This document is an Attachment 15 IDIQ_CDRL Table that provides details on Contract Data Requirements List (CDRL) items for the Space Test Experiment Platform (STEP) 2.0 program. The STEP 2.0 program is a Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) contract with separate Delivery Orders to procure spacecraft and space access for science and technology experiments. The CDRL table lists over 100 data deliverables, such as technical reports, test plans, drawings, interface control documents, and management plans, with associated Data Item Descriptions (DIDs), frequencies, and due dates. The key details include contract types, period of performance, proposal due date, and the government agency involved (Department of the Air Force). The document references the associated federal contract opportunity, which is a Request for Proposal (RFP) for the STEP 2.0 program.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 15 IDIQ_CDRL Table_20240116STEP 2.0
SOW CDRL Title CDRL DID/Authority Title DID/Authority Frequency
8.2.2 Command and Telemetry Formats , Telemetry Engineering Convers ions and Timing A001 Technical Report - Study/Services DI-MISC-80508B 15 wd prior to PADR
8.3.2 SC Level Integration and Tes t Report A001 Technical Report - Study/Services DI-MISC-80508B 15 wd after Tes t Event
8.3.1 Component Tes t Plan Concept A002 Tes t Plan DI-NDTI-80566A Draft: 30 wd after ATP
Final: 90 wd after ATP
8.3.2 SC Level Integration and Tes t Plan A002 Tes t Plan DI-NDTI-80566A 15 wd prior to SIRR
8.2.6 Thermal Analys is Report A003 Sys tems Engineering Management Plan (SEMP) DI-SESS-81785A Initial: At PADR
Final: 15 wd after TVAC
8.2.2 Component / Subsys tem Specifications A004 Sys tem/Subsys tem Specification (SSS) DI-IPSC-81431A At SIRR
8.2.2 Integrated Avionics User Guide A005 Scientific and Technical Reports DI-MISC-80711A ASREQ
10.6 Required in the bulleted lis t, so it should be a CDRL B001 Report, Record of Meeting Minutes DI-ADMN-81505 7 wd after meeting
10.4.1 SV Tes t Readiness Review (TRR) Minutes B001 Report, Record of Meeting Minutes DI-ADMN-81505 7 wd after meeting
10.4.3 Test Data Review (TDR) Minutes B001 Report, Record of Meeting Minutes DI-ADMN-81505 7 wd after meeting
9.1.2 Payload Accommodation Des ign Review (PADR) Minutes B001 Report, Record of Meeting Minutes DI-ADMN-81505 7 wd after meeting
9.7 Payload Handling and Integration Plan B002 Technical Report - Study/Services DI-MISC-80508B 15 wd prior to PADR
10.6 Pre-Ship Review (PSR) Package B002 Technical Report - Study/Services DI-MISC-80508B 20 wd prior to PSR
10.4.2.1 Payload Functional Performance Tes t Report B002 Technical Report - Study/Services DI-MISC-80508B 15 wd after Tes t Event
9.1.1 Payload Users Guide (PUG) B003 Scientific and Technical Reports DI-MISC-80711A 30 wd after DO CA
10.4.3.1 Environmental Tes t and Inspection Report B004 Technical Report - Study/Services DI-MISC-80508B 15 wd after Tes t Event
10.1.1 SV Finite Element Verification Report (Cross-Orthogonality Matrix) B004 Technical Report - Study/Services DI-MISC-80508B At Tes t Data Review
10.4.1 SV Tes t Readiness Review (TRR) Package B004 Technical Report - Study/Services DI-MISC-80508B 20 wd prior to TRR
10.4.2 SV Assembly, Integration & Tes t (AI&T) Report B004 Technical Report - Study/Services DI-MISC-80508B 15 wd prior to PSR
10.4.3 Test Data Review (TDR) Package B004 Technical Report - Study/Services DI-MISC-80508B 20 wd prior to TDR
10.4.4 Week in the Life Tes t Report B004 Technical Report - Study/Services DI-MISC-80508B 15 wd after Tes t Event
10.4.5 SV-to-Ground Compatibility Tes t Report B004 Technical Report - Study/Services DI-MISC-80508B 15 wd after Tes t Event
10.4.2 SV Assembly, Integration, and Tes t (AI&T) Procedures B005 Tes t Plan DI-NDTI-80566A 20 wd prior to PIRR
10.4.2.1 Payload Functional Performance Tes t Procedures B005 Tes t Plan DI-NDTI-80566A 15 wd prior to Sys tem Level Functional Tes ting
10.4.3.1 Environmental Tes t Plan B005 Tes t Plan DI-NDTI-80566A 20 wd prior to TRR
10.4.4 Week in the Life Tes t Plan B005 Tes t Plan DI-NDTI-80566A 15 wd prior to Tes t Event
10.4.5 SV-to-Ground Compatibility Tes t Plan B005 Tes t Plan DI-NDTI-80566A 15 wd prior to Tes t Event
10.1.2 CAD Drawings B006 Product Drawings /Models and Associated Lis ts DI-SESS-81000F At PADR
