ASI-002 Revised Commissioning Spec.pdf
PDF 246 KB Posted
- Attached to
- Repair HVAC Systems, Gainesville, FL
- Solicitation number
- 1232SA26Q0704
About this file
This is an Architect's Supplemental Instructions (ASI) document that modifies Section 23 08 00 (Commissioning of Mechanical Systems) for the B1 & B11 HVAC Repair project at Gainesville, FL for the USDA ARS. Issued by The Johnson-McAdams Firm on 7/10/2026 as ASI Number 002, the document replaces the originally issued specification section with an updated version and requires contractor compliance without change to contract sum or time.
The specification establishes comprehensive commissioning requirements for HVAC systems, including mandatory sequencing and scheduling of functional performance testing after completion of equipment installation, cleaning, flushing, disinfection, calibration, and final Testing, Adjusting, and Balancing (TAB) reports. Required submittals with Government approval include test equipment product data, pipe flushing and water treatment reports, pre-functional checklists, seasonal and full-load test reports, and certificates of readiness. The contractor must provide all testing equipment with specified calibration standards: temperature sensors accurate to ±0.5°F with ±0.1°F resolution, and pressure sensors accurate to ±2.0 percent of measured value range. Pre-functional checklists must cover physical installation verification for ductwork, piping, equipment, fixtures, and controls, with validation by the Commissioning Agent (CxC), Mechanical Commissioning Specialist, Quality Control Manager, and trade subcontractors. Functional Performance Testing must be conducted with the CxC present, include manufacturer representatives for chillers, and employ 100 percent sampling unless deficiency rates allow reduced sampling. Seasonal and full-load performance tests must be executed and witnessed by the Contracting Officer, with reports submitted within 14 days of completion. The contractor is responsible for correcting all identified deficiencies, and the Contracting Officer may withhold payment for costs associated with re-testing, aborted tests, and government team expenses.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Document G710™ – 2017 Architect's Supplemental Instructions
PROJECT:
B1 & B11 HVAC Repair ASI INFORMATION:
Gainesville FL ASI Number: 002
Date: 7/10/2026
OWNER: USDA ARS ARCHITECT: The Johnson-McAdams Firm
The Contractor shall carry out the Work in accordance with the following supplemental instructions without change in Contract Sum or Contract Time. Proceeding with the Work in accordance with these instructions indicates your acknowledgment that there will be no change in the Contract Sum or Contract Time.
(Insert a detailed description of the Architect’s supplemental instructions and, if applicable, attach or reference specific exhibits.)
This ASI addresses Specification Section 23 08 00 Commissioning of Mechanical Systems. Replace the version of this section originally issued with the attached version.
ISSUED BY THE ARCHITECT:
The Johnson-McAdams Firm ARCHITECT (Firm name)
SIGNATURE
Thomas E. Lovelace, Prog Mgr
PRINTED NAME AND TITLE
7/10/2026
DATE
AIA Document G710™ – 2017. Copyright © 1979, 1992 and 2017 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects’ legal counsel, copyright@aia.org.
mailto:copyright@aia.org mailto:right@aia.org
Repair HVAC System, Bldgs. 1 and 11 3925
SECTION 23 08 00
COMMISSIONING OF MECHANICAL SYSTEMS
05/23, CHG 1: 08/24
PART 1 GENERAL
Building Commissioning is a systematic, quality-focused process for enhancing the delivery of a project that focuses on verifying and documenting that all of the commissioned systems and assemblies are planned, designed, installed, tested, operated, and maintained to meet the project requirements. The purpose is to reduce the cost and performance risks associated with delivering facilities projects, and to increase value to owners, occupants, and users.
