ATTACHMENT 12 - CDS IDIQ - TASK ORDER 2 PRICE SCHEDULE.xlsx
XLSX spreadsheet 178 KB Posted
- Solicitation number
- 36C77620R0015
About this file
This document provides notice of an upcoming Clinical Decision Support Services solicitation from the Department of Veterans Affairs.
The VA Program Contract Activity Central anticipates soliciting proposals for a multiple-award, firm-fixed-price IDIQ contract to small businesses to provide subject matter expertise, policy guidance, and strategic recommendations regarding clinical decision support standards implementation for VA IT systems. The NAICS code is 541611 with a small business size standard of $16.5 million. The solicitation will be issued as a small business set-aside for 28 calendar days. The ordering period is for ten years and the effective period is for fifteen years. The scope includes providing the VHA Clinical Informatics and Data Management Office program with CDS services. The solicitation and amendments are estimated to be posted on August 11, 2018 on FEDBIZOPPS and the VA Vendor Portal where offers must be submitted. All offerors must be registered in SAM prior to award.
View the file
Other files
Show 40 more
Latest 50 of 54 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule
| PROCUREMENT SENSITIVE | Prepared By: | Apurva Desai | |
| FOUO | Date Revised: | 5/22/19 | |
| Version: | Version No 3.2 | ||
| CLIN: Contract Line Item Number | |||
| SLIN: Sub-line Item Number | |||
| NSP: Not Separately Priced |
| CONTRACT PERIOD: BASE PERIOD | |||||||||||||
| June 01, 2018 thru May 31, 2019(estimated) | Annual Escalation 3% | ||||||||||||
| CLIN | CLIN DESCRIPTION | UNIT | UNIT PRICE | QTY | TOTAL PRICE | QTY | Option Year 1 | QTY | Option Year 2 | QTY | Option Year 3 | QTY | Option Year 4 |
| 0001 | 5.1.2 Formation and Function of SME Teams | JB | NSP | 1 | NSP | 1 | 1 | 1 | 1 | ||||
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1 and associated deliverables. | |||||||||||||
| 0001AA | SME Team List | EA | $6,610.00 | 1 | $6,610.00 | 1 | $6,808.30 | 1 | $7,012.55 | 1 | $7,222.93 | 1 | $7,439.61 |
| The Contractor shall provide all labor, materials, etc to set up, organize, and document a new SME Team and prepare the SME Team List. This SLIN shall be priced on a "per team" price. | |||||||||||||
| 0001AB | SME Team List Monthly Update | EA | $1,448.00 | 12 | $17,376.00 | 12 | $17,897.28 | 12 | $18,434.16 | 12 | $18,987.24 | 12 | $19,556.88 |
| The Contractor shall provide all labor, materials, etc to set up, organize, and maintain an SME Team and keep the SME Team List current. This SLIN shall be priced on a "per team per month" price. | |||||||||||||
| 0002 | 5.1.3 SME Team Meetings and Calls | JB | NSP | 52 | NSP | 52 | 52 | 52 | 52 | ||||
| Contractor shall meet at least weekly with each SME team to determine the specific content and design of each CDS Artifact. | |||||||||||||
| 0002AA | Meeting Minutes with Action Items | EA | $7,232.00 | 52 | $376,064.00 | 52 | $387,345.92 | 52 | $398,966.36 | 52 | $410,935.20 | 52 | $423,263.36 |
| In accordance with Paragraph 5.1.3 of the PWS. | |||||||||||||
| 0003 | 5.1.4 Terminology Content for CDS Artifacts | JB | NSP | 1 | NSP | 1 | 1 | 1 | 1 | ||||
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.4 and associated deliverables. | |||||||||||||
| 0003AA | Tabular List of Placeholder UUIDs in each CDS Artifact | EA | $1,480.00 | 12 | $17,760.00 | 12 | $18,292.80 | 12 | $18,841.56 | 12 | $19,406.88 | 12 | $19,989.00 |
| This Firm-Fixed-Price SLIN includes all labor, material, and other costs required for maintaining the list of Placeholder UUIDs. | |||||||||||||
| 0003AB | Terminology Status Meeting Minutes | EA | $1,524.00 | 52 | $79,248.00 | 52 | $81,625.44 | 52 | $84,074.12 | 52 | $86,596.64 | 52 | $89,194.56 |
| This Firm-Fixed-Price SLIN includes all labor, material, and other costs required for participating in and documenting terminology status meetings. | ` | ||||||||||||
| 0004 |
Apurva Desai, PMP: Apurva Desai, PMP:
| Diane - do we really want these items, vs. a report with the artifacts and a running list? | 5.1.6 Common Concerns to a Future Implementation Team | JB | NSP | 1 | NSP | 1 | 1 | 1 | 1 | |||||
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.6 and associated deliverables. | ||||||||||||||
| 0004AA | Repository of Future Implementation Concerns Common to multiple CDS Artifacts | EA | $8,676.00 | 12 | $104,112.00 | 12 | $107,235.36 | 12 | $110,452.44 | 12 | $113,766.00 | 12 | $117,178.92 | |
| This Firm-Fixed-Price SLIN includes all labor, material, and other costs required to maintain the repositiory detailed in PWS paragraph 5.1.6 | ||||||||||||||
| 0004AB | Annual white paper at end of each exercised period of performance | EA | $18,628.80 | 1 | $18,628.80 | 1 | $19,187.66 | 1 | $19,763.29 | 1 | $20,356.19 | 1 | $20,966.88 | |
| This Firm-Fixed-Price SLIN includes all labor, material, and other costs required to complete the required annual white paper | ||||||||||||||
| 0005 | 5.1.7 CDS Roadmap and Recommendations | JB | NSP | 1 | NSP | 1 | 1 | 1 | 1 | |||||
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.7 and associated deliverables. | ||||||||||||||
| 0005AA | CDS Roadmap White Paper | EA | $91,791.33 | 1 | $91,791.33 | 1 | $94,545.07 | 1 | $97,381.43 | 1 | $100,302.87 | 1 | $103,311.95 | |
| This Firm-Fixed-Price SLIN includes all labor, material, and other costs required to complete a CDS Roadmap and Recommendations White Paper. | ||||||||||||||
| 0005AB | CDS Roadmap Presentation | EA | $10,091.99 | 1 | $10,091.99 | 1 | $10,394.75 | 1 | $10,706.59 | 1 | $11,027.79 | 1 | $11,358.62 | |
| This Firm-Fixed-Price SLIN includes all labor, material, and other costs required to complete the presentation associated with the CDS Roadmap | ||||||||||||||
| 0006 | 5.1.8 E-Consult Option for any CDS Artifact | JB | NSP | 1 | NSP | 1 | 1 | 1 | 1 | |||||
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.8 and associated deliverable. | ||||||||||||||
| 0006AA | Update existing E-Consult CDS Artifact | EA | $79,963.80 | 1 | $79,963.80 | 1 | $82,362.71 | 1 | $84,833.60 | 1 | $87,378.60 | 1 | $89,999.96 | |
| This Firm-Fixed-Price SLIN includes all labor, material, and other costs required to update an existing E-Consult CDS Artifacts | ||||||||||||||
| 0007 | 5.1.9 CDS Artifact Validation Process | JB | NSP | 1 | NSP | 1 | 1 | 1 | 1 | |||||
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.9 and associated deliverables. | ||||||||||||||
| 0007AA | CDS Artifact Validation Process Technical Approach | EA | $115,877.60 | 1 | $115,877.60 | 1 | $119,353.93 | 1 | $122,934.55 | 1 | $126,622.58 | 1 | $130,421.26 | |
