This document is an attachment to a federal contract opportunity that contains Exhibit Line Item Numbers (ELINs) for non-recurring labor, materials, and equipment costs associated with an indefinite-delivery, indefinite-quantity (IDIQ) contract for automotive painting, refinishing, and mechanical repair services.
The contract opportunity is for a Facility Support Contract (FSC) to provide all labor, management, supervision, tools, materials, equipment, facilities, transportation, and other items necessary to perform autobody repair, painting, and refinishing services on government-owned automotive and similar vehicles for the Naval Facilities Engineering Command Southwest (NAVFAC SW) in the Southwest Region. The contract includes a base period and four one-year option periods, with a total not-to-exceed value of $75,000. There is also a 6-month extension of services at $15,000. The ELINs cover hourly labor rates for painters, body workers, and mechanics, as well as lump sum costs for additional labor, materials, and equipment. Pricing for the ELINs must be negotiated by the Contracting Officer.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| Non-recurring Cost Summary | |
| Period of Performance | Total Price |
| Base Period | $ 25,000.00 |
| Option Period One | $ 25,000.00 |
| Option Period Two | $ 25,000.00 |
| Option Period Three | $ 25,000.00 |
| Option Period Four | $ 25,000.00 |
| 52.217-8 | $ 15,000.00 |
| Total: | $ 75,000.00 |
ELINs-Base Period-IDIQ
| ATTACHMENT J-0200000-06 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N6247324R3206 |
| Line Item 0001- Non-Recurring Work - Base Period | |||||||
| PROVIDE PRICES FOR NON-RECURRING SERVICES- IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs A001 through A004 | |||||||
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Measure | Unit Price | Extended Price | |
| A001 | Unit Priced Labor Hour Work - Painter Automotive - Service Contract Act (SCA) - MUST BE NEGOTIATED BY KO. | Fully burdened labor rate for a vehicle painter. This rate is to include paint, all overhead, and consumable materials required to paint a vehicle. Consumable material are items such as primers, adhesives, tape, stir sticks, cleaners, sandpaper, thinner, drop cloths, rags, filters, etc. | |||||
| Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work. Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour. Task order completion times will be specified on each task order. | 500 | HR | $ - 0 | ||||
| A002 | Unit Priced Labor Hour Work - Vehicle Body Worker/ Paint Preparation - Service Contract Act (SCA) - MUST BE NEGOTIATED BY KO. | Fully burdened labor rate for a vehicle body worker. This rate is to include all overhead, and consumable materials required to perform body work, and/or prepare a vehicle for paint. Consumable material are items such as body fillers, primers, adhesives, tape, stir sticks, cleaners, sandpaper, thinner, drop cloths, rags, filters, etc. | |||||
| Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work. Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour. Task order completion times will be specified on each task order. | 500 | HR | $ - 0 | ||||
| A003 | Unit Priced Labor Hour Work - Motor Vehicle Mechanic - Service Contract Act (SCA) - MUST BE NEGOTIATED BY KO. | Fully burdened labor rate for a motor vehicle mechanic. This rate to include all overhead, and profit required for mechanical repair/installation of components associated with autobody repair. | |||||
| Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work. Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour. Task order completion times will be specified on each task order. | 300 | HR | $ - 0 | ||||
| A004 | Labor / Material / Equipment Cost - MUST BE NEGOTIATED BY KO. | Provide all labor, materials and equipment to perform work in accordance with the scope and delivery schedule negotiated per each order. These items are associated with autobody repair and paint not included in ELINs above. These may include items and/or components of mechanical systems or glass. i.e. power train, engine systems, steering, instrumentation, alighment, tires and wheels, glass, and/or specialty items or personnel. | 1 | LS | $ 25,000.00 | $ 25,000.00 | |
| Non-Recurring Total | $ 25,000.00 |
ELINs-Option One-IDIQ
| ATTACHMENT J-0200000-06 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N6247324R3206 |
| Line Item 0001- Non-Recurring Work - Option Period One | |||||||
| PROVIDE PRICES FOR NON-RECURRING SERVICES- IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs B001 through B004 | |||||||
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Measure | Unit Price | Extended Price | |