1.1 SEQUENCING AND SCHEDULING
Complete functional performance testing prior to performance verification testing required by Section 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC. Complete the following prior to starting Functional Performance Tests of mechanical systems:
a. All equipment and systems completed, cleaned, flushed, disinfected, calibrated, tested, and operate in accordance with contract documents and construction plans and specifications
b. Final DALT Report submitted and approved in accordance with Section
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
c. Pre-final Testing, Adjusting, and Balancing Report submitted in accordance with Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Test Equipment ; G
SD-06 Test Reports
Pipe Flushing, Testing, And Water Treatment Reports ; G
Completed Pre-Functional Checklists ; G
Seasonal Test Report ; G
Full-Load Test Report ; G
SD-07 Certificates
Certificate Of Readiness ; G
SECTION 23 08 00 Page 1
REVISED 7-10-2026
1.3 ACCESSIBILITY REQUIREMENTS
Equipment, systems, and devices for commissioned systems must be accessible. Make necessary modifications if systems and devices are not accessible for inspections and testing.
Assist commissioning team in testing by removing equipment covers, opening access panels, and other required activities that assist with visual oversight. Furnish ladders, flashlights, meters, gauges, or other inspection equipment as necessary.
1.4 COORDINATION
Coordinate with the Commissioning Provider in accordance with the Commissioning Plan to schedule inspections as required to support the commissioning process. Furnish additional information requested by the Commissioning Provider . Coordinate scheduling of Functional Performance Testing with the commissioning team. Provide plans, reports, notes, and other documentation to the Commissioning Provider as specified in the commissioning plan, as it is completed.
1.5 PIPE FLUSHING, TESTING, AND WATER TREATMENT REPORTS
Test requirements are specified in Division 23 piping Sections. Prepare a pipe system cleaning, flushing, and hydrostatic testing log. Provide cleaning, flushing, testing, and water treatment log and final reports.
Include the following in the pipe system cleaning, flushing, and hydrostatic testing log:
a. Minimum flushing water velocity.
b. Water treatment reports.
c. Tracking checklist for managing and ensuring that all pipe sections have been cleaned, flushed, hydrostatically tested, and chemically treated.
1.6 CERTIFICATE OF READINESS
Submit Certificate of Readiness documentation for all equipment and systems including start-up reports; completed Pre-Functional Checklists;
Testing, Adjusting, and Balancing (TAB) Report; Issues Log; HVAC Controls Start-Up Reports. Do not schedule Functional Performance Tests for the system until the Certificate of Readiness for that system receives approval by the Government. The CxC, Quality Control Manager, and the Mechanical, Electrical, Controls, and TAB subcontractor representatives must sign and date the Certificate of Readiness.
PART 2 PRODUCTS
2.1 TEST EQUIPMENT
Provide all testing equipment required to perform testing for the systems to be commissioned, except for equipment specific to and used by TAB as required by Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC.
Provide a sufficient quantity of two-way radios for each subcontractor.
Submit list of Test Equipment and instrumentation to be used for testing including equipment/instrument identification number, equipment
SECTION 23 08 00 Page 2 application or planned use, manufacturer, make, model, and serial number, and calibration history with certificates. Also list special equipment and proprietary tools specific to a piece of equipment required for testing.
2.1.1 Proprietary Equipment
Provide manufacturer's proprietary test equipment and software required by any equipment manufacturer for programming and start-up, whether specified or not. Provide manufacturer test equipment, demonstrate its use, and assist in the commissioning process as needed. Provide data logging equipment and software required to test equipment.
2.1.2 Calibration and Accuracy
Comply with equipment manufacturer's test equipment calibration procedures and intervals. Recalibrate test instruments immediately after instruments have been repaired resulting from being dropped or damaged. Affix calibration tags to test instruments. Furnish calibration records to Contracting Officer upon request.
Provide all testing equipment of sufficient quality and accuracy to test and measure system performance with the tolerances specified. Unless otherwise noted, the following minimum requirements apply: Provide temperature sensors and digital thermometers with a certified calibration within the past year to an accuracy of 0.5 degrees F and a resolution of plus or minus 0.1 degrees F. Provide pressure sensors with an accuracy of plus or minus 2.0 percent of the value range being measured (not full range of meter) and calibrated within the last year.
PART 3 EXECUTION
3.1 MEETINGS
Provide timely updates on construction schedule changes to allow the Commissioning Provider to execute commissioning process efficiently.
Notify Contracting Officer of anticipated construction delays to commissioning activities not yet performed or not yet scheduled.