| The Contractor shall provide all labor, materials, etc to set up, process, and produce analysis white paper documenting the CDS Artifacts validation process detailed in PWS paragraph 5.1.9. | ||||||||||||||
| 0008 | 5.1.10.4 ECA Rule CDS Artifacts Task 1: Clinical Knowledge Research | JB | NSP | 1 | NSP | 1 | 1 | 1 | 1 | |||||
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.10.4 and associated deliverables. | ||||||||||||||
| 0008AA | Major Level ECA Rule Content White Paper (1 for each ECA rule) | EA | $58,448.88 | 1 | $58,448.88 | 1 | $60,202.35 | 1 | $62,008.42 | 1 | $63,868.67 | 1 | $65,784.73 | |
| 0008AB | High Level ECA Rule Content White Paper (1 for each ECA rule) | EA | $41,971.66 | 1 | $41,971.66 | 1 | $43,230.81 | 1 | $44,527.73 | 1 | $45,863.57 | 1 | $47,239.47 | |
| 0008AC | Moderate Level ECA Rule Content White Paper (1 for each ECA rule) | EA | $32,082.44 | 1 | $32,082.44 | 1 | $33,044.91 | 1 | $34,036.26 | 1 | $35,057.35 | 1 | $36,109.07 | |
| 0008AD | Low Level ECA Rule Content White Paper (1 for each ECA rule) | EA | $17,206.22 | 1 | $17,206.22 | 1 | $17,722.41 | 1 | $18,254.08 | 1 | $18,801.70 | 1 | $19,365.75 | |
| 0009 | 5.1.10.5 ECA RuleCDS Artifacts Task 2: Information Design | JB | NSP | 1 | NSP | 1 | 1 | 1 | 1 | |||||
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.10.5 and associated deliverables. | ||||||||||||||
| 0009AA | Major Level ECA Rule Conceptual Structure Document (1 for each ECA rule) | EA | $191,737.20 | 1 | $191,737.20 | 1 | $197,489.32 | 1 | $203,414.00 | 1 | $209,516.42 | 1 | $215,801.91 | |
| 0009AB | High Level ECA Rule Conceptual Structure Document (1 for each ECA rule) | EA | $102,604.80 | 1 | $102,604.80 | 1 | $105,682.94 | 1 | $108,853.43 | 1 | $112,119.04 | 1 | $115,482.61 | |
| 0009AC | Moderate Level ECA Rule Conceptual Structure Document (1 for each ECA rule) | EA | $65,563.50 | 1 | $65,563.50 | 1 | $67,530.41 | 1 | $69,556.32 | 1 | $71,643.01 | 1 | $73,792.30 | |
| 0009AD | Low Level ECA Rule Conceptual Structure Document (1 for each ECA rule) | EA | $35,258.40 | 1 | $35,258.40 | 1 | $36,316.15 | 1 | $37,405.64 | 1 | $38,527.81 | 1 | $39,683.64 | |
| 0010 | 5.1.10.6 ECA Rule CDS Artifacts Task 3: Intervention Specification | JB | NSP | 1 | NSP | 1 | 1 | 1 | 1 | |||||
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.10.6 and associated deliverables. | ||||||||||||||
| 0010AA | Major Level ECA Rule CDS Artifacts Report (1 for each ECA rule) | EA | $50,333.80 | 1 | $50,333.80 | 1 | $51,843.81 | 1 | $53,399.13 | 1 | $55,001.10 | 1 | $56,651.14 | |
| 0010AB | High Level ECA Rule CDS Artifacts Report (1 for each ECA rule) | EA | $25,694.90 | 1 | $25,694.90 | 1 | $26,465.75 | 1 | $27,259.72 | 1 | $28,077.51 | 1 | $28,919.84 | |
| 0010AC | Moderate Level ECA Rule CDS Artifacts Report (1 for each ECA rule) | EA | $12,337.90 | 1 | $12,337.90 | 1 | $12,708.04 | 1 | $13,089.28 | 1 | $13,481.96 | 1 | $13,886.42 | |
| 0010AD | Low Level ECA Rule CDS Artifacts Report (1 for each ECA rule) | EA | $5,260.66 | 1 | $5,260.66 | 1 | $5,418.48 | 1 | $5,581.03 | 1 | $5,748.47 | 1 | $5,920.92 | |
| 0010AE | Major Level ECA Rule CDS Artifacts Validation Report (1 for each ECA rule) | EA | $54,104.40 | 1 | $54,104.40 | 1 | $55,727.53 | 1 | $57,399.36 | 1 | $59,121.34 | 1 | $60,894.98 | |
| 0010AF | High Level ECA Rule CDS Artifacts Validation Report (1 for each ECA rule) | EA | $40,578.30 | 1 | $40,578.30 | 1 | $41,795.65 | 1 | $43,049.52 | 1 | $44,341.00 | 1 | $45,671.23 | |
| 0010AG | Moderate Level ECA Rule CDS Artifacts Validation Report (1 for each ECA rule) | EA | $27,052.20 | 1 | $27,052.20 | 1 | $27,863.77 | 1 | $28,699.68 | 1 | $29,560.67 | 1 | $30,447.49 | |
| 0010AH | Low Level ECA Rule CDS Artifacts Validation Report (1 for each ECA rule) | EA | $18,461.10 | 1 | $18,461.10 | 1 | $19,014.93 | 1 | $19,585.38 | 1 | $20,172.94 | 1 | $20,778.13 | |
| 0010AI | Future Implementation Concerns for ECA Rule CDS Artifacts White Paper (1 white paper for each ECA rule) | EA | $71,054.60 | 1 | $71,054.60 | 1 | $73,186.24 | 1 | $75,381.83 | 1 | $77,643.28 | 1 | $79,972.58 | |
| 0011 | 5.1.11.4 Order Set CDS Artifactss Task 1: Clinical Knowledge Research | JB | NSP | 1 | NSP | 1 | 1 | 1 | 1 | |||||
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.11.4 and associated deliverables. | ||||||||||||||
| 0011AA | Major Complexity Order Set Content White Paper (1 for each Order Set) | EA | $83,924.40 | 1 | $83,924.40 | 1 | $86,442.13 | 1 | $89,035.40 | 1 | $91,706.46 | 1 | $94,457.65 | |
| 0011AB | High Complexity Order Set Content White Paper (1 for each Order Set) | EA | $57,833.30 | 1 | $57,833.30 | 1 | $59,568.30 | 1 | $61,355.35 | 1 | $63,196.01 | 1 | $65,091.89 | |
| 0011AC | Moderate Complexity Order Set Content White Paper (1 for each Order Set) | EA | $44,407.20 | 1 | $44,407.20 | 1 | $45,739.42 | 1 | $47,111.60 | 1 | $48,524.95 | 1 | $49,980.69 | |
| 0011AD | Low Complexity Order Set Content White Paper (1 for each Order Set) | EA | $30,031.10 | 1 | $30,031.10 | 1 | $30,932.03 | 1 | $31,859.99 | 1 | $32,815.79 | 1 | $33,800.27 | |
| 0012 | 5.1.11.5 Order Set CDS Artifactss Task 2: Information Design | JB | NSP | 1 | NSP | 1 | 1 | 1 | 1 | |||||
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.11.5 and associated deliverables. | ||||||||||||||
| 0012AA | Major Complexity Order Set Conceptual Structure Document (1 for each Order Set) | EA | $191,737.20 | 1 | $191,737.20 | 1 | $197,489.32 | 1 | $203,414.00 | 1 | $209,516.42 | 1 | $215,801.91 | |
| 0012AB | High Complexity Order Set Conceptual Structure Document (1 for each Order Set) | EA | $102,604.80 | 1 | $102,604.80 | 1 | $105,682.94 | 1 | $108,853.43 | 1 | $112,119.04 | 1 | $115,482.61 | |
| 0012AC | Moderate Complexity Order Set Conceptual Structure Document (1 for each Order Set) | EA | $65,563.50 | 1 | $65,563.50 | 1 | $67,530.41 | 1 | $69,556.32 | 1 | $71,643.01 | 1 | $73,792.30 | |
| 0012AD | Low Complexity Order Set Conceptual Structure Document (1 for each Order Set) | EA | $35,258.40 | 1 | $35,258.40 | 1 | $36,316.15 | 1 | $37,405.64 | 1 | $38,527.81 | 1 | $39,683.64 | |
| 0013 | 5.1.11.6 Order Set CDS Artifactss Task 3: Intervention Specification | JB | NSP | 1 | NSP | 1 | 1 | 1 | 1 | |||||
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.11.6 and associated deliverables. | ||||||||||||||
| 0013AA | Major Complexity Order Set CDS Artifacts Report (1 for each Order Set) | EA | $48,467.80 | 1 | $48,467.80 | 1 | $49,921.83 | 1 | $51,419.49 | 1 | $52,962.07 | 1 | $54,550.94 | |
| 0013AB | High Complexity Order Set CDS Artifacts Report (1 for each Order Set) | EA | $24,761.90 | 1 | $24,761.90 | 1 | $25,504.76 | 1 | $26,269.90 | 1 | $27,058.00 | 1 | $27,869.74 | |