10.3 Electrical and Mechanical Drawings / Schematics and Specifications B007 Developmental Des ign Drawings /Models and Associated Lis ts DI-SESS-81002F At PADR
9.1.2 Payload Accommodation Des ign Review (PADR) Package B008 Design Review Information Package (DRIP) DI-SESS-81757A 20 wd prior to PADR
10.4 SV Integrated Tes t Plan B009 Sys tems Engineering Management Plan (SEMP) DI-SESS-81785A 30 wd prior to PIRR
10.1.1 SV Finite Element Model (FEM) B010 Mathematical Model Finite Element Structural Report DI-GDRQ-81256B 20 wd prior to PADR
10.1.1 Correlated FEM Tes t Results B010 Mathematical Model Finite Element Structural Report DI-GDRQ-81256B At TDR
10.1.1 SV Finite Element Analys is (FEA) Report B010 Mathematical Model Finite Element Structural Report DI-GDRQ-81256B At PADR
10.1.3 SV Thermal Model B011 Mathematical Model Finite Element Analys is Report DI-GDRQ-81257A Initial: 20 wd prior to PADR
Test Correlated: At TDR
9.2 SC-to-PL ICD B012 Interface Control Document (ICD) DI-SESS-81248B Initial: At PADR
Final: At TDR
13.10 Miss ion Readiness Review (MRR) Minutes C001 Report, Record of Meeting Minutes DI-ADMN-81505 7 wd after meeting
13.10 Miss ion Readiness Review (MRR) Package C002 Technical Report - Study/Services DI-MISC-80508B 20 wd prior to MRR
13.2 Inputs , Launch Range Requirements C002 Technical Report - Study/Services DI-MISC-80508B Draft: L-12 mos
Final: L-6 mos
13.8 SV Launch Site Requirements Document C002 Technical Report - Study/Services DI-MISC-80508B Draft: L-18 mos
Final: L-12 mos
13.9 Inputs , Environmental Impact Analys is (AF 813) C002 Technical Report - Study/Services DI-MISC-80508B Draft: 15 wd prior to PADR
Final: L-12 mos
13.8.1 LV Site Integration and Tes ting Plan C003 Tes t Plan DI-NDTI-80566A 90 wd prior to PSR
13.8.1 LV Site Integration and Tes ting Procedures C003 Tes t Plan DI-NDTI-80566A 45 wd prior to PSR
14.1.4 Ground Segment Readiness Review (GSRR) Minutes D001 Report, Record of Meeting Minutes DI-ADMN-81505 7 wd after meeting
14.2.2 SV and Operations Training Material D002 Training Material DI-ILSS-80872 L-6 mos
15.1 Program Protection Implementation Plan (PPIP) D003 Program Protection Implementation Plan (PPIP) DI-ADMN-81306
Initial: 90 wd after ATP
Annual Update: On Anniversary Date of Award through end of firs t year of on-orbit operations
14.1.4 Ground Segment Readiness Review (GSRR) Package D004 Technical Report - Study/Services DI-MISC-80508B 20 wd prior to Review
14.1.5 Ground Segment Verification Tes t Report D004 Technical Report - Study/Services DI-MISC-80508B L-4 mos
14.2.1 Concept of Operations (CONOPS) D004 Technical Report - Study/Services DI-MISC-80508B 15 wd prior to PADR
14.2.3 Normal Operations Readiness Review (NORR) Package D004 Technical Report - Study/Services DI-MISC-80508B At day of Event
14.1.5 Ground Segment Verification Tes t Plan D005 Tes t Plan DI-NDTI-80566A 15 wd prior to Tes t Event
15.4 Cyber Security Implementation Plan D006 Cybersecurity Implementation Plan DI-MGMT-82002B Draft: 30 wd after ATP
Final: 90 wd after ATP
14.1.2 SV-to-Ground ICD D007 Interface Control Document (ICD) DI-SESS-81248B Intial: At TRR
Final: At GSRR
14.1.3 PL-to-Ground ICD D007 Interface Control Document (ICD) DI-SESS-81248B Initial: At TRR
Final: At GSRR
15.2 COMSEC Security Plan D008 Communication Security Sys tem Description DI-MCCR-80340 Draft: 30 wd after ATP
Final: 90 wd after ATP
15.2 Cryptographic Security Plan D008 Communication Security Sys tem Description DI-MCCR-80340 Draft: 30 wd after ATP
Final: 90 wd after ATP
15.3 COMSEC Key Management Plan D008 Communication Security Sys tem Description DI-MCCR-80340 Draft: 30 wd after ATP
Final: 90 wd after ATP
14.2.2 On Orbit Handbook (OOH) D009 Engineering Manual DI-TMSS-81723 10 wd prior to GSRR
14.2.2 SC Handbook D009 Engineering Manual DI-TMSS-81723 10 wd prior to GSRR
14.2.2 SV Command and Telemetry Handbook D009 Engineering Manual DI-TMSS-81723 10 wd prior to GSRR
14.1.6 Risk Management Framework (RMF) Package D010 DIACAP AND RMF Deliverable Data DI-MGMT-82000 Draft: 30 wd after ATP
Final: 90 wd after ATP
15.1 Security and Accreditation Plan D011
Contractor's Sys tems Security Plan and Associated Plans OfAction To Implement
NIST SP 800-171 on a Contractor's .
