Attachment 18 SOW_Seed Project.pdf

PDF 149 KB Posted

Attached to
SABER MACC Federal contract opportunity
Solicitation number
FA441923R0001
Issued by
Department of the Air Force Air Education and Training Command

About this file

This statement of work outlines requirements for renovating the roof of Building 72 at Altus Air Force Base in Oklahoma. The project involves removing the existing built-up roof that is approximately 30 years old and installing a new watertight built-up roof system with a 20-year warranty. Additional work includes replacing standing seam metal roofing, designing and installing new exterior gutters, replacing boiler flues and ventilation equipment, repairing exterior insulation and finish system damaged areas, and ensuring the building remains weather-tight during construction. The contractor must meet all applicable codes and standards, field-verify drawings, and complete any incidental work necessary. References listed provide additional criteria for roofing, structural engineering, and Altus AFB facility standards.

The related federal contract opportunity is a multiple award construction contract vehicle called SABER issued by the Air Force Air Education and Training Command to fulfill requirements at Altus Air Force Base, including the roof renovation project outlined in the statement of work.

View the file

Other files for this federal contract opportunity

Other files attached to SABER MACC, newest first.
File Type Posted
Attachment 14 SECTION L Instructions to Offerors.pdf PDF
Attachment 15 SECTION M Evaluation of Offerors.pdf PDF
FA441923R0001 Amendment 6.pdf PDF
Attachment 23 Questions and Answer Set 4.pdf PDF
Attachment 22 Questions and Answers Set 3.pdf PDF
Attachment 14 SECTION L Instructions to Offerors.pdf PDF
FA441923R0001 Amendment 5.pdf PDF
Attachment 15 SECTION M Evaluation of Offerors.pdf PDF
Attachment 1 MACC SABER SOW dated 24 February.pdf PDF
Attachment 14 SECTION L Instructions to Offerors.pdf PDF
Attachment 21 Questions and Answers Set 2.pdf PDF
Attachment 15 SECTION M Evaluation of Offerors.pdf PDF
Attachment 20 Bldg 72 Asbestos Drawing.pdf PDF
Attachment 1 MACC_SABER SOW_ Version 4.pdf PDF
Attachment 14 SECTION L Instructions to Offerors.pdf PDF
Questions and Answers.pdf PDF
Attachment 15 SECTION M Evaluation of Offerors.pdf PDF
Attachment 15 SECTION M Evaluation of Offerors.pdf PDF
Attachment 14 SECTION L Instructions to Offerors.pdf PDF
Attachment 11 Wage Determination OK20230039 dated 06 Jan 2023 Jackson Building.pdf PDF
Attachment 7 Wage Determination OK20230021 dated 06 Jan 2023 Garfield Highway.pdf PDF
Attachment 5 Wage Determination AR20230172 dated 06 Jan 2023 Sebastian Highway.pdf PDF
Attachment 19 Seed Project Drawnings.pdf PDF
Attachment 6 Wage Determination OK20230018 dated 06 Jan 2023 Jackson Highway.pdf PDF
Attachment 4 Wage Determination AR20230057 dated 06 Jan 2023 Sebastian Heavy.pdf PDF
Attachment 1 MACC_SABER SOW_ Version 3.pdf PDF
Released Solicitation - FA441923R0001.pdf PDF
READ ME - SABER FAQ.docx DOCX document
Attachment 9 Wage Determination OK20230036 dated 06 Jan 2023 Jackson Heavy.pdf PDF
Attachment 13 Wage Determination TX20230274 dated 06 Jan 2023 Wichita Building.pdf PDF
Attachment 8 Wage Determination OK20230034 dated 06 Jan 2023 Garfield Heavy.pdf PDF
Attachment 3 Wage Determination AR20230034 dated 06 Jan 2023 Sebastian Building.pdf PDF
Attachment 12 Wage Determination TX20230005 dated 06 Jan 2023 Wichita Heavy and Highway.pdf PDF
Attachment 17 Specifications.pdf PDF
Attachment 15 SECTION M Evaluation of Offerors.docx DOCX document
Attachment 2 Ordering Procedures.docx DOCX document
Attachment 10 Wage Determination OK20230038 dated 06 Jan 2023 Garfield Building.pdf PDF
Attachment 14 SECTION L Instructions to Offerors.docx DOCX document
Attachment 16 Off Ramp Procedures.docx DOCX document
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AGGN221036 Renovate Roof, B72

STATEMENT OF WORK

FOR THE REPAIR OF

RENOVATE ROOF, B72

AT

ALTUS AIR FORCE BASE, OKLAHOMA

Project Number:

AGGN221036

13 December 2022

1. BACKGROUND:

Built in 1956, this building has served many functions over the years. The built up roof was last replaced approximately 30 years ago and has little to no slope in many areas. This causes ponding, and internal leaking. The roof also has internal downspouts which will be abandoned. A hailstorm also damaged the EFIS in multiple areas. Per asbestos report (request report from CO if not attached), this roof may contain asbestos.