| 0013AC | Moderate Complexity Order Set CDS Artifacts Report (1 for each Order Set) | EA | $11,964.70 | 1 | $11,964.70 | 1 | $12,323.64 | 1 | $12,693.35 | 1 | $13,074.15 | 1 | $13,466.38 | |
| 0013AD | Low Complexity Order Set CDS Artifacts Report (1 for each Order Set) | EA | $4,850.44 | 1 | $4,850.44 | 1 | $4,995.95 | 1 | $5,145.83 | 1 | $5,300.21 | 1 | $5,459.21 | |
| 0013AE | Major Complexity Order Set CDS Artifacts Validation Report (1 for each Order Set) | EA | $54,104.40 | 1 | $54,104.40 | 1 | $55,727.53 | 1 | $57,399.36 | 1 | $59,121.34 | 1 | $60,894.98 | |
| 0013AF | High Complexity Order Set CDS Artifacts Validation Report (1 for each Order Set) | EA | $40,578.30 | 1 | $40,578.30 | 1 | $41,795.65 | 1 | $43,049.52 | 1 | $44,341.00 | 1 | $45,671.23 | |
| 0013AG | Moderate Complexity Order Set CDS Artifacts Validation Report (1 for each Order Set) | EA | $27,052.20 | 1 | $27,052.20 | 1 | $27,863.77 | 1 | $28,699.68 | 1 | $29,560.67 | 1 | $30,447.49 | |
| 0013AH | Low Complexity Order Set CDS Artifacts Validation Report (1 for each Order Set) | EA | $18,461.10 | 1 | $18,461.10 | 1 | $19,014.93 | 1 | $19,585.38 | 1 | $20,172.94 | 1 | $20,778.13 | |
| 0013AI | Future Implementation Concerns for Order Set CDS Artifacts White Paper (1 white paper for each Order Set) | EA | $71,054.60 | 1 | $71,054.60 | 1 | $73,186.24 | 1 | $75,381.83 | 1 | $77,643.28 | 1 | $79,972.58 | |
| 0014 | 5.1.12.4 Documentation Template CDS Artifactss Task 1: Clinical Knowledge Research | JB | NSP | 1 | NSP | 1 | 1 | 1 | 1 | |||||
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.12.4 and associated deliverables. | ||||||||||||||
| 0014AA | Major Complexity Documentation Template Content White Paper (1 for each Documentation Template) | EA | $125,886.60 | 1 | $125,886.60 | 1 | $129,663.20 | 1 | $133,553.09 | 1 | $137,559.69 | 1 | $141,686.48 | |
| 0014AB | High Complexity Documentation Template Content White Paper (1 for each Documentation Template) | EA | $88,051.60 | 1 | $88,051.60 | 1 | $90,693.15 | 1 | $93,413.94 | 1 | $96,216.36 | 1 | $99,102.85 | |
| 0014AC | Moderate Complexity Documentation Template Content White Paper (1 for each Documentation Template) | EA | $68,427.45 | 1 | $68,427.45 | 1 | $70,480.27 | 1 | $72,594.68 | 1 | $74,772.52 | 1 | $77,015.70 | |
| 0014AD | Low Complexity Documentation Template Content White Paper (1 for each Documentation Template) | EA | $46,863.30 | 1 | $46,863.30 | 1 | $48,269.20 | 1 | $49,717.27 | 1 | $51,208.79 | 1 | $52,745.06 | |
| 0015 | 5.1.12.5 Documentation Template CDS Artifactss Task 2: Information Design | JB | NSP | 1 | NSP | 1 | 1 | 1 | 1 | |||||
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.12.5 and associated deliverables. | ||||||||||||||
| 0015AA | Major Complexity Documentation Template Conceptual Structure Document (1 for each Documentation Template) | EA | $377,314.40 | 1 | $377,314.40 | 1 | $388,633.83 | 1 | $400,292.85 | 1 | $412,301.63 | 1 | $424,670.68 | |
| 0015AB | High Complexity Documentation Template Conceptual Structure Document (1 for each Documentation Template) | EA | $200,589.60 | 1 | $200,589.60 | 1 | $206,607.29 | 1 | $212,805.51 | 1 | $219,189.67 | 1 | $225,765.36 | |
| 0015AC | Moderate Complexity Documentation Template Conceptual Structure Document (1 for each Documentation Template) | EA | $129,587.00 | 1 | $129,587.00 | 1 | $133,474.61 | 1 | $137,478.85 | 1 | $141,603.21 | 1 | $145,851.31 | |
| 0015AD | Low Complexity Documentation Template Conceptual Structure Document (1 for each Documentation Template) | EA | $68,976.80 | 1 | $68,976.80 | 1 | $71,046.10 | 1 | $73,177.49 | 1 | $75,372.81 | 1 | $77,634.00 | |
| 0016 | 5.1.12.6 Documentation Template CDS Artifactss Task 3: Intervention Specification | JB | NSP | 1 | NSP | 1 | 1 | 1 | 1 | |||||
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.12.6 and associated deliverables. | ||||||||||||||
| 0016AA | Major Complexity Documentation Template CDS Artifacts Report (1 for each Documentation Template) | EA | $96,935.60 | 1 | $96,935.60 | 1 | $99,843.67 | 1 | $102,838.98 | 1 | $105,924.15 | 1 | $109,101.87 | |
| 0016AB | High Complexity Documentation Template CDS Artifacts Report (1 for each Documentation Template) | EA | $49,523.80 | 1 | $49,523.80 | 1 | $51,009.51 | 1 | $52,539.80 | 1 | $54,115.99 | 1 | $55,739.47 | |
| 0016AC | Moderate Complexity Documentation Template CDS Artifacts Report (1 for each Documentation Template) | EA | $23,929.40 | 1 | $23,929.40 | 1 | $24,647.28 | 1 | $25,386.70 | 1 | $26,148.30 | 1 | $26,932.75 | |
| 0016AD | Low Complexity Documentation Template CDS Artifacts Report (1 for each Documentation Template) | EA | $20,296.24 | 1 | $20,296.24 | 1 | $20,905.13 | 1 | $21,532.28 | 1 | $22,178.25 | 1 | $22,843.60 | |
| 0016AE | Major Complexity Documentation Template CDS Artifacts Validation Report (1 for each Documentation Template) | EA | $54,104.40 | 1 | $54,104.40 | 1 | $55,727.53 | 1 | $57,399.36 | 1 | $59,121.34 | 1 | $60,894.98 | |
| 0016AF | High Complexity Documentation Template CDS Artifacts Validation Report (1 for each Documentation Template) | EA | $40,578.30 | 1 | $40,578.30 | 1 | $41,795.65 | 1 | $43,049.52 | 1 | $44,341.00 | 1 | $45,671.23 | |
| 0016AG | Moderate Complexity Documentation Template CDS Artifacts Validation Report (1 for each Documentation Template) | EA | $27,052.20 | 1 | $27,052.20 | 1 | $27,863.77 | 1 | $28,699.68 | 1 | $29,560.67 | 1 | $30,447.49 | |
| 0016AH | Low Complexity Documentation Template CDS Artifacts Validation Report (1 for each Documentation Template) | EA | $18,461.10 | 1 | $18,461.10 | 1 | $19,014.93 | 1 | $19,585.38 | 1 | $20,172.94 | 1 | $20,778.13 | |
| 0016AI | Future Implementation Concerns for Documentation Template CDS Artifacts White Paper (1 white paper for each Documentation Template) | EA | $71,054.60 | 1 | $71,054.60 | 1 | $73,186.24 | 1 | $75,381.83 | 1 | $77,643.28 | 1 | $79,972.58 | |
| 0017 | 5.1.12.7 Documentation Template CDS Artifacts Task 4: Presentation Design | JB | NSP | 1 | NSP | 1 | 1 | 1 | 1 | |||||
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.12.7 and associated deliverables. | ||||||||||||||
| 0017AA | Major Complexity Documentation Template Mockups/Wireframes (1 for each documentation template CDS Artifacts) | EA | $263,643.60 | 1 | $263,643.60 | 1 | $271,552.91 | 1 | $279,699.50 | 1 | $288,090.48 | 1 | $296,733.19 | |
| 0017AB | High Complexity Documentation Template Mockups/Wireframes (1 for each documentation template CDS Artifacts) | EA | $195,701.60 | 1 | $195,701.60 | 1 | $201,572.65 | 1 | $207,619.83 | 1 | $213,848.42 | 1 | $220,263.87 | |
