USE OF 1-1/2 RADIUS ELBOW AND ONLY UPON APPROVAL OF CONTRACTING OFFICER. PROVIDE TURNING VANES IN ALL SQUARE ELBOWS GREATER THAN OR EQUAL TO 45°. TURNING VANES MUST BE SINGLE THICKNESS TYPE WITHOUT RAILING EDGE. TURNING VANES LONGER THAN 36 INCHES
MUST BE DOUBLE THICKNESS TYPE.
14. DUCTWORK RUNOUTS TO AIR DISTRIBUTION DEVICES MUST BE SAME DIAMETER AS AIR DISTRIBUTION DEVICE INLET
CONNECTION UNLESS OTHERWISE NOTED ON THE DRAWINGS.
15. FLEXIBLE DUCTWORK RUNOUTS FROM BRANCH DUCTS TO AIR DISTRIBUTION DEVICES MUST NOT EXCEED 5 FEET IN LENGTH.
BENDS IN FLEXIBLE DUCTWORK MUST NOT EXCEED A MAXIMUM OF 45 DEGREE CHANGE OF DIRECTION AND MUST BE SUPPORTED SUCH THAT THE BEND RADIUS IS NOT RESTRICTIVE TO AIR FLOW THROUGH THE DUCT. FLEXIBLE DUCTWORK
MUST NOT BE CRUSHED OR DISTORTED IN ITS FINAL CONFIGURATION.
16. PROVIDE SHEETMETAL TRANSITIONS AT AIR HANDLING UNITS, HEAT PUMP UNITS, FANS, AND OTHER SIMILAR HVAC EQUIPMENT. TRANSITION TO FULL SIZE OF CONNECTION ON UNIT. FLEXIBLE DUCT CONNECTORS MUST BE USED ON FINAL
CONNECTION TO AIR HANDLING EQUIPMENT.
17. TRANSFER DUCTS MUST BE SIZED FOR MAX VELOCITY ALLOWED OF 500 FPM. OPEN-ENDED TRANSFER DUCTS MUST HAVE
90° ELBOW FOR SOUND ATTENUATION.
18. LOUVERED SUPPLY AIR DIFFUSERS MUST BE 4-WAY FLOW UNLESS OTHERWISE SHOWN BY FLOW ARROWS ON THE DRAWINGS. LINEAR DIFFUSERS MUST BE ADJUSTABLE 2-WAY FLOW. PROVIDE BATT INSULATION ON DIFFUSER AND GRILLES
THAT ARE EXPOSED TO CEILING PLENUM.
19. EXACT LOCATIONS OF THERMOSTATS, CO2 SENSORS, AND EMCS SENSORS MUST BE COORDINATED WITH FINAL LOCATIONS OF WALL-MOUNTED ARCHITECTURAL AND ELECTRICAL EQUIPMENT. MOUNT THERMOSTATS AND CO2 SENSORS MINIMUM 48"
AFF.
20. SPECIFICATIONS TAKE PRECEDENCE OVER DRAWINGS. HOWEVER, ITEMS SHOWN ON DRAWING BUT NOT IN THE SPECIFICATIONS ARE REQUIRED WITHIN THE PROJECT SCOPE. IN ADDITION, SPECIFIC ITEMS SHOWN ON THE DRAWINGS TAKE PRECEDENCE OVER SPECIFICATIONS IN CASES WHERE THE SPECIFICATION HAS OPTIONS.
21. ALL EQUIPMENT MUST BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S APPROVED PUBLISHED LITERATURE.
22. DUCT SIZES SHOWN ARE INSIDE CLEAR DIMENSIONS.
23. EXPOSED DUCTWORK, WITH THE EXCEPTION OF DUCTWORK IN MECHANICAL ROOMS MUST BE DOUBLE-WALL, DUCTWORK WITH COATING.
24. ALL THERMOSTATS MUST BE WALL MOUNTED AND WIRED.
25. ALL EQUIPMENT INSTALLED IN THIS PROJECT MUST COMPLY WITH THE "BUY AMERICAN ACT" (BAA). BASIS OF DESIGN
SHOWN ON SCHEDULES IS TO ESTABLISH A STANDARD OF QUALITY, NOT TO LIMIT COMPETITION. EQUIVALENT EQUIPMENT FROM ANOTHER MANUFACTURER IS ACCEPTABLE. MANUFACTURER NAME AND MODEL NUMBERS ARE BASIS OF DESIGN AND ARE SHOWN FOR INFORMATION ONLY AND MAY OR MAY NOT COMPLY WITH BAA. REFER TO
SPECIFICATIONS FOR COMPLETE REQUIREMENTS.
26. CONTROLS CONTRACTOR MUST PROVIDE ALL LOW VOLTAGE DEVICES, CONDUCTORS, AND PATHWAYS IN ACCORDANCE WITH THE REQUIREMENTS OF 26 20 00. INSTALL CONTROL WIRING IN CONDUIT. SEE DIVISION 26 SPECIFICATIONS FOR
REQUIREMENTS.
27. ALL WORK AT RISK OF CONTACT WITH LABORATORY CHEMICALS MUST BE PERFORMED IN ACCORDANCE WITH NFPA 45.
HVAC GENERAL NOTES:
1. THE DEMOLITION PLANS AND EXISTING CONDITIONS SHOWN ARE APPROXIMATE AND ARE TO BE FIELD VERIFIED. ITEMS TO
BE REMOVED ARE DENOTED BY HATCHING. ADDITIONAL ITEMS ARE LIKEY TO REQUIRE REMOVAL, RELOCATION AND/OR REINSTALLATION TO PERFORM THE WORK BUT REQUIRE VERIFICATION THRU C.O. BEFORE PERFORMING THE WORK.
2. DEMOLITION MUST INCLUDE, BUT IS NOT LIMITED TO, THE ITEMS IDENTIFIED. THE CONTRACTOR MUST COORDINATE ALL REQUIRED RENOVATION AND NEW CONSTRUCTION WITH THE EXISTING BUILDING TO IDENTIFY THE TOTAL EXTENT OF THE
DEMOLITION WORK REQUIRED.
3. THE CONTRACTOR IS RESPONSIBLE FOR THE DEMOLITION AND REMOVAL OF ALL EXISTING BUILDING COMPONENTS, MATERIALS, EQUIPMENT, AND APPURTENANCES AS REQUIRED TO PROVIDE ALL NEW CONSTRUCTION.
4. IN THE EVENT THE CONTRACTOR ENCOUNTERS MATERIAL REASONABLY BELIEVED TO BE ASBESTOS, LEAD-BASED PAINT, OR ANY OTHER HAZARDOUS MATERIAL WHICH HAS NOT BEEN RENDERED HARMLESS, THE CONTRACTOR MUST IMMEDIATELY
REPORT THE CONDITION TO THE CONTRACTING OFFICER IN WRITING.
5. THE CONTRACTOR IS RESPONSIBLE FOR THE ERECTION, MAINTENANCE, AND REMOVAL OF ALL CONSTRUCTION ASSISTANCE
DEVICES SUCH AS SCAFFOLDING AND BARRIERS.
6. THE BUILDING ENVELOPE MUST REMAIN WATERTIGHT THROUGHOUT THE CONSTRUCTION PROCESS.
7. IF IT BECOMES NECESSARY DURING DEMOLITION TO TEMPORARILY REMOVE ANY EXISTING WORK NOT SPECIFICALLY NOTED TO BE REMOVED OR RELOCATED (THEREBY IMPLYING THAT THEY ARE TO BE LEFT FOR FUTURE USE), THE CONTRACTOR
MUST REINSTALL SAID WORK TO FULLY OPERABLE CONDITION IN THEIR ORIGINAL LOCATIONS
8. CONTRACTOR MUST DEMOLISH ALL EQUIPMENT, PIPING, DUCTWORK, INSULATION, SUPPORTS, CONTROLS
THERMOSTATS, WIRING AND ALL APPURTENANCES WITH THE HVAC SYSTEM TO BE DEMOLISHED.
9. PROTECT EXISTING INTERIOR WALLS DURING REMOVAL AND CONSTRUCTION. PROVIDE TEMPORARY PROTECTION FROM DUST, NOISE, DAMAGE, ETC. AND CONSTRUCTION BARRIERS AND OTHER SITE PROTECTION REQUIREMENTS CONSISTENT
WITH THE SPECIFICATIONS SECTION, AND DIVISION 1, GENERAL REQUIREMENTS.