2. SCOPE:

As shown on drawings, provide a complete new watertight built-up roof system (BUR) with a no dollar limit (NDL) twenty (20) year warranty to include new cap trims, scuppers, gravel stops surrounding the roof drains, and providing sufficient vertical clearance and fasteners on flashing along curbs, edging and perimeter in accordance with UFC 3-110-03 Roofing. Replace all standing seam metal roof on building following base standards.

Design and submit drawings for new exterior gutter system. Provide new gravity ventilators and boiler flues. Properly dispose of asbestos roofing material properly per Altus AFB local regulations. Design and submit drawings for EFIS repair.

3. DESCRIPTION OF WORK:

a. Design roof per UFC 3-301-01, Structural Engineering, and Sheet Metal and Air

Conditioning Contractors National Association’s (SMACNA) Architectural Sheet Metal Manual (current edition).Perform required site visit(s) to verify work required according to the documents provided and obtain field information for basis of proposal and workplan. And UFC 3-110-03 Roofing.

i. Install new elastomeric mopping bitumen with a poly-felt-polyester BUR reinforcement with a protected membrane roof surface option.

ii. The new roof system shall withstand ultimate wind speed of 115 mph per UFC 3-301-01, Appendix E, Table E-1 Wind Loading Data Table

iii. The wall scuppers and interior drains shall provide minimum drainage requirement per UFC 3-110-03, Roofing, Section 3-3.5 and SMACNA rainfall intensity of 7.6 inches per hour. Removal and replacement of existing roof system

iv. Roof slope at a minimum shall be 1/8 inch is to 12”.

v. Provide 8” minimum vertical clearance along perimeters and curbs, and adequate fasteners for flashing. Torch apply flashing membrane. Apply roof cement on curbs.Work at elevations may be in excess of 15 feet

b. Remove roof system down to existing metal deck or substrate. Inform Contracting Officer (CO) or representative for any damage or deficiency on the metal deck or substrate.

c. Ensure that building remains weather-tight at all times before, during and after work, and anticipated bad weather.

d. Remove and install new single source three-ply styrene butadiene styrene (SBS) modified bitumen (MB) roof to include insulation, flashing and accessories according to UFC 3-110-03 change 2 Roofing, and UFGS 072200 and 075200

e. Remove and install new 22 Ga. manufactured finished gravel stops, metal flashing, and scupper per UFGS 024100 and 076000.

f. For roof penetrations refer also to UFGS 024100 and 233423.00 40:

i. Remove and install new boiler flues as needed to include new flashing and pitch pockets.

ii. Remove and re-install existing mechanical intake and exhaust to include new curb, flashing and cricket.

iii. Remove and re-install space heater flue to include new flashing and pitch pocket.

iv. Remove and install new flashing around all existing vent pipes

g. Remove and install new interior roof drainage system as needed in accordance with

UFGS 220000.

h. Exterior Insulation Finish System (EFIS) repair:

i. Identify best solution for repairing damaged sections of EFIS

ii. Repair EFIS damaged walls to match existing

4. PROJECT REQUIREMENTS:

a. Ensure that building remains weather-tight at all times before, during and after work, and anticipated bad weather.The Contractor shall coordinate the equipment/material lay down area prior to start of construction of the project.

b. Maintain a clean and dry surface prior to start of work.The facility may be occupied 24/7.

5. GENERAL REQUIREMENTS:

a. All work performed on this project shall meet all local, state, federal, Air Force and

DOD codes as well as adhere to all temporary environmental controls outlined in Specification Section 01 57 19.00 20.

b. The Government depends on the existing as-built drawings provided by previous Contractors for the accuracy. The Contractor is advised to field-verify all required information before providing a proposal.

c. The Contractor shall be required to accomplish various other small items of incidental work which may become necessary to complete the project in a satisfactory and workmanlike manner meeting the approval of the contracting officer or their designated representative. The Contractor shall include all such items of work as part of their detailed estimate for the work to be performed.

d. The Contractor shall provide all labor, materials, travel, equipment and supervision necessary to perform all work required for this project.

e. Damage to the building, utilities or any other element during the execution of this project shall be repaired and restored to its original condition by the Contractor provided workers, skilled in trades involved, at no additional cost to Government.

6. References:

The references listed below form a part of the required criteria for this project, and may not be all inclusive, nor the most current edition. The list does not relieve the contractor from ensuring the project meets all applicapble standards.

UFC 1-200-01 DOD Building Code General Requirements UFC 1-200-02 High Performance and Sustainable Building Requirements UFC 3-110-03 Roofing UFC 3-301-01 Structural Engineering Unified Facilities Guide Specifications (UFGS) Altus AFB Installation Facilities Standards (IFS) available at https://www.wbdg.org/ffc/af-afcec/installation-facilities-standards-ifs/altus-afb-ifs

Note: All references in the International Building Code to the International Electrical Code shall be considered to be references to NFPA 70. All references in the International Building Code to the International Fuel Gas Code shall be considered to be references to NFPA 54 and NFPA 58. All references in the International Building Code to the International Fire Code shall be considered to be references to Unified Facilities Criteria (UFC) 3-600-01

END OF SOW