Attachment 19 - Overhead Door Preventive Maintenance checklist.xls
XLS spreadsheet 45 KB Posted
- Solicitation number
- W912DY26RA076
About this file
This file is an Overhead Door Preventive Maintenance (PM) Checklist template used to document and track routine maintenance activities performed on overhead doors at Fort Hood. The checklist is designed to be completed by technicians during each preventive maintenance visit and includes fields for recording the building number, technician name, date, time in/out, total hours worked, and specific bay door number being serviced.
The checklist encompasses a comprehensive range of inspection and maintenance tasks including balancing and leveling doors, inspecting and straightening doors, cleaning and lubricating rollers, inspecting and replacing bolts as needed, lubricating hinges, door guides and pulleys, inspecting cables and drums, inspecting pins and cords, adjusting springs, checking panels for damage, and testing all operational systems (control switches, contacts, loops, photocells, limit switches, safety sensors, and warning lights). Additional maintenance items include inspection, cleaning, and lubrication of motors, chains, belts, and gears, as well as inspection of weather stripping and operators (open, close, stop functions). The checklist also requires CO sensor calibration and testing. The form includes a comments section for documenting findings and requires signature approval by Quality Assurance and Evaluation (QAE) personnel with options to accept or reject the work performed. This template supports the Fort Hood overhead door maintenance contract (W912DY26RA076), which covers preventive and corrective maintenance for approximately 3,375 overhead doors across the installation.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Attachment 19 - OVERHEAD DOOR PREVENTIVE MAINTENANCE (PM) CHECKLIST |
| BUILDING No. |
| TECHNICIAN NAME: DATE: |
| TIME IN: TIME OUT: TOTAL HOURS: |
| BAY DOOR NUMBER: |
| Balance and Level Doors |
| Inspect and Straighten Doors |
| Inspect, Clean and Lubricate Rollers |
| Inspect Bolts and/or Replace Damaged or Missing Bolts |
| Inspect and Lubricate All Hinges, Door Guides and Pulley's |
| Inspect All Cables and Drums |
| Inspect Pins and Cords |
| Inspect and Adjust Springs |
| Inspect Panels for Damage |
| Inspect Opertion of Control Switches |
| Inspect Operation of Contacts |
| Inspect Operation of Loops |
| Inspect Operation of Photocells |
| Inspect Operation of Limit Switches |
| Inspect Operation of Safety Sensors |
| Inspect Operation of Warning Lights |
| Inspect, Clean and Lubricate Motors |
| Inspect, Clean and Lubricate Chains |
| Inspect, Clean and Lubricate Belts |
| Inspect, Clean and Lubricate Gears |
| Inspect Weather Stripping |
| Inspect Operators: |
| a. Open |
| b. Close |
| c. Stop |
| CO Sensor Calibration & Testing |
| COMMENTS: |
| COMMENTS: |
| QAE Signature: Date: QAE Accept QAE Reject |