10. IN AREAS OF WORK, AT EXISTING FINISHES TO REMAIN, PATCH AND REPAIR ANY DAMAGE TO MATCH EXISTING FINISH.
PREPARE SURFACE TO RECEIVE NEW FINISHES.
11. FIXED ITEMS ON WALLS AND CEILINGS WILL REMAIN IN PLACE DURING CONSTRUCTION. CONTRACTOR MUST PROVIDE
PROTECTION OF EXISTING FIXED ITEMS.
12. ALL WORK AT RISK OF CONTACT WITH LABORATORY CHEMICALS MUST BE PERFORMED IN ACCORDANCE WITH NFPA 45.
HVAC GENERAL DEMOLITION NOTES:
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
J:
\g re en w oo d\
J ob s\
U
SD
A B1
B
H
VA
C
R ep ai r G ai ne sv ille
F L\
W or ki ng F ol de r\M ec h\ B1
P1
\M -0
-P
1.
dw g M ay
4,
- 4 :0
9p m
COR
TEL
E. WILSON
E. WILSON
TBD
TBD 5/04/2026
Agricultural
Service Research
USDA ARS
5601 SUNNYSIDE AVENUE
RM 3-2102
BELTVILLE MD 20705
REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL
AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -
GAINESVILLE, FLORIDA
BTD
JND
BUILDING 11 - PHASE 1
HVAC SYMBOL LEGEND
M-002
-10"
S1
ABBREVIATIONS:
@ AT
& AND
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ARCH ARCHITECTURAL
AS AIR SEPARATOR
ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATING,
AND AIR CONDITIONING ENGINEERS
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
APD AIR PRESSURE DROP
BLDG BUILDING
BTU, BTUH BRITISH THERMAL UNITS, BTUs PER HOUR
C CONDENSATE RECEIVER
CD CONDENSATE DRAIN
CFM CUBIC FEET PER MINUTE
CHW CHILLED WATER
CHWP CHILLED WATER PUMP
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CLG COOLING
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
CO2 CARBON DIOXIDE
CONC CONCRETE
COND STEAM CONDENSATE
CONN CONNECT, CONNECTING, CONNECTION
CONT CONTINUED
CONV STEAM CONVERTER
COP COEFFICIENT OF PERFORMANCE
COR CONTRACTING OFFICER'S (OWNER'S)
REPRESENTATIVE
CU CONDENSING UNIT
D DEPTH
D DIFFUSER
DISC DISCONNECT
DB, Tdb DRY BULB (TEMPERATURE) dBA DECIBELS
DCW DOMESTIC COLD WATER
DDC DIRECT DIGITAL CONTROLS
DEG F (°F) DEGREES FAHRENHEIT
DFCU DUCTLESS FAN COIL UNIT
DIA, Ø DIAMETER
DIV DIVISION
DN DOWN
DP DIFFERENTIAL PRESSURE
DWG DRAWING
DWH DOMESTIC WATER HEATER
DX DIRECT EXPANSION
(E) EXISTING
EA EXHAUST AIR
EAG EXHAUST AIR GRILLE
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EFF EFFICIENCY
ELEC ELECTRICAL
EMCS ENERGY MONITORING AND CONTROLS SYSTEM
ER EXHAUST REGISTER
ERV ENERGY RECOVERY VENTILATOR
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETR EXISTING TO REMAIN
EUH ELECTRIC UNIT HEATER
EWT ENTERING WATER TEMPERATURE
EXIST. EXISTING
EXT EXTERIOR
EXH EXHAUST
DEG EXISTING
FCU FAN COIL UNIT
FD FIRE DAMPER
FFE FINISHED FLOOR ELEVATION
FLA FULL LOAD AMPS
FPD FLUID PRESSURE DROP
FPM FEET PER MINUTE
FSD FIRE SMOKE DAMPER
FT FOOT, FEET
GA GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
GRD GRILLES, REGISTERS AND DIFFUSERS
HP HORSE POWER
HR HOUR
HTG HEATING
HTR HEATER
HTW HEATING WATER
HTWR HEATING WATER RETURN
HTWS HEATING WATER SUPPLY
HVAC HEATING, VENTILATING, AND AIR CONDITIONING
HWP HOT WATER PIPE
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HZ HERTZ
IMC INTERNATIONAL MECHANICAL CODE
IN INCH, INCHES
IN WC INCHES WATER COLUMN
IN WG INCHES WATER GAUGE
IPLV INTEGRATED PART LOAD VALUE
KW KILOWATTS
L LENGTH, LOUVER (WALL)
LAT LEAVING AIR TEMPERATURE
LBD LINEAR BAR DIFFUSER
LB POUNDS
LD LINEAR DIFFUSER
LPR LOW PRESSURE RETURN
LPS LOW PRESSURE SUPPLY
LWT LEAVING WATER TEMPERATURE
M MOTORIZED
MA MIXED AIR
MAX MAXIMUM
MBH 1000 BRITISH THERMAL UNITS
MCA MINIMUM CIRCUIT AMPACITY
MECH MECHANICAL
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING VALUE
MIN MINIMUM
MOCP MAXIMUM OVER CURRENT PROTECTION
MSS SP MANUFACTURERS STANDARD SOCIETY STANDARD
PRACTICE
MTL METAL
N.C. NORMALLY CLOSED
NC NOISE CRITERIA
NG NATURAL GAS
NO. NUMBER
N.O. NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
PD PRESSURE DROP
PH PHASE
PLBG PLUMBING
PPM PARTS PER MILLION
PRV PRESSURE RELIEF VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAUGE
QTY QUANTITY
R/A RETURN AIR
RAG RETURN AIR GRILLE
REF REFER TO, REFERENCE
RF RADIO FREQUENCY
REQD REQUIRED
RH RELATIVE HUMIDITY, ROOF HOOD
RLD RECTANGULAR LINEAR DIFFUSER
RM ROOM
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
SA SUPPLY AIR
SAD SUPPLY AIR DIFFUSER
SAG SUPPLY AIR GRILLE
SD SMOKE DAMPER, SMOKE DETECTOR
SEER SEASONAL ENERGY EFFICIENCY RATIO
SF SUPPLY FAN
SHT SHEET
SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTOR'S
NATIONAL ASSOCIATION
SP STATIC PRESSURE
SS STAINLESS STEEL
SWR SIDEWALL REGISTER
T&P TEMPERATURE AND PRESSURE
TEMP TEMPERATURE
TSTAT THERMOSTAT
TYP TYPICAL
UH UNIT HEATER
UL UNDERWRITER'S LABORATORY
UMCS UTILITY MONITORING AND CONTROL SYSTEM
V VOLTAGE, VOLTS
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER
VFD VARIABLE FREQUENCY DRIVE
WG WATER GAUGE
WB WET BULB (TEMPERATURE)
WPD WATER PRESSURE DROP
W/O WITHOUT
MISCELLANEOUS LEGEND:
AIR DISTRIBUTION DEVICE TAGS
AIRFLOW (CFM)
NORTH ARROW
SD
SP
F
CO
DUCT SMOKE DETECTOR
CARBON MONOXIDE SENSOR
STATIC PRESSURE SENSOR
FIRESTAT
TEMPERATURE SENSORT
VARIABLE FREQUENCY DRIVEVFD
FLOW ARROW
RETURN AIR GRILLE
SUPPLY AIR DIFFUSER
FLOW ARROWS INDICATE AIR PATTERN.
NO FLOW ARROWS SHOWN INDICATES
4-WAY PATTERN.
EXHAUST AIR GRILLE
T THERMOSTAT
H HUMIDISTAT
TH THERMOSTAT/ HUMIDISTAT
HUMIDITY SENSORH
NECK SIZE
DP DIFFERENTIAL PRESSURE SENSOR
POINT OF RECONNECTION OR
EXTENT OF DEMOLITION
PIPING LEGEND:
EXISTING PIPING (EXIST.)
