This submittal list document outlines submittal requirements for the Repair Hangar Roof, B40 project solicited by the Department of the Air Force Air Education and Training Command. Key submittals include preconstruction schedules and lists, shop drawings, product data, samples, design data, test reports, certificates, manufacturer instructions, and operation and maintenance data. Submittals are required for roofing, metal wall panels, flashing and sheet metal, joint sealants, and paints and coatings. The related solicitation seeks bids to repair the hangar roof at H40 and amendments must be submitted by the revised response date.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repair Hangar Roof, B40 TYMX203906 1093906 February 06, 2020 8:21 AM
SUBMITTAL LIST
This report lists all the submittal numbers and descriptions found in the Section Submittal Articles, along with the Section and subpart in which the descriptions appear. The explanatory text immediately below each submittal description is for information only, and appears in the Submittal Procedure Section, but does not appear in the Sections listed in this report.
HINT: Double-clicking a Section number will open the Section in the Editor.
SD-01 Preconstruction Submittals
Preconstruction Submittals include schedules and a tabular list of locations, features, and other pertinent information regarding products, materials, equipment, or components to be used in the work.
SECTION: 01 11 00.10 SUBPART: 1.1
SECTION: 01 14 00 SUBPART: 1.2
SECTION: 01 30 00 SUBPART: 1.2
SECTION: 01 32 01.00 10 SUBPART: 1.2
SECTION: 01 32 16.00 20 SUBPART: 1.1
SECTION: 01 33 00 SUBPART: 1.2
SECTION: 01 33 16.00 10 SUBPART: 1.5
SECTION: 01 33 29 SUBPART: 1.3
SECTION: 01 35 26 SUBPART: 1.3
SECTION: 01 45 00.00 10 SUBPART: 1.2
SECTION: 01 45 00.10 20 SUBPART: 1.2
SECTION: 01 50 00 SUBPART: 1.2
SECTION: 01 57 20 SUBPART: 1.3
SECTION: 01 74 19 SUBPART: 1.4
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
SECTION: 07 22 00 SUBPART: 1.2
SECTION: 07 52 00 SUBPART: 1.3
SECTION: 07 60 00 SUBPART: 1.3
Submittal List
SECTION: 07 61 14.00 20 SUBPART: 1.4
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
SECTION: 01 78 00 SUBPART: 1.3
SECTION: 07 22 00 SUBPART: 1.2
SECTION: 07 52 00 SUBPART: 1.3
SECTION: 07 60 00 SUBPART: 1.3
SECTION: 07 61 14.00 20 SUBPART: 1.4
SECTION: 09 90 00 SUBPART: 1.2
SD-04 Samples
Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.
SECTION: 07 60 00 SUBPART: 1.3
SECTION: 07 61 14.00 20 SUBPART: 1.4
SECTION: 09 90 00 SUBPART: 1.2
SD-05 Design Data
Design calculations, mix designs, analyses or other data pertaining to a part of work.
SECTION: 01 33 16.00 10 SUBPART: 1.5
SECTION: 01 45 00.00 10 SUBPART: 1.2
SECTION: 07 52 00 SUBPART: 1.3
SECTION: 07 61 14.00 20 SUBPART: 1.4
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. Unless specified in another section, testing must have been within three years of date of contract award for the project.
SECTION: 01 35 26 SUBPART: 1.3
SECTION: 01 45 00.00 10 SUBPART: 1.2
SECTION: 01 50 00 SUBPART: 1.2
SECTION: 01 57 20 SUBPART: 1.3
SECTION: 01 57 20 SUBPART: 1.3
SECTION: 01 74 19 SUBPART: 1.4
SECTION: 06 10 00 SUBPART: 1.2
SECTION: 07 22 00 SUBPART: 1.2
SECTION: 07 61 14.00 20 SUBPART: 1.4
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that the product, system, or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
SECTION: 01 32 16.00 20 SUBPART: 1.1
SECTION: 01 35 26 SUBPART: 1.3
SECTION: 01 50 00 SUBPART: 1.2
SECTION: 01 57 20 SUBPART: 1.3
SECTION: 07 22 00 SUBPART: 1.2
SECTION: 07 52 00 SUBPART: 1.3
SECTION: 07 61 14.00 20 SUBPART: 1.4
SECTION: 09 90 00 SUBPART: 1.2
SD-08 Manufacturer's Instructions
Preprinted material describing installation of a product, system or material, including special notices and (SDS)concerning impedances, hazards and safety precautions.
SECTION: 01 78 00 SUBPART: 1.3
SECTION: 07 22 00 SUBPART: 1.2
SECTION: 07 52 00 SUBPART: 1.3
SECTION: 07 60 00 SUBPART: 1.3
SECTION: 07 61 14.00 20 SUBPART: 1.4
SECTION: 09 90 00 SUBPART: 1.2
SD-10 Operation and Maintenance Data
Data provided by the manufacturer, or the system provider, including manufacturer's help and product line documentation, necessary to maintain and install equipment, for operating and maintenance use by facility personnel.
SECTION: 01 78 00 SUBPART: 1.3
SECTION: 07 60 00 SUBPART: 1.3
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
SECTION: 01 33 16.00 10 SUBPART: 1.5
SECTION: 01 33 29 SUBPART: 1.3
SECTION: 01 74 19 SUBPART: 1.4
SECTION: 01 78 00 SUBPART: 1.3
SECTION: 07 52 00 SUBPART: 1.3
SECTION: 07 61 14.00 20 SUBPART: 1.4
SECTION: 09 90 00 SUBPART: 1.2