DI-MGMT-82247
Draft ASREQ
Final ASREQ
7.10 Special Studies E001 Scientific and Technical Reports DI-MISC-80711A ASREQ
6.2.3 Quarterly Management Meeting Minutes F001 Report, Record of Meeting Minutes DI-ADMN-81505 7 wd after meeting
6.2.5 SV and Ground Support Operations Working Group Minutes F001 Report, Record of Meeting Minutes DI-ADMN-81505 7 wd after meeting
6.3.1 Funds and Labor Hour Report (FLHR) F002 Funds and Labor Hour Expenditure Report (FLHR) DI-FNCL-81537 Initial: 16 wds after the firs t full accounting month
Final: 20 wd after the end of the second full accounting period
6.6.1 Item Unique Identification (IUID) Marking Activity, Validation and Verification Report F003 Item Unique Identification (IUID) Marking Activity, Validation and Verification
Report
DI-MGMT-81804A ASREQ
7.2.2 DAL F004 Data Access ion Lis t (DAL) DI-MGMT-81453B
Initial: 180 cd after ATP
Recurring: Semi-annually within 5 wd of the anniversary of the
ATP and the anniversary of the firs t submittal
6.3.3 Small Bus iness Subcontractor Report F005 Small Bus iness Subcontractor Report DI-MGMT-81642 Bi-Annual 1: NLT 6 March each year
Bi-Annual 2: NLT 6 October each year
6.4 Program Management Plan (PMP) F006 Management Plan DI-MGMT-81797 Draft: 30 wd after ATP
Final: 90 wd after ATP
7.2.3 Risk Management Plan (RMP) F007 Contractor's Risk Management Plan DI-MGMT-81808 Draft: 30 wd after ATP
Final: 90 wd after ATP
6.7 Space Debris Assessment Report (SDAR) and End of Life Plan (EOLP) (SDAR/EOLP) F008 Technical Report – Study/Services DI-MISC-80508B Draft: L-12 mos
Final: 60 wd prior to PSR
6.7 Inputs , Spaceflight Worthiness Certification (SFWC) F008 Technical Report – Study/Services DI-MISC-80508B Draft: L-12 mos
Final: 60 wd prior to PSR
7.2.6 Contamination Control Plan F008 Technical Report - Study/Services DI-MISC-80508B Draft: 30 wd after ATP
Final: 90 wd after ATP
7.2.8 EMI/EMC Des ign Practices and Control F008 Technical Report - Study/Services DI-MISC-80508B Draft: 30 wd after ATP
Final: 90 wd after ATP
6.7 Accident / Incident Report F009 Accident/Incident Report DI-SAFT-81563 Verbal notification within 24 hours after accident/incident;
Updates as information becomes available; By e-mail ASAP
7.2.1 System Engineering Management Plan (SEMP) F010 Sys tems Engineering Management Plan (SEMP) DI-SESS-81785A Draft: 30 wd after ATP
Final: 90 wd after ATP
7.2.2 Configuration Management Plan (CMP) F010 Sys tems Engineering Management Plan (SEMP) DI-SESS-81785A Draft: 30 wd after ATP
Final: 90 wd after ATP
7.9 Hardware/Sys tem Configuration Identification F010 Sys tems Engineering Management Plan (SEMP) DI-SESS-81785A Draft: 30 wd after ATP
Final: 90 wd after ATP
7.2.4 Contractor’s Software Management/Development Plan (SMP/SDP) F010 Sys tems Engineering Management Plan (SEMP) DI-SESS-81785A Draft: 30 wd after ATP
Final: 90 wd after ATP
7.2.7 Quality Assurance Plan F010 Sys tems Engineering Management Plan (SEMP) DI-SESS-81785A Draft: 30 wd after ATP
Final: 90 wd after ATP
7.2.7 Product Assurance Plan F010 Sys tems Engineering Management Plan (SEMP) DI-SESS-81785A Draft: 30 wd after ATP
Final: 90 wd after ATP
7.2.5 Parts , Materials & Process Control Plan F010 Sys tems Engineering Management Plan (SEMP) DI-SESS-81785A Draft: 30 wd after ATP
Final: 90 wd after ATP