ITEMS TO BE DEMOLISHED
FLEXIBLE CONNECTION
THERMOMETER
PRESSURE REDUCING VALVE
MANUAL AIR VENT
PRESSURE/TEMPERATURE TAP WITH
BALL VALVE
PRESSURE SWITCH
PLUG VALVE
FLOW SWITCH
T&P RELIEF VALVE
AUTOMATIC AIR VENT
PRESSURE GAUGE WITH GAUGE COCK
PS
FS
BUTTERFLY VALVE
STRAINER WITH BLOWDOWN VALVE,
CAP, AND CHAIN
FLOW MEASURING/BALANCING/SHUT-
OFF VALVE
GATE VALVE
CHECK VALVE
BALL VALVE
CONCENTRIC REDUCER
DIRECTION OF FLOW
ECCENTRIC REDUCER
PIPE FLANGE
PIPE CAP
UNION
TEE OUTLET UP
BRANCH BOTTOM CONNECTION
BRANCH TOP CONNECTION
ELBOW UP
ELBOW DOWN
RISE OR DROP
TEE OUTLET DOWN
DUCTWORK LEGEND:
M
FIRE DAMPER
EXHAUST AIR DUCT DOWN
EXHAUST AIR DUCT UP
RETURN AIR DUCT DOWN
30"x14"
SQUARE TO ROUND DUCT BRANCH TAKE-OFF
WITH 45 DEGREE BRANCH INLET
ROUND DUCT BRANCH TAKE-OFF FROM
RECTANGULAR MAIN WITH CONICAL TAP
FLEXIBLE DUCT CONNECTION
DUCT SIZE TRANSITION
RECTANGULAR DUCT BRANCH TAKE-OFF
WITH 45 DEGREE BRANCH INLET
90 DEGREE DUCT ELBOW WITH TURNING VANES
24"Ø ROUND DUCT. DIAMETER INDICATED IN INCHES.
IN-LINE 90 DEGREE RISE/DROP IN
SUPPLY DUCT
FD
SD
DAMPER TYPE:
M - MOTORIZED DAMPER (ELECTRIC)
VD
SMOKE DAMPER
VOLUME/BALANCING DAMPER
(LABEL MAY BE OMITTED)
BD
BACKDRAFT DAMPER
(COUNTER-BALANCED UNLESS
OTHERWISE NOTED)
RADIUS DUCT ELBOW - ROUND OR
RECTANGULAR (MIN. 1.5 RADIUS UNLESS
OTHERWISE NOTED)
RECTANGULAR DUCT. SIZE INDICATED IN
INCHES, FIRST NUMBER IS SIDE SHOWN.
DASHED LINES INDICATE ACOUSTICAL LINER
FSD
COMBINATION
FIRE/SMOKE DAMPER
IN-LINE 90 DEGREE RISE/DROP IN
RETURN DUCT
DUCT SIZE TRANSITION RECTANGULAR TO
ROUND
RETURN AIR DUCT UP
SUPPLY OR OUTSIDE AIR DUCT DOWN
SUPPLY OR OUTSIDE AIR DUCT UP
IN-LINE 90 DEGREE RISE/DROP IN
EXHAUST DUCT
SD
DUCT MOUNTED SMOKE DETECTORGLOBE VALVEPLAN
NORTH
HATCHING INDICATES ITEMS TO
BE DISMANTLED AND REMOVED.
DEMOLITION LEGEND:
EXISTING EQUIPMENT
CH-1 (E) (E) AFTER AN EQUIPMENT
MARK INDICATES EXISTING
TRUE NORTH
DIFFUSER MARK (REFER
TO GRD SCHEDULE)
HEATING WATER RETURN (HTWR)
HEATING WATER SUPPLY (HTWS)
CHILLED WATER RETURN (CHWR)
CHILLED WATER SUPPLY (CHWS)
ABBREVIATION NOTES:
1. SOME ABBREVIATIONS SHOWN MAY NOT BE USED FOR THIS PROJECT.
2. SCHEDULED EQUIPMENT IS NOTED USING UNDERLINED TEXT SUCH AS AHU-1. THIS IS NOT AN
ABBREVIATION. IT IS AN EQUIPMENT MARK. REFER TO SCHEDULE SHEETS M-601 THRU M-699
FOR INFORMATION REGARDING SCHEDULED EQUIPMENT.
AHU-1
FC-168FC-169
FC-100
FC-101FC-102
FC-157FC-156FC-155FC-154FC-153FC-141FC-140FC-139FC-138FC-137FC-136FC-135FC-134
FC-118 FC-117 FC-116 FC-115 FC-114 FC-113
STORAGE
INSECT REARING LAB
STORAGE
COLD ROOM
INSECT REARING RM.
ENVIRONMENTAL RM.
123A
CORRIDOR
123B
INSECT REARING ROOM
STORAGE
OFFICE
LAB
CORRIDOR
STAIRWELL
MEN'S TOILET
WOMEN'S TOILET
MECH. RM.
OFFICE
OFFICE
135 OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CORRIDOR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
C O
R R
ID
O
R
OFFICE
STORAGE
ELECTRICAL RM.
112A
HANDICAPPED TOILET - MEN
111A
HANDICAPPED TOILET - WOMEN
111B
MECHANICAL RM.
C O
R R
ID
O
R
MECHANICAL RM.
STORAGE
CORRIDOR
STORAGE
OFFICE
OFFICE
170 OFFICE
169 OFFICE
OFFICE
OFFICE
STORAGE
DARK RM.
DARK RM.
LIGHT RM.
RESEARCH SPACE
OFFICE
LAB
BREAK RM.
CORRIDOR
CORRIDOR
175A
CORRIDOR
C O
R R
ID
O
R
LAB
LAB
LAB
LAB
LAB
LAB
CORRIDOR
CONFERENCE RM.
177 COPY RM.
ELECTRICAL RM.
178MECHANICAL RM.
MEN'S
WOMEN'S
FREEZER RM.
LAB
LAB
LAB
LAB
LAB
196ALAB
LAB
LAB
LAB
LAB
MECHANICAL RM.
RESEARCH SPACE
190RESEARCH SPACE
190A
AN
TE
R O
O M
0B
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
JANITOR'S CLOSET
STAIRWELL
ELEVATOR LOBBY
RESEARCH
152A
OFFICE
152 RESEARCH
LAB
LAB
MECH. RM.
LAB
RESEARCH
C O
R R
ID
O
R
EPM
REVISIONS
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
SAFETY & HEALTH
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
J:
\g re en w oo d\
J ob s\
U
SD
A B1
B
H
VA
C
R ep ai r G ai ne sv ille
F L\
W or ki ng F ol de r\M ec h\ B1
P1
\M D
1-
P1 .d w g
M ay
4,
- 4
:0 9p m
COR
TEL
E. WILSON
E. WILSON
TBD
TBD 5/04/2026
Agricultural
Service Research
USDA ARS
5601 SUNNYSIDE AVENUE
RM 3-2102
BELTVILLE MD 20705
REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL
AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -
GAINESVILLE, FLORIDA
BTD
SCALE:
BUILDING 11 - PHASE 1
FIRST FLOOR HVAC DEMO
3/32" = 1'-0"
MD101
1 1
1 1
11111 11111111
111111
GENERAL NOTES
GRAPHIC SCALE
1'-0'
KEYED NOTESX
1. DISMANTLE AND REMOVE EXISTING FAN
COIL UNIT AND ALL APPURTENANCES. ALL
EXISTING DUCTWORK (WHERE APPLICABLE),
CHILLED WATER, AND HEATING WATER
PIPING, INSULATION, AND VALVES MUST BE
CAPPED AND REMAIN IN PLACE FOR
RECONNECTION.
2. DISMANTLE AND REMOVE EXISTING AIR
HANDLING UNIT AND ALL APPURTENANCES.
ALL EXISTING DUCTWORK, CHILLED WATER,
AND HEATING WATER PIPING, INSULATION,
AND VALVES MUST BE CAPPED AND REMAIN
IN PLACE FOR RECONNECTION.
DKM
BUILDING 11 - PHASE 1
FIRST FLOOR HVAC DEMO
MD101
A. THE DEMOLITION PLAN AND EXISTING
CONDITIONS ARE APPROXIMATE. ITEMS TO
BE REMOVED ARE DESIGNATED BY
HATCHING AND DASHED LINES. OTHER ITEMS
ARE INTENDED TO REMAIN IN PLACE UNLESS
NOTED OTHERWISE.
B. CONTRACTOR MUST PROTECT ALL EXISTING
HVAC EQUIPMENT, DUCTWORK, DIFFUSERS,
PIPING, VALVES, CONTROLS, INSULATION,
ETC. FROM ANY DAMAGE OR
CONTAMINATION. OPEN ENDS OF ALL
DUCTWORK MUST BE COVERED DURING
CONSTRUCTION.