3.2 COMMISSIONING CONSTRUCTION OBSERVATION CHECKLISTS
Commissioning construction observation checklists include Pre-Functional Checklists and Functional Performance Test Checklists. Provide commissioning construction observation checklists for the Interim and Final Construction Phase Commissioning Plan.
3.2.1 Pre-Functional Checklists
The Pre-Functional Checklists must include items for physical inspection or testing that demonstrate that installation and start-up of equipment and systems is complete. Refer to paragraph PRE-FUNCTIONAL CHECKS.
Pre-functional checklists must be tailored to verify the specific installation requirements and details of the construction documents and manufacturer's instructions.
3.2.2 Functional Performance Test Checklists
Functional Performance Test Checklists must include procedures that explain, step-by-step, the actions and expected results that will
SECTION 23 08 00 Page 3 demonstrate that the system performs in accordance with the contract.
Refer to paragraph FUNCTIONAL PERFORMANCE TESTING. Include the following sections and details appropriate to the systems being tested in the Functional Performance Test Checklists:
a. Notable system features including information about controls to facilitate understanding of system operation and maintenance
b. Conclusions and recommendations. Conclusions must clearly indicate if system does or does not perform in accordance with contract requirements and specifications. Recommendation must clearly indicate that the system should or should not be approved by the Government.
c. Test conditions including date, beginning and ending time, and beginning and ending outdoor air conditions
d. Attendees
e. Identification of the equipment involved in the test
f. System feature identification
g. Point-to-point observations including demonstrating system flow meters and sensors have been calibrated and are correctly displayed on the Operator work station
h. Actuator operation observations demonstrating actuator responses to commands from the control system
i. As-found condition of the system operation
j. List of test items with step numbers along with the corresponding feature or control operation, intended test procedure, expected system response, and pass/fail indication.
k. Space for comments for each test item.
3.3 PRE-FUNCTIONAL CHECKS
Complete one Pre-Functional Checklist for each individual item of equipment or system for each system required to be commissioned including, but not limited to, ductwork, piping, equipment, fixtures, and controls.
Include manufacturer start-up checklists associated with equipment with the submission of the Pre-Functional Checklists. Provide manufacturer's installation manual for each type of unit. Indicate commissioning team member inspection and validation of each Pre-Functional Checklist item by initials. Validation of each Pre-Functional Checklist item by each team member indicates that item conforms to the contract documents and validated design in their area of responsibility. Commissioning Specialist validation of each Pre-Functional Checklist item indicates that each item has been installed correctly and in accordance with contract documents. Required commissioning team members for Pre-Functional Checks includes the CxC, Mechanical Commissioning Specialist, Quality Control Manager, sub-contractor representative for each trade responsible for construction/installation of the checklist item, and the TAB representative (for items impacting TAB). Submit the initialed and Completed Pre-Functional Checklists no later than 7 calendar days after completion of inspection of all checklists items for each system.
SECTION 23 08 00 Page 4
3.4 STARTUP AND INITIAL CHECKOUT
Document start-up and initial testing procedures, and include in the Completed Pre-Functional Checklists submittal, including:
a. Startup tests and factory testing reports.
b. Manufacturer's representative start-up, operating, troubleshooting and maintenance procedures.
c. Perform and clearly document system operational checks and quality control checks as they are completed, and providing a copy to the commissioning team.
d. Correct deficiencies and sign the Certificate of Readiness for each system before functional performance testing
3.5 DUCT AIR LEAKAGE TEST (DALT) REPORT REVIEW AND VERIFICATION
3.5.1 Duct Air Leakage Test (DALT) Report Review
The Mechanical System Technical Commissioning Specialist must review the pre-final DALT Report required by Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC. Identify any deficiencies to the Contracting Officer's Representative and the Contractor's Quality Control Personnel and include in the issues log. All deficiencies must be resolved prior to DALT Report approval.
3.5.2 Duct Air Leakage Test (DALT) Report Verification
The Mechanical System Technical Commissioning Specialist must witness the DALT Field Acceptance Testing specified by Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC and identify any deficiencies to the Contracting Officer's Representative and the Contractor's Quality Control Personnel and include in the issues log. All deficiencies must be resolved prior to DALT Report approval.