| B001 | Unit Priced Labor Hour Work - Painter Automotive - Service Contract Act (SCA) - MUST BE NEGOTIATED BY KO. | Fully burdened labor rate for a vehicle painter. This rate is to include paint, all overhead, and consumable materials required to paint a vehicle. Consumable material are items such as primers, adhesives, tape, stir sticks, cleaners, sandpaper, thinner, drop cloths, rags, filters, etc. | |||||
| Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work. Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour. Task order completion times will be specified on each task order. | 500 | HR | $ - 0 | $ - 0 | |||
| B002 | Unit Priced Labor Hour Work - Vehicle Body Worker/ Paint Preparation - Service Contract Act (SCA) - MUST BE NEGOTIATED BY KO. | Fully burdened labor rate for a vehicle body worker. This rate is to include all overhead, and consumable materials required to perform body work, and/or prepare a vehicle for paint. Consumable material are items such as body fillers, primers, adhesives, tape, stir sticks, cleaners, sandpaper, thinner, drop cloths, rags, filters, etc. | |||||
| Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work. Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour. Task order completion times will be specified on each task order. | 500 | HR | $ - 0 | $ - 0 | |||
| B003 | Unit Priced Labor Hour Work - Motor Vehicle Mechanic - Service Contract Act (SCA) - MUST BE NEGOTIATED BY KO. | Fully burdened labor rate for a motor vehicle mechanic. This rate to include all overhead, and profit required for mechanical repair/installation of components associated with autobody repair. | |||||
| Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work. Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour. Task order completion times will be specified on each task order. | 300 | HR | $ - 0 | $ - 0 | |||
| B004 | Labor / Material / Equipment Cost - MUST BE NEGOTIATED BY KO. | Provide all labor, materials and equipment to perform work in accordance with the scope and delivery schedule negotiated per each order. These items are associated with autobody repair and paint not included in ELINs above. These may include items and/or components of mechanical systems or glass. i.e. power train, engine systems, steering, instrumentation, alighment, tires and wheels, glass, and/or specialty items or personnel. | 1 | LS | $ 25,000.00 | $ 25,000.00 | |
| Non-Recurring Total | $ 25,000.00 |
ELINs-Option Two-IDIQ
| ATTACHMENT J-0200000-06 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N6247324R3206 |
| Line Item 0001- Non-Recurring Work - Option Period Two | |||||||
| PROVIDE PRICES FOR NON-RECURRING SERVICES- IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs C001 through C004 | |||||||
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Measure | Unit Price | Extended Price | |
| C001 | Unit Priced Labor Hour Work - Painter Automotive - Service Contract Act (SCA) - MUST BE NEGOTIATED BY KO. | Fully burdened labor rate for a vehicle painter. This rate is to include paint, all overhead, and consumable materials required to paint a vehicle. Consumable material are items such as primers, adhesives, tape, stir sticks, cleaners, sandpaper, thinner, drop cloths, rags, filters, etc. | |||||
| Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work. Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour. Task order completion times will be specified on each task order. | 500 | HR | $ - 0 | $ - 0 | |||
| C002 | Unit Priced Labor Hour Work - Vehicle Body Worker/ Paint Preparation - Service Contract Act (SCA) - MUST BE NEGOTIATED BY KO. | Fully burdened labor rate for a vehicle body worker. This rate is to include all overhead, and consumable materials required to perform body work, and/or prepare a vehicle for paint. Consumable material are items such as body fillers, primers, adhesives, tape, stir sticks, cleaners, sandpaper, thinner, drop cloths, rags, filters, etc. | |||||
| Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work. Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour. Task order completion times will be specified on each task order. | 500 | HR | $ - 0 | $ - 0 | |||
| C003 | Unit Priced Labor Hour Work - Motor Vehicle Mechanic - Service Contract Act (SCA) - MUST BE NEGOTIATED BY KO. | Fully burdened labor rate for a motor vehicle mechanic. This rate to include all overhead, and profit required for mechanical repair/installation of components associated with autobody repair. | |||||
| Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work. Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour. Task order completion times will be specified on each task order. | 300 | HR | $ - 0 | $ - 0 | |||