C. ALL VAV BOXES AS WELL AS GENERAL
EXHAUST, HOOD EXHAUST, AND MAKE UP
AIR VALVES ARE EXISTING TO REMAIN.
D. THE SPECIFIC WORK REQUIRED FOR THIS
PHASE IS LISTED IN THE KEYED NOTES
BELOW. NO DEMOLITION WORK IS TO BE
PERFORMED ON ANY EQUIPMENT
DUCTWORK, PIPING, ETC. NOT SPECIFICALLY
LISTED IN THE KEYED NOTES.
ELEVATOR LOBBY
LOBBY
CONFERENCE ROOM
POINT OF DEMOLITION
EQUIPMENT TO BE DEMOLISHED
LEGEND
CORRIDOR
CORRIDOR
FC-208FC-209FC-210FC-211
FC-232 FC-233 FC-234 FC-235
SCALE:
BUILDING 11 - PHASE 1
SECOND FLOOR HVAC DEMO
3/32" = 1'-0"
MD102
GENERAL NOTES
GRAPHIC SCALE
1'-0'
06' 6'3'
SCALE: 3/16" =
KEYED NOTESX
1. DISMANTLE AND REMOVE EXISTING FAN
COIL UNIT AND ALL APPURTENANCES. ALL
EXISTING DUCTWORK (WHERE APPLICABLE),
CHILLED WATER, AND HEATING WATER
PIPING, INSULATION, AND VALVES MUST BE
CAPPED AND REMAIN IN PLACE FOR
RECONNECTION.
EPM
REVISIONS
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
SAFETY & HEALTH
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
J:
\g re en w oo d\
J ob s\
U
SD
A B1
B
H
VA
C
R ep ai r G ai ne sv ille
F L\
W or ki ng F ol de r\M ec h\ B1
P1
\M D
2-
P1 .d w g
M ay
4,
- 4
:0 9p m
COR
TEL
E. WILSON
E. WILSON
TBD
TBD 5/04/2026
Agricultural
Service Research
USDA ARS
5601 SUNNYSIDE AVENUE
RM 3-2102
BELTVILLE MD 20705
REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL
AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -
GAINESVILLE, FLORIDA
BTD
DKM
BUILDING 11 - PHASE 1
SECOND FLOOR HVAC DEMO
MD102
A. THE DEMOLITION PLAN AND EXISTING
CONDITIONS ARE APPROXIMATE. ITEMS TO
BE REMOVED ARE DESIGNATED BY
HATCHING AND DASHED LINES. OTHER ITEMS
ARE INTENDED TO REMAIN IN PLACE UNLESS
NOTED OTHERWISE.
B. CONTRACTOR MUST PROTECT ALL EXISTING
HVAC EQUIPMENT, DUCTWORK, DIFFUSERS,
PIPING, VALVES, CONTROLS, INSULATION,
ETC. FROM ANY DAMAGE OR
CONTAMINATION. OPEN ENDS OF ALL
DUCTWORK MUST BE COVERED DURING
CONSTRUCTION.
C. ALL VAV BOXES AS WELL AS GENERAL
EXHAUST, HOOD EXHAUST, AND MAKE UP
AIR VALVES ARE EXISTING TO REMAIN
D. THE SPECIFIC WORK REQUIRED FOR THIS
PHASE IS LISTED IN THE KEYED NOTES
BELOW. NO DEMOLITION WORK IS TO BE
PERFORMED ON ANY EQUIPMENT
DUCTWORK, PIPING, ETC. NOT SPECIFICALLY
LISTED IN THE KEYED NOTES.
1 1 1 1 1 1
1 1 1
WOMEN'S
ELEVATOR LOBBY
STORAGE
STAIRWELL
MEN'S
LIBRARY
LIBRARY
OFFICE
OFFICE
OFFICE
OFFICE
LAB
LAB
LAB
CORRIDOR
GLASS CLEANING RM.
LAB
LAB
STORAGE
JANITOR'S CLOSET
CORRIDOR
CENTRIFUGE RM.
RESEARCH
LAB
STORAGE
SHOWER RM.
ST
O
R
AG
E
STAIRWELL
ELEVATOR LOBBY
MEN'S
WOMEN'S
OFFICE
OFFICE
OFFICE
CONFERENCE RM.
CORRIDOR
LAB
LAB
237A
LAB
LAB
LAB
OFFICE
OFFICE
CORRIDOR
C O
R R
ID
O
R
LAB
OFFICE
OFFICE
LAB
OFFICE
GLASS CLEANING RM.
LAB
LAB
LAB
LAB
BREAK RM.
258A
C O
R R
ID
O
R
M
EC
H . R
M
OFFICE
EN
VI
R O
N M
EN
TA
L R
M
LAB
LAB
LAB
LAB
LAB
LAB
LAB
LAB
LAB
CORRIDOR
CORRIDOR
C O
R R
ID
O
R
M
EC
H . R
M
CORRIDOR
POINT OF DEMOLITION
EQUIPMENT TO BE DEMOLISHED
LEGEND
BUILDING 11
GREENHOUSE
EXIST. CHS
EXIST. CHR EXIST. CHS
EXIST. CHR
EXIST. ACCH-2
EXIST. ACCH-1
EXIST. 150 (6") CHILLED WATER PIPING TO REMAIN, 750 (30") BELOW GRADE
TRANS.
G
EN
EXIST. CHR
EXIST. CHSEXIST. CHR
EXIST. CHS
34'-1 1/2"
EXISTING THRUST
BLOCK TO REMAIN
EXISTING THRUST
BLOCK TO REMAIN
EXISTING THRUST
BLOCK TO REMAIN
SCALE:
BUILDING 11
EXISTING MECHANICAL SITE PLAN DEMO
3/32" = 1'-0"
MD103
GENERAL NOTES
GRAPHIC SCALE
1'-0'
KEYED NOTESX
1. DISMANTLE AND REMOVE EXISTING AIR
COOLED CHILLER. PREPARE EXISTING
PIPING FOR CONNECTION TO NEW CHILLER.
EXISTING CONCRETE PAD TO REMAIN.
EPM
REVISIONS
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
SAFETY & HEALTH
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
C :\U se rs
\T O
M
LO
V~ 1\
Ap pD at a\
Lo ca l\T em p\ Ac
Pu bl is h_
8\ M
D
3- P1
.d w g M ay
4,
- 4 :0
9p m
COR
TEL
E. WILSON
E. WILSON
TBD
TBD 5/04/2026
Agricultural
Service Research
USDA ARS
5601 SUNNYSIDE AVENUE
RM 3-2102
BELTVILLE MD 20705
REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL
AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -
GAINESVILLE, FLORIDA
BTD
DKM
BUILDING 11 - PHASE 1
EXISTING MECHANICAL SITE PLAN DEMO
MD103
A. THE DEMOLITION PLAN AND EXISTING
CONDITIONS ARE APPROXIMATE. ITEMS TO
BE REMOVED ARE DESIGNATED BY
HATCHING AND DASHED LINES. OTHER ITEMS
ARE INTENDED TO REMAIN IN PLACE UNLESS
NOTED OTHERWISE.
B. CONTRACTOR MUST PROTECT ALL EXISTING
HVAC EQUIPMENT, PIPING, VALVES,
INSULATION, CONTROLS, ETC. FROM ANY
DAMAGE OR CONTAMINATION.
C. THE SPECIFIC WORK REQUIRED FOR THIS
PHASE IS LISTED IN THE KEYED NOTES
BELOW. NO DEMOLITION WORK IS TO BE
PERFORMED ON ANY EQUIPMENT
DUCTWORK, PIPING, ETC. NOT SPECIFICALLY
LISTED IN THE KEYED NOTES.