| 0017AC | Moderate Complexity Documentation Template Mockups/Wireframes (1 for each documentation template CDS Artifacts) | EA | $177,522.40 | 1 | $177,522.40 | 1 | $182,848.07 | 1 | $188,333.51 | 1 | $193,983.52 | 1 | $199,803.03 | |
| 0017AD | Low Complexity Documentation Template Mockups/Wireframes (1 for each documentation template CDS Artifacts) | EA | $87,441.20 | 1 | $87,441.20 | 1 | $90,064.44 | 1 | $92,766.37 | 1 | $95,549.36 | 1 | $98,415.84 | |
| 0018 | 5.1.13.3 Composite CDS Artifactss Task 1: Identify Data Elements Common to all Composite CDS Artifactss | JB | NSP | 1 | NSP | 1 | 1 | 1 | 1 | |||||
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.13.3 and associated deliverables. | ||||||||||||||
| 0018AA | Composite CDS Artifacts Common Information List | EA | $13,540.00 | 1 | $13,540.00 | 1 | $13,946.20 | 1 | $14,364.59 | 1 | $14,795.52 | 1 | $15,239.39 | |
| 0019 | 5.1.13.4 Composite CDS Artifactss Task 2: Identify Requirements to Harmonize and Integrate Member CDS Artifactss | JB | NSP | 1 | NSP | 1 | 1 | 1 | 1 | |||||
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.13.4 and associated deliverables. | ||||||||||||||
| 0019AA | White Paper to Harmonize and Integrate Member CDS Artifactss (1 for each composite CDS Artifacts ordered) | EA | $41,740.60 | 1 | $41,740.60 | 1 | $42,992.82 | 1 | $44,282.60 | 1 | $45,611.08 | 1 | $46,979.41 | |
| 0020 | 5.1.13.5 Composite CDS Artifactss Task 3: Create Composite CDS Artifactss | JB | NSP | 1 | NSP | 1 | 1 | 1 | 1 | |||||
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.13.5 and associated deliverables. | ||||||||||||||
| 0020AA | Major Complexity Composite CDS Artifacts Reports (1 for each composite CDS Artifacts ordered) | EA | $112,386.60 | 1 | $112,386.60 | 1 | $115,758.20 | 1 | $119,230.94 | 1 | $122,807.87 | 1 | $126,492.11 | |
| 0020AB | High Complexity Composite CDS Artifacts Reports (1 for each composite CDS Artifacts ordered) | EA | $77,926.60 | 1 | $77,926.60 | 1 | $80,264.40 | 1 | $82,672.33 | 1 | $85,152.50 | 1 | $87,707.07 | |
| 0020AC | Moderate Complexity Composite CDS Artifacts Reports (1 for each composite CDS Artifacts ordered) | EA | $59,989.95 | 1 | $59,989.95 | 1 | $61,789.65 | 1 | $63,643.34 | 1 | $65,552.64 | 1 | $67,519.22 | |
| 0020AD | Low Complexity Composite CDS Artifacts Reports (1 for each composite CDS Artifacts ordered) | EA | $43,488.30 | 1 | $43,488.30 | 1 | $44,792.95 | 1 | $46,136.74 | 1 | $47,520.84 | 1 | $48,946.46 | |
| 0021 | 5.1.14.1 Tooling Needs Assessment | JB | NSP | 1 | NSP | 1 | 1 | 1 | 1 | |||||
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.14.1 and associated deliverables. | ||||||||||||||
| 0021AA | White paper detailing the result of the tooling needs assessment. | EA | $94,081.20 | 1 | $94,081.20 | 1 | $96,903.64 | $99,810.75 | $102,805.07 | $105,889.22 | ||||
| 0022 | 5.1.14.2 Tooling Environmental Scan | JB | NSP | 1 | NSP | 1 | 1 | 1 | 1 | |||||
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.14.2 and associated deliverables. | ||||||||||||||
| 0022AA | White paper detailing the result of environmental scan of existing knowledge artifact editing and simulation environment tools | EA | $96,517.07 | 1 | $96,517.07 | 1 | $99,412.58 | 1 | $102,394.96 | 1 | $105,466.80 | 1 | $108,630.81 | |
| 0023 | 5.1.14.3 Tooling Gap Analysis | JB | NSP | 1 | NSP | 1 | 1 | 1 | 1 | |||||
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.14.3 and associated deliverables. | ||||||||||||||
| 0023AA | White paper detailing the result of CDS Artifacts Tooling gap analysis | EA | $73,295.20 | 1 | $73,295.20 | 1 | $75,494.06 | 1 | $77,758.88 | 1 | $80,091.64 | 1 | $82,494.39 | |
| 0024 | 5.1.14.4 Limited Applied Usability Assessment | JB | NSP | 1 | NSP | 1 | 1 | 1 | 1 | |||||
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.14.4 and associated deliverables. | ||||||||||||||
| 0024AA | White paper with analysis of results of limited applied usability assessment of CDS Artifacts tools | EA | $90,999.60 | 1 | $90,999.60 | 1 | $93,729.59 | 1 | $96,541.48 | 1 | $99,437.72 | 1 | $102,420.85 | |
| TOTAL BASE YEAR (Tasks 1-7) | $ 5,615,836.13 | $ 5,784,311.24 | $ 5,957,840.56 | $ 6,136,575.97 | $ 6,320,673.25 | |||||||||
| TOTAL BASE YEAR (Ad Hoc) | $500,000.00 | $515,000.00 | $530,450.00 | $546,363.50 | $562,754.41 | |||||||||
| TOTAL BASE YEAR (All ) | $ 6,115,836.13 | $ 6,299,311.24 | $ 6,488,290.56 | $ 6,682,939.47 | $ 6,883,427.66 |
FIVE (5) YEAR PROJECTION $ 32,469,805.05
| Total IDIQ Ceiling: | $100,000,000.00 | w/o VistA Evolution | |
| The Government estimate is based on contract history and currently known requirements. We expect that emerging developments within the Department will soon dramatically increase the need for the Clinical Decision Support (CDS) services covered by this IDIQ. Specifically, the Electronic Health Record Modernization (EHRM) project will result in significant additional work in the areas of identifying, coverting and migrating critical CDS artificats from VA's legacy platform to the new EHRM platform (Cerner). | Total Estimate | ||
| Base Period | $ 6,115,836.13 | ||
| Option Period 1 | $ 6,299,311.24 | ||
| Option Period 2 | $ 6,488,290.56 | ||
| Option Period 3 | $ 6,682,939.47 | ||
| Option Period 4 | $ 6,883,427.66 | ||
| Total | $ 32,469,805.05 |
| $ 100,000,000.00 |
| $ 32,469,805.05 |
| $ 67,530,194.95 |
| $ 13,506,038.99 |
Task Order 1
| CONTRACT PERIOD: BASE PERIOD | |||||
| September 30, 2020 thru September 29, 2021 (estimated) | |||||
| CLIN | CLIN DESCRIPTION | UNIT | UNIT PRICE | QTY | TOTAL PRICE |
| 0001 | 5.1.2 Formation and Function of SME Teams | JB | NSP | 1 | NSP |
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1 and associated deliverables. | |||||
| 0001AA | SME Team List | EA | |||
| The Contractor shall provide all labor, materials, etc to set up, organize, and document a new SME Team and prepare the SME Team List. This SLIN shall be priced on a "per team" price. | |||||
| 0001AB | SME Team List Monthly Update | EA | |||
| The Contractor shall provide all labor, materials, etc to set up, organize, and maintain an SME Team and keep the SME Team List current. This SLIN shall be priced on a "per team per month" price. | |||||
| 0002 | 5.1.3 SME Team Meetings and Calls | JB | NSP | - 0 | NSP |
| Contractor shall meet at least weekly with each SME team to determine the specific content and design of each CDS Artifacts. | |||||
| 0002AA | Meeting Minutes with Action Items | EA | - 0 | ||
| In accordance with Paragraph 5.1.3 of the PWS. | |||||
| 0003 | 5.1.4 Terminology Content for CDS CDS Artifactss | JB | NSP | 1 | NSP |
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.4 and associated deliverables. | |||||
| 0003AA | Tabular List of Placeholder UUIDs in each CDS Artifacts | EA | |||