3.6 TESTING, ADJUSTING, AND BALANCING REPORT REVIEW AND VERIFICATION
3.6.1 Testing, Adjusting, and Balancing (TAB) Report Review
The Mechanical System Technical Commissioning Specialist must review the pre-final TAB Report required by Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC and identify any deficiencies to the Contracting Officer's Representative and the Contractor's Quality Control Personnel and include in the issues log. All deficiencies must be resolved prior to TAB Report approval.
3.6.2 Testing, Adjusting, and Balancing (TAB) Report Verification
The Mechanical System Technical Commissioning Specialist must witness the TAB Field Acceptance Testing specified by Section 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC and identify any deficiencies to the Contracting Officer's Representative and the Contractor's Quality Control Personnel and include in the issues log. All deficiencies must be resolved prior to TAB Report approval.
SECTION 23 08 00 Page 5
3.7 HVAC CONTROLS START-UP AND PERFORMANCE VERIFICATION TEST REVIEW
The Mechanical System Technical Commissioning Specialist must review the Start-Up Testing Report, PVT Procedures and PVT Reports, including endurance testing trend submittals, required by Section 23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC. The Mechanical System Technical Commissioning Specialist must review each submittal and identify any deficiencies to the Contracting Officer's Representative and the Contractor's Quality Control Personnel and include in the issues log. All deficiencies must be resolved prior to final acceptance.
3.8 FUNCTIONAL PERFORMANCE TESTING
Conduct Functional Performance Testing in accordance with this Section.
Prior to Functional Performance Testing, complete all prerequisites in accordance with paragraph SEQUENCING AND SCHEDULING. Demonstrate that all system components have been installed, that each control device and item of equipment operates, and that the systems operate and perform, including interactive operation between systems, in accordance with contract documents.
3.8.1 Test Scheduling and Coordination
Schedule and conduct Initial Functional Performance Tests as soon as all contract work is completed, regardless of the season . Develop and implement means of artificial loading to demonstrate, to a reasonable level of confidence, the ability of the HVAC systems to handle peak seasonal loads. Schedule Functional Performance Tests for each system only after the Certificate of Readiness has been approved by the Government for the system. Correct all deficiencies identified through any prior review, inspection, or test activity before the start of Functional Performance Tests.
Functional Performance Tests must be performed with the CxC present.
Government reserves the right to witness all tests. Coordinate test schedule with Government representatives.
3.8.2 Preparation
Put equipment and systems into operation and continue operation during each working day of functional performance testing, as required. Verify temperature and pressure taps in accordance with Contract Documents.
Provide a pressure/temperature plug at each water sensor which is an input point to control system.
Perform minor adjustments to equipment and systems during Functional Performance Tests as deemed necessary by the commissioning team. Where calibrated DDC sensors cannot be used to record test data, provide measuring instruments, logging devices, and data acquisition equipment to record data for the complete range of test data for the required test period.
3.8.3 Testing Procedures
Provide all necessary materials and system modifications to produce the necessary flows, pressures, temperatures, and other conditions necessary to execute the test according to the specified conditions. At completion of the test, return the affected building equipment and systems to their pre-test condition.
SECTION 23 08 00 Page 6
Follow the Functional Performance Test from the approved Final Construction Phase Commissioning Plan. Perform Functional Performance Tests for each item of equipment and each system required to be commissioned. Verify all sensor calibrations, control responses, safeties, interlocks, operating modes, sequences of operation, capacities, and all other performance requirements comply with contract, regardless of the specific items listed within the checklists provided. In general, testing must progress from equipment or components to subsystems to systems to interlocks and connections between systems. Commissioning Specialists are responsible for determining the order of components and systems to be tested.
Indicate validation of each item of equipment and systems tested by signature of each commissioning team member for each test. The Quality Control Representative, Commissioning Specialists, and Contracting Officer's Representative, if present, must indicate validation after the equipment and systems are free of deficiencies.