POINT OF DEMOLITION
EQUIPMENT TO BE DEMOLISHED
H W
R
WH-1
AI
R
VA
C
REFRIGERATED AIR
DRYERS
COLD WATER MAKEUP TRAIN AND REDUCED
PRESSURE BACKFLOW PREVENTER, SEE
DETAIL 8, SHEET M-19, TYPICAL OF TWO THIS
SHEET
EXPANSION TANKS,
DIAPHRAGM TYPE
NEW CONTROL AIR
COMPRESSOR
LABORATORY AIR
COMPRESSOR
LABORATORY AIR
COMPRESSOR
LABORATORY
VACUUM PUMP
LABORATORY
VACUUM PUMP
DOMESTIC WATER
HEAT EXCHANGER HE-1
DOMESTIC HOT WATER
STORAGE TANK
CP-2
CP-1
2"
HWS
HWR
P-7
V-1
BOILER B-1
H W
R
HWS
HWS
HWS
V-2
AS-2
C H
R
C H
S
H W
S
H W
R
H W
S
H W
S
H W
S
CHR
CHS
CHS
AS-1
CHR
CHRCHR
CHS
CHS
CHR
C H
S
C H
R
P-8(E)
P-1(E)
P-2(E) P-3B(E)
P-3A(E)
P-5A(E)
P-5B(E)
P-6(E)
P-4(E)
EPM
REVISIONS
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
SAFETY & HEALTH
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
C :\U se rs
\T O
M
LO
V~ 1\
Ap pD at a\
Lo ca l\T em p\ Ac
Pu bl is h_
8\ M
D
1.
dw g M ay
4,
- 4 :0
9p m
COR
TEL
E. WILSON
E. WILSON
TBD
TBD 5/04/2026
Agricultural
Service Research
USDA ARS
5601 SUNNYSIDE AVENUE
RM 3-2102
BELTVILLE MD 20705
REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL
AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -
GAINESVILLE, FLORIDA
BTD
SCALE:
BUILDING 11 - PHASE 1
ENLARGED MECHANICAL ROOM DEMO
3/8" = 1'-0"
MD401
GENERAL NOTES
GRAPHIC SCALE
1'-0'
KEYED NOTESX
JND
BUILDING 11 - PHASE 1
ENLARGED MECHANICAL ROOM DEMO
MD401
POINT OF DEMOLITION
EQUIPMENT TO BE DEMOLISHED
STORAGE
ELECTRICAL RM.
112A
H
AN
D
IC
AP
PE
D T
O
IL
ET
M
EN
1A
H
AN
D
IC
AP
PE
D T
O
IL
ET
W O
M
EN
1B
MECHANICAL RM.
C O
R R
ID
O
R
1. DISMANTLE AND REMOVE EXISTING PUMP
AND ALL APPURTENANCES. ALL EXISTING
PIPING, INSULATION, AND VALVES MUST BE
CAPPED AND REMAIN IN PLACE FOR
RECONNECTION. EXISTING CONCRETE PAD
(IF APPLICABLE) MUST REMAIN.
A. THE DEMOLITION PLAN AND EXISTING
CONDITIONS ARE APPROXIMATE. ITEMS TO
BE REMOVED ARE DESIGNATED BY
HATCHING AND DASHED LINES. OTHER ITEMS
ARE INTENDED TO REMAIN IN PLACE UNLESS
NOTED OTHERWISE.
B. CONTRACTOR MUST PROTECT ALL EXISTING
HVAC EQUIPMENT, DUCTWORK, DIFFUSERS,
PIPING, VALVES, CONTROLS, INSULATION,
ETC. FROM ANY DAMAGE OR
CONTAMINATION. OPEN ENDS OF ALL
DUCTWORK MUST BE COVERED DURING
CONSTRUCTION.
C. THE SPECIFIC WORK REQUIRED FOR THIS
PHASE IS LISTED IN THE KEYED NOTES
BELOW. NO DEMOLITION WORK IS TO BE
PERFORMED ON ANY EQUIPMENT
DUCTWORK, PIPING, ETC. NOT SPECIFICALLY
LISTED IN THE KEYED NOTES.
FC-168FC-169
FC-100
FC-101FC-102
FC-157FC-156FC-155FC-154FC-153FC-141FC-140FC-139FC-138FC-137FC-136FC-135FC-134
FC-118 FC-117 FC-116 FC-115 FC-114 FC-113
AHU-1
SCALE:
BUILDING 11
FIRST FLOOR HVAC
3/32" = 1'-0"
M-101
GENERAL NOTES
GRAPHIC SCALE
1'-0'
KEYED NOTESX
1. PROVIDE FAN COIL UNIT AND ALL
APPURTENANCES IN PLACE OF EXISTING.
RECONNECT TO ALL EXISTING CAPPED
DUCTWORK (WHERE APPLICABLE), CHILLED
WATER, AND HEATING WATER PIPING.
2. PROVIDE AIR HANDLING UNIT AND ALL
APPURTENANCES IN PLACE. RECONNECT
TO ALL EXISTING CAPPED DUCTWORK,
CHILLED WATER, AND HEATING WATER
PIPING. MODIFY/REPLACE EXISTING
EQUIPMENT PAD AS NEEDED FOR AIR
HANDLER REPLACEMENT.
EPM
REVISIONS
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
SAFETY & HEALTH
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
J:
\g re en w oo d\
J ob s\
U
SD
A B1
B
H
VA
C
R ep ai r G ai ne sv ille
F L\
W or ki ng F ol de r\M ec h\ B1
P1
\M
1- P1
.d w g M ay
4,
- 4 :0
9p m
COR
TEL
E. WILSON
E. WILSON
TBD
TBD 5/04/2026
Agricultural
Service Research
USDA ARS
5601 SUNNYSIDE AVENUE
RM 3-2102
BELTVILLE MD 20705
REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL
AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -
GAINESVILLE, FLORIDA
BTD
DKM
BUILDING 11 - PHASE 1
FIRST FLOOR HVAC
M-101
A. CONTRACTOR MUST PROTECT ALL EXISTING
HVAC EQUIPMENT, DUCTWORK,
DIFFUSERS,PIPING, VALVES, CONTROLS,
INSULATION, ETC. FROM ANY DAMAGE OR
CONTAMINATION. OPEN ENDS OF ALL
DUCTWORK (EXISTING AND NEW) MUST BE
COVERED DURING CONSTRUCTION.
CONTRACTOR MUST MECHANICALLY CLEAN
ENTIRE HVAC SYSTEM IN WORK AREA TO
REMOVE ALL VISIBLE CONTAMINANTS, SUCH
THAT SYSTEMS ARE CAPABLE OF PASSING
NADCA CLEANING VERIFICATION TESTING
STANDARDS ONCE CONSTRUCTION IS
COMPLETE.
B. HVAC SYSTEMS AND EQUIPMENT SHOWN ON
THIS DRAWING ARE APPROXIMATE.
CONTRACTOR SHALL FIELD VERIFY ALL
EXISTING CONDITIONS.
C. CONTRACTOR MUST BALANCE THE AIRFLOW
OF THE DIFFUSERS AND GRILLES TO THE
VALUES SHOWN ON THE DRAWINGS.
CONTRACTOR MUST BALANCE VAV BOXES,
DAMPERS, AIR HANDLING UNIT, AND ALL
OTHER EQUIPMENT IMPACTED BY DIFFUSER
AND GRILLE BALANCING.
D. ALL VAV BOXES AS WELL AS GENERAL
EXHAUST, HOOD EXHAUST, AND MAKE UP
AIR VALVES ARE EXISTING TO BE ADJUSTED
FOR AIR BALANCING.
E. THE SPECIFIC WORK REQUIRED FOR THIS
PHASE IS LISTED IN THE KEYED NOTES
BELOW. ANY EQUIPMENT, DUCTWORK,
PIPING, ETC. NOT SPECIFICALLY LISTED IN
THE KEYED NOTES IS EXISTING.
1 1
1 1
11111 11111111
11111
POINT OF CONNECTION
LEGEND
STORAGE
INSECT REARING LAB
STORAGE
COLD ROOM
INSECT REARING RM.
ENVIRONMENTAL RM.
123A
CORRIDOR
123B
INSECT REARING ROOM
STORAGE
OFFICE
LAB
CORRIDOR
STAIRWELL
MEN'S TOILET
WOMEN'S TOILET
MECH. RM.
OFFICE
OFFICE
135 OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CORRIDOR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
C O
R R
ID
O
R
OFFICE
STORAGE
ELECTRICAL RM.
112A
HANDICAPPED TOILET - MEN
111A
HANDICAPPED TOILET - WOMEN
111B
MECHANICAL RM.
C O
R R
ID
O
R
MECHANICAL RM.
STORAGE
CORRIDOR
STORAGE
OFFICE
OFFICE
170 OFFICE
169 OFFICE
OFFICE
OFFICE
STORAGE
DARK RM.
DARK RM.
LIGHT RM.
RESEARCH SPACE
OFFICE
LAB
BREAK RM.