| This Firm-Fixed-Price SLIN includes all labor, material, and other costs required for maintaining the list of Placeholder UUIDs. | |||||
| 0003AB | Terminology Status Meeting Minutes | EA | |||
| This Firm-Fixed-Price SLIN includes all labor, material, and other costs required for participating in and documenting terminology status meetings. | |||||
| 0004 | 5.1.6 Common Concerns to a Future Implementation Team | JB | NSP | - 0 | NSP |
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.6 and associated deliverables. | |||||
| 0004AA | Repository of Future Implementation Concerns Common to multiple CDS Artifactss | EA | |||
| This Firm-Fixed-Price SLIN includes all labor, material, and other costs required to maintain the repositiory detailed in PWS paragraph 5.1.6 | |||||
| 0004AB | Annual white paper at end of each exercised period of performance | EA | |||
| This Firm-Fixed-Price SLIN includes all labor, material, and other costs required to complete the required annual white paper | |||||
| 0005 | 5.1.7 CDS Roadmap and Recommendations | JB | NSP | - 0 | NSP |
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.7 and associated deliverables. | |||||
| 0005AA | CDS Roadmap White Paper | EA | |||
| This Firm-Fixed-Price SLIN includes all labor, material, and other costs required to complete a CDS Roadmap and Recommendations White Paper. | |||||
| 0005AB | CDS Roadmap Presentation | EA | |||
| This Firm-Fixed-Price SLIN includes all labor, material, and other costs required to complete the presentation associated with the CDS Roadmap | |||||
| 0006 | 5.1.8 E-Consult Option for any CDS Artifacts | JB | NSP | - 0 | NSP |
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.8 and associated deliverable. | |||||
| 0006AA | Update existing E-Consult CDS Artifacts | EA | |||
| This Firm-Fixed-Price SLIN includes all labor, material, and other costs required to update an existing E-Consult CDS Artifacts | |||||
| 0007 | 5.1.9 CDS Artifacts Validation Process | JB | NSP | - 0 | NSP |
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.9 and associated deliverables. | |||||
| 0007AA | CDS Artifact Validation Process Technical Approach | EA | |||
| The Contractor shall provide all labor, materials, etc to set up, process, and produce analysis white paper documenting the CDS Artifacts validation process detailed in PWS paragraph 5.1.9. | |||||
| 0008 | 5.1.10.4 ECA Rule CDS Artifactss Task 1: Clinical Knowledge Research | JB | NSP | - 0 | NSP |
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.10.4 and associated deliverables. | |||||
| 0008AA | Major Level ECA Rule Content White Paper (1 for each ECA rule) | EA | |||
| 0008AB | High Level ECA Rule Content White Paper (1 for each ECA rule) | EA | |||
| 0008AC | Moderate Level ECA Rule Content White Paper (1 for each ECA rule) | EA | |||
| 0008AD | Low Level ECA Rule Content White Paper (1 for each ECA rule) | EA | |||
| 0009 | 5.1.10.5 ECA Rule CDS Artifactss Task 2: Information Design | JB | NSP | - 0 | NSP |
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.10.5 and associated deliverables. | |||||
| 0009AA | Major Level ECA Rule Conceptual Structure Document (1 for each ECA rule) | EA | |||
| 0009AB | High Level ECA Rule Conceptual Structure Document (1 for each ECA rule) | EA | |||
| 0009AC | Moderate Level ECA Rule Conceptual Structure Document (1 for each ECA rule) | EA | |||
| 0009AD | Low Level ECA Rule Conceptual Structure Document (1 for each ECA rule) | EA | |||
| 0010 | 5.1.10.6 ECA Rule CDS Artifactss Task 3: Intervention Specification | JB | NSP | - 0 | NSP |
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.10.6 and associated deliverables. | |||||
| 0010AA | Major Level ECA Rule CDS Artifacts Report (1 for each ECA rule) | EA | |||
| 0010AB | High Level ECA Rule CDS Artifact Report (1 for each ECA rule) | EA | |||
| 0010AC | Moderate Level ECA Rule CDS Artifact Report (1 for each ECA rule) | EA | |||
| 0010AD | Low Level ECA Rule CDS Artifact Report (1 for each ECA rule) | EA | |||
| 0010AE | Major Level ECA Rule CDS Artifact Validation Report (1 for each ECA rule) | EA | |||
| 0010AF | High Level ECA Rule CDS Artifact Validation Report (1 for each ECA rule) | EA | |||
| 0010AG | Moderate Level ECA Rule CDS Artifact Validation Report (1 for each ECA rule) | EA | |||
| 0010AH | Low Level ECA Rule CDS Artifact Validation Report (1 for each ECA rule) | EA | |||
| 0010AI | Future Implementation Concerns for ECA Rule CDS Artifact White Paper (1 white paper for each ECA rule) | EA | |||
| 0011 | 5.1.11.4 Order Set CDS Artifacts Task 1: Clinical Knowledge Research | JB | NSP | - 0 | NSP |
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.11.4 and associated deliverables. | |||||
| 0011AA | Major Complexity Order Set Content White Paper (1 for each Order Set) | EA | |||
| 0011AB | High Complexity Order Set Content White Paper (1 for each Order Set) | EA | |||
| 0011AC | Moderate Complexity Order Set Content White Paper (1 for each Order Set) | EA | |||
| 0011AD | Low Complexity Order Set Content White Paper (1 for each Order Set) | EA | |||
| 0012 | 5.1.11.5 Order Set CDS Artifacts Task 2: Information Design | JB | NSP | - 0 | NSP |
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.11.5 and associated deliverables. | |||||
| 0012AA | Major Complexity Order Set Conceptual Structure Document (1 for each Order Set) | EA | |||
| 0012AB | High Complexity Order Set Conceptual Structure Document (1 for each Order Set) | EA | |||
| 0012AC | Moderate Complexity Order Set Conceptual Structure Document (1 for each Order Set) | EA | |||
| 0012AD | Low Complexity Order Set Conceptual Structure Document (1 for each Order Set) | EA | |||
| 0013 | 5.1.11.6 Order Set CDS Artifacts Task 3: Intervention Specification | JB | NSP | - 0 | NSP |
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.11.6 and associated deliverables. | |||||
| 0013AA | Major Complexity Order Set CDS Artifact Report (1 for each Order Set) | EA | |||
| 0013AB | High Complexity Order Set CDS Artifact Report (1 for each Order Set) | EA | |||
| 0013AC | Moderate Complexity Order Set CDS Artifact Report (1 for each Order Set) | EA | |||
| 0013AD | Low Complexity Order Set CDS Artifact Report (1 for each Order Set) | EA | |||
| 0013AE | Major Complexity Order Set CDS Artifact Validation Report (1 for each Order Set) | EA | |||
| 0013AF | High Complexity Order Set CDS ArtifactValidation Report (1 for each Order Set) | EA | |||
| 0013AG | Moderate Complexity Order Set CDS Artifact Validation Report (1 for each Order Set) | EA | |||
| 0013AH | Low Complexity Order Set CDS Artifact Validation Report (1 for each Order Set) | EA | |||
