Attachment 12 - Cost Estimate Sheet.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Add/Repair Base Infrastructure Federal contract opportunity
- Solicitation number
- FA480320B0002
About this file
This document contains a cost estimate sheet and related federal contract opportunity solicitation. The cost estimate sheet provides pricing details for demolition, design, environmental surveys, clearing and grubbing, erosion control, fencing, roadway construction, and project supervision required to add and repair base infrastructure at Frierson Road on the north side of an air force base. The federal contract opportunity solicitation seeks bids for the same scope of work, including demolition of buildings, installation of new fencing and gates, roadway construction, and related tasks. The solicitation is set aside for historically underutilized business zones and will be awarded based on sealed bids considering only price. Interested parties must register on beta.sam.gov and subscribe to notices on that site. The awarded contractor must use the wide area workflow system and be registered there as well. Bids are due by May 20th to the 20th Contracting Squadron at Shaw Air Force Base. The opportunity is designated for the Department of the Air Force Air Combat Command.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| ` | ||||||||||||||
| Project: Add/Repair Base Infrastructure | ||||||||||||||
| Location: Frierson Rd. North Side of Base | ||||||||||||||
| VLSB -15-0007 | ||||||||||||||
| Project Engineer: | ||||||||||||||
| Department: | ||||||||||||||
| Contractor: 8-Apr-20 | ||||||||||||||
| Address: PR No.: | ||||||||||||||
| For Official Use Only | ||||||||||||||
| Reference | Line No. | Item | Unit of | |||||||||||
| Measure | Quantity | Material Costs | Labor Costs | Direct Cost | Line Total | |||||||||
| Unit Cost | Total | Labor Hours | Labor Cost | Labor-Hours | Avg. Rate ($/hr.) | Total | ||||||||
| ASBESTOS/LEAD SURVEY | ||||||||||||||
| Previous Projects | 1 | Survey | EA | $0.00 | 0.000 | $0.00 | ||||||||
| Estimated 6% of the skating rink and Furniture store will contain asbestos. | 2 | Abatement | SF | #DIV/0! | #DIV/0! | #DIV/0! | ||||||||
| DESIGN | ||||||||||||||
| estimated 8% | 3 | Civil Design | EA | $0.00 | 0.000 | $0.00 | ||||||||
| Estimate provided by CE environmental | 4 | Archaeological Study (Phase I and II) CLIN 0003 | EA | $0.00 | 0.000 | $0.00 | ||||||||
| Estimate provided by CE environmental | 5 | Wetlands delineation and credits | EA | $0.00 | 0.000 | $0.00 | ||||||||
| DEMO | ||||||||||||||
| Estimated weight, hauling, and fees at landfill | 6 | Well pump house with tank | SF | $0.00 | #DIV/0! | #DIV/0! | #DIV/0! | $0.00 | ||||||
| 7 | Skating Rink | SF | $0.00 | #DIV/0! | #DIV/0! | #DIV/0! | $0.00 | |||||||
| 8 | Standalone Concrete Slab | SF | $0.00 | #DIV/0! | #DIV/0! | #DIV/0! | $0.00 | |||||||
| 9 | Dog Kennel w/ concrete yard | SF | $0.00 | #DIV/0! | #DIV/0! | #DIV/0! | $0.00 | |||||||
| 10 | Furniture Store | SF | $0.00 | #DIV/0! | #DIV/0! | #DIV/0! | $0.00 | |||||||
| 11 | Fencing | LF | $0.00 | #DIV/0! | #DIV/0! | #DIV/0! | $0.00 | |||||||
| 12 | Trash Grate | LF | $0.00 | #DIV/0! | #DIV/0! | #DIV/0! | $0.00 | |||||||
| VLSB 15-0004 - Power Distribution | 13 | Primary Electrical lines | LF | $0.00 | #DIV/0! | #DIV/0! | #DIV/0! | $0.00 | ||||||
| CLEARING AND GRUBBING | ||||||||||||||
| Repair Base Pavements Contract | 14 | Tree Removal | EA | $0.00 | #DIV/0! | #DIV/0! | #DIV/0! | |||||||
| 15 | Clearing and grubbing | ACRE | $0.00 | #DIV/0! | #DIV/0! | #DIV/0! | ||||||||
| 16 | Erosion Control | ACRE | #DIV/0! | #DIV/0! | #DIV/0! | |||||||||
| EROSION CONTROL | ||||||||||||||
| 17 | Storm Water | LS | ||||||||||||
| 18 | Hydroseed | SY | #DIV/0! | #DIV/0! | #DIV/0! | |||||||||
| FENCING / GATES | ||||||||||||||
| Repair Base Pavements Contract | 19 | Fencing | LF | #DIV/0! | #DIV/0! | #DIV/0! | ||||||||
| 20 | K-12 Rolling Gate | EA | ||||||||||||
| 21 | Double Swing Gate | EA | #DIV/0! | #DIV/0! | #DIV/0! | |||||||||
| Previous Projects | 22 | Concrete Jersey Barriers | EA | #DIV/0! | #DIV/0! | #DIV/0! | ||||||||
| VLSB 14-0099 Rpr Perimeter Fence North (ATFP) | 23 | Trash Grate | LF | #DIV/0! | #DIV/0! | #DIV/0! | ||||||||
| ROADWAY | ||||||||||||||
| Repair Base Pavements Contract | 24 | Surface Prep | SF | #DIV/0! | #DIV/0! | #DIV/0! | ||||||||
| 25 | Crushed Stone | TON | #DIV/0! | #DIV/0! | #DIV/0! | |||||||||
| 26 | Surface Course | TON | #DIV/0! | #DIV/0! | #DIV/0! | |||||||||
| 27 | Paint | SF | #DIV/0! | #DIV/0! | #DIV/0! | |||||||||
| IMPROVED SURFACE | ||||||||||||||
| Repair Base Pavements Contract | 28 | Surface Prep | SF | #DIV/0! | #DIV/0! | #DIV/0! | ||||||||
| 39 | Crushed Stone | TON | #DIV/0! | #DIV/0! | #DIV/0! | |||||||||
| SUPERVISION | ||||||||||||||
| Previous Projects | 30 | Foreman | days | $0.00 | ||||||||||
| 31 | Project Manager | days | $0.00 | |||||||||||
| 32 | Project Superintendent | days | $0.00 | |||||||||||
| 33 | General Conditions | days | $0.00 | |||||||||||
| Totals: | $0.00 | $0.00 | $0.00 | $0.00 |
| Total Material Cost: | $0.00 |
| Total Labor Cost: | $0.00 |
| Direct Cost: | $0.00 |
| Total Line Item Cost: | $0.00 |
| Overhead: | $0.00 |
| Subtotal: | $0.00 |
| Profit: | $0.00 |
| Subtotal: |
| Bond: |
| Total Contract Price: |
FA480320B0001
Attachment 12
VLSB 15-0007
File details come from the government source that posted it. Updated .