3.8.4 Simulating Conditions
Functional performance testing is conducted by simulating conditions at control devices to initiate a control system response. Before testing, calibrate all sensors, transducers and devices. Over-writing control input values through the control system is not acceptable unless approved by the Contracting Officer. Perform each test under conditions that simulate actual conditions as close as is practically possible. Specific examples of simulating conditions are provided below. Do not simulate conditions when damage to the system or building may result.
a. When varying static pressures inside ductwork cannot be simulated within the duct, and where a sensor signals the controls system to initiate sequences at various duct static pressures, it is acceptable to simulate the various pressures with a Pneumatic Squeeze-Bulb Type Signaling Device with gauge temporarily attached to the sensing tube leading to the transmitter. It is not acceptable to reset the various set-points, nor to simulate an electric analog signal (unless approved as noted above).
b. Dirty filter pressure drops can be simulated by partially blocking filter face.
c. Freeze-stat safeties can be simulated by packing portion of sensor with ice.
d. High outside air temperatures can be simulated with a hair blower.
e. Raising entering cooling coil temperatures by activating a heating/preheat coil can be used to simulate entering cooling coil conditions.
f. Do not use signal generators to simulate sensor signals unless approved by the Contracting Officer, as noted above, for special cases.
g. Control set points can be altered. For example, to see the air conditioning compressor lockout work at an outside air temperature below 55 degrees F, when the outside air temperature is above 55 degrees F, temporarily change the lockout set point to be 0 degrees F above the current outside air temperature. Caution: Set points are
SECTION 23 08 00 Page 7 not to be raised or lowered to a point to cause damage to the components, systems, or the building structure and contents.
h. Test duct mounted smoke detectors in accordance with the manufacturer's recommendations. Perform the tests with air system at minimum airflow condition.
i. Test current sensing relays used for fan and pump status signals to control system to indicate unit failure and run status by resetting the set point on the relay to simulate a lost belt or unit failure while the unit is running. Confirm that the failure alarm was generated and received at the control system. After the test is conducted, return the set point to its original set-point or a set-point as indicated by the Contracting Officer.
3.8.5 Manufacturer's Representative
Provide a factory trained representative authorized by the equipment manufacturer to perform Functional Performance Testing for the following equipment:
Chillers
Ensure the test representative reviews, approves, and signs the completed field test report. Include person's name with signatures.
3.8.6 Sample Strategy
Complete a Functional Performance Test Checklist for each item of equipment or system to be tested. During testing, Government representatives may select the specific equipment or system to be tested for sample sizes less than 100 percent.
3.8.6.1 100 Percent Sample Procedures
Systems or equipment for which 100 percent sample size are tested fail if one or more of the test procedures results in discovery of a deficiency and the deficiency cannot be resolved within 5 minutes during the test.
Re-test to the extent necessary to confirm that the deficiencies have been corrected without negatively impacting the performance of the rest of the system.
3.8.6.2 Less than 100 Percent Sample Procedures
Randomly test each sample group of identical equipment. If 10 percent of the units in the first sample fail the functional performance tests, test a second sample group, the same size as the first sample group. The second sample must not include any units from the first sample group.
If 10 percent of the units in the second sample fail, test all remaining units. If at any point frequent failures occur the CxC may stop the testing and require the contractor to perform and document a checkout of the remaining units prior to continuing functional testing.
3.9 RETESTING REQUIREMENTS
Abort tests if any deficiency prevents successful completion of the test or if any required commissioning team member is not present for the test.
SECTION 23 08 00 Page 8
Re-test only after all deficiencies identified during the original tests have been corrected.
Contracting Officer may withhold payment equivalent to lost time, re-testing, and aborted tests. These costs may include salary, travel costs, and per diem for Government team members. Correct deficiencies as identified by the commissioning team and retest the systems to be commissioned.
3.10 SYSTEM ACCEPTANCE
Systems may be partially accepted prior to seasonal testing if they comply with all construction contract and accepted design requirements that can be tested during initial Functional Performance Tests. All test procedures must be successful completed prior to full systems acceptance.
3.11 SEASONAL TESTS
Perform Initial Functional Performance Tests as soon as all contract work is completed, but prior to facility turnover, regardless of the season.
In addition to the Initial Functional Performance Tests, perform Functional Performance Tests of HVAC systems during peak heating and cooling seasons during outdoor air condition design extremes. Schedule Seasonal Functional Performance Tests in coordination with the Contracting Officer. Submit Seasonal Test Report within 14 days of test completion.