| 0013AI | Future Implementation Concerns for Order Set CDS Artifact White Paper (1 white paper for each Order Set) | EA | |||
| 0014 | 5.1.12.4 Documentation Template CDS Artifacts Task 1: Clinical Knowledge Research | JB | NSP | - 0 | NSP |
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.12.4 and associated deliverables. | |||||
| 0014AA | Major Complexity Documentation Template Content White Paper (1 for each Documentation Template) | EA | |||
| 0014AB | High Complexity Documentation Template Content White Paper (1 for each Documentation Template) | EA | |||
| 0014AC | Moderate Complexity Documentation Template Content White Paper (1 for each Documentation Template) | EA | |||
| 0014AD | Low Complexity Documentation Template Content White Paper (1 for each Documentation Template) | EA | |||
| 0015 | 5.1.12.5 Documentation Template CDS Artifacts Task 2: Information Design | JB | NSP | - 0 | NSP |
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.12.5 and associated deliverables. | |||||
| 0015AA | Major Complexity Documentation Template Conceptual Structure Document (1 for each Documentation Template) | EA | |||
| 0015AB | High Complexity Documentation Template Conceptual Structure Document (1 for each Documentation Template) | EA | |||
| 0015AC | Moderate Complexity Documentation Template Conceptual Structure Document (1 for each Documentation Template) | EA | |||
| 0015AD | Low Complexity Documentation Template Conceptual Structure Document (1 for each Documentation Template) | EA | |||
| 0016 | 5.1.12.6 Documentation Template CDS Artifacts Task 3: Intervention Specification | JB | NSP | - 0 | NSP |
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.12.6 and associated deliverables. | |||||
| 0016AA | Major Complexity Documentation Template CDS Artifact Report (1 for each Documentation Template) | EA | |||
| 0016AB | High Complexity Documentation Template CDS Artifact Report (1 for each Documentation Template) | EA | |||
| 0016AC | Moderate Complexity Documentation Template CDS Artifact Report (1 for each Documentation Template) | EA | |||
| 0016AD | Low Complexity Documentation Template CDS Artifact Report (1 for each Documentation Template) | EA | |||
| 0016AE | Major Complexity Documentation Template CDS Artifact Validation Report (1 for each Documentation Template) | EA | |||
| 0016AF | High Complexity Documentation Template CDS ArtifactValidation Report (1 for each Documentation Template) | EA | |||
| 0016AG | Moderate Complexity Documentation Template CDS Artifact Validation Report (1 for each Documentation Template) | EA | |||
| 0016AH | Low Complexity Documentation Template CDS Artifact Validation Report (1 for each Documentation Template) | EA | |||
| 0016AI | Future Implementation Concerns for Documentation Template CDS Artifact White Paper (1 white paper for each Documentation Template) | EA | |||
| 0017 | 5.1.12.7 Documentation Template CDS Artifacts Task 4: Presentation Design | JB | NSP | - 0 | NSP |
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.12.7 and associated deliverables. | |||||
| 0017AA | Major Complexity Documentation Template Mockups/Wireframes (1 for each documentation template CDS Artifact) | EA | |||
| 0017AB | High Complexity Documentation Template Mockups/Wireframes (1 for each documentation template CDS Artifact) | EA | |||
| 0017AC | Moderate Complexity Documentation Template Mockups/Wireframes (1 for each documentation template CDS Artifact) | EA | |||
| 0017AD | Low Complexity Documentation Template Mockups/Wireframes (1 for each documentation template CDS Artifact) | EA | |||
| 0018 | 5.1.13.3 Composite CDS Artifacts Task 1: Identify Data Elements Common to all Composite CDS Artifacts | JB | NSP | - 0 | NSP |
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.13.3 and associated deliverables. | |||||
| 0018AA | Composite CDS Artifact Common Information List | EA | |||
| 0019 | 5.1.13.4 Composite CDS Artifacts Task 2: Identify Requirements to Harmonize and Integrate Member CDS Artifacts | JB | NSP | - 0 | NSP |
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.13.4 and associated deliverables. | |||||
| 0019AA | White Paper to Harmonize and Integrate Member CDS Artifacts (1 for each composite CDS Artifact ordered) | EA | |||
| 0020 | 5.1.13.5 Composite CDS Artifacts Task 3: Create Composite CDS Artifacts | JB | NSP | - 0 | NSP |
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.13.5 and associated deliverables. | |||||
| 0020AA | Major Complexity Composite CDS Artifact Reports (1 for each composite CDS Artifact ordered) | EA | |||
| 0020AB | High Complexity Composite CDS Artifact Reports (1 for each composite CDS Artifact ordered) | EA | |||
| 0020AC | Moderate Complexity Composite CDS Artifact Reports (1 for each composite CDS Artifact ordered) | EA | |||
| 0020AD | Low Complexity Composite CDS Artifact Reports (1 for each composite CDS Artifact ordered) | EA | |||
| 0021 | 5.1.14.1 Tooling Needs Assessment | JB | NSP | - 0 | NSP |
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.14.1 and associated deliverables. | |||||
| 0021AA | White paper detailing the result of the tooling needs assessment. | EA | |||
| 0022 | 5.1.14.2 Tooling Environmental Scan | JB | NSP | - 0 | NSP |
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.14.2 and associated deliverables. | |||||
| 0022AA | White paper detailing the result of environmental scan of existing knowledge artifact editing and simulation environment tools | EA | |||
| 0023 | 5.1.14.3 Tooling Gap Analysis | JB | NSP | - 0 | NSP |
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.14.3 and associated deliverables. | |||||
| 0023AA | White paper detailing the result of CDS Artifact Tooling gap analysis | EA | |||
| 0024 | 5.1.14.4 Limited Applied Usability Assessment | JB | NSP | - 0 | NSP |
| This Firm-Fixed-Priced (FFP) CLIN includes all labor, material, and other costs required for the successful completion of the services detailed in PWS paragraph 5.1.14.4 and associated deliverables. | |||||
| 0024AA | White paper with analysis of results of limited applied usability assessment of CDS Artifact tools | EA | |||
| TOTAL BASE YEAR (Tasks 1-7) | |||||
| TOTAL BASE YEAR (Ad Hoc) | |||||
| TOTAL BASE YEAR (All ) |
| PROCUREMENT SENSITIVE | |||||||
| FOUO | |||||||
| Del. | Lab Cat | $/Hr | # Hrs | Total | Unit $ | Unit/Yr | 1 Yr |
| 1AA | Project Manager | $132.00 | 10 | $1,320.00 | |||
| Program Analyst, Junior | $74.00 | 40 | $2,960.00 | ||||
| Senior Subject Matter Expert | $233.00 | 10 | $2,330.00 | ||||
| Unit Price (single occurrence) | $6,610.00 | $6,610.00 | 1 | $6,610.00 | |||
| 1AB | Project Manager | $132.00 | 2 | $264.00 | |||
