About this file
This document contains a cost estimate breakdown for the repair of a hangar roof at Joint Base San Antonio Randolph in Texas. The estimate includes line items for the deconstruction and removal of the existing built-up and wood roofing systems down to the steel decking, as well as the installation of new standing seam metal roof panels, gutters, downspouts, roof flashing, and related materials. Scaffolding and a crane crew are also included. Standard wages, insurance, overhead costs, and markup percentages have been applied to each line item according to the location in Texas. The total estimated project cost is $637,190.90.
The related federal contract opportunity is a solicitation from the Department of the Air Force for the repair of Hangar 40 under Solicitation FA301620R0045. Amendment 03 provides additional details for the project, which involves removing and replacing the hangar's roof system.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1093906 Repair Hangar Roof B 40 TYMX203906
Hangar 40 JBSA Randolph JBSA RandTX 78150
Data Release : Year 2020 Quarter 1 Unit Cost Estimate
Quantity
LineNumber
Line Sour ce
Description Crew
Daily Output
Labor Hours
Unit
Labor Type
Data Release
CCI Location Notes
92000 024210201010
Deconstruction of roofing and accessories, built-up roofs, up to 2 stories, excludes handling, packaging or disposal costs S.F. STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
2 024210201010 A Cleaning up, clean up after job completion, allow, max Job STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 017413200040]
1 024210201010 A
Workers' compensation &
employer's liability insurance, steel erection, structural Payroll STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 013113301600]
1 024210201010 A
Overhead & Profit, allowance to add to items in this book that do not include subs O&P, average % STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 013113800020]
1 024210201010 A
Mark-up, general Contractors mark-up for change of scope as bid, overtime work by general contractor, add % STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 013113500650]
1 024210201010 A
Main office expense, average for General Contractors as a percentage of annual volume, annual volume to $1,000,000, minimum % Vol. STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 013113400080]
1 024210201010 A
Workers' compensation &
employer's liability insurance, roofing Payroll STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 013113301500]
1 024210201010 A Construction management fees, for work to $1,000,000 Project STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 011131200090]
800 024210201020
Deconstruction of roofing and accessories, gutters, fascia and rakes, up to 2 stories, excludes handling, packaging or disposal costs L.F. STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
1 024210201020 A Cleaning up, clean up after job completion, allow, max Job STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 017413200040]
1 024210201020 A
Workers' compensation &
employer's liability insurance, steel erection, structural Payroll STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 013113301600]
1 024210201020 A
Overhead & Profit, allowance to add to items in this book that do not include subs O&P, average % STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 013113800020]
1 024210201020 A
Mark-up, general Contractors mark-up for change of scope as bid, overtime work by general contractor, add % STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 013113500650]
1 024210201020 A
Main office expense, average for General Contractors as a percentage of annual volume, annual volume to $1,000,000, minimum % Vol. STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 013113400080]
1 024210201020 A
Workers' compensation &
employer's liability insurance, roofing Payroll STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 013113301500]
1 024210201020 A Construction management fees, for work to $1,000,000 Project STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 011131200090]
46500 074113201060
Steel roofing panels, standing seam, painted finish, on substrate, 2" standing seam, 24 gauge S.F. STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
1 074113201060 A Cleaning up, clean up after job completion, allow, max Job STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 017413200040]
1 074113201060 A
Workers' compensation &
employer's liability insurance, steel erection, structural Payroll STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 013113301600]
1 074113201060 A
Overhead & Profit, allowance to add to items in this book that do not include subs O&P, average % STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 013113800020]
1 074113201060 A
Mark-up, general Contractors mark-up for change of scope as bid, overtime work by general contractor, add % STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 013113500650]
1 074113201060 A
Main office expense, average for General Contractors as a percentage of annual volume, annual volume to $1,000,000, minimum % Vol. STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 013113400080]
1 074113201060 A
Workers' compensation &
employer's liability insurance, roofing Payroll STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 013113301500]
1 074113201060 A Construction management fees, for work to $1,000,000 Project STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 011131200090]
90000 053123502400
Metal roof decking, steel, open type B wide rib, galvanized, over 500 Sq, 1-1/2" D, 22 gauge S.F. STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
1 053123502400 A Cleaning up, clean up after job completion, allow, max Job STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 017413200040]
1 053123502400 A
Workers' compensation &
employer's liability insurance, steel erection, structural Payroll STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 013113301600]
1 053123502400 A
Overhead & Profit, allowance to add to items in this book that do not include subs O&P, average % STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 013113800020]
1 053123502400 A
Mark-up, general Contractors mark-up for change of scope as bid, overtime work by general contractor, add % STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 013113500650]
1 053123502400 A
Main office expense, average for General Contractors as a percentage of annual volume, annual volume to $1,000,000, minimum % Vol. STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 013113400080]
1 053123502400 A
Workers' compensation &
employer's liability insurance, roofing Payroll STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 013113301500]
1 053123502400 A Construction management fees, for work to $1,000,000 Project STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 011131200090]
46500 024210202010
Deconstruction of wood components, roof sheeting, up to 2 stories, excludes handling, packaging or disposal costs S.F. STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
1 024210202010 A Cleaning up, clean up after job completion, allow, max Job STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 017413200040]
1 024210202010 A
Workers' compensation &
employer's liability insurance, steel erection, structural Payroll STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 013113301600]
1 024210202010 A
Overhead & Profit, allowance to add to items in this book that do not include subs O&P, average % STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 013113800020]
1 024210202010 A
Mark-up, general Contractors mark-up for change of scope as bid, overtime work by general contractor, add % STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 013113500650]
1 024210202010 A
Main office expense, average for General Contractors as a percentage of annual volume, annual volume to $1,000,000, minimum % Vol. STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 013113400080]
1 024210202010 A
Workers' compensation &
employer's liability insurance, roofing Payroll STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 013113301500]
1 024210202010 A Construction management fees, for work to $1,000,000 Project STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 011131200090]
1200 077123105400 Steel downspouts, galvanized, round, corrugated, 6" diameter, 28 gauge L.F. STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
1 077123105400 A Cleaning up, clean up after job completion, allow, max Job STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 017413200040]
900 077123302800 Galvanized steel gutters, half round or box, stock, 6" wide, 26 gauge L.F. STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
1 077123302800 A Cleaning up, clean up after job completion, allow, max Job STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
[Adjusted by 017413200040]
24 024119190840
Selective demolition, rubbish handling, dumpster, 40 C.Y., 10 ton capacity, weekly rental, includes one dump per week, cost to be added to demolition cost Week STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
800 024119255020 Selective demolition, saw cutting, wood sheathing, on roof, to 1" thick L.F. STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
400 070505100220
Selective demolition, thermal and moisture protection, flashing, sheet metal S.F. STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
20 073219104070
Roof tiles, pipe flashing tile w/rubber boot, 100% recycled copper, for 4-1/2" pipe Ea. STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
120 015419500500
Crane crew, daily use for small jobs, 80-ton truck-mounted hydraulic crane, portal to portal Day STD
Year 2020 Quarter
TEXAS / SAN ANTONIO (781-
782)
637190905196106857