CORRIDOR
CORRIDOR
175A
CORRIDOR
C O
R R
ID
O
R
LAB
LAB
LAB
LAB
LAB
LAB
CORRIDOR
CONFERENCE RM.
177 COPY RM.
ELECTRICAL RM.
178MECHANICAL RM.
MEN'S
WOMEN'S
FREEZER RM.
LAB
LAB
LAB
LAB
LAB
196ALAB
LAB
LAB
LAB
LAB
MECHANICAL RM.
RESEARCH SPACE
190RESEARCH SPACE
190A
AN
TE
R O
O M
0B
OFFICE
153 OFFICE
OFFICE
OFFICE
OFFICE
JANITOR'S CLOSET
STAIRWELL
ELEVATOR LOBBY
RESEARCH
152A
OFFICE
152 RESEARCH
LAB
LAB
149MECH. RM.
LAB
RESEARCH
C O
R R
ID
O
R
ELEVATOR LOBBY
LOBBY
CONFERENCE ROOM
CORRIDOR
CORRIDOR
FC-235FC-234FC-233FC-232
FC-211 FC-210 FC-209 FC-208 FC-207 FC-206
SCALE:
BUILDING 11
SECOND FLOOR HVAC
3/32" = 1'-0"
M-102
GENERAL NOTES
KEYED NOTESX
1. PROVIDE FAN COIL UNIT AND ALL
APPURTENANCES IN PLACE OF EXISTING.
RECONNECT TO ALL EXISTING CAPPED
DUCTWORK (WHERE APPLICABLE), CHILLED
WATER, AND HEATING WATER PIPING.
EPM
REVISIONS
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
SAFETY & HEALTH
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
J:
\g re en w oo d\
J ob s\
U
SD
A B1
B
H
VA
C
R ep ai r G ai ne sv ille
F L\
W or ki ng F ol de r\M ec h\ B1
P1
\M
2- P1
.d w g M ay
4,
- 4 :0
9p m
COR
TEL
E. WILSON
E. WILSON
TBD
TBD 5/04/2026
Agricultural
Service Research
USDA ARS
5601 SUNNYSIDE AVENUE
RM 3-2102
BELTVILLE MD 20705
REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL
AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -
GAINESVILLE, FLORIDA
BTD
DKM
BUILDING 11 - PHASE 1
SECOND FLOOR HVAC
M-102
A. CONTRACTOR MUST PROTECT ALL EXISTING
HVAC EQUIPMENT, DUCTWORK,
DIFFUSERS,PIPING, VALVES, CONTROLS,
INSULATION, ETC. FROM ANY DAMAGE OR
CONTAMINATION. OPEN ENDS OF ALL
DUCTWORK (EXISTING AND NEW) MUST BE
COVERED DURING CONSTRUCTION.
CONTRACTOR MUST MECHANICALLY CLEAN
ENTIRE HVAC SYSTEM IN WORK AREA TO
REMOVE ALL VISIBLE CONTAMINANTS, SUCH
THAT SYSTEMS ARE CAPABLE OF PASSING
NADCA CLEANING VERIFICATION TESTING
STANDARDS ONCE CONSTRUCTION IS
COMPLETE.
B. HVAC SYSTEMS AND EQUIPMENT SHOWN ON
THIS DRAWING ARE APPROXIMATE.
CONTRACTOR SHALL FIELD VERIFY ALL
EXISTING CONDITIONS.
C. CONTRACTOR MUST BALANCE THE AIRFLOW
OF THE DIFFUSERS AND GRILLES TO THE
VALUES SHOWN ON THE DRAWINGS.
CONTRACTOR MUST BALANCE VAV BOXES,
DAMPERS, AIR HANDLING UNIT, AND ALL
OTHER EQUIPMENT IMPACTED BY DIFFUSER
AND GRILLE BALANCING.
D. ALL VAV BOXES AS WELL AS GENERAL
EXHAUST, HOOD EXHAUST, AND MAKE UP
AIR VALVES ARE EXISTING TO BE ADJUSTED
FOR AIR BALANCING.
E. THE SPECIFIC WORK REQUIRED FOR THIS
PHASE IS LISTED IN THE KEYED NOTES
BELOW. ANY EQUIPMENT, DUCTWORK,
PIPING, ETC. NOT SPECIFICALLY LISTED IN
THE KEYED NOTES IS EXISTING.
1 1 1 1 1 1
1 1 1
GRAPHIC SCALE
1'-0'
POINT OF CONNECTION
EXIST. CHS
EXIST. CHR EXIST. CHS
EXIST. CHR
EXIST. ACCH-2
ACCH-1
EXIST. 150 (6") CHILLED WATER PIPING, 750 (30") BELOW GRADE
TRANS.
G
EN
EXIST. CHR
EXIST. CHSEXIST. CHR
EXIST. CHS
34'-1 1/2"
EXISTING THRUST BLOCK
EXISTING THRUST BLOCK
EXISTING THRUST BLOCK
SCALE:
BUILDING 11
MECHANICAL SITE PLAN
3/32" = 1'-0"
M-103
GENERAL NOTES
GRAPHIC SCALE
A. CONTRACTOR MUST PROTECT ALL EXISTING
HVAC EQUIPMENT, PIPING, VALVES,
CONTROLS, INSULATION, ETC. FROM ANY
DAMAGE OR CONTAMINATION.
B. HVAC SYSTEMS AND EQUIPMENT SHOWN ON
THIS DRAWING ARE APPROXIMATE.
CONTRACTOR SHALL FIELD VERIFY ALL
EXISTING CONDITIONS.
C. THE SPECIFIC WORK REQUIRED FOR THIS
PHASE IS LISTED IN THE KEYED NOTES
BELOW. ANY EQUIPMENT, DUCTWORK,
PIPING, ETC. NOT SPECIFICALLY LISTED IN
THE KEYED NOTES IS EXISTING.
1'-0'
KEYED NOTESX
EPM
REVISIONS
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
SAFETY & HEALTH
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
J:
\g re en w oo d\
J ob s\
U
SD
A B1
B
H
VA
C
R ep ai r G ai ne sv ille
F L\
W or ki ng F ol de r\M ec h\ B1
P1
\M
3- P1
.d w g M ay
4,
- 4 :0
9p m
COR
TEL
E. WILSON
E. WILSON
TBD
TBD 5/04/2026
Agricultural
Service Research
USDA ARS
5601 SUNNYSIDE AVENUE
RM 3-2102
BELTVILLE MD 20705
REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL
AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -
GAINESVILLE, FLORIDA
BTD
DKM
BUILDING 11 - PHASE 1
MECHANICAL SITE PLAN
M-103
1. PROVIDE AIR COOLED CHILLER AND ALL
APPURTENANCES ON EXISTING EQUIPMENT
PAD. RECONNECT TO EXISTING PIPING AND
CONTROLS TO ALLOW FOR A FULLY
FUNCTIONING CHILLED WATER SYSTEM.
POINT OF CONNECTION
H W
R
AI
R
VA
C
REFRIGERATED AIR
DRYERS (ETR)
EXPANSION
TANKS (ETR)
LABORATORY AIR
COMPRESSOR
(ETR)
LABORATORY AIR
COMPRESSOR
(ETR)
LABORATORY
VACUUM PUMP
(ETR)
LABORATORY
VACUUM PUMP
(ETR)
DOMESTIC WATER
HEAT EXCHANGER
(ETR)
DOMESTIC HOT WATER
STORAGE TANK
(ETR)
CP-2 (ETR)
CP-1 (ETR)
2"
HWS
HWR
P-7
V-1
(ETR)
BOILER B-1
H W
R
HWS
HWS
HWS
V-2
(ETR)
AS-2
(ETR)
C H
R
C H
S
H W
S
H W
R
H W
S
H W
S
H W
S
CHR
CHS
CHS
AS-1
CHR
CHRCHR
CHS
CHS
CHR
C H
S
C H
R
P-8
P-1
P-2 P-3B
P-3A
P-5A
P-5B
P-6
P-4
WH-1
(ETR)
EPM
REVISIONS
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
SAFETY & HEALTH
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
J:
\g re en w oo d\
J ob s\
U
SD
A B1
B
H
VA
C
R ep ai r G ai ne sv ille
F L\
W or ki ng F ol de r\M ec h\ B1
P1
\M -4
.d w g
M ay
4,
- 4
:0 9p m
COR
TEL
E. WILSON
E. WILSON
TBD
TBD 5/04/2026
Agricultural
Service Research
USDA ARS
5601 SUNNYSIDE AVENUE
RM 3-2102
BELTVILLE MD 20705
REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL
AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -
GAINESVILLE, FLORIDA
BTD
SCALE:
BUILDING 11
ENLARGED MECHANICAL ROOM DEMO
3/8" = 1'-0"
MD401
GRAPHIC SCALE
1'-0'
KEYED NOTESX
JND
BUILDING 11 - PHASE 1
ENLARGED MECHANICAL ROOM
M-401
STORAGE
ELECTRICAL RM.