| Program Analyst, Junior | $74.00 | 16 | $1,184.00 | ||||
| Unit Price (single occurrence) | $1,448.00 | $1,448.00 | 1 | $1,448.00 | |||
| $8,058.00 |
| PROCUREMENT SENSITIVE | ||||
| FOUO | ||||
| Del. | Lab Cat | $/Hr | # Hrs | Total |
| 002 | Project Manager | $132.00 | 8 | $1,056.00 |
| Program Analyst, Junior | $74.00 | 32 | $2,368.00 | |
| Clinical Analyst | $ 128.50 | 16 | $2,056.00 | |
| Faciliator | $146.00 | 12 | $1,752.00 |
| Unit Price | $7,232.00 | per month |
| $86,784.00 | 12 months |
| PROCUREMENT SENSITIVE | ||||||
| FOUO | ||||||
| Del. | Lab Cat | $/Hr | # Hrs | Total | Unit/Yr | 1 Yr |
| 3AA | Program Analyst, Jr | $74.00 | 20 | $1,480.00 | ||
| Senior Subject Matter Expert | $233.00 | 2 | $466.00 |
| Unit Price (per group) | $1,480.00 | 12 | $17,760.00 | |||
| 3AB | Program Analyst, Jr | $74.00 | 8 | $592.00 | ||
| Senior Subject Matter Expert | $233.00 | 4 | $932.00 |
| Unit Price (per ballot) | $1,524.00 | 52 | $79,248.00 |
| $97,008.00 |
| PROCUREMENT SENSITIVE | ||||||
| FOUO | ||||||
| Del. | Lab Cat | $/Hr | # Hrs | Total | Unit/Yr | 1 Yr |
| 4AA | Project Manager | $132.00 | 8 | $1,056.00 | ||
| Program Analyst, Junior | $74.00 | 40 | $2,960.00 | |||
| Senior Subject Matter Expert | $233.00 | 20 | $4,660.00 | |||
| Unit Price (per project) | 68 | $8,676.00 | 1 | $8,676.00 |
| 4AB | Project Manager | $132.00 | 10 | $1,320.00 | ||
| Program Analyst, Junior | $74.00 | 40 | $2,960.00 | |||
| Senior Technical Writer | $121.11 | 80 | $9,688.80 | |||
| Senior Subject Matter Expert | $233.00 | 20 | $4,660.00 | |||
| Unit Price (per project) | 150 | $18,628.80 | 1 | $18,628.80 |
$27,304.80
| PROCUREMENT SENSITIVE | ||||||
| FOUO | ||||||
| Del. | Lab Cat | $/Hr | # Hrs | Total | Unit/Yr | 1 Yr |
| 5AA | Project Manager | $137.00 | 12 | $1,644.00 | ||
| Program Analyst | $122.93 | 120 | $14,751.60 | |||
| Senior Technical Writer | $102.19 | 80 | $8,175.47 | |||
| Senior Subject Matter Expert | $210.06 | 160 | $33,610.13 | |||
| Senior Subject Matter Expert | $210.06 | 160 | $33,610.13 | |||
| Unit Price (per terminology consultation request) | $91,791.33 | 1 | $91,791.33 |
| 5AB | Project Manager | $137.00 | 4 | $548.00 |
| Program Analyst | $122.93 | 20 | $2,458.60 | |
| Senior Technical Writer | $102.19 | 20 | $2,043.87 | |
| Senior Subject Matter Expert | $210.06 | 12 | $2,520.76 | |
| Senior Subject Matter Expert | $210.06 | 12 | $2,520.76 |
Unit Price (per terminology consultation request) $10,091.99 1 $10,091.99
$101,883.32
| PROCUREMENT SENSITIVE | ||||||
| FOUO | ||||||
| Del. | Lab Cat | $/Hr | # Hrs | Total | Unit/Yr | 1 Yr |
| 6AA | Project Manager | $132.00 | 12 | $1,584.00 | ||
| Program Analyst | $122.93 | 160 | $19,668.80 | |||
| Senior Technical Writer | $121.11 | 100 | $12,111.00 | |||
| Senior Subject Matter Expert | $233.00 | 200 | $46,600.00 |
Unit Price (per release) $79,963.80 1 $79,963.80
$79,963.80
| PROCUREMENT SENSITIVE | ||||
| FOUO | ||||
| Del. | Lab Cat | $/Hr | # Hrs | Total |
| 007 | Project Manager | $132.00 | 20 | $2,640.00 |
| Program Analyst | $122.93 | 160 | $19,668.80 | |
| Senior Technical Writer | $121.11 | 80 | $9,688.80 | |
| Senior Subject Matter Expert | $233.00 | 120 | $27,960.00 | |
| Senior Subject Matter Expert | $233.00 | 120 | $27,960.00 | |
| Senior Subject Matter Expert | $233.00 | 120 | $27,960.00 |
Unit Price $115,877.60
| PROCUREMENT SENSITIVE | |||||||
| FOUO | |||||||
| Del. | Lab Cat | $/Hr | # Hrs | Total | Unit $ | Unit/Yr | 1 Yr |
| 8AA | Project Manager | $132.00 | 40 | $5,280.00 | |||
| Program Analyst, Senior | $112.50 | 80 | $9,000.00 | ||||
| Program Analyst, Junior | $74.00 | 80 | $5,920.00 | ||||
| Senior Technical Writer | $121.11 | 8 | $968.88 | ||||
| Senior Subject Matter Expert | $233.00 | 160 | $37,280.00 |
Unit Price (single occurrence) $58,448.88 $58,448.88 1 $58,448.88
| 8AB | Project Manager | $132.00 | 30 | $3,960.00 |
| Program Analyst, Senior | $112.50 | 50 | $5,625.00 | |
| Program Analyst, Junior | $74.00 | 50 | $3,700.00 | |
| Senior Technical Writer | $121.11 | 6 | $726.66 | |
| Senior Subject Matter Expert | $233.00 | 120 | $27,960.00 |
| Unit Price (single occurrence) | $41,971.66 | $41,971.66 | 1 | $41,971.66 | |||
| 8AC | Project Manager | $132.00 | 24 | $3,168.00 | |||
| Program Analyst, Senior | $112.50 | 40 | $4,500.00 | ||||
| Program Analyst, Junior | $74.00 | 40 | $2,960.00 | ||||
| Senior Technical Writer | $121.11 | 4 | $484.44 | ||||
| Senior Subject Matter Expert | $233.00 | 90 | $20,970.00 |
Unit Price (single occurrence) $32,082.44 $32,082.44 1 $32,082.44
| 8AD | Project Manager | $132.00 | 12 | $1,584.00 |
| Program Analyst, Senior | $112.50 | 20 | $2,250.00 | |
| Program Analyst, Junior | $74.00 | 20 | $1,480.00 | |
| Senior Technical Writer | $121.11 | 2 | $242.22 | |
| Senior Subject Matter Expert | $233.00 | 50 | $11,650.00 |
| Unit Price (single occurrence) | $17,206.22 | $17,206.22 | 1 | $17,206.22 |
| $149,709.20 |
| PROCUREMENT SENSITIVE | |||||||
| FOUO | |||||||
| Del. | Lab Cat | $/Hr | # Hrs | Total | Unit $ | Unit/Yr | 1 Yr |
| 9AA | Project Manager | $132.00 | 80 | $10,560.00 | |||
| Program Analyst, Senior | $112.50 | 240 | $27,000.00 | ||||
| Program Analyst, Junior | $74.00 | 240 | $17,760.00 | ||||
| Senior Technical Writer | $121.11 | 120 | $14,533.20 | ||||
| Senior Subject Matter Expert | $233.00 | 480 | $111,840.00 | ||||
| Usability Engineer | $83.70 | 120 | $10,044.00 |
Unit Price (single occurrence) $191,737.20 $191,737.20 1 $191,737.20
| 9AB | Project Manager | $132.00 | 60 | $7,920.00 |
| Program Analyst, Senior | $112.50 | 120 | $13,500.00 | |
| Program Analyst, Junior | $74.00 | 120 | $8,880.00 | |
| Senior Technical Writer | $121.11 | 80 | $9,688.80 | |
| Senior Subject Matter Expert | $233.00 | 240 | $55,920.00 | |
| Usability Engineer | $83.70 | 80 | $6,696.00 |
| Unit Price (single occurrence) | $102,604.80 | $102,604.80 | 1 | $102,604.80 | |||
| 9AC | Project Manager | $132.00 | 30 | $3,960.00 | |||
| Program Analyst, Senior | $112.50 | 80 | $9,000.00 | ||||
| Program Analyst, Junior | $74.00 | 80 | $5,920.00 | ||||
| Senior Technical Writer | $121.11 | 50 | $6,055.50 | ||||
| Senior Subject Matter Expert | $233.00 | 160 | $37,280.00 | ||||
| Usability Engineer | $83.70 | 40 | $3,348.00 |
Unit Price (single occurrence) $65,563.50 $65,563.50 1 $65,563.50
| 9AD | Project Manager | $132.00 | 20 | $2,640.00 |
| Program Analyst, Senior | $112.50 | 40 | $4,500.00 | |
| Program Analyst, Junior | $74.00 | 40 | $2,960.00 | |
| Senior Technical Writer | $121.11 | 40 | $4,844.40 | |
| Senior Subject Matter Expert | $233.00 | 80 | $18,640.00 | |
| Usability Engineer | $83.70 | 20 | $1,674.00 |