7.6 Reliability Predictions F011 Reliability and Maintainability Predictions Report DI-SESS-81497B At PADR
7.6 Failure Mode, Effects and Analys is Report (FMEA) F012 Failure Mode, Effects and Critical Analys is Report (FMECA) DI-SESS-81495A At PADR
6.4 Integrated Master Schedule (IMS) F013 Technical Report - Study/Services DI-MISC-80508B Monthly - NLT 16 wd after the accounting period end date
6.7 System Safety Program Plan (SSPP) F014 Sys tem Safety Program Plan (SSPP) DI-SAFT-81626 Draft: 30 wd after ATP
Final: 90 wd after ATP
6.7 Preliminary Hazard Lis t F015 Sys tem Safety Hazard Analys is Report (SSHAR) DI-SAFT-80101C Initial: At PADR
Final: 60 wd prior to PSR
6.3.2 Contract Work Breakdown Structure (CWBS) F016 Contract Work Breakdown Structure (CWBS) DI-MGMT-81334D
Contractors shall be required to submit the CWBS Dictionary at frequencies specified in the AFCARC-approved contract
CSDR plan and in the contract.
6.3.2 Cost and Hour Report (Flexfile) F017 Cost and Hour Report (Flexfile) DI-FNCL-82162
Contractors shall be required to submit the Cos t and Hour
Report (FlexFile) at frequencies specified in the AFCARC-approved CSDR plan.
6.3.2 CSDR Technical Data Report F018 Technical Data Report DI-MGMT-82165
Contractors shall be required to submit Technical Data Reports at frequencies specified in the AFCARC-approved CSDR plan and in the contract.
7.8 Requirements Verification Matrix (RVM) F019 Recurring Hardware Requirements Verification Documentation DI-NDTI-81942
Initial: 15 wd prior to SIRR
Updated: 15 WD prior to Spacecraft Acceptance Review
Updated: 15 wd prior to PIRR
Updated: 15 wd prior to MRR
Final: 15 wd prior to NORR
6.7 Inputs , Miss ile Sys tem Pre-Launch Safety Package (MSPSP) F020 Mishap Risk Assessment Report (MRAR) DI-SAFT-81300B Draft: At SIRR
Final: L-6 mos
6.7 Safety Assessment Report (SAR) F021 Safety Assessment Report (SAR) DI-SAFT-80102C Draft: L-12 mos
Final: 60 wd prior to PSR
6.2.5 Ground Specification Document (GSD) F022 Technical Report - Study/Services DI-MISC-80508B 30 cd prior to PADR
7.7 Inputs , NTIA Allocation Reques t F022 Technical Report – Study/Services DI-MISC-80508B ASREQ
7.7 Inputs , E3 Analys is F022 Technical Report – Study/Services DI-MISC-80508B ASREQ
7.7 His torical Spectrum Documentation F022 Technical Report – Study/Services DI-MISC-80508B 20 wd after ATP
7.7 FCC Call Sign F022 Technical Report – Study/Services DI-MISC-80508B Upon FCC Licens ing
7.7 E3 Verification Procedures (E3VP) F023 Electromagnetic Environmental Effect (E3) Verification Procedures (E3VP) DI-EMCS-81541B ASREQ
7.7 E3 Integration and Analys is Report (E3IAR) F024
Electromagnetic Environmental Effect (E3) Integration and Analys is Report
(E3IAR)
DI-EMCS-81540B ASREQ
7.7 E3 Verification Report (E3VR) F025 Electromagnetic Environmental Effect (E3) Verification Report (E3VR) DI-EMCS-81542B ASREQ
7.4 System Engineering Model (SEM) F026 Sys tems Engineering Management Plan (SEMP) DI-SESS-81785A
Initial SAM; 30 wd prior to SRR
Draft SAM; 30 cd prior to PADR
Final SAM; at TDR
12 Transportation, Handling and Packaging Plan H001 Packaging Plan DI-PACK-80455 20 wd prior to PSR
11 Storage Plan H002 Sys tems Engineering Management Plan (SEMP) DI-SESS-81785A L-6 mos
8.1 Spacecraft and Ground Technical Specifications Sheet (SGTSS) J001 Scientific and Technical Reports DI-MISC-80711A 30 wd after IDIQ CA