112A
H
AN
D
IC
AP
PE
D T
O
IL
ET
M
EN
1A
H
AN
D
IC
AP
PE
D T
O
IL
ET
W O
M
EN
1B
MECHANICAL RM.
C O
R R
ID
O
R
1. PROVIDE PUMP AS SCHEDULED AND ALL
APPURTENANCES. CONNECT TO EXISTING
PIPING. PROVIDE FASTENERS AND
GASKETS. INSTALL PUMP ON EXISTING
CONCRETE PAD (IF APPLICABLE).
GENERAL NOTES
A. CONTRACTOR MUST PROTECT ALL EXISTING
HVAC EQUIPMENT, PIPING, VALVES,
CONTROLS, INSULATION, ETC. FROM ANY
DAMAGE OR CONTAMINATION.
B. HVAC SYSTEMS AND EQUIPMENT SHOWN ON
THIS DRAWING ARE APPROXIMATE.
CONTRACTOR SHALL FIELD VERIFY ALL
EXISTING CONDITIONS.
C. THE SPECIFIC WORK REQUIRED FOR THIS
PHASE IS LISTED IN THE KEYED NOTES
BELOW. ANY EQUIPMENT, DUCTWORK,
PIPING, ETC. NOT SPECIFICALLY LISTED IN
THE KEYED NOTES IS EXISTING.
POINT OF CONNECTION
1. PLENUM FAN
2. OPENING TOP 40x30
3. LIGHT SWITCH AND/OR RECEPTACLE RH
4. EXTERNAL VFD RH
5. EXTERNAL UNIT CONTROLLER LH
6. COOLING COIL
7. HEATING COIL
8. 1" N.P.T.E.
9. MARINE LIGHT
10. CARTRIDGE FILTERS
EPM
REVISIONS
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
SAFETY & HEALTH
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
J:
\g re en w oo d\
J ob s\
U
SD
A B1
B
H
VA
C
R ep ai r G ai ne sv ille
F L\
W or ki ng F ol de r\M ec h\ B1
P1
\M -5
-P
1.
dw g M ay
4,
- 4 :0
9p m
COR
TEL
E. WILSON
E. WILSON
TBD
TBD 5/04/2026
Agricultural
Service Research
USDA ARS
5601 SUNNYSIDE AVENUE
RM 3-2102
BELTVILLE MD 20705
REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL
AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -
GAINESVILLE, FLORIDA
BTD
DKM
BUILDING 11 - PHASE 1
MECHANICAL DETAILS
M-501
SCALE:
AIR COOLED CHILLER DETAIL
NO SCALE
M-501
PLAN
SOUTH ELEVATION EAST ELEVATIONWEST ELEVATION
POWER CONNECTION
(FAR SIDE)
6" INLET WATER
CONNECTION
6" OUTLET WATER
CONNECTION
28'-2 1/4"
7'-4"
OPERATOR INTERFACE
WATER CONNECTION
PLAN
SOUTH ELEVATION
SCALE:
AIR HANDLING UNIT DETAIL
NO SCALE
M-501
6 7
EXISTING
CONCRETE
PAD
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
J:
\g re en w oo d\
J ob s\
U
SD
A B1
B
H
VA
C
R ep ai r G ai ne sv ille
F L\
W or ki ng F ol de r\M ec h\ B1
P1
\M -5
-P
1.
dw g M ay
4,
- 4 :0
9p m
COR
TEL
E. WILSON
E. WILSON
TBD
TBD 5/04/2026
Agricultural
Service Research
USDA ARS
5601 SUNNYSIDE AVENUE
RM 3-2102
BELTVILLE MD 20705
REPAIR HVAC SYSTEM, BULDINGS 1 AND 11 CENTER FOR MEDICAL
AGRICULTURAL AND VETENARY ENTOMOLOGY (CMAVE) -
GAINESVILLE, FLORIDA
BTD
DKM
BUILDING 11 - PHASE 1
MECHANICAL DETAILS
M-502
ROOF RAILS, REFER TO
ARCHITECTURAL DETAILS
1-5/8" x 12 GAUGE STRUT CHANNEL
EQUAL TO UNISTRUT P1000T
2 HOLE POST BASE EQUAL TO
UNISTRUT P2941
STRAP DUCT TO FRAME WITH
16 GA STRAPPING MINIMUM
STAINLESS STEEL EXHAUST
DUCT PER PLANS
ANGLE BRACKET EQUAL TO
UNISTRUT P1325. PROVIDE
CHANNEL NUTS AND BOLTS
ROOF
BIRD SCREEN
MOTOR
STAINLESS STEEL BACKDRAFT DAMPER
EXISTING EXHAUST DUCT
SECURE FAN TO CURB
ROOF
VIBRATION ABSORBING
MOUNT
DUCT
FASTENING
FLANGE
MANUFACTURER PROVIDED ROOF CURB
ACCESS PANEL
B O
T T O
M I
N
LE
T
BYPASS DAMPER
(22 wt ea)
ISOLATION DAMPER
(81 wt ea)
MOTOR COVER
BYPASS
WEATHERHOOD
W/ BIRD SCREEN
(97 wt ea)
BYPASS AIR PLENUM
(600 wt ea)
B O
T T O
M I
N
LE
T
ROOF CURB
(171 wt ea)
DISCONNECT SWITCH
DRAIN HOLE
1/2 INCH FPT
FAN WITH MOTOR
(785 wt Blower ea) (225 wt Motor ea) (27 wt Drive ea)
LIFTING LUG
NOZZLE
(108 wt ea)
ROOF RAILS, REFER TO
ARCHITECTURAL DETAILS
1-5/8" x 12 GAUGE STRUT CHANNEL
EQUAL TO UNISTRUT P1000T
2 HOLE POST BASE
EQUAL TO UNISTRUT
P2941
45°BRACKET EQUAL TO
UNISTRUT P1546
VARIABLE SPEED DRIVE
ENCLOSURE PER
EQUIPMENT SCHEDULES
MOUNT TOP OF VFD ENCLOSURE
AT 60" ABOVE ROOF SURFACE
ROOF TOP CONSTRUCTION
A. FABRICATION AND ERECTION SHALL BE GOVERNED BY THE
REQUIREMENTS OF THE AMERICAN INSTITUTE OF STEEL
CONSTRUCTION.
B. ALL STRUCTURAL STEEL SHALL CONFORM TO ASTM:
A36 - M,S,HP,C,MC,L-SHAPES
A500 B - TUBES (HSS)
C. ALL WELDING SHALL BE PERFORMED BY CERTIFIED WELDER
AND PERFORMED IN ACCORDANCE WITH AWS D1.1. WELDING
MATERIALS SHALL BE E70XX AND BE COMPATIBLE WITH BASE
METAL MATERIALS.
D. FIELD VERIFY ALL DIMENSIONS PRIOR TO BEGINNING
FABRICATION.
E. THE CONTRACTOR SHALL PROVIDE A FIRE WATCH DURING
ALL HOT WORK INCLUDING BUT NOT LIMITED TO WELDING
OPERATIONS. SUITABLE FIRE EXTINGUISHING EQUIPMENT
SHALL BE MAINTAINED IN A STATE OF READINESS FOR
INSTANT USE.
F. THE BUILDING SHALL REMAIN WATERTIGHT DURING AND
THROUGH THE COMPLETION OF CONSTRUCTION. THE
CONTRACTOR SHALL SEEK APPROVAL FROM THE BUILDING
OWNER FOR ANY WORK THAT INVOLVES A BUILDING
ENVELOPE PENETRATION.
G. PROVIDE EQUIPMENT MOUNTING WITH SEISMIC/VIBRATION
ISOLATI0N PER MANUFACTURER'S WRITTEN
RECOMMENDATIONS FOR THIS APPLICATION.