Include seasonal test report in the Updated Final Commissioning Report.
Execute seasonal functional performance testing, witnessed by the Contracting Officer. Correct deficiencies and make adjustments to O&M manuals and as-built drawings for applicable issues identified in any seasonal testing.
3.12 FULL-LOAD TESTS
Perform Initial Functional Performance Tests as soon as all contract work is completed, but prior to facility turnover. In addition to the Initial Functional Performance Tests, perform Functional Performance Tests of HVAC systems under full-load conditions. Schedule Full-Load Functional Performance Tests in coordination with the Contracting Officer. Submit Full-Load Test Report within 14 days of test completion.
Execute full-load functional performance testing, witnessed by the Contracting Officer. Correct deficiencies and make adjustments to O&M manuals and as-built drawings for applicable issues identified in any full load testing.
3.13 TRAINING
The Mechanical Systems Technical Commissioning Specialist must review the training plan required by Section 01 78 23 OPERATION AND MAINTENANCE DATA and identify any deficiencies to the Contracting Officer's Representative and the Contractor's Quality Control Personnel.
3.14 COMMISSIONING REPORT
Include all completed Pre-Functional Checklists and Functional Performance Checklists in the Commissioning Report. Include the approved TAB Report.
SECTION 23 08 00 Page 9
-- End of Section --
SECTION 23 08 00 Page 10
| ASI-002 |
| ISSUED BY THE ARCHITECT: |
| SIGNATURE |
| DATE |
| 23 08 00 |
| 23 08 00 - COMMISSIONING OF MECHANICAL SYSTEMS |
| PART 1 GENERAL |
| 1.1 SEQUENCING AND SCHEDULING |
| 1.2 SUBMITTALS |
| 1.3 ACCESSIBILITY REQUIREMENTS |
| 1.4 COORDINATION |
| 1.5 PIPE FLUSHING, TESTING, AND WATER TREATMENT REPORTS |
| 1.6 CERTIFICATE OF READINESS |
| PART 2 PRODUCTS |
| 2.1 TEST EQUIPMENT |
| 2.1.1 Proprietary Equipment |
| 2.1.2 Calibration and Accuracy |
| PART 3 EXECUTION |
| 3.1 MEETINGS |
| 3.2 COMMISSIONING CONSTRUCTION OBSERVATION CHECKLISTS |
| 3.2.1 Pre-Functional Checklists |
| 3.2.2 Functional Performance Test Checklists |
| 3.3 PRE-FUNCTIONAL CHECKS |
| 3.4 STARTUP AND INITIAL CHECKOUT |
| 3.5 DUCT AIR LEAKAGE TEST DALT REPORT REVIEW AND VERIFICATION |
| 3.5.1 Duct Air Leakage Test DALT Report Review |
| 3.5.2 Duct Air Leakage Test DALT Report Verification |
| 3.6 TESTING, ADJUSTING, AND BALANCING REPORT REVIEW AND VERIFICATION |
| 3.6.1 Testing, Adjusting, and Balancing TAB Report Review |
| 3.6.2 Testing, Adjusting, and Balancing TAB Report Verification |
| 3.7 HVAC CONTROLS START-UP AND PERFORMANCE VERIFICATION TEST REVIEW |
| 3.8 FUNCTIONAL PERFORMANCE TESTING |
| 3.8.1 Test Scheduling and Coordination |
| 3.8.2 Preparation |
| 3.8.3 Testing Procedures |
| 3.8.4 Simulating Conditions |
| 3.8.5 Manufacturer's Representative |
| 3.8.6 Sample Strategy |
| 3.8.6.1 100 Percent Sample Procedures |
| 3.8.6.2 Less than 100 Percent Sample Procedures |
| 3.9 RETESTING REQUIREMENTS |
| 3.10 SYSTEM ACCEPTANCE |
| 3.11 SEASONAL TESTS |
| 3.12 FULL-LOAD TESTS |
| 3.13 TRAINING |
| 3.14 COMMISSIONING REPORT |