| C004 | Labor / Material / Equipment Cost - MUST BE NEGOTIATED BY KO. | Provide all labor, materials and equipment to perform work in accordance with the scope and delivery schedule negotiated per each order. These items are associated with autobody repair and paint not included in ELINs above. These may include items and/or components of mechanical systems or glass. i.e. power train, engine systems, steering, instrumentation, alighment, tires and wheels, glass, and/or specialty items or personnel. | 1 | LS | $ 25,000.00 | $ 25,000.00 | |
| Non-Recurring Total | $ 25,000.00 |
ELINs-Option Three-IDIQ
| ATTACHMENT J-0200000-06 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N6247324R3206 |
| Line Item 0001- Non-Recurring Work - Option Period Three | |||||||
| PROVIDE PRICES FOR NON-RECURRING SERVICES- IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs D001 through D004 | |||||||
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Measure | Unit Price | Extended Price | |
| D001 | Unit Priced Labor Hour Work - Painter Automotive - Service Contract Act (SCA) - MUST BE NEGOTIATED BY KO. | Fully burdened labor rate for a vehicle painter. This rate is to include paint, all overhead, and consumable materials required to paint a vehicle. Consumable material are items such as primers, adhesives, tape, stir sticks, cleaners, sandpaper, thinner, drop cloths, rags, filters, etc. | |||||
| Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work. Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour. Task order completion times will be specified on each task order. | 500 | HR | $ - 0 | ||||
| D002 | Unit Priced Labor Hour Work - Vehicle Body Worker/ Paint Preparation - Service Contract Act (SCA) - MUST BE NEGOTIATED BY KO. | Fully burdened labor rate for a vehicle body worker. This rate is to include all overhead, and consumable materials required to perform body work, and/or prepare a vehicle for paint. Consumable material are items such as body fillers, primers, adhesives, tape, stir sticks, cleaners, sandpaper, thinner, drop cloths, rags, filters, etc. | |||||
| Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work. Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour. Task order completion times will be specified on each task order. | 500 | HR | $ - 0 | ||||
| D003 | Unit Priced Labor Hour Work - Motor Vehicle Mechanic - Service Contract Act (SCA) - MUST BE NEGOTIATED BY KO. | Fully burdened labor rate for a motor vehicle mechanic. This rate to include all overhead, and profit required for mechanical repair/installation of components associated with autobody repair. | |||||
| Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work. Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour. Task order completion times will be specified on each task order. | 300 | HR | $ - 0 | ||||
| D004 | Labor / Material / Equipment Cost - MUST BE NEGOTIATED BY KO. | Provide all labor, materials and equipment to perform work in accordance with the scope and delivery schedule negotiated per each order. These items are associated with autobody repair and paint not included in ELINs above. These may include items and/or components of mechanical systems or glass. i.e. power train, engine systems, steering, instrumentation, alighment, tires and wheels, glass, and/or specialty items or personnel. | 1 | LS | $ 25,000.00 | $ 25,000.00 | |
| Non-Recurring Total | $ 25,000.00 |
ELINs-Option Four-IDIQ
| ATTACHMENT J-0200000-06 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N6247324R3206 |
| Line Item 0001- Non-Recurring Work - Option Period Four | |||||||
| PROVIDE PRICES FOR NON-RECURRING SERVICES- IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs E001 through E004 | |||||||
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Measure | Unit Price | Extended Price | |
| E001 | Unit Priced Labor Hour Work - Painter Automotive - Service Contract Act (SCA) - MUST BE NEGOTIATED BY KO. | Fully burdened labor rate for a vehicle painter. This rate is to include paint, all overhead, and consumable materials required to paint a vehicle. Consumable material are items such as primers, adhesives, tape, stir sticks, cleaners, sandpaper, thinner, drop cloths, rags, filters, etc. | |||||
| Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work. Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour. Task order completion times will be specified on each task order. | 500 | HR | $ - 0 | ||||
| E002 | Unit Priced Labor Hour Work - Vehicle Body Worker/ Paint Preparation - Service Contract Act (SCA) - MUST BE NEGOTIATED BY KO. | Fully burdened labor rate for a vehicle body worker. This rate is to include all overhead, and consumable materials required to perform body work, and/or prepare a vehicle for paint. Consumable material are items such as body fillers, primers, adhesives, tape, stir sticks, cleaners, sandpaper, thinner, drop cloths, rags, filters, etc. | |||||
| Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work. Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour. Task order completion times will be specified on each task order. | 500 | HR | $ - 0 | ||||
| E003 | Unit Priced Labor Hour Work - Motor Vehicle Mechanic - Service Contract Act (SCA) - MUST BE NEGOTIATED BY KO. | Fully burdened labor rate for a motor vehicle mechanic. This rate to include all overhead, and profit required for mechanical repair/installation of components associated with autobody repair. | |||||
| Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work. Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour. Task order completion times will be specified on each task order. | 300 | HR | $ - 0 | ||||
| E004 | Labor / Material / Equipment Cost - MUST BE NEGOTIATED BY KO. | Provide all labor, materials and equipment to perform work in accordance with the scope and delivery schedule negotiated per each order. These items are associated with autobody repair and paint not included in ELINs above. These may include items and/or components of mechanical systems or glass. i.e. power train, engine systems, steering, instrumentation, alighment, tires and wheels, glass, and/or specialty items or personnel. | 1 | LS | $ 25,000.00 | $ 25,000.00 | |
| Non-Recurring Total | $ 25,000.00 |
52.217-8 (6mo)
| ATTACHMENT J-0200000-06 |
| EXHIBIT LINE ITEM NUMBERS |
| SOLICITATION/CONTRACT #N6247324R3206 |
| Line Item 0001- Non-Recurring Work - 52.217-8 Extension of Services 6 Months | |||||||
| PROVIDE PRICES FOR NON-RECURRING SERVICES- IN ACCORDANCE WITH SECTION C, SPEC ITEM 4 | |||||||
| ELINs C001 through C004 | |||||||
| ELIN | Product Name | Description Extended | Estimated Quantity | Unit of Measure | Unit Price | Extended Price | |
| C001 | Unit Priced Labor Hour Work - Painter Automotive - Service Contract Act (SCA) - MUST BE NEGOTIATED BY KO. | Fully burdened labor rate for a vehicle painter. This rate is to include paint, all overhead, and consumable materials required to paint a vehicle. Consumable material are items such as primers, adhesives, tape, stir sticks, cleaners, sandpaper, thinner, drop cloths, rags, filters, etc. | |||||
| Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work. Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour. Task order completion times will be specified on each task order. | 250 | HR | $ - 0 | ||||
| C002 | Unit Priced Labor Hour Work - Vehicle Body Worker/ Paint Preparation - Service Contract Act (SCA) - MUST BE NEGOTIATED BY KO. | Fully burdened labor rate for a vehicle body worker. This rate is to include all overhead, and consumable materials required to perform body work, and/or prepare a vehicle for paint. Consumable material are items such as body fillers, primers, adhesives, tape, stir sticks, cleaners, sandpaper, thinner, drop cloths, rags, filters, etc. | |||||
| Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work. Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour. Task order completion times will be specified on each task order. | 250 | HR | $ - 0 | ||||
| C003 | Unit Priced Labor Hour Work - Motor Vehicle Mechanic - Service Contract Act (SCA) - MUST BE NEGOTIATED BY KO. | Fully burdened labor rate for a motor vehicle mechanic. This rate to include all overhead, and profit required for mechanical repair/installation of components associated with autobody repair. | |||||
| Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Item 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work. Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour. Task order completion times will be specified on each task order. | 150 | HR | $ - 0 | ||||
| C004 | Labor / Material / Equipment Cost - MUST BE NEGOTIATED BY KO. | Provide all labor, materials and equipment to perform work in accordance with the scope and delivery schedule negotiated per each order. These items are associated with autobody repair and paint not included in ELINs above. These may include items and/or components of mechanical systems or glass. i.e. power train, engine systems, steering, instrumentation, alighment, tires and wheels, glass, and/or specialty items or personnel. | 1 | LS | $ 15,000.00 | $ 15,000.00 | |
| Non-Recurring Total | $ 15,000.00 |
File details come from the government source that posted it. Updated .