Attachment_13_IA_C113_Progress_Schedule.pdf

PDF 181 KB Posted

Attached to
HVAC Replacement & Repairs and Building Automation Federal contract opportunity
Solicitation number
140A2325R0023
Issued by
Department of the Interior Bureau of Indian Affairs Bureau of Indian Education

About this file

The document is a Department of the Interior, Indian Affairs Contract Progress Schedule (Form IA-C113) template with detailed instructions for contractors on how to complete the form. The two-page document provides comprehensive guidance for tracking project work elements, including how to:

  • List major work elements in logical sequence
  • Assign percentage weights to each work element (totaling 100%)
  • Chart planned periodic progress across weekly columns
  • Report work progress at intervals established by the contracting officer
  • Prepare and submit revised schedules if contract modifications occur

The instructions emphasize the importance of accurate reporting, noting that progress percentages are used in contract administration and potential partial payment approvals. Contractors are required to prepare three copies of the form, submit them to the contracting officer, and carefully plan work to match the proposed schedule, with immediate reporting required if any delays are anticipated.

View the file

Other files for this federal contract opportunity

Other files attached to HVAC Replacement & Repairs and Building Automation, newest first.
File Type Posted
Sol_140A2325R0023_Amd_0005.pdf PDF
San_Simon_HVAC_Repair_and_Replacment_Amended_SOW_June_2025_Final_0004.pdf PDF
AHERA_Reinspection_Report__2022__San_Simon_School__5-6-25_0004.pdf PDF
Sol_140A2325R0023_Amd_0004.pdf PDF
San_Simon_BIE_Trip_Report_0003.pdf PDF
Sol_140A2325R0023_Amd_0003.pdf PDF
San_Simon_As-Built_Drawings_2025_0003.pdf PDF
Sol_140A2325R0023_Amd_0002.pdf PDF
Sol_140A2325R0023_Amd_0001.pdf PDF
Sol_140A2325R0023.pdf PDF
Attachment_1_San_Simon_HVAC_Repair_and_Replacement_SOW_Final.pdf PDF
Attachment_2_DSRM_Safety__Health_and_Accessibility_Guidelines_Architects__Engineers_May_2020.pdf PDF
Attachment_9_SF24_Bid_Bond.pdf PDF
Attachment_11_SF25A_Payment_Bond.pdf PDF
Attachment_3_DFMC_Health_and_Safety_Codes_and_Stds.pdf PDF
Attachment_8_Wage_Determination_AZ20250040_2-14-2025.pdf PDF
Attachment_12_SF1413_Statement_and_Acknowledgement.pdf PDF
Attachment_5_2007_School_Facilities_Design_Handbook.pdf PDF
Attachment_10_SF25_Performance_Bond.pdf PDF
Attachment_14__IA_C713_Progress_Report.pdf PDF
Attachment_17_IA_-_IEE_Representation_Form.pdf PDF
Attachment_16__Questions_and_Answers_Log.xlsx XLSX spreadsheet
Attachment_4_DSRM_Final_Inspection_and_Certificate_of_Occupancy_Guidelines.pdf PDF
Attachment_6_Guiding_principles_for_sustainable_federal_buildings_122020.pdf PDF
Attachment_7_IA_Form_3000v2_Material_Approval_Submittal.pdf PDF
Attachment_15_Min_Qualification_Standards_for_PM.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of the Interior, Indian Affairs

CONTRACT PROGRESS SCHEDULE

(See Contractor's Instructions on Reverse)

1. CONTRACT NO. 8. PROJECT TITLE 10. APPROVAL RECOMMENDED BY:

DATE SIGNED PROJECT ENGINEER / COR SIGNATURE

2. STARTING DATE

3. COMPLETION DATE 9. SUBMITTED BY:

4. PURCHASE REQUEST NO. DATE SIGNED CONTRACTOR'S NAME (Last, First, Middle Initial) ADDRESS (Street, City, State, Zip Code)

CONTRACTOR'S SIGNATURE 11. APPROVED BY:

5. PROJECT NO. DATE CONTRACTING OFFICER'S SIGNATURE

6. ACTUAL STARTING DATE

7. ACTUAL COMPLETION

LINE

NO

A

WORK ELEMENTS

B

C

WEEKS

D E F G H I J K L M N O P Q

FORM IA-C113

Page 1 of ____

INSTRUCTIONS TO CONTRACTORS

1. Prepare three copies of this form IA-C113, in accordance with these instructions, and submit to the contracting officer at the time stated in the contract or as established by the contracting officer.