SCALE:
ROOF DUCT SUPPORT
NOT TO SCALE
M-502
SCALE:
DUPLEX LAB EXHAUST FAN DETAIL
NOT TO SCALE
M-502
SCALE:
DOWNBLAST ROOF EXHAUST FAN DETAIL
NOT TO SCALE
M-502
SCALE:
VFD SUPPORT DETAIL
NOT TO SCALE
M-502
AIR COOLED SCREW CHILLER SCHEDULE
MARK
BASIS OF DESIGN GENERAL DATA EVAPORATOR DATA COMPRESSOR DATA CONDENSER DATA ELECTRICAL DATA
OPERATING
WEIGHT
(LB)MFR MODEL NO.
NOMINAL
CAPACITY
(TONS)
REFRIGERANT
FLOW
(GPM) FLUID
MAX
PRESSURE
DROP
(FT H2O)
ENTERING
WATER
TEMPERATURE
(°F)
LEAVING
WATER
TEMPERATURE
(°F)
QUANTITY TYPE
MOTOR
CONTROL
TYPE
AMBIENT
TEMPERATURE
(°F)
FAN
QUANTITY VOLTAGE POWER
CONNECTIONS
UNIT
MCA
(AMPS)
UNIT
MOCP
(AMPS)
UNIT
SCCR
(AMPS)
ACCH-1 TRANE ACRC250 250 R513A 466 20% P.G. 8.5 56 43 2 VARIABLE
VOLUME VFD 95 12 460/3 1 486 600 65,000 16,500
NOTES
1. FACTORY MOUNTED CONTROL TRANSFORMER. CHILLER SHALL HAVE RAPID RESTART OPTION.
2. CHILLER SHALL HAVE A SHELL AND TUBE EVAPORATOR WITH 0.75" THICK INSULATION.
3. FACTORY MOUNTED SINGLE NON-FUSED DISCONNECT SWITCH WITH CIRCUIT BREAKER AND 115V FIELD POWERED CONVENIENCE OUTLET.
4. FACTORY MOUNTED BACNET INTERFACE CARD COMPATIBLE WITH EXISTING SITE ENERGY MANAGEMENT SYSTEM.
5. FACTORY MOUNTED CHILLED WATER FLOW SWITCH.
6. CHILLER CONTROL PANEL SHALL BE SELECTED FOR 125 F AMBIENT TEMPERATURE.
7. CHILLER SHALL HAVE VARIABLE SPEED CONTROL ON ALL CONDENSER FANS.
8. FACTORY MOUNTED COMPRESSOR HEATERS.
9. MECHANICAL CONTRACTOR SHALL INTERLOCK CHILLED WATER PUMPS WITH CHILLER.
10. PROVIDE CHILLER ELASTOMERIC ISOLATORS.
11. UNIT SHALL HAVE TWO REFRIGERANT CIRCUITS. EACH CIRCUIT SHALL INCLUDES COMPRESSOR SUCTION AND DISCHARGE SERVICE VALVES, LIQUID LINE SHUTOFF VALVE, REMOVABLE CORE FILTER, LIQUID LINE SIGHT GLASS, CHARGING PORT AND AN ELECTRONIC EXPANSION VALVE.
12. FACTORY START-UP. FIVE YEARS COMPLETE PARTS, REFRIGERANT, LABOR AND SERVICE WARRANTY.
13. CHILLER SHALL BE CERTIFIED BASED ON AHRI AND ASHRAE 90.1 STANDARDS.
14. CHILLER SHALL HAVE FACTORY MOUNTED PHASE PROTECTION WITH LED AND GROUND FAULT W/ GROUND FAULT PROTECTION FOR THE UNIT.
15. CHILLER MUST BE SHIPPED COMPLETELY WRAPPED IN HEAVY DUTY BAG TO PROTECT FROM ROAD DAMAGE, ROAD SALT, AND CONSTRUCTION DIRT.
16. CHILLER SHALL HAVE FACTORY MOUNTED COMPRESSOR AND CONDENSER FAN SOUND REDUCTION PACKAGE.
17. CHILLER SHALL BE SHIPPED FROM THE FACTORY WITH A FULL REFRIGERANT CHARGE.
NOTES:
1. PROVIDE SUPPLY AND RETURN SMOKE DETECTORS COMPATIBLE WITH EXISTING FIRE ALARM SYSTEM.
2. PROVIDE MIXING BOX SECTION WITH DAMPERS AND ACTUATORS COMPATIBLE WITH EXISTING BUILDING AUTOMATION SYSTEM, FILTER SECTION WITH MERV 8 PRE-FILTERS AND
MERV 13 SECONDARY FILTERS, PRE-HEAT SECTION, COOLING SECTION, HINGED AND LATCHED ACCESS SECTION, FAN SECTION AND DISCHARGE PLENUM. REFER TO ELEVATIONS
FOR CONFIGURATION DETAILS.
3. PROVIDE UNIT WITH HEAVY DUTY BASE RAIL. INSTALL ON 4" HIGH CONCRETE HOUSEKEEPING PAD.
4. UNIT SHALL BE SHIPPED IN MULTIPLE SECTIONS FOR FIELD ASSEMBLY TO ACCOMMODATE INSTALLATION IN BUILDING.
5. DOUBLE WALL CONSTRUCTION WITH FOAM INJECTED INSULATION.
6. PROVIDE STAINLESS STEEL SLOPED DRAIN PANS IN ALL COIL SECTIONS.
7. REUSE EXISTING VFD.
CENTRAL STATION AIR HANDLING UNIT SCHEDULE
MARK
BASIS OF DESIGN AIRFLOW DATA HOT WATER PRE-HEAT COIL DATA CHILLED WATER COOLING COIL DATA ELECTRICAL DATA
OPERATING
WEIGHT
(LB)
NOTES
MFR MODEL
NO.
SUPPLY
AIR FLOW
(CFM)
MINIMUM
OUTSIDE
AIR
(CFM)
ESP
(IN. WG)
TSP
(IN. WG)
FAN
QTY
FAN
MOTOR
POWER
(HP)
TOTAL
HEAT
(MBH)
ENTERING
WATER
TEMP
(°F)
LEAVING
WATER
TEMP
(°F)
WATER
FLOW
(GPM)
WATER
PRESSURE
DROP
(FT HD)
ENTERING
AIR
TEMP
(°F)
LEAVING
AIR
TEMP
(°F)
AIR
PRESSURE
DROP
(IN. WG)
TOTAL
COOLING
(MBH)
SENSIBLE
COOLING
(MBH)
ENTERING
WATER
TEMP
(°F)
LEAVING
WATER
TEMP
(°F)
WATER
FLOW
(GPM)
WATER
PRESSURE
DROP
(FT HD)
ENTERING
AIR
DRY BULB
(°F)
ENTERING
AIR
WET BULB
(°F)
LEAVING
AIR
DRY BULB
(°F)
LEAVING
AIR
WET BULB
(°F)
AIR
PRESSURE
DROP
(IN. WG)
VOLTAGE
(V/PH/Hz)
FLA
(AMPS)
MCA
(AMPS)
MAX
FUSE
(AMPS)
AHU-1 TRANE CSAA030 18,100 18,100 4.0 7.4 2 20 667 160 140 67 8 21 55 0.3 1592 872 44 59 222 14.6 98.2 79.3 55 54.9 1.9 460/3/60 52.65 65.65 110 4299 ALL
DKM
BUILDING 11 - PHASE 1
MECHANICAL SCHEDULES
M-601
EPM
REVISIONS
DESCRIPTION
SHEET
DATEP.A.
FIRM
U
NO.
D
REAL PROPERTY
SAFETY & HEALTH
A
DATE
PROJECT NO.
SUSDA
BY
OF
THE
DESIGNER
PROJECT MGR
JOB #
CHECKED BY
A-E FIRM
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson-McAdams
ARCHITECTS/ENGINEERS · PLANNING · SURVEYING · MANAGEMENT
J:
\g re en w oo d\
J ob s\
U
SD
A B1
B
H
VA
C
R ep ai r G ai ne sv ille
F L\
W or ki ng F ol de r\M ec h\ B1
P1
\M -6
-P
1.
dw g M ay
4,
- 4 :0
9p m
COR
TEL
E. WILSON
E. WILSON
TBD
TBD 5/04/2026
Agricultural
Service Research
USDA ARS
5601 SUNNYSIDE AVENUE
RM 3-2102
BELTVILLE MD 20705
REPAIR HVAC…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .