Attachment 19 Acronym List.pdf

PDF 294 KB Posted

Attached to
RFP - Space Test Experiments Platform (STEP) 2. 0 Federal contract opportunity
Solicitation number
FA880924RB001
Issued by
Department of the Air Force

About this file

This document is an Attachment 19 Acronym List for the Request for Proposal (RFP) for the Space Test Experiment Platform (STEP) 2.0 program, Solicitation #FA880924RB001. The STEP 2.0 program establishes a Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) contract to procure spacecraft and space access for science and technology experiments. The anticipated period of performance is a base period of 5 years with 1 option period of 5 additional years. The contract type is anticipated to be Firm Fixed Price, with a separate line item for a Not Separately Priced Data and Reports CLIN that may be either Firm Fixed Price or Cost Plus Fixed-Fee. Proposal submissions are due by July 12, 2024. The contracting activity is the Department of the Air Force.

View the file

Other files for this federal contract opportunity

Other files attached to RFP - Space Test Experiments Platform (STEP) 2. 0, newest first.
File Type Posted
Questions_Answers_Step2.0_28June24v2.pdf PDF
ATTACHMENT 9 - IDIQ SECTION L INSTRUCTIONS FOR PROPOSAL_v2.pdf PDF
Questions_Answers_Step2_28June24v2.pdf PDF
STEP 2.0_IDIQ_Section Jv2.pdf PDF
Solicitation FA880924RB0010001.pdf PDF
Questions_Answers_13Jun24.pdf PDF
Attachment 17 SF328-18b.pdf PDF
ATTACHMENT 12 Gateway Questionnaire_Response Form v2.pdf PDF
Attachment 13 Prior Customer Questionnaire v2.pdf PDF
FA880924RB001 RFP STEP 2.pdf PDF
Attachment 2 Systems Requirement Document (SRD) (3).pdf PDF
ATTACHMENT 5 Ordering Guide.pdf PDF
Attachment 15 IDIQ_CDRL Table.pdf PDF
Vendor_Registration.pdf PDF
ATTACHMENT 10 IDIQ SECTION M EVALUATION FACTORS.pdf PDF
Solicitation - FA880924RB001Final.pdf PDF
Attachment 4 DD254 FA880924RB001.pdf PDF
ATTACHMENT 9 - IDIQ SECTION L INSTRUCTIONS FOR PROPOSAL.pdf PDF
Attachment 12 Gateway Questionnaire_Response Form.pdf PDF
Attachment 13 Prior Customer Questionnaire.pdf PDF
Attachment 17 SF328-18b.pdf PDF
Attachment 20 Compliance-Reference Table.pdf PDF
Attachment 7 IDIQ_OCI Checklist.pdf PDF
Attachment 1 Statement of Work (SOW).pdf PDF
Attachment 3 Spacecraft and Ground Technical Specification Sheet (SGTSS).pdf PDF
Attachment 6 ON OFF RAMPING PROC.pdf PDF
ATTACHMENT 8 DD 2794 IDIQ CSDR Plan v2.xlsx XLSX spreadsheet
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Acquisition Delta, Innovation and Prototyping Space Test Program (STP)

Space Test Experiments Platform 2.0 (STEP 2.0)

Attachment 19 Acronym List

FA8809-24-R-B001

Version 1 Space Systems Command

Acquisition Delta, Innovation and Prototyping DoD Space Test Program

(SSC/SZIS)

Kirtland Air Force Base Albuquerque, NM 87117

STEP 2.0 IDIQ

Attachment 19 Acronym List FA8809-24-R-B001

Acquisition Delta, Innovation and Prototyping Space Test Program (STP)

Space Test Experiment Platform 2.0 (STEP 2.0)

SUBMITTED BY:

Date Signed

DAVID J. LORE, Major, USSF Program Manager, STEP 2.0

APPROVED BY:

Date Signed

BRIAN A. SHIMEK, Lt Colonel, USSF Director, DoD Space Test Program

Version Effective Date Prepared by Changes

1.0 10 May 2024 Maj LORE, DoD STP Document Creation

Acronym List FA8809-24-R-B001 Attachment 19

Table of Contents

1.0 A: _______________________________________________________________________ 5

2.0 B: _______________________________________________________________________ 5

3.0 C: _______________________________________________________________________ 5

4.0 D: _______________________________________________________________________ 6

5.0 E:________________________________________________________________________ 6

6.0 F: ________________________________________________________________________ 6

7.0 G: _______________________________________________________________________ 7

8.0 H: _______________________________________________________________________ 7

9.0 I: ________________________________________________________________________ 7

10.0 J: ________________________________________________________________________ 7

11.0 K: _______________________________________________________________________ 8

12.0 l: ________________________________________________________________________ 8

13.0 M: _______________________________________________________________________ 8

14.0 N: _______________________________________________________________________ 8

15.0 O: _______________________________________________________________________ 8

16.0 P: ________________________________________________________________________ 9

17.0 Q: _______________________________________________________________________ 9

18.0 R: _______________________________________________________________________ 9

19.0 S: ________________________________________________________________________ 9

20.0 T:_______________________________________________________________________ 10

21.0 U: ______________________________________________________________________ 11

22.0 V: ______________________________________________________________________ 11

23.0 W: ______________________________________________________________________ 11

24.0 X: ______________________________________________________________________ 11

25.0 Y: ______________________________________________________________________ 11

26.0 Z:_______________________________________________________________________ 11

1.0 A:

ACA ________________________________________________ Associated Contractor Agreements ADR ___________________________________________________Alternative Disputes Resolution AFFARS _____________________________ Air Force Federal Acquisition Regulation Supplement AFI ____________________________________________________________ Air Force Instruction AFMAN ___________________________________________________________ Air Force Manual AFRL _________________________________________________ Air Force Research Laboratories AFSPCMAN _________________________________________ Air Force Space Command Manual AIAA __________________________________ American Institute of Aeronautics and Astronautics AI&T __________________________________________________ Assembly, Integration, and Test ANSI ____________________________________________ American National Standards Institute AO _____________________________________________________________ Authorizing Official ATC ___________________________________________________________ Authority to Connect ATO ____________________________________________________________Authority to Operate ATP ___________________________________________________________ Authority to Proceed ASCA ____________________________________________ Agent of the Security Control Assessor ASME _______________________________________ American Society of Mechanical Engineers ASTM _______________________________________ American Society for Testing and Materials

2.0 B:

BER _________________________________________________________________ Bit-error-rate BOL ______________________________________________________________ Beginning of Life

3.0 C:

CAD ________________________________________________________ Computer-Aided Design CCB _____________________________________________________ Configuration Control Board CCSDS ___________________________________ Consultative Committee for Space Data Systems CDRL _________________________________________________ Contract Data Requirements List CM _______________________________________________________ Configuration Management CMP __________________________________________________ Configuration Management Plan CNSSP __________________________________ Committee on National Security Systems Policies COMSEC ___________________________________________________ Communications Security CONOPS ______________________________________________________ Concept of Operations CO _____________________________________________________________ Contracting Officer COR ________________________________________________ Contracting Officer Representative COTS ____________________________________________ Commercially Available Off-the-Shelf Crypto ___________________________________________________________ Cryptographic Unit CUI ________________________________________________ Controlled Unclassified Information CVCM _________________________________________ Collected Volatile Condensable Material CRWL ____________________________________________ Contractor Responsibility Watch List CSDR ________________________________________________ Cost and Software Data Reporting CWBS _____________________________________________ Contract Work Breakdown Structure

C&DH __________________________________________________ Command and Data Handling C/G _______________________________________________________________ Center of Gravity

4.0 D:

DAL ____________________________________________________________ Data Accession List dB ________________________________________________________________________ Decibel DCSA ___________________________________ Defense Counterintelligence and Security Agency DFARS ________________________________ Defense Federal Acquisition Regulation Supplement DAFFARS _____________ Department of the Air Force Federal Acquisition Regulation Supplement DNH __________________________________________________________________ Do No Harm DO _________________________________________________________________ Delivery Order DoD __________________________________________________________Department of Defense DoDI ______________________________________________________________ DoD Instruction DoDM ________________________________________________________________ DoD Manual DoD-SSP ______________________________________ Department of Defense Single Stock Point DoD-STD _____________________________________________________________ DoD Standard DSN ___________________________________________________________ Deep Space Network

5.0 E:

E3 _______________________________________________ Electromagnetic Environmental Effects ECB ______________________________________________________ Engineering Change Board ECD ______________________________________________________ Estimated Completion Date ECP ____________________________________________________ Engineering Change Proposal ECU _________________________________________________________ End Cryptographic Unit EDAC __________________________________________________ Error Detection And Correction EELV _____________________________________________ Evolved Expendable Launch Vehicle EIRP _______________________________________________ Equivalent Isotropic Radiated Power EM ________________________________________________________________ Electromagnetic EMC ___________________________________________________ Electromagnetic Compatibility EMI _____________________________________________________ Electromagnetic Interference EN _______________________________________________________________ Evaluation Notice EOL ___________________________________________________________________ End-of-Life EOLP ______________________________________________________________ End-of-Life Plan ESPA _______________________________________________ EELV Secondary Payload Adapter EU _______________________________________________________________ Engineering Unit

6.0 F:

FAR ___________________________________________________ Federal Acquisition Regulation FCC _____________________________________________ Federal Communications Commission FCT ______________________________________________________ Factory Compatibility Test FEA _________________________________________________________ Finite Element Analysis FEM ___________________________________________________________ Finite Element Model FFRDC ________________________________ Federally Funded Research and Development Center

FIST _____________________________________________________ Fully Integrated System Test FLHR ___________________________________________________ Funds and Labor Hour Report FMEA __________________________________________________ Failure Mode Effects Analysis FOPR _______________________________________________ Fair Opportunity Proposal Request FPR _________________________________________________________ Final Proposal Revision FRB ___________________________________________________________Failure Review Board

7.0 G:

GAO ________________________________________________ Government Accountability Office GEO __________________________________________________________ Geosynchronous Orbit GEVS _______________________________________ General Environmental Verification Standard GFP __________________________________________________ Government Furnished Property GSFC ____________________________________________________ Goddard Space Flight Center GOP __________________________________________________________Ground Operation Plan GN&C _______________________________________________ Guidance Navigation and Control GPS _______________________________________________________ Global Positioning System GSD __________________________________________________ Ground Specification Document GSE ______________________________________________________ Ground Support Equipment GSRR ______________________________________________ Ground Segment Readiness Review G/T __________________________________________________________________ Gain to Noise GTO _____________________________________________________ Geostationary Transfer Orbit

8.0 H:

HW _____________________________________________________________________ Hardware

9.0 I:

IATT _______________________________________________________ Interim Authority-to-Test IAW ____________________________________________________________ In Accordance With I&T _____________________________________________________________ Integration and Test ICD _______________________________________________________ Interface Control Document IDIQ _____________________________________________ Indefinite Delivery/Indefinite Quantity ILC _________________________________________________________ Initial Launch Capability IMS ______________________________________________________ Integrated Master Schedule IPMDAR Integrated Program Management Data and Analysis Report IPS _________________________________________________________ Integrated Payload Stack IPT _________________________________________________________ Integrated Product Team IRAD ______________________________________________ Internal Research and Development ISARB _________________________________________ International Space Access Review Board ISO ________________________________________________ International Standards Organization ITAR ___________________________________________ International Traffic in Arms Regulation IUID _______________________________________________________ Item Unique Identification

10.0 J:

11.0 K:

12.0 L:

LEO _______________________________________________________________ Low Earth Orbit LEOP _______________________________________________ Launch and Early Operation Phase LPTA _____________________________________________ Lowest Price Technically Acceptable LV ________________________________________________________________ Launch Vehicle

13.0 M:

MA ______________________________________________________________ Mission Assurance MAC _________________________________________________________ Multi Award Contract MIL-HDBK _______________________________________________________ Military Handbook MIL-PRF ____________________________________________ Military Performance Specification MIL-STD __________________________________________________________ Military Standard MM ______________________________________________________________ Mission Manager MOI _____________________________________________________________ Moments of Inertia MPE _________________________________________________ Maximum Predicted Environment MRAR ________________________________________________ Mishap Risk Assessment Report MRR _______________________________________________________Mission Readiness Review MSPSP ________________________________________ Missile System Pre-launch Safety Package M&P _________________________________________________________ Materials and Processes

14.0 N:

NASA _____________________________________ National Aeronautics and Space Administration NDA _______________________________________________________ Non-disclosure Agreement NDAA _____________________________________________ National Defense Authorization Act NISPOM ___________________________ National Industrial Security Program Operating Manual NIST ______________________________________ National Institute of Standards and Technology NMGRT __________________________________________________ New Mexico Gross Receipts NORR ___________________________________________ Nominal Operations Readiness Review NRL ______________________________________________________ Naval Research Laboratory NSA _______________________________________________________ National Security Agency NTIA _____________________________ National Telecommunication Information Administration

15.0 O:

OAP ___________________________________________________________ Orbit Average Power OCI __________________________________________________ Organizational Conflict of Interest ODAA _____________________________________ Office of the Designated Approving Authority ODMSP _____________________________________ Orbital Debris Mitigation Standard Practices OOH ____________________________________________________________ On-Orbit Handbook OV-1 _____________________________________________ High Level Concept Graphic Diagram

16.0 P:

PADR __________________________________________ Payload Accommodation Design Review PCO ____________________________________________________ Procuring Contracting Officer PCQ ____________________________________________________ Prior Customer Questionnaire PEO ________________________________________________________ Program Element Officer PGI ______________________________________________ Procedures, Guidance, and Information PI _____________________________________________________________ Principal Investigator PIEE ______________________________________ Procurement Integrated Enterprise Environment PIRR _____________________________________________ Payload Integration Readiness Review PL ________________________________________________________________________ Payload PLA _______________________________________________________________ Payload Adapter PLC _____________________________________________________________ Payload Contractor PLRD ________________________________________________ Payload Requirements Document PM _______________________________________________________________ Program Manager PMP ______________________________________________________ Program Management Plan POC _______________________________________________________ Payload Operations Center PoP ___________________________________________________________ Period of Performance PPIP ___________________________________________ Program Protection Implementation Plan Ps ____________________________________________________________ Probability of Success PSR _______________________________________________________________ Pre-Ship Review PUG ___________________________________________________________ Payload Users Guide