| Unit Price (single occurrence) | $35,258.40 | $35,258.40 | 1 | $35,258.40 |
| $395,163.90 |
| PROCUREMENT SENSITIVE | |||||||
| FOUO | |||||||
| Del. | Lab Cat | $/Hr | # Hrs | Total | Unit $ | Unit/Yr | 1 Yr |
| 10AA | Project Manager | $132.00 | 40 | $5,280.00 | |||
| Program Analyst, Senior | $112.50 | 120 | $13,500.00 | ||||
| Program Analyst, Junior | $71.42 | 160 | $11,427.20 | ||||
| Senior Technical Writer | $121.11 | 60 | $7,266.60 | ||||
| Senior Subject Matter Expert | $233.00 | 40 | $9,320.00 | ||||
| Usability Engineer | $177.00 | 20 | $3,540.00 |
Unit Price (single occurrence) $50,333.80 $50,333.80 1 $50,333.80
| 10AB | Project Manager | $132.00 | 24 | $3,168.00 |
| Program Analyst, Senior | $112.50 | 60 | $6,750.00 | |
| Program Analyst, Junior | $71.42 | 80 | $5,713.60 | |
| Senior Technical Writer | $121.11 | 30 | $3,633.30 | |
| Senior Subject Matter Expert | $233.00 | 20 | $4,660.00 | |
| Usability Engineer | $177.00 | 10 | $1,770.00 |
| Unit Price (single occurrence) | $25,694.90 | $25,694.90 | 1 | $25,694.90 | |||
| 10AC | Project Manager | $132.00 | 12 | $1,584.00 | |||
| Program Analyst, Senior | $112.50 | 20 | $2,250.00 | ||||
| Program Analyst, Junior | $71.42 | 40 | $2,856.80 | ||||
| Senior Technical Writer | $121.11 | 10 | $1,211.10 | ||||
| Senior Subject Matter Expert | $233.00 | 16 | $3,728.00 | ||||
| Usability Engineer | $177.00 | 4 | $708.00 |
Unit Price (single occurrence) $12,337.90 $12,337.90 1 $12,337.90
| 10AD | Project Manager | $132.00 | 4 | $528.00 |
| Program Analyst, Senior | $112.50 | 8 | $900.00 | |
| Program Analyst, Junior | $74.00 | 12 | $888.00 | |
| Senior Technical Writer | $121.11 | 6 | $726.66 | |
| Senior Subject Matter Expert | $233.00 | 8 | $1,864.00 | |
| Usability Engineer | $177.00 | 2 | $354.00 |
Unit Price (single occurrence) $5,260.66 $5,260.66 1 $5,260.66
| 10AE | Project Manager | $132.00 | 40 | $5,280.00 |
| Program Analyst, Senior | $112.50 | 120 | $13,500.00 | |
| Program Analyst, Junior | $74.00 | 160 | $11,840.00 | |
| Senior Technical Writer | $121.11 | 40 | $4,844.40 | |
| Senior Subject Matter Expert | $233.00 | 80 | $18,640.00 | |
| Usability Engineer | $177.00 | 0 | $0.00 |
Unit Price (single occurrence) $54,104.40 $54,104.40 1 $54,104.40
| 10AF | Project Manager | $132.00 | 30 | $3,960.00 |
| Program Analyst, Senior | $112.50 | 90 | $10,125.00 | |
| Program Analyst, Junior | $74.00 | 120 | $8,880.00 | |
| Senior Technical Writer | $121.11 | 30 | $3,633.30 | |
| Senior Subject Matter Expert | $233.00 | 60 | $13,980.00 | |
| Usability Engineer | $177.00 | 0 | $0.00 |
Unit Price (single occurrence) $40,578.30 $40,578.30 1 $40,578.30
| 10AG | Project Manager | $132.00 | 20 | $2,640.00 |
| Program Analyst, Senior | $112.50 | 60 | $6,750.00 | |
| Program Analyst, Junior | $74.00 | 80 | $5,920.00 | |
| Senior Technical Writer | $121.11 | 20 | $2,422.20 | |
| Senior Subject Matter Expert | $233.00 | 40 | $9,320.00 | |
| Usability Engineer | $83.70 | 0 | $0.00 |
Unit Price (single occurrence) $27,052.20 $27,052.20 1 $27,052.20
| 10AH | Project Manager | $132.00 | 10 | $1,320.00 |
| Program Analyst, Senior | $112.50 | 40 | $4,500.00 | |
| Program Analyst, Junior | $74.00 | 60 | $4,440.00 | |
| Senior Technical Writer | $121.11 | 10 | $1,211.10 | |
| Senior Subject Matter Expert | $233.00 | 30 | $6,990.00 | |
| Usability Engineer | $83.70 | 0 | $0.00 |
Unit Price (single occurrence) $18,461.10 $18,461.10 1 $18,461.10
| 10AI | Project Manager | $132.00 | 40 | $5,280.00 |
| Program Analyst, Senior | $112.50 | 80 | $9,000.00 | |
| Program Analyst, Junior | $74.00 | 120 | $8,880.00 | |
| Senior Technical Writer | $121.11 | 60 | $7,266.60 | |
| Senior Subject Matter Expert | $233.00 | 160 | $37,280.00 | |
| Usability Engineer | $83.70 | 40 | $3,348.00 |
Unit Price (single occurrence) $71,054.60 $71,054.60 1 $71,054.60
$304,877.86
| PROCUREMENT SENSITIVE | |||||||
| FOUO | |||||||
| Del. | Lab Cat | $/Hr | # Hrs | Total | Unit $ | Unit/Yr | 1 Yr |
| 11AA | Project Manager | $132.00 | 40 | $5,280.00 | |||
| Program Analyst, Senior | $112.50 | 80 | $9,000.00 | ||||
| Program Analyst, Junior | $74.00 | 120 | $8,880.00 | ||||
| Senior Technical Writer | $121.11 | 40 | $4,844.40 | ||||
| Senior Subject Matter Expert | $233.00 | 240 | $55,920.00 |
Unit Price (single occurrence) $83,924.40 $83,924.40 1 $83,924.40
| 11AB | Project Manager | $132.00 | 35 | $4,620.00 |
| Program Analyst, Senior | $112.50 | 60 | $6,750.00 | |
| Program Analyst, Junior | $74.00 | 75 | $5,550.00 | |
| Senior Technical Writer | $121.11 | 30 | $3,633.30 | |
| Senior Subject Matter Expert | $233.00 | 160 | $37,280.00 |
| Unit Price (single occurrence) | $57,833.30 | $57,833.30 | 1 | $57,833.30 | |||
| 11AC | Project Manager | $132.00 | 30 | $3,960.00 | |||
| Program Analyst, Senior | $112.50 | 50 | $5,625.00 | ||||
| Program Analyst, Junior | $74.00 | 60 | $4,440.00 | ||||
| Senior Technical Writer | $121.11 | 20 | $2,422.20 | ||||
| Senior Subject Matter Expert | $233.00 | 120 | $27,960.00 |
Unit Price (single occurrence) $44,407.20 $44,407.20 1 $44,407.20
| 11AD | Project Manager | $132.00 | 20 | $2,640.00 |
| Program Analyst, Senior | $112.50 | 20 | $2,250.00 | |
| Program Analyst, Junior | $74.00 | 40 | $2,960.00 | |
| Senior Technical Writer | $121.11 | 10 | $1,211.10 | |
| Senior Subject Matter Expert | $233.00 | 90 | $20,970.00 |
| Unit Price (single occurrence) | $30,031.10 | $30,031.10 | 1 | $30,031.10 |
| $216,196.00 |
| PROCUREMENT SENSITIVE | |||||||
| FOUO | |||||||
| Del. | Lab Cat | $/Hr | # Hrs | Total | Unit $ | Unit/Yr | 1 Yr |
| 12AA | Project Manager | $132.00 | 80 | $10,560.00 | |||
| Program Analyst, Senior | $112.50 | 240 | $27,000.00 | ||||
| Program Analyst, Junior | $74.00 | 240 | $17,760.00 | ||||
| Senior Technical Writer | $121.11 | 120 | $14,533.20 | ||||
| Senior Subject Matter Expert | $233.00 | 480 | $111,840.00 | ||||
| Usability Engineer | $83.70 | 120 | $10,044.00 |
Unit Price (single occurrence) $191,737.20 $191,737.20 1 $191,737.20
| 12AB | Project Manager | $132.00 | 60 | $7,920.00 |
| Program Analyst, Senior | $112.50 | 120 | $13,500.00 | |
| Program Analyst, Junior | $74.00 | 120 | $8,880.00 | |
| Senior Technical Writer | $121.11 | 80 | $9,688.80 | |
| Senior Subject Matter Expert | $233.00 | 240 | $55,920.00 | |
| Usability Engineer | $83.70 | 80 | $6,696.00 |
| Unit Price (single occurrence) | $102,604.80 | $102,604.80 | 1 | $102,604.80 | |||
| 12AC | Project Manager | $132.00 | 30 | $3,960.00 | |||
| Program Analyst, Senior | $112.50 | 80 | $9,000.00 | ||||
| Program Analyst, Junior | $74.00 | 80 | $5,920.00 | ||||
| Senior Technical Writer | $121.11 | 50 | $6,055.50 | ||||
| Senior Subject Matter Expert | $233.00 | 160 | $37,280.00 |