2. Blocks 1, 2, and 3. Enter the contract number, starting date, and completion date as shown on the contract.

3. Block 8. Enter the title of the project as shown on the contract.

4. Block 9. Enter name and address of your firm. The three copies submitted to the contracting officer must be dated and signed by the contractor or an authorized representative of the firm.

5. Lines 1 through 12. Major elements of work (whether unit price or lump sum contract) such as excavation, concrete work, carpentry, engineering, installation of communication electronic facilities, etc., will be shown in Column B in logical sequence and in sufficient detail to identify the element. If the contract calls for more than 11 work elements, additional copies of this may be used as a continuation for the work elements.

6. The percentage of each listed work element to the complete job will be shown opposite each element in Column C. As an example, if 3 work elements are shown: excavation, concrete work, and backfill, and it is estimated that excavation is 50% of the total job, concrete 30%, and backfill 20%, these percentages will be shown opposite each element. The total must equal 100%.

7. Columns D through Q will be used to show planned periodic progress, as required by the contracting officer, during the period of the contract. Only the top half of the space under these columns will be used by contractors. Using the example cited above and assuming that the contract period for performance is 8 weeks, and it is planned to accomplish 10% of the excavation work the 1st week and 20%each week until excavation is complete, 10 would be shown in the upper half of Line 1 under Column D, 20 under Column E, and 20 under Column F for a total of 50%. If it is planned to accomplish the concrete work during the 4th, 5th, and 6th weeks in equal amounts, 10 would be entered under Columns G, H, and I on Line 2. Assuming the backfill will be accomplished during the 7th and 8th weeks, 10 would be entered under Columns J and K on Line 3. If the contract extends beyond 14 weeks, additional copies of this form may be used as a continuation of performance record.

8. Total amount of work planned at intervals as shown in Columns D through Q will be totaled and entered in the top half of the space under the appropriate column of Line 12. Again, using the example cited above, the totals under Columns D through K would read 10, 20, 20, 10, 10, 10, 10, 10 for a total of 100%. These totals will be used to plot an overlay graph using Lines 4 through 11, beginning with Column D and extending to the right the number of columns (weeks) authorized by the contract for performance time.

9. In the event the contract is modified by the contracting officer under terms of the contract, changing the progress of work as originally scheduled, adding or deleting work or changing the original completion date, a revised progress schedule will be prepared and submitted to the contracting officer for approval. In preparing the revised schedule, the amount of work completed will be considered, together with the changed new completion date set forth in the contract modification. Considering these factors, the work under the contract will be rescheduled over the new total performance time in the same manner that the original schedule was prepared. The new completion date will be entered in Block 3. "First Revised Schedule," "Second Revised Schedule," etc., will be entered to the left of the form title. Time of submission of the revised schedule will be determined by the contracting officer.

10. At such intervals as may be established by the contracting officer, the contractor will submit to the contracting officer the IA-C713 "Contract Progress Report," indicating the percentage of work accomplished for each work element during the established reporting period. Accurate reports are of the utmost importance to the contractor and to the Government, since the percentage of completion, or progress, thus reported is used in administration of the contract and may be used in connection with approval of partial payments under the contract. Care should be taken to plan the work in such manner that it can be accomplished as stated in this schedule. If, for any reason, it becomes known that any part of the progress under this contract will be delayed, this fact should be reported to the contracting officer immediately.