17.0 Q:

QASP ______________________________________________ Quality Assurance Surveillance Plan

18.0 R:

R&D ______________________________________________________ Research and Development RF ________________________________________________________________ Radio Frequency RFA ___________________________________________________ Radio Frequency Authorization RFP ___________________________________________________________ Request for Proposal RMF ____________________________________________________ Risk Management Framework RMP __________________________________________________________Risk Management Plan RVM ________________________________________________ Requirements Verification Matrix

19.0 S:

SAR _______________________________________________________ Safety Assessment Report SC ______________________________________________________________________ Spacecraft SCG _____________________________________________________ Security Classification Guide SDAR __________________________________________ Space Vehicle Debris Assessment Report SDP ______________________________________________________ Software Development Plan SE ______________________________________________________________ System Engineering SEIP ________________________________________________ Standard Electrical Interface Panel

SEM ______________________________________________________ System Engineering Model SEMP ____________________________________________ System Engineering Management Plan SERB _________________________________________________ Space Experiment Review Board SETA _____________________________________ Systems Engineering and Technical Assistance SFWC ______________________________________________ Spaceflight Worthiness Certification SGTSS _______________________________ Spacecraft and Ground Technical Specifications Sheet SGLS __________________________________________________ Space Ground Link Subsystem SIA ________________________________________________________Standard Interface Adapter SIRR ___________________________________________ Spacecraft Integration Readiness Review SMC _________________________________________________ Space and Missile Systems Center SMCI ______________________________________ Space and Missile Systems Center Instruction SMP ______________________________________________________ Software Management Plan SOH ________________________________________________________________ State of Health SOW _____________________________________________________________ Statement of Work SRD __________________________________________________ System Requirements Document SRR _____________________________________________________ System Requirement Review SSC _______________________________________________________ Space Systems Command SSCI _____________________________________________ Space Systems Command Instructions SSCMAN _____________________________________________ Space Systems Command Manual SSPP _____________________________________________________ System Safety Program Plan S&T _________________________________________________________Science and Technology STDN __________________________________ Spacecraft Tracking and Data Acquisition Network STEP _________________________________________________ Space Test Experiment Platform STP _____________________________________________________________ Space Test Program SV __________________________________________________________________ Space Vehicle SVC ________________________________________________________ Space Vehicle Contractor SV-1 _____________________________________________ System Interface Description Diagram SW ______________________________________________________________________ Software SZIS _______________________________________ Acquisition Delta, Innovation and Prototyping

20.0 T:

TAA ___________________________________________________ Technical Assistant Agreement TBD _____________________________________________________________ To Be Determined TBR _______________________________________________________________ To Be Reviewed TBS ________________________________________________________________ To Be Supplied TDR ______________________________________________________________ Test Data Review TDRS __________________________________________ Tracking and Data Relay Satellite System TML _______________________________________________________________ Total Mass Loss TOR ______________________________________________________ Technical Operating Report TPM ______________________________________________ Technical Performance Measurement TRR __________________________________________________________Test Readiness Review TS-SCI _________________________________ Top Secret / Sensitive Compartmented Information TT&C _______________________________________________ Telemetry Tracking and Command T-VAC ___________________________________________________________ Thermal / Vacuum

21.0 U:

US __________________________________________________________________ United States UTC _____________________________________________________ Universal Time Coordinated

22.0 V:

VCC ________________________________________________________ Vehicle Command Count

23.0 W:

WBS ______________________________________________________ Work Breakdown Structure

24.0 X:

25.0 Y:

26.0 Z:

1.0 A:
2.0 B:
3.0 C:
4.0 D:
5.0 E:
6.0 F:
7.0 G:
8.0 H:
9.0 I:
10.0 J:
11.0 K:
12.0 l:
13.0 M:
14.0 N:
15.0 O:
16.0 P:
17.0 Q:
18.0 R:
19.0 S:
20.0 T:
21.0 U:
22.0 V:
23.0 W:
24.0 X:
25.0 Y:
26.0 Z:
2024-05-10T09:53:14-0600
LORE.DAVID.JAMES.1395819158
2024-05-20T15:42:03-0600
SHIMEK.BRIAN.ANDREW.1252700109
Date1_af_date: 5/10/24
Date2_af_date: 5/20/24

File details come from the government source that